RFPAttachment11bWDCA30.doc
DOC document 133 KB Posted
- Solicitation number
- W9124J12R0015
About this file
Attachment 11b
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JOB ORDER CONTRACT (JOC)
W9124J-12-R-0015
ATTACHMENT 11b
WAGE DETERMINATION
WD CA-30 (Rev.-10) was first posted on www.wdol.gov on 01/06/2012
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE DAVIS-BACON ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: CA-30
Diane Koplewski Division of | Revision No.: 10 Director Wage Determinations| Date Of Revision: 09/28/2012
General Decision Number: CA120030 09/28/2012 CA30
Superseded General Decision Number: CA20100030
State: California
Construction Type: Residential
Counties: Alameda, Calaveras, Contra Costa, El Dorado, Marin, Mariposa, Monterey, Napa, Nevada, Placer, Sacramento, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz, Solano, Sonoma, Sutter, Tuolumne, Yolo and Yuba Counties in California.
RESIDENTIAL CONSTRUCTION PROJECTS (including single family homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 01/06/2012
1 01/20/2012
2 03/02/2012
3 04/20/2012
4 06/01/2012
5 06/08/2012
6 07/13/2012
7 08/03/2012
8 09/07/2012
9 09/14/2012
10 09/28/2012
* ASBE0016-002 04/01/2012
AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO & SANTA CLARA COUNTIES
AREA 2: CALAVERAS, EL DORADO, MARIPOSA, MONTEREY, NEVADA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SOLANO, SONOMA, STANISLAU, SUTTER, TUOLUMNE, YOLO, & YUBA COUNTIES
Rates Fringes
Asbestos Workers/Insulator
(Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Area 1......................$ 52.20 18.47
Area 2......................$ 40.55 18.47
* ASBE0016-009 01/01/2012
Rates Fringes
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)....$ 30.53 6.75
BRCA0003-001 06/01/2011
Rates Fringes
MARBLE FINISHER..................$ 28.02 12.22
BRCA0003-002 05/01/2011
Rates Fringes
BRICKLAYER
( 1) Mariposa...............$ 34.11 19.34
( 7) Marin, Napa, San
Francisco, San Mateo, Solano, Sonoma..............$ 39.85 22.00
( 8) Alameda, Contra
Costa, San Benito, Santa
Clara.......................$ 39.63 19.92
( 9) Calaveras, El Dorado, Nevada, Placer, Sacramento, Sutter, Tuolumne,...................$ 35.11 18.99
(16) Monterey, Santa Cruz...$ 35.91 22.42
SPECIALTY PAY:
(A) Underground work such as tunnel work, sewer work, manholes, catch basins, sewer pipes and telephone conduit shall be paid $1.25 per hour above the regular rate. Work in direct contact with raw sewage shall receive $1.25 per hour in addition to the above.
(B) Operating a saw or grinder shall receive $1.25 per hour above the regular rate.
(C) Gunite nozzle person shall receive $1.25 per hour above the regular rate.
BRCA0003-007 06/01/2011
Rates Fringes
TERRAZZO FINISHER................$ 30.30 13.77
TERRAZZO WORKER..................$ 39.30 21.20
FOOTNOTE: Base machine operator: $1.00 per hour additional.
BRCA0003-009 06/01/2011
Rates Fringes
MARBLE MASON.....................$ 39.22 18.68
BRCA0003-012 01/01/2011
Rates Fringes
TILE FINISHER
Alameda, Contra Costa, Marin, Monterey, Napa, San
Benito, San Francisco, San
Mateo, Santa Clara, Stanta
Cruz, Solano................$ 21.44 12.31
Calaveras, Tuolumne.........$ 21.26 12.44
El Dorado, Nevada, Placer, Sacramento, Sutter, Yolo, Yuba........................$ 21.21 10.01
Sonoma......................$ 20.93 11.79
Tile Layer
Alameda, Contra Costa, Marin, Monterrey, Napa, San Benito, San Francisco, San Mateo, Santa clara, Santa Cruz, Solano..........$ 38.61 13.73
Calaveras, Tuolumne.........$ 34.41 13.68
El Dorado, Nevada, Placer, Sacramento, Sutter, Yolo, Yuba........................$ 36.08 11.95
Sonoma......................$ 35.54 13.68
CARP0022-001 07/01/2012
San Francisco County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 38.50 25.68
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 38.65 25.68
Journeyman Carpenter........$ 38.50 25.68
Millwright..................$ 38.60 27.27
CARP0035-005 08/01/2010
AREA 1: Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano & Sonoma Counties
AREA 2: Monterey, San Benito & Santa Cruz Counties
AREA 4: Calaveras, El Dorado, Mariposa, Nevada, Placer, Sacramento, Sutter, Tuolumne, Yolo, & Yuma Counties
Rates Fringes
Drywall Installers/Lathers:
Area 1......................$ 37.50 23.58
Area 2......................$ 31.62 23.58
Area 4......................$ 30.77 23.58
Drywall Stocker/Scrapper
Area 1......................$ 18.75 14.40
Area 2......................$ 15.81 14.40
Area 4......................$ 15.39 14.40
CARP0035-009 07/01/2012
Marin County
Rates Fringes
CARPENTER
Bridge Builder/Highway
Carpenter...................$ 38.50 25.68
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 38.65 25.68
Journeyman Carpenter........$ 38.50 25.68
Millwright..................$ 38.60 27.27
CARP0046-001 07/01/2012
El Dorado (West), Placer (West), Sacramento and Yolo Counties
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 38.50 25.68
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 32.77 25.68
Journeyman Carpenter........$ 32.62 25.68
Millwright..................$ 35.12 27.27
Footnote: Placer County (West) includes territory West of and including Highway 49 and El Dorado County (West) includes territory West of and including Highway 49 and territory inside the city limits of Placerville.
CARP0046-003 07/01/2012
El Dorado (East), Nevada, Placer (East), Sutter and Yuba Counties
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 38.50 23.51
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 31.42 23.51
Journeyman Carpenter........$ 31.27 23.51
Millwright..................$ 32.77 23.51
CARP0152-001 07/01/2012
Contra Costa County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 38.50 25.68
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 38.65 25.68
Journeyman Carpenter........$ 38.50 25.68
Millwright..................$ 38.60 27.27
CARP0152-005 07/01/2010
Calaveras, Mariposa and Tuolumne Counties
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 37.50 23.14
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 30.42 23.14
Journeyman Carpenter........$ 30.27 23.14
Millwright..................$ 32.77 24.73
CARP0180-001 07/01/2012
Solano County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 38.50 25.68
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 38.65 25.68
Journeyman Carpenter........$ 38.50 25.68
Millwright..................$ 38.60 27.27
CARP0217-001 07/01/2012
San Mateo County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 38.50 25.68
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 38.65 25.68
Journeyman Carpenter........$ 38.50 25.68
Millwright..................$ 38.60 27.27
CARP0405-001 07/01/2012
Santa Clara County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 38.50 25.68
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 38.65 25.68
Journeyman Carpenter........$ 38.50 25.68
Millwright..................$ 38.60 27.27
CARP0405-002 07/01/2012
San Benito County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 38.50 25.68
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 32.77 25.68
Journeyman Carpenter........$ 32.62 25.68
Millwright..................$ 35.12 27.27
CARP0505-001 07/01/2012
Santa Cruz County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 38.50 25.68
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 32.77 25.68
Journeyman Carpenter........$ 32.62 25.68
Millwright..................$ 35.12 27.27
CARP0605-001 07/01/2012
Monterey County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 38.50 25.68
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 32.77 25.68
Journeyman Carpenter........$ 32.62 25.68
Millwright..................$ 35.12 27.27
CARP0713-001 07/01/2012
Alameda County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 38.50 25.68
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 38.65 25.68
Journeyman Carpenter........$ 38.50 25.68
Millwright..................$ 38.60 27.27
CARP0751-001 07/01/2012
Napa and Sonoma Counties
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 38.50 25.68
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 38.65 25.68
Journeyman Carpenter........$ 38.50 25.68
Millwright..................$ 38.60 27.27
ELEC0006-003 12/01/2011
Rates Fringes
Sound & Communications
Installer...................$ 30.12 3%+13.70
Technician..................$ 34.29 3%+13.70
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.
ELEC0006-005 06/01/2012
SAN FRANCISCO COUNTY
Rates Fringes
ELECTRICIAN......................$ 32.92 3%+14.28
Work on residential wood frame remodel and repair in all wood-constructed buildings not to exceed 24 living units; and new wood frame single structure 1 or 2 family houses, or on all wood- constructed buildings not to exceed 20 living units under 1 roof excluding projects or tracts containing more than 2 houses, or more than 1 building
ELEC0006-009 06/01/2012
SAN FRANCISCO COUNTY:
Rates Fringes
ELECTRICIAN
All other work..............$ 54.87 25.595
ELEC0180-002 12/01/2011
NAPA & SOLANO COUNTIES
Rates Fringes
ELECTRICIAN......................$ 28.22 3%+10.79
ELEC0234-002 06/01/2012
MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES:
Rates Fringes
ELECTRICIAN......................$ 41.20 21.80
ELEC0302-002 06/01/2011
CONTRA COSTA COUNTY
Rates Fringes
CABLE SPLICER....................$ 50.49 3%+22.95
ELECTRICIAN......................$ 44.21 3%+22.95
ELEC0332-002 06/04/2012
SANTA CLARA COUNTY
Rates Fringes
ELECTRICIAN......................$ 29.82 12.094
ELEC0340-001 12/01/2011
EL DORADO (West of Sierra Mt. Watershed), NEVADA (West of Sierra Mt. Watershed), PLACER (West of Sierra Mt. Watershed), SACRAMENTO, SUTTER, YOLO, YUBA
Rates Fringes
ELECTRICIAN
Four stories................$ 38.93 17.67
Work on single family homes and apartments up to and including 3 stories.....$ 19.25 3%+10.52
ELEC0401-006 01/01/2011
EL DORADO (east of the main watershed divide), NEVADA (east of the main watershed), and PLACER (east of the main watershed divide) COUNTIES
Rates Fringes
ELECTRICIAN......................$ 20.63 8.12
ELEC0551-003 12/01/2009
MARIN AND SONOMA COUNTIES:
Rates Fringes
ELECTRICIAN......................$ 28.22 3%+9.79
ELEC0595-003 12/01/2009
CALAVERAS COUNTY
Rates Fringes
CABLE SPLICER....................$ 37.13 7.5%+20.04
ELECTRICIAN......................$ 22.10 3%+9.24
ELEC0595-004 06/01/2012
ALAMEDA COUNTY
Rates Fringes
CABLE SPLICER....................$ 50.63 3%+27.93
ELECTRICIAN......................$ 45.00 3%+27.93
ELEC0617-002 06/01/2011
SAN MATEO COUNTY
Rates Fringes
ELECTRICIAN......................$ 50.00 24.64
ELEC0684-002 12/01/2008
MARIPOSA, MERCED AND TUOLUMNE COUNTIES
Rates Fringes
ELECTRICIAN......................$ 22.10 3%+9.24
ELEV0008-001 01/01/2012
Rates Fringes
ELEVATOR MECHANIC................$ 57.29 23.535
FOOTNOTES:
PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.
PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
ENGI0003-007 06/27/2011
"AREA 1" WAGE RATES ARE LISTED BELOW
"AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.
SEE AREA DESCRIPTIONS BELOW
Rates Fringes
OPERATOR: Power Equipment
(AREA 1:)
GROUP 1.....................$ 37.77 24.00
GROUP 2.....................$ 36.24 24.00
GROUP 3.....................$ 34.76 24.00
GROUP 4.....................$ 33.38 24.00
GROUP 5.....................$ 32.11 24.00
GROUP 6.....................$ 30.79 24.00
GROUP 7.....................$ 29.65 24.00
GROUP 8.....................$ 28.51 24.00
GROUP 8-A...................$ 26.30 24.00
OPERATOR: Power Equipment
(Cranes and Attachments -
AREA 1:)
GROUP 1
Cranes.....................$ 38.65 24.00
Oiler......................$ 31.68 24.00
Truck crane oiler..........$ 35.25 24.00
GROUP 2
Cranes.....................$ 36.89 24.00
Oiler......................$ 31.42 24.00
Truck crane oiler..........$ 34.96 24.00
GROUP 3
Cranes.....................$ 35.15 24.00
Hydraulic..................$ 30.79 24.00
Oiler......................$ 31.18 24.00
Truck crane oiler..........$ 34.69 24.00
FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds.
GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds. m.r.c.
GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane mounted continuous flight tie back machine, tonnage to apply; Crane mounted drill attachment, tonnage to apply; Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; Loader 4 cu. yds. and over; Long reach excavator; Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track loader 4 cu. yds. and over; Wheel excavator (up to and including 750 cu. yds. per hour)
GROUP 4: Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loader up to and including 3/4 cu. yd.; Concrete batch plant (wet or dry); Dozer and/or push cat; Pull-type elevating loader; Gradesetter, grade checker (GPS, mechanical or otherwise); Grooving and grinding machine; Heading shield operator; Heavy-duty drilling equipment, Hughes, LDH, Watson 3000 or similar; Heavy-duty repairperson and/or welder; Lime spreader; Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar); Miller Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil stabilizer (P & H or equal); Spider plow and spider puller; Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.;
Tractor-drawn scraper; Tractor, compressor drill combination; Welder; Woods-Mixer (and other similar Pugmill equipment)
GROUP 5: Cast-in-place pipe laying machine; Combination slushier and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor, building site; Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to Waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist; Mechanical finishers (concrete) (Clary, Johnson, Bidwell Bridge Deck or similar types); Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt); Mine or shaft hoist; Portable crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled compactor with dozer; tractor with boom D6 or smaller; Trenching machine, maximum digging capacity over 5 ft. depth; Vermeer T-600B rock cutter or similar
GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom-type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Chemical grouting machine, truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator; Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines only); Pipe wrapping machine (tractor propelled and supported); Screed (except asphaltic concrete paving); Self- propelled pipeline wrapping machine; Tractor; Self-loading chipper; Concrete barrier moving machine
GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons; Cary lift or similar; Combination slurry mixer and/or cleaner; Drilling equipment, 20 ft. and under m.r.c.; Firetender (hot plant); Grouting machine operator; Highline cableway signalperson; Stationary belt loader (Kolman or similar); Lift slab machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals); Self-propelled compactor (without dozer); Signalperson; Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck-type loader
GROUP 8: Bit sharpener; Boiler tender; Box operator; Brakeperson; Combination mixer and compressor (shotcrete/gunite); Compressor operator; Deckhand; Fire tender;
Forklift (under 20 ft.); Generator; Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump operator; Refrigeration plant; Reservoir-debris tug (self- propelled floating); Ross Carrier
(construction site); Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator (includes vacuum sweeper); Slusher operator; Surface heater; Switchperson; Tar pot firetender; Tugger hoist, single drum; Vacuum cooling plant; Welding machine (powered other than by electricity)
GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper
ALL CRANES AND ATTACHMENTS
GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons
GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane
GROUP 3: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under; Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) over 15 tons;
AREA DESCRIPTIONS:
POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS, TUNNEL AND UNDERGROUND [These areas do not apply to Piledrivers and Steel Erectors]
AREA 1: ALAMEDA, BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES
AREA 2 - MODOC COUNTY
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:
ALPINE COUNTY:
Area 1: Northernmost part
Area 2: Remainder
CALAVERAS COUNTY:
Area 1: Except Eastern part
Area 2: Eastern part
COLUSA COUNTY:
Area 1: Eastern part
Area 2: Remainder
DEL NORTE COUNTY:
Area 1: Extreme Southwestern corner
Area 2: Remainder
ELDORADO COUNTY:
Area 1: North Central part
Area 2: Remainder
FRESNO COUNTY
Area 1: Except Eastern part
Area 2: Eastern part
GLENN COUNTY:
Area 1: Eastern part
Area 2: Remainder
HUMBOLDT COUNTY:
Area 1: Except Eastern and Southwestern parts
Area 2: Remainder
LAKE COUNTY:
Area 1: Southern part
Area 2: Remainder
LASSEN COUNTY:
Area 1: Western part along the Southern portion of border with Shasta County
Area 2: Remainder
MADERA COUNTY
Area 1: Remainder
Area 2: Eastern part
MARIPOSA COUNTY
Area 1: Remainder
Area 2: Eastern part
MENDOCINO COUNTY:
Area 1: Central and Southeastern parts
Area 2: Remainder
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern part
NEVADA COUNTY:
Area 1: All but the Northern portion along the border of Sierra County
Area 2: Remainder
PLACER COUNTY:
Area 1: All but the Central portion
Area 2: Remainder
PLUMAS COUNTY:
Area 1: Western portion
Area 2: Remainder
SHASTA COUNTY:
Area 1: All but the Northeastern corner
Area 2: Remainder
SIERRA COUNTY:
Area 1: Western part
Area 2: Remainder
SISKIYOU COUNTY:
Area 1: Central part
Area 2: Remainder
SONOMA COUNTY:
Area 1: All but the Northwestern corner
Area 2: Remainder
TEHAMA COUNTY:
Area 1: All but the Western border with Mendocino & Trinity Counties
Area 2: Remainder
TRINITY COUNTY:
Area 1: East Central part and the Northeaster border with Shasta County
Area 2: Remainder
TULARE COUNTY;
Area 1: Remainder
Area 2: Eastern part
TUOLUMNE COUNTY:
Area 1: Remainder
Area 2: Eastern Part
ENGI0003-019 06/27/2011
SEE AREA DESCRIPTIONS BELOW
Rates Fringes
OPERATOR: Power Equipment
(LANDSCAPE WORK ONLY)
GROUP 1
AREA 1.....................$ 28.64 19.96
AREA 2.....................$ 30.64 19.96
GROUP 2
AREA 1.....................$ 25.04 19.96
AREA 2.....................$ 27.04 19.96
GROUP 3
AREA 1.....................$ 20.43 19.96
AREA 2.....................$ 22.43 19.96
GROUP DESCRIPTIONS:
GROUP 1: Landscape Finish Grade Operator: All finish grade work regardless of equipment used, and all equipment with a rating more than 65 HP.
GROUP 2: Landscape Operator up to 65 HP: All equipment with a manufacturer's rating of 65 HP or less except equipment covered by Group 1 or Group 3. The following equipment shall be included except when used for finish work as long as manufacturer's rating is 65 HP or less: A-Frame and Winch Truck, Backhoe, Forklift, Hydragraphic Seeder Machine, Roller, Rubber-Tired and Track Earthmoving Equipment, Skiploader, Straw Blowers, and Trencher 31 HP up to 65 HP.
GROUP 3: Landscape Utility Operator: Small Rubber-Tired Tractor, Trencher Under 31 HP.
AREA DESCRIPTIONS:
AREA 1: ALAMEDA, BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES
AREA 2 - MODOC COUNTY
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:
ALPINE COUNTY:
Area 1: Northernmost part
Area 2: Remainder
CALAVERAS COUNTY:
Area 1: Except Eastern part
Area 2: Eastern part
COLUSA COUNTY:
Area 1: Eastern part
Area 2: Remainder
DEL NORTE COUNTY:
Area 1: Extreme Southwestern corner
Area 2: Remainder
ELDORADO COUNTY:
Area 1: North Central part
Area 2: Remainder
FRESNO COUNTY
Area 1: Except Eastern part
Area 2: Eastern part
GLENN COUNTY:
Area 1: Eastern part
Area 2: Remainder
HUMBOLDT COUNTY:
Area 1: Except Eastern and Southwestern parts
Area 2: Remainder
LAKE COUNTY:
Area 1: Southern part
Area 2: Remainder
LASSEN COUNTY:
Area 1: Western part along the Southern portion of border with Shasta County
Area 2: Remainder
MADERA COUNTY
Area 1: Remainder
Area 2: Eastern part
MARIPOSA COUNTY
Area 1: Remainder
Area 2: Eastern part
MENDOCINO COUNTY:
Area 1: Central and Southeastern parts
Area 2: Remainder
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern part
NEVADA COUNTY:
Area 1: All but the Northern portion along the border of Sierra County
Area 2: Remainder
PLACER COUNTY:
Area 1: All but the Central portion
Area 2: Remainder
PLUMAS COUNTY:
Area 1: Western portion
Area 2: Remainder
SHASTA COUNTY:
Area 1: All but the Northeastern corner
Area 2: Remainder
SIERRA COUNTY:
Area 1: Western part
Area 2: Remainder
SISKIYOU COUNTY:
Area 1: Central part
Area 2: Remainder
SONOMA COUNTY:
Area 1: All but the Northwestern corner
Area 2: Remainder
TEHAMA COUNTY:
Area 1: All but the Western border with Mendocino & Trinity Counties
Area 2: Remainder
TRINITY COUNTY:
Area 1: East Central part and the Northeaster border with Shasta County
Area 2: Remainder
TULARE COUNTY;
Area 1: Remainder
Area 2: Eastern part
TUOLUMNE COUNTY:
Area 1: Remainder
Area 2: Eastern Part
IRON0002-001 07/01/2012
Rates Fringes
IRONWORKER
Fence Erector...............$ 26.58 16.345
Ornamental, Reinforcing and Structural..............$ 33.00 24.985
PREMIUM PAY:
$6.00 additional per hour at the following locations:
China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB
$4.00 additional per hour at the following locations:
Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center
$2.00 additional per hour at the following locations:
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock
LABO0036-001 07/01/2007
SAN FRANCISCO AND SAN MATEO COUNTIES:
Rates Fringes
MASON TENDER, BRICK..............$ 26.93 16.50
FOOTNOTES: Underground work such as sewers, manholes, catch basins, sewer pipes, telephone conduits, tunnels and cut trenches: $5.00 per day additional. Work in live sewage: $2.50 per day additional.
LABO0036-002 07/01/2007
SAN FRANCISCO AND SAN MATEO COUNTIES:
Rates Fringes
PLASTER TENDER...................$ 26.48 16.23
FOOTNOTES: Work on a suspended scaffold: $5.00 per day additional. Work operating a plaster mixer pump gun: $1.00 per hour additional.
LABO0067-001 06/28/2010
AREA "A" - ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES
AREA "B" - CALVERAS, EL DORADO, MARIPOSA, MONTEREY, NAPA, NEVADA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SOLANO, SONOMA, SUTTER, TUOLUMNE, YOLO AND YUBA COUNTIES
Rates Fringes
Laborers: (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 27.84 15.82
GROUP 1.....................$ 27.14 15.82
GROUP 1-a...................$ 27.36 15.82
GROUP 1-c...................$ 27.19 15.82
GROUP 1-e...................$ 27.69 15.82
GROUP 1-f...................$ 27.72 15.82
GROUP 1-g (Contra Costa
County).....................$ 27.34 15.82
GROUP 2.....................$ 26.99 15.82
GROUP 3.....................$ 26.89 15.82
GROUP 4.....................$ 20.58 15.82
See groups 1-b and 1-d under laborer classifications.
Laborers: (CONSTRUCTION CRAFT
LABORERS - AREA B:)
Construction Specialist
Group.......................$ 26.84 15.82
GROUP 1.....................$ 26.14 15.82
GROUP 1-a...................$ 26.36 15.82
GROUP 1-c...................$ 26.19 15.82
GROUP 1-e...................$ 26.69 15.82
GROUP 1-f...................$ 26.72 15.82
GROUP 2.....................$ 25.99 15.82
GROUP 3.....................$ 25.89 15.82
GROUP 4.....................$ 19.58 15.82
Laborers: (GUNITE - AREA A:)
GROUP 1.....................$ 28.10 15.82
GROUP 2.....................$ 27.60 15.82
GROUP 3.....................$ 27.60 15.82
GROUP 4.....................$ 27.60 15.82
Laborers: (GUNITE - AREA B:)
GROUP 1.....................$ 27.10 15.82
GROUP 2.....................$ 26.60 15.82
GROUP 3.....................$ 26.60 15.82
GROUP 4.....................$ 26.60 15.82
Laborers: (WRECKING - AREA A:)
GROUP 1.....................$ 27.14 15.82
GROUP 2.....................$ 26.99 15.82
Laborers: (WRECKING - AREA B:)
GROUP 1.....................$ 26.14 15.82
GROUP 2.....................$ 25.99 15.82
Landscape Laborer (GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - AREA A:)
Establishment Warranty
Period......................$ 20.58 15.82
New Construction............$ 26.89 15.82
Landscape Laborer (GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - AREA B:)
Establishment Warranty
Period......................$ 19.58 15.82
New Construction............$ 25.89 15.82
FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts (not applicable to workers entitled to receive the wage rate set forth in Group 1-a): $0.25 per hour additional.
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipe layer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. "Sewer cleaner" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding
GROUP 1-d: Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 1 g: CONTRA COSTA COUNTY: Pipelayer (including grade checking on connection with peiplaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole from setters
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification "material cleaner" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of "form stripping, cleaning and oiling and moving to the next point of erection".
GUNITE LABORER CLASSIFICATION
GROUP 1: Structural nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
AREA DESCRIPTIONS:
AREA 1: ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES
AREA 2: CALVERAS, EL DORADO, MARIPOSA, MONTEREY, NAPA, NEVADA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SOLANO, SONOMA, SUTTER, TUOLUMNE, YOLO AND YUBA COUNTIES
LABO0067-004 12/01/2011
ALAMEDA, CALAVERAS, CONTRA COSTA, MARIN, MARIPOSA, MONTEREY, NAPA, NEVADA, PLACER, SACRAMENTO, SAN FRANCISCO,SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, SONOMA, SUTTER, TUOLUMNE, YOLO, AND YUBA COUNTIES:
Rates Fringes
Asbestos Removal Laborer.........$ 18.68 8.15
SCOPE OF WORK: Covers site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations.
LABO0073-002 07/01/2009
CALAVERAS, EL DORADO, MARIPOSA, MARIN, NAPA, NEVADA, PLACER, SACRAMENTO, SOLANO, SONOMA, SUTTER, TUOLUMNE, YOLO & YUBA
Rates Fringes
Plasterer tender.................$ 28.37 14.14
LABO0073-004 07/01/2011
CALVERAS, MARIPOSA, AND TUOLUMNE COUNTIES:
Rates Fringes
LABORER
Mason Tender-Brick..........$ 30.95 14.43
LABO0139-003 07/01/2011
NAPA, SOLANO AND SONOMA COUNTIES:
Rates Fringes
LABORER
Mason Tender-Brick..........$ 30.87 14.52
FOOTNOTE: Refractory work where heat-protective clothing is required: $2.00 per hour additional.
LABO0166-002 07/01/2006
ALAMEDA AND CONTRA COSTA COUNTIES:
Rates Fringes
Plasterer tender.................$ 30.15 15.90
Gun Man $0.75 per hour additional
LABO0166-003 07/01/2006
ALAMEDA AND CONTRA COSTA COUNTIES
Rates Fringes
Brick Tender.....................$ 27.60 15.90
FOOTNOTES: Work on jobs where heat-protective clothing is required: $2.00 per hour additional. Work at grinders: $.25 per hour additional. Manhole work: $2.00 per day additional.
LABO0185-003 07/01/2011
EL DORADO, MONTEREY, NEVADA, PLACER, SACRAMENTO, SAN BENITO, SUTTER, YOLO AND YUBA COUNTIES:
Rates Fringes
LABORER
Mason Tender-Brick..........$ 30.62 14.43
LABO0270-002 07/01/2008
Santa Clara & Santa Cruz Counties
Rates Fringes
MASON TENDER, BRICK
Santa Clara County..........$ 27.93 13.48
Santa Cruz County...........$ 26.93 13.48
LABO0270-004 07/01/2007
SANTA CLARA & SANTA CRUZ
Rates Fringes
PLASTER TENDER...................$ 27.62 13.73
LABO0291-002 07/01/2011
MARIN COUNTY
Rates Fringes
LABORER
Mason Tender-Brick..........$ 31.87 14.43
LABO0297-002 08/01/2007
MONTEREY AND SAN BENITO COUNTIES:
Rates Fringes
Plasterer tender.................$ 23.70 11.50
FOOTNOTE: Mixer person: $4.00 per day additional.
PAIN0016-002 01/01/2012
CALAVERAS, EL DORADO (west of the Sierra Nevada Mountains), MARIPOSA, NEVADA (west of the Sierra Nevada Mountains); PLACER (west of the Sierra Nevada Mountains); SACRAMENTO, STANISLAUS, SUTTER, TUOLUMNE, YOLO & YUBA COUNTIES:
Rates Fringes
Painters:
Brush.......................$ 28.35 15.74
SPRAY/SANDBLAST: $0.50 additional per hour.
EXOTIC MATERIALS: $1.00 additional per hour.
HIGH TIME: Over 50 ft above ground or water level $2.00 additional per hour. 100 to 180 ft above ground or water level $4.00 additional per hour. Over 180 ft above ground or water level $6.00 additional per hour.
PAIN0016-009 01/01/2012
ALAMEDA, CONTRA COSTA, MARIPOSA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ AND SONOMA COUNTIES
Rates Fringes
SOFT FLOOR LAYER.................$ 44.87 17.78
PAIN0016-011 01/01/2012
AREA 1: ALAMEDA; CONTRA COSTA; NAPA; SAN FRANCISCO; SAN MATEO; SANTA CLARA; SOLANO and SONOMA COUNTIES
AREA 2: CALAVERAS, EL DORADO COUNTY (West of the Sierra Nevada Mountains); MARIPOSA, MONTEREY; PLACER (West of the Sierra Nevada Mountains); SACRAMENTO; SAN BENITO; SANTA CRUZ; SIERRA (West of the Sierra Nevada Mountains); SUTTER, TUOLUMNE AND YUBA COUNTIES
Rates Fringes
Drywall Finisher/Taper
AREA 1......................$ 40.37 19.64
AREA 2......................$ 36.24 18.24
PAIN0016-013 01/01/2012
ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, SAN BENITO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO & SONOMA COUNTIES
Rates Fringes
PAINTER..........................$ 33.09 19.83
FOOTNOTES:
Spray Work: $0.50 additional per hour.
Exotic Materials: $0.75 additional per hour
PAIN0016-019 01/01/2012
SAN FRANCISCO COUNTY
Rates Fringes
PAINTER..........................$ 36.71 19.83
* PAIN0169-003 07/01/2012
MARIPOSA COUNTY
Rates Fringes
GLAZIER..........................$ 32.48 17.60
PAIN0169-006 01/01/2012
ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SONOMA COUNTIES; and SOLANO COUNTY (west of a line defined as follows: Hwy. 80 corridor beginning at the City of Fairfield, including Travis Air Force Base and Suisun City; going north of Manakas Corner Rd., continue north on Suisun Valley Rd. to the Napa County line; Hwy. 80 corridor south on Grizzly Island Rd. to the Grizzly Island Management area):
Rates Fringes
GLAZIER..........................$ 41.88 20.39
* PAIN0567-002 01/01/2011
EL DORADO COUNTY (east of the Sierra Nevada Mountains); NEVADA COUNTY (east of the Sierra Nevada Mountains); PLACER COUNTY (east of the Sierra Nevada Mountains):
Rates Fringes
PAINTER
Brush and Roller............$ 25.17 14.57
Spray Painter & Paper
Hanger......................$ 26.02 14.57
PREMIUMS:
Spray & Paperhanger = $0.85/hr
Special Coatings (Brush), & Sandblast = $0.50/hr
Special Coatings (Spray), & Steeplejack = $1.00/hr
Swing Stage = $2.00/hr
*A special coating is a coating that requires the mixing of 2 or more products.
* PAIN0567-008 07/01/2012
EL DORADO COUNTY (east of the Sierra Nevada Mountains); NEVADA COUNTY (east of the Sierra Nevada Mountains); AND PLACER COUNTY (east of the Sierra Nevada Mountains):
Rates Fringes
SOFT FLOOR LAYER.................$ 25.15 11.24
PAIN0567-011 07/01/2010
EL DORADO COUNTY (east of the Sierra Nevada Mountains); NEVADA COUNTY (east of the Sierra Nevada Mountains); PLACER COUNTY (east of the Sierra Nevada Mountains):
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 26.54 9.74
STEEPLEJACK-Drywall Finisher over 40 ft with open space below: $1.50 additional per hour.
PAIN0767-002 01/01/2012
CALAVERAS, EL DORADO, NEVADA, PLACER, SACRAMENTO; SOLANO (Remainder of County), SUTTER, TUOLUMNE, YOLO AND YUBA COUNTIES:
Rates Fringes
GLAZIER..........................$ 32.24 18.59
PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr. Day, President's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day and Christmas Day.
FOOTNOTE: Employee required to wear a body harness shall receive $1.50 above the basic hourly rate at any elevation.
PAIN1176-001 07/01/2011
HIGHWAY IMPR0VEMENT
Rates Fringes
Parking Lot Striping/Highway
Marking:
GROUP 1.....................$ 31.35 11.65
GROUP 2.....................$ 26.65 11.65
GROUP 3.....................$ 26.96 11.65
CLASSIFICATIONS
GROUP 1: Striper: Layout and application of painted traffic stripes and marking; hot thermo plastic; tape, traffic stripes and markings
GROUP 2: Gamecourt & Playground Installer
GROUP 3: Protective Coating, Pavement Sealing
PAIN1237-002 01/01/2012
CALAVERAS COUNTY AND EL DORADO (west of the Sierra Nevada Mountains); NEVADA (west of the Sierra Nevada Mountains); PLACER COUNTY (west of the Sierra Nevada Mountains);
SACRAMENTO, SUTTER, TUOLUMNE, YOLO AND YUBA COUNTIES:
Rates Fringes
SOFT FLOOR LAYER.................$ 28.25 16.53
PLAS0066-001 08/01/2011
ALAMEDA, CONTRA COSTA, SAN FRANCISCO AND SAN MATEO COUNTIES:
Rates Fringes
PLASTERER........................$ 32.24 24.64
PLAS0300-002 07/01/2009
Rates Fringes
PLASTERER
AREA 224: San Benito, Santa Clara & Santa Cruz
Counties....................$ 34.22 14.08
AREA 295: Calaveras, El
Dorado, Napa, Nevada, Placer, Sacramento, Solano, Sonoma, Sutter, Yolo & Yuba Counties........$ 32.82 15.10
AREA 337: Monterey County...$ 31.01 13.93
AREA 355: Marin County......$ 32.82 15.30
PLAS0300-005 06/28/2010
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.65 18.56
* PLUM0038-003 07/01/2012
MARIN, SAN FRANCISCO & SONOMA COUNTIES
Rates Fringes
PLUMBER (Plumber, Steamfitter, Refrigeration
Fitter)
(1) Wood Frame
Construction in San
Francisco, and all work in
Marin & Sonoma Counties.....$ 51.00 37.36
(2) New Construction in
San Francisco County........$ 60.00 39.94
* PLUM0038-007 07/01/2012
MARIN, SAN FRANCISCO & SONOMA COUNTIES
Rates Fringes
Landscape/Irrigation Fitter
(Underground/Utility Fitter).....$ 51.00 29.40
PLUM0062-001 07/01/2012
MONTEREY AND SANTA CRUZ COUNTIES
Rates Fringes
PLUMBER & STEAMFITTER............$ 40.55 23.69
PLUM0159-002 07/01/2012
CONTRA COSTA COUNTY
Rates Fringes
Plumber, Pipefitter, Steamfitter......................$ 33.66 15.89
* PLUM0342-002 07/04/2012
ALAMEDA COUNTY
Rates Fringes
PLUMBER & STEAMFITTER............$ 52.46 32.54
PLUM0343-002 07/01/2012
NAPA & SOLANO COUNTIES:
Rates Fringes
Plumbers and Pipefitters.........$ 30.60 18.50
FOOTNOTES: Work from trusses, temporary staging, unguarded structures 35' from the ground or water: $.75 per hour additional. Work from swinging scaffolds, boatswains chairs or similar devices: $.75 per hour additional.
PLUM0350-002 01/01/2011
EL DORADO, NEVADA AND PLACER COUNTIES (LAKE TAHOE BASIN ONLY)
Rates Fringes
Plumbers and Pipefitters.........$ 34.60 10.50
PLUM0355-002 07/01/2012
ALAMEDA, CALAVERAS, CONTRA COSTA, EL DORADO, MARIPOSA, MONTEREY, NAPA, NEVADA, PLACER, SACRAMENTO, SAN BENITO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, SUTTER, TUOLUMNE, YOLO & YUBA COUNTIES:
Rates Fringes
Underground Utility Worker
/Landscape Fitter...........$ 28.35 8
PLUM0393-002 09/01/2009
SAN BENITO & SANTA CLARA COUNTIES
Rates Fringes
Plumbers and Pipefitters.........$ 30.90 7.90
PLUM0442-004 07/01/2012
CALAVERAS, MARIPOSA, SUTTER, TUOLUMNE & YUBA COUNTIES
Rates Fringes
PLUMBER & STEAMFITTER............$ 35.95 23.79
PLUM0447-003 07/01/2012
EL DORADO COUNTY (does not include Lake Tahoe area); NEVADA COUNTY (does not include Lake Tahoe area); PLACER COUNTY (does not include Lake Tahoe area); SACRAMENTO AND YOLO COUNTIES:
Rates Fringes
Plumbers and Pipefitters.........$ 30.48 17.22
PLUM0467-001 07/01/2012
SAN MATEO COUNTY
Rates Fringes
Plumber/Pipefitter/Steamfitter...$ 54.00 28.41
ROOF0040-001 08/01/2012
SAN FRANCISCO & SAN MATEO COUNTIES:
Rates Fringes
ROOFER...........................$ 33.61 12.37
ROOF0081-002 08/01/2011
CALAVERAS, MARIPOSA, AND TUOLUMNE COUNTIES:
Rates Fringes
ROOFER...........................$ 28.49 10.75
ROOF0081-003 08/01/2011
ALAMEDA, CONTRA COSTA, MARIN, NAPA, SOLANO, AND SONOMA COUNTIES:
Rates Fringes
ROOFER...........................$ 33.16 10.90
ROOF0081-005 08/01/2011
EL DORADO, NEVADA, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES:
Rates Fringes
ROOFER...........................$ 31.88 10.90
ROOF0095-001 08/01/2011
MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES
Rates Fringes
ROOFER
Journeyman..................$ 35.58 10.90
Kettle person (2 kettles);
Bitumastic, Enameler, Coal
Tar, Pitch and Mastic worker......................$ 35.58 10.90
* SFCA0483-002 07/30/2012
ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SOLANO AND SONOMA COUNTIES:
Rates Fringes
SPRINKLER FITTER.................$ 27.78 14.27
SFCA0669-006 04/01/2012
CALAVERAS, EL DORADO, MARIPOSA, MONTEREY, NEVADA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SUTTER, TUOLUMNE, YOLO AND YUBA COUNTIES:
Rates Fringes
SPRINKLER FITTER.................$ 32.33 19.40
SHEE0104-002 07/01/2009
AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SOLANO & SONOMA
AREA 2: MONTEREY & SAN BENITO
AREA 3: SANTA CRUZ
Rates Fringes
SHEET METAL WORKER
AREA 1......................$ 37.67 23.93
AREA 2......................$ 37.32 3%+22.45
AREA 3......................$ 39.25 22.26
SHEE0104-004 07/01/2012
MARIPOSA AND TUOLUMNE COUNTIES:
Rates Fringes
SHEET METAL WORKER...............$ 34.61 27.66
SHEE0104-013 07/01/2011
CALAVERAS COUNTY:
Rates Fringes
SHEET METAL WORKER...............$ 25.85 23.97
SHEE0104-017 07/01/2011
EL DORADO, NEVADA, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES:
Rates Fringes
SHEET METAL WORKER...............$ 24.38 8.34
* TEAM0094-001 07/01/2012
Rates Fringes
Truck drivers:
GROUP 1.....................$ 27.13 22.49
GROUP 2.....................$ 27.43 22.49
GROUP 3.....................$ 27.73 22.49
GROUP 4.....................$ 28.08 22.49
GROUP 5.....................$ 28.43 22.49
FOOTNOTES: Articulated dump truck; Bulk cement spreader (with or without auger); Dumpcrete truck; Skid truck (debris box); Dry pre-batch concrete mix trucks; Dumpster or similar type; Slurry truck: Use dump truck yardage rate. Heater planer; Asphalt burner; Scarifier burner; Industrial lift truck (mechanical tailgate); Utility and clean-up truck: Use appropriate rate for the power unit or the equipment utilized.
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Dump trucks, under 6 yds.; Single unit flat rack (2-axle unit); Nipper truck (when flat rack truck is used appropriate flat rack shall apply); Concrete pump truck (when flat rack truck is used appropriate flat rack shall apply); Concrete pump machine; Fork lift and lift jitneys; Fuel and/or grease truck driver or fuel person; Snow buggy; Steam cleaning; Bus or personhaul driver; Escort or pilot car driver; Pickup truck; Teamster oiler/greaser and/or serviceperson; Hook tender (including loading and unloading); Team driver; Tool room attendant (refineries)
GROUP 2: Dump trucks, 6 yds. and under 8 yds.; Transit mixers,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .