W9124J-12-R-0015_Amendment_0002.docx

DOCX document 32 KB Posted

Attached to
Job Order Contract (JOC), Fort Hunter Liggett, California
Solicitation number
W9124J12R0015
Issued by

About this file

This is amendment 2 to add additional language to Section F.4 Performance.

View the file

Other files

File Type Posted
RFPAttachment12SiteVisitAgendaFHL.doc DOC document
W9124J-12-R-0015-0001.pdf PDF
RFPAttachment15PPQuestionnaire.doc DOC document
RFPAttachment18FHL_QAs.doc DOC document
RFPAttachment11aWDCA29.doc DOC document
RFPAttachment8FHLForm6A.PDF PDF
RFPAttach5ENGForm93.pdf PDF
RFPAttachment13ConsentLetterFHL.doc DOC document
Pre-Proposal.ppt PPT presentation
RFPAttachment16PriceEvalExample.doc DOC document
RFPAttachment7aJOCSiteLocation.pdf PDF
RFPAttachment4ENGForm4026.pdf PDF
RFPAttachment11bWDCA30.doc DOC document
RFPAttachment14SpecificRelevantKs.doc DOC document
Site_Visit_PreProposal_Sign_In_Roster_3_Oct_2012.pdf PDF
RFPAttachment2DDForm1354.pdf PDF
W9124J12R0015_Pre-proposal_Conf_Version_Highlighted_Pages_Only.pdf PDF
RFPAttachment6ENGForm93A.pdf PDF
RFPAttach1LocalAgencyRecordCheck.pdf PDF
RFPAttachment9ENGForm2440.pdf PDF
RFPAttachment3ENGForm4025R.pdf PDF
RFPAttachment10ENGForm2538-1.pdf PDF
W9124J12R0015_21_Sept_2012.pdf PDF
RFPAttachment17(SampleTask).doc DOC document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9124J-12-R-0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION F - DELIVERIES OR PERFORMANCE

The following have been modified:

DELIVERIES OR PERFORMANCE

F.1 DELIVERABLES: Except as specified or directed otherwise by the Contracting Officer, the Contractor shall provide all deliverables including but not limited to reports, plans, and schedules through the Contracting Officer. All plans and schedules shall be approved in writing by the Contracting Officer except as specified otherwise herein or as delegated by the Contracting Officer.

F.2 COMMENCEMENT OF MOBILIZATION/WORK:

a. Immediately after contract award, the Contractor shall commence familiarization activities prior to actual work on individual task orders.

b. Within ten (10) calendar days after notification of contract award, the Contractor shall submit Performance and Payment Bonds to the Contracting Officer in accordance with contract clause 52.228-15 entitled “Performance and Payment Bonds—Construction.”

c. Within five (5) working days of acceptance by the Government of bonds, the Contractor shall:

(1) Initiate mobilization to the Contractor’s on-site office space/yard as designated by the Contracting Officer.

(2) Initiate utility hookups to the Contractor’s yard, provided that utilities are available.

(3) Initiate the completion of all other Phase-In requirements identified in the SOW.

d. Within 30 calendar days after contract award, the Contractor shall have all critical staff members available and be fully operational and capable of immediately starting work on any required task order.

F.3 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:

a. The Contractor shall commence work at the time specified on the task order, prosecute the work in accordance with the approved construction schedule, and complete the entire work not later than the specified completion date. The time stated for completion shall include submittal approvals, correction of punch list items, final inspection, final cleanup of the premises, submission of operation and maintenance manuals, tagging of installed equipment, and submission of as-built drawings.

b. Inspection of Work - Technical surveillance of workmanship and inspection of materials for work being performed under this contract is the responsibility of the Government’s authorized representative - normally the Contracting Officer’s Representative (COR). This provision in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in the terms of the contract. Designation of a COR shall be by a separate letter to the individual selected with a copy furnished to the contractor.

c. Preparation of Progress Schedules and Reports - The reports contemplated by the clause 52.236-15 entitled “Schedules for Construction Contracts” shall be accomplished on and in accordance with instructions pertaining to the ENG Form 2440 (Attachment 9).

d. All work performed under this contract shall conform to the best practices of the trade or class of work involved and shall be executed in a careful and orderly manner by workmen skilled in their respective trades. All work shall be performed in strict compliance with the drawings and/or Job Order Contract (JOC) Technical Specifications or to current industry standards and or trade practices when not specified.

F.4 PERFORMANCE: This is an indefinite delivery/ indefinite quantity contract for maintenance and repair of real property, and minor construction projects, effective for a 12-month period. The contract also provides for four (4) additional one-year options to be exercised at the discretion of the Government. Individual task order performance times will be negotiated and shall be specified in each task order. Based on source selection procedures, there is a potential that contract award may be made earlier than planned. If this occurs, the period of performance (POP) stated in this Section may be change to reflect a POP starting on or shortly after the award date.

(END OF SECTION F)

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it. Updated .