14 13 12 11 10 9 8 7 6 5 4 3 2
A
B
C
A
B
C
D
14 13 12 11 10 9 8 7 6 5 4 3 2 1
A
B
C
D
A
B
C
D
KAYAK
IN BAG
STORAGE
BING
BING
SUIT
DRY
ASSEMBLED KAYAK
STORAGE RACK
ASSEMBLED KAYAK
STORAGE RACK
EL 7' - 0"
EL 7' - 0"
EL 7' - 0"
DIMENSION
POINT
EL 7' - 0"
CHASE
EL 6' - 10 1/4"
EL 7' - 0"
6" CONCRETE FLAT CURB
RETAINING WALL
UNDER DOCK AND
RAMPS, SEE STRUCT.
EL 7' - 0"
EL 7' - 0"
EL 6' - 10 1/4"
EL 7' - 0"
EL 6' - 10 1/4"
EDGE OF CONCRETE
SLAB & LINE OF
CANTILEVER ABOVE
EL 6' - 10 1/4"
KAYAK
IN BAG
STORAGE
BING
BING
SUIT
DRY
10' - 0' WIDE
ROLLING DOOR
F-470
RACK
F-470
BINS
KAYAK
STORAGE
STAIR STAIR
STAIR
STAIR
EDGE OF CONCRETE
SLAB & LINE OF
CANTILEVER ABOVE
DIMENSION
POINT
MECHANICAL AND
PLUMBING CHASE
EL 7' - 0"
F-470
RACK
10' - 0' WIDE
ROLLING DOOR
A1 A11
A1 A11
A1 A11
A
A
I
A1 A11
A1 A11
B
B
EDGE OF CONCRETE SLAB &
LINE OF CANTILEVER ABOVE
DINING HALL
M A
T C
H
L I N
E
UP UP
UPUP
A1 A14
I
A1 A1
GROUND FLOOR COMPOSITE PLAN
SCALE
1/16" = 1'-0"
8' - 6"
162' - 6"
305' - 2"
9' - 2" 125' - 0"
DWN
UP
DWN
UP
DWN
UP
DWN
UP
A1 A1
GROUND FLOOR COMPOSITE PLAN
SCALE
1/16" = 1'-0"
16' 8' 0' 16' 32' FT
SCALE : 1/16" = 1'-0"
A1 A11
A1 A11
B
B
A1 A11
A1
A11
A
A
A1 A11
I
A1 A14
I
A1 A17
DINING HALL
M A
T C
H
L I N
E
EL 13' - 4 1/2"
R A
M P
D
O W
N
DWN
DWN
EL 9' - 6 1/2"
EL 13' - 4 1/4"
EL 8' - 10 1/2"
EL 19' - 10 1/4"
EL 13' - 6"
DIMENSION
POINT
EL 13' - 4 1/2"
DOOK
EL 9' - 5 1/2"
EL 8' - 10 1/2"
UTILITY CAN STOR
103 102
FOOD SVC
ELECTRICAL
ROOM
EL 13' - 5 3/4"
RECEIVING
KITCHEN
EL 13' - 6"
DRY
STOR
DIMENSION
POINT
EL 19' - 10 1/4"
CHAINLINK
FENCE
(FLOOR TO
CEILING)
BARRACKS
LARGE VBOAT STORAGE
EL 7' - 5"
STORAGE
BARRACKS
MECHANICAL
ROOM
R E
G U
L A
R
A
N D
S
H O
R T
O
D
E
L I N
E
WAREWASH
MEN
WOMAN
DAYROOM
EL 13' - 6"EL 13' - 6"
EL 20' - 0"
CORRIDOR
64 SEATS
DINNING AREA
CORRIDOR
STUDENT
STUDENT
STUDENT
STUDENT
STUDENT
STUDENT
STUDENT
STUDENT
STUDENT
STUDENT
STUDENT
STUDENT
LAUNDRY
MECHANICAL
STUDENT
STUDENT
STUDENT
STUDENT
STUDENT
STUDENT
STUDENT
STUDENT
STUDENT
STUDENT
STUDENT
STUDENT
STAIR
BALCONY
EL 19' - 10 1/4"
STAIR
BALCONY
BALCONY
STAIR
EL 13' - 4 1/4"
EL 19' - 10 1/4"
BALCONY
STAIR
BALCONY
LAUNDRY
EL 19' - 10 1/4"
8' - 6"
162' - 6" 9' - 2"
305' - 2"
125' - 0"
NEW 5 x 5 STAINLESS
STEEL JUNCTION BOX
CONDUIT
TURNS
UP INTO
BREEZEWAY
APPROXIMATE LOCATION OF
CHILLER; 2 -4" AND 2 -1"
CONDUITS LEAD HERE FROM
ELECTRICAL ROOM.
CONDUIT REPLACEMNET
UNDER ELECTRICAL ROOM; 6 - 4"
AND 5 - 1" CONDUITS LEAVE ELEC ROOM;
3 -1" CONDUITS TURN BACK UP
INTO ELECTRICAL OR KITCHEN, AND
THE REST RUN THE LENGTH OF THE
DINING FACILITY.
12 - 1" CONDUITS LEAVE ELECTRICAL
ROOM AT THIS POINT AND RUN THE
LENGTH OF THE DINING FACILITY AND
TURN UP AT SHOWN LOCATION.
CONDUIT RUN LENGTH OF BREEZEWAY
TO MECHANICAL ROOM AT END OF
BUILDING.
EXISTING PANEL
P ON 1st FLOOR.
PANEL C ON 2nd
FLOOR.
EXISTING
PANEL L ON
1st FLOOR, PANEL B ON
2nd FLOOR.
D
NOTES:.
1. ALL EXPOSED METALLIC CONDUITS REPLACED
WITH SCHEDULED 80 PVC CONDUITS.
2. ELECTRICAL CIRCUITS (IN NEW CONDUIT) RAN
WITHOUT SPLICING FROM THE ELECTRICAL
ROOM TO THE ELECTRICAL PANELS AND
MECHANICAL EQUIPMENT THAT THEY SERVE.
END PVC
REPLACEMENT.
TRANSITION
POINT FROM NEW
PVC TO EXISTING
METALIC CONDUITS
2 - 4" CONDUIT
TURN UP INTO
LAUNDRY ROOM
LOCATED IN FIRST
FLOOR AND THE
REST RUN THE
LENGTH OF THE
BREEZEWAY
6 - 4" EXISTING
MAIN POWER
FEEDERS FROM
UNDERGROUND
TO ELECTRICAL
ROOM.
ENCLOSED
WITH
CONCRETE
| Sheets and Views |
| Layout1 (2) |
File details come from the government source that posted it.