AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to:
a. Provide the Questions and Answ ers to all prospective offerors.
b. Provide the Pre-Proposal Conference Slides.
c. Provide the Site Visitor Roster.
SEE CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 67
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Oct-2012
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124J-12-R-0015
X 9B. DATED (SEE ITEM 11)
21-Sep-2012
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Oct-2012
CODE
MICC - FSH
ATTN: MICC - FSH
2205 INFANTRY POST RD
210-466-2145
FORT SAM HOUSTON TX 78234-1361
W9124J 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9124J-12-R-0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
BLOCK 14 CONTINUATION
d. Update Section B.1 OFFER to reflect that an acceptable proposed coefficient has changed from two (2) decimal points to three (3) decimal points.
e. Update Section C, paragraphs C.1.4.1 and C.2.1.6.1 by requiring that the on-site Project manager be on-site "full-time.”
f. Updating Section J, Attachments 11a and 11b, with the most currect DOL General Wage Decisions dated 28 September 2012, and adding Attachment 18, Questions and Answers.
g. Update Section L-I-C.3(d)(1) to reflect the a proposed coefficient has changed from two (2) decimal points to three (3) decimal points.
h. Update Section L-I-C.3(c) to reflect the due date for Past Performance Questionnaires (Attachment 15) has changed from 16 October 2012 to 18 October 2012.
i. Update Section M.B.3(c), the relevancy determination paragraph, last sentence is changed from: "..establish the degree of relevancy of past performance." to "..establish the relevancy of past performance.";
j. Update all the CLIN's to reflect a proposed coefficient has changed from two (2) decimal points to three (3) decimal points.
k. Delete the contents of SOW paragraph C.1.4.4. requiring licenses for plumbers and electricians. Paragraph is amended to reflect “reserved.”
l. Correct solicitation number on headings for Attachments 14-17 to reflect W9124J-12-R-0015.
m. Change BLOCK 13A OF THE SF 1442 FOR THE HOUR AND DATE FOR RECEIPT OF PROPOSALS
FROM 4:00 PM CST, 23 OCTOBER 2012 TO 4:00 PM CST, 25 OCTOBER 2012.
(END OF BLOCK 14)
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 23-Oct-2012 04:00 PM to 25-Oct-2012 04:00 PM.
The Issued By organization has changed from
MICC - FSH
ATTN: MICC - FSH
2205 INFANTRY POST RD
210-466-2158
FORT SAM HOUSTON TX 78234-1361
to
MICC - FSH
ATTN: MICC - FSH
2205 INFANTRY POST RD
210-466-2145
FORT SAM HOUSTON TX 78234-1361
SECTION B - SUPPLIES OR SERVICES AND PRICES
SUBCLIN 0002AA
The CLIN extended description has changed:
FROM: Coefficient for pre-priced work performed during Normal Working Hours in Zone I - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
TO: Coefficient for pre-priced work performed during Normal Working Hours in Zone I - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
SUBCLIN 0002AB
The CLIN extended description has changed FROM: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone I - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
TO: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone I - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places.
The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
SUBCLIN 0003AA
FROM: Coefficient for pre-priced work performed during Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
TO: Coefficient for pre-priced work performed during Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
SUBCLIN 0003AB
FROM: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
TO: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places.
The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the
CLIN 0004
FROM: Non-Pre-priced (NPP)
TO: Coefficient for Non-Pre-priced (NPP).
SUBCLIN 1002AA
FROM: Coefficient for pre-priced work performed during Normal Working Hours in Zone I - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
TO: Coefficient for pre-priced work performed during Normal Working Hours in Zone I - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
SUBCLIN 1002AB
FROM: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone I - Fort
Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
TO: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone I - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places.
The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the
SUBCLIN 1003AA
FROM: Coefficient for pre-priced work performed during Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
TO: Coefficient for pre-priced work performed during Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
SUBCLIN 1003AB
FROM: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
TO: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places.
The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the
CLIN 1004
SUBCLIN 2002AA
FROM: Coefficient for pre-priced work performed during Normal Working Hours in Zone I - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
TO: Coefficient for pre-priced work performed during Normal Working Hours in Zone I - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
SUBCLIN 2002AB
FROM: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone I - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
TO: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone I - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places.
The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the
SUBCLIN 2003AA
FROM: Coefficient for pre-priced work performed during Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
TO: Coefficient for pre-priced work performed during Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
SUBCLIN 2003AB
FROM: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
TO: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places.
The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the
CLIN 2004
SUBCLIN 3002AA
FROM: Coefficient for pre-priced work performed during Normal Working Hours in Zone I - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
TO: Coefficient for pre-priced work performed during Normal Working Hours in Zone I - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
SUBCLIN 3002AB
FROM: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone I - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the
TO: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone I - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places.
The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the
SUBCLIN 3003AA
FROM: Coefficient for pre-priced work performed during Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
TO: Coefficient for pre-priced work performed during Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
SUBCLIN 3003AB
FROM: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
TO: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places.
The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the
CLIN 3004
SUBCLIN 4002AA
FROM: Coefficient for pre-priced work performed during Normal Working Hours in Zone I - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
TO: Coefficient for pre-priced work performed during Normal Working Hours in Zone I - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
SUBCLIN 4002AB
FROM: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone I - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
TO: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone I - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places.
The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the
SUBCLIN 4003AA
FROM: Coefficient for pre-priced work performed during Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
TO: Coefficient for pre-priced work performed during Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
SUBCLIN 4003AB
FROM: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to two decimal places. The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the evaluation.
TO: Coefficient for pre-priced work performed during Other Than Normal Working Hours in Zone II - Fort Hunter Liggett, California. Coefficient includes all costs for bonds. Coefficients shall be carried to three decimal places.
The MAX QUANTITY is a dollar estimate of the amount of labor and material necessary to perform the work represented by the respective SubCLIN. The offeror shall apply its coefficient (UNIT PRICE) to the MAX QUANTITY (dollar estimate) to arrive at the MAX AMOUNT and MAX NET AMT. This is for evaluation purposes only. The resulting estimated dollar amount (MAX NET AMT) is a means of providing consistency to the
CLIN 4004
The following have been modified:
NOTES TO BID SCHEDULE
THIS IS A COMPETITIVE SOLICITATION RESTRICTED TO 8(a) FIRMS LOCATED WITHIN THE
GEOGRAPHICAL AREA SERVICED BY THE FRESNO, SAN FRANCISCO, AND SACRAMENTO SBA
DISTRICT OFFICES.
B.1 OFFER: The offer shall be a coefficient. Offers shall be “Net” (e.g., 1.000) or a percentage “Decrease From” (e.g., 0.951) or “Increase To” (e.g., 1.234) the unit prices listed in the Unit Price Book (UPB). Offerors who submit separate percentage factors for separate line items in the UPB shall be considered unacceptable and the offer will be considered non-responsive. Percentage factors shall not extend beyond three decimal points.
B.1.1 Each Offeror shall submit percentage factors (coefficients) as shown in paragraph B.1.
B.1.2 NORMAL WORKING HOURS: The Contractor shall perform any or all tasks described in the task orders during normal working hours as defined in Section C.1.20 entitled “Work Hours.”
B1.3 OTHER THAN NORMAL WORKING HOURS: The Contractor shall perform any or all tasks described in the task orders during other than normal working hours. Other than normal working hours are hours outside the Normal Work Hours as defined in Section C.1.20. This coefficient shall only be used when the Government requires and approves the Contractor to perform work outside the installation’s normal working hours.
B.1.4 COEFFICIENT: The Offerors coefficient shall contain all costs other than the pre-priced unit prices and shall include, but not be limited to:
1. All costs associated with bonding (specifically bond premiums)
2. All waste and excess material as defined in Section H.13, entitled “Waste and Excess Quantities in the
Completed in-place Construction Quantities”
3. Mobilization and close out for the total contract and each task order
4. Cleanup for the total contract and for each task order, including final cleanup
5. Safety and compliance with environmental laws—costs associated with performing work in compliance with EPA/OSHA regulations, including but not limited to obtaining any necessary licenses and permits, reports requirements
6. Traffic and work site signs, barriers, and barricades
7. Contractor’s overhead, profit, labor burden, contingencies
8. Insurance
9. Subcontractor overhead and profit
10. Compliance with tax laws including business taxes, contributions, memberships, corporate headquarters support such as legal, financial
11. Permits, licenses, and fees
12. Project management and supervision
13. Protection of and/or moving of Government property
14. Contractor’s quality control
15. Office management and equipment
16. Interest associated with funding of equipment and payroll
17. Depreciation of mobile office(s)
18. CADD and as-built drawings, and submittals
19. Allowance for differences between location-specific Davis-Bacon wage rates and the rates used in the
UPB line items
20. Work-site security
21. UPB costs confidence (to include issues regarding how the cost data are captured and the size/types of projects they reflect)
22. Three (3) network licenses of e4Clicks Professional Project Estimator
23. Three (3) electronic database licenses of the RSMeans Facilities Construction Cost Data
24. Three (3) electronic database licenses of the RSMeans Assemblies Cost Data
25. One (1) hard copy book of the RSMeans Construction Cost Data
26. Risk of lower than expected contract dollar amount
27. Risk of poor subcontractor performance and re-performance
28. Other risks of doing business
29. Operation and maintenance manuals
30. Protective clothing
31. Equipment rental
32. Electricity, water and restroom facilities not readily available at the project site
33. All costs associated with the Subdivisions/Major Classifications identified in paragraph C.4.2.3.5
34. Sales tax on material and equipment costs
All components of price shall be included in the Offerors coefficients as no allowance for an omitted cost will be made later.
B.2 BONDS: PERFORMANCE AND PAYMENT BONDS. Within 10 days after contract award, a Performance Payment Bonds, each with good and sufficient surety or sureties acceptable to the Government, shall be furnished in accordance with FAR clause 52.228-15, Performance and Payment Bonds – Construction, in the penal amounts indicated below:
(1) PERFORMANCE BOND. The penal amount of the performance bond shall be 100 percent of the original contract price.
(2) PAYMENT BOND. The penal amount of the payment bond shall 100 percent of the original contract price.
Any bonds furnished shall be furnished by the Contractor to the Government prior to commencement of task order performance.
NOTE: * For PERFORMANCE AND PAYMENT BONDS, "Bid Price or Contract Price" means the JOC’s annual maximum--$6,000,000. Once the annual maximum has been met, the Contractor shall be required to provide additional bonding in accordance with contract clause 52.228-2 “Additional Bond Security.” The Contractor shall be required to maintain bonds for the estimated annual maximum or the total of all open work orders whichever is greater.
B.3 PARTIAL AWARD: The Government will not make a partial award under the terms of this solicitation. Each CLIN and SubCLIN shall contain an offer in order to be considered acceptable, other than those CLINs that contain the statement, “No price entry required under this CLIN.”
B.4 OPTIONS: The Government reserves the right to exercise options to extend the basic contract period of the contract for four additional 12-month periods in accordance with FAR Clause 52.217-9 (Option to Extend the Term of the Contract). Annual adjustments for option year pricing shall be accomplished by updating the Unit Price Book (UPB). Coefficients shall NOT be adjusted for any option period.
B.5 ORDERING PERIODS. The term “POP” in Section F-Deliveries or Performance, should be viewed as an ordering period.
(END OF SECTION B)
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
SECTION C - DESCRIPTION
C.1 SCOPE OF WORK: This is an indefinite delivery/indefinite quantity contract for a broad range of sustainment, restoration, modernization (SRM) and minor construction work on real property at United States Army Garrison (USAG) Fort Hunter Liggett, Monterey County, California, and immediate surrounding areas. Upon receipt of a task order, the Contractor shall provide all work, materials, supplies, parts (including system components), supervision, labor, and equipment, except when specified as Government furnished, for sustainment, restoration, modernization (SRM) and minor construction projects on the installation described in this paragraph. The work shall be performed by the Contractor in accordance with the contract, the Contractor’s proposal, and all applicable federal, state, and local laws, regulations, codes, or directives. Additionally, all work shall comply with applicable DoD, UFC, Army Reserve IT Manual, Army Technical Guide for Installation Information Infrastructure Architecture, and Army Corp of Engineers (USACE) regulations & requirements.
C.1.1 The Contractor’s work and responsibilities shall include all contractor planning, programming, administration, and management necessary to provide all repair, maintenance, or construction and related services as specified in the task order. The Contractor shall ensure that all work provided meets, or exceeds critical reliability rates or tolerances specified or included in applicable documents. The Contractor shall provide related services such as preparing and submitting required reports, performing administrative work, and submitting necessary information as specified under this contract and within individual task orders.
C.1.2 The JOC process using the current RS Means Estimating books as the pricing standard provides common ground between the Government and Contractor to allow a means to negotiate quantities required for construction requirements. This is an indefinite-delivery/indefinite-quantity type contract. The use of negotiated, definitive, bilateral task orders on a fixed-price basis is contemplated. After validation of a requirement, the Government will prepare an Independent Government Estimate (IGE). A description of the proposed scope of work will be presented to the Contractor for preparation of its proposal. This proposal shall subsequently be evaluated and an agreement will be reached through discussions/negotiations, prior to execution of the bilateral task order. Some integral non-pre-priced work may be included in the proposal. Upon finalization of negotiations and issuance of a task order, it is the Government’s intent to have bought a scope of work, i.e., a job rather than the quantities of tasks. However, the scope of work may include any significant quantities, methods of construction and/or quality levels required. Task orders will be issued in accordance with contract clauses FAR 52.216-19, “Order Limitations”, 52.216-22, “Indefinite Quantity” and DFARS 252.216-7006 “Ordering”.
C.1.3 OBJECTIVE: The objective of the JOC contract is to provide a quick, responsive and cost efficient method to accomplish a broad range of sustainment, restoration, modernization (SRM) and minor construction requirements to support the mission of the U.S Army.
C.1.4 PERSONNEL:
C.1.4.1 On-Site Contractor Support: The Contractor shall provide a single on-site, full-time project manager who shall have full authority to act for the Contractor. This individual shall be designated in writing (listing name, address, and telephone number) to the KO. The project manager shall be responsible for the overall management and coordination of this contract and shall be the central point of contact with the Government for performance of all work under this contract. Another individual may be designed to act for the project manager. This individual shall also be designated in writing (listing name, address, and telephone number) to the KO. However, at least a one-day advanced written notice of such change shall be provided to the KO.
C.1.4.2 Contractor Personnel: The Contractor shall be responsible for selecting personnel who are well qualified to perform the required work, for supervising techniques used in their work, and for keeping them informed of all improvements, changes, and methods of operations.
C.1.4.3 The Contractor shall have an on-site staff to respond to the requirements set forth in this contract. These personnel shall be available for support throughout the contract period and any option periods.
C.1.4.4 RESERVED.
C.1.4.5 Personnel List: Ten calendar (10) days prior to performance of the first task order, the Contractor shall provide the Contracting Officer his personnel list including a resume for each key individual including, but not limited to: Project Manager; QC Manager; Superintendent; Estimator; etc. Additionally, the Contractor shall provide the Contracting Officer a resume for any newly hired key personnel within five (5) working days of hiring.
C.1.4.6 The Government will not exercise any supervision or control over contractor employees performing work under the contract. Such employees shall be accountable solely to the Contractor, not the Government. The Contractor, in turn, shall be accountable to the Government for contractor employees.
C.1.4.7 The Contractor shall take appropriate personnel action, as required, in the event employees become involved with civilian or military authorities because of misconduct. The Contractor, his employees, and subcontractor employees are subject to the same general rules of conduct while on the installation that apply to Government civilian employees. The Government reserves the right to refuse installation access to any contractor employee if the Contracting Officer determines it to be in the best interest of the Government. The Contractor shall be fully responsible for the performance and conduct of his employees at all times while on Government property performing under the contract. The Contractor shall not allow any employee to perform work under the contract while under the influence of alcohol, drugs, or any other incapacitating agent. Military police and other law enforcement personnel have the right to deny entry to the Government property or remove from the Government property any contractor employee for misconduct that endangers the health or safety of people or property or for reasons of security. In addition, the Post Commander may bar an individual from entering the post under the authority of 18 U.S.C. 1382. Removal from post of a contractor employee in accordance with above shall not relieve the Contractor from the requirement to meet all of the terms and conditions of the contract.
C.1.5 TECHNICAL SPECIFICATIONS AND THE UNIT PRICE BOOK. The following documents shall be used in the execution of work under this contract:
C.1.5.1 Fort Hunter Liggett's Job Order Contract Technical Specifications, divisions 1 through 48, Fort Hunter Liggett, CA, dated June 1, 2012. Contract Specifications shall be utilized to the furthest extent possible, however project specific changes may be incorporated and negotiated prior to task order delivery.
C.1.5.1.1 The Technical Specifications are numbered and organized by the latest edition of the Construction Specification Institute's (CSI) master format. Technical Specifications can be found through the Fort Hunter Liggett Web Site: http://www.liggett.army.mil/rss_pao/images/UFGS_COMPLETE.pdf.
C.1.5.1.2 Some Technical Specifications are broad scoped in nature and contain a variety of items. Therefore, they will have several construction task catalog (also known as the unit price book) designators.
C.1.5.1.3 The intent of these Technical Specifications is to furnish concise industrial and/or commercial standards for maintenance and repair, and minor construction of Government facilities. In the absence of specific guidance in the technical provisions, industry and/or commercial standards or local codes as a minimum shall be utilized.
Consult the Contracting Officer before utilizing any variance to industry, commercial standards, or local codes.
C.1.5.2 UNIT PRICE BOOK: The unit price book (UPB), also referred to as Construction Task Catalog (CTC), used for this contract shall be the RSMeans Facilities Construction Cost Data (hereafter referred to as RSMeans UPB or UPB), current at time of award and updated quarterly.
C.1.5.2.1 UNIT PRICES: The RSMeans UPB contains pricing information for the description of work to be accomplished and for the unit of measure specified. The unit prices stated in the RSMeans UPB includes the following: Direct labor through the foreman level at Davis-Bacon wage rates for the area; equipment costs for the region; tools; and materials costs including all incidentals. Incidentals are items such as, but not limited to nails, screws, weldments, and connectors. All prices in the UPB are for complete and in-place construction unless explicitly described otherwise. Material unit costs include delivery to the typical project site unless explicitly described otherwise. Demolition costs in the UPB include costs for removal of the item, handling, and loading in a truck. Demolition costs include placement of non-salvageable items in truck or dumpster or turn-in of salvageable item to Defense Reutilization and Marketing Office (DRMO), FHL recycling center or disposed off the military installation as directed by the Contracting Officers’ Representative (COR). Demolition costs do not include costs for hauling.
C.1.5.2.2 LABOR: Labor costs factored into the UPB are based on the average wage rates from the applicable editions of the California General Davis-Bacon Wage Determinations. No allowance has been made for overtime in the labor rates factored in the UPB. Furthermore, wages for management/supervisory/administrative personnel have not been factored in the labor rates used in the UPB.
C.1.5.2.3 MATERIAL: Material costs factored into the UPB were determined by contacting manufacturers, dealers, distributors, and contractors throughout the United States.
C.1.5.2.4 EQUIPMENT: Equipment costs within the UPB include not only rental costs, but also operating costs.
C.1.5.2.3 TESTING: Testing, adjusting, and balancing of installed equipment is included in the installed unit price in the RSMeans UPB. This includes pipe testing, equipment start-up, system adjusting and balancing and testing of compaction.
C.1.5.2.4 DEMOLITION: Unit prices cover the cost of removal or demolition of these line items. Demolition includes handling and disposal of demolished items, whether salvageable or non-salvageable, unless specified otherwise by the RSMeans UPB task.
C.l.5.2.5 The RSMeans UPB consists of divisions 1 through 48, which are applicable to divisions 1 though 48 of the job order contract technical specifications.
C.1.5.2.6 COST ESTIMATES: Cost estimates prepared using the RSMeans UPB will not, and are not expected to mirror precise actual costs of performing work on each task order under this contract. Therefore, it is imperative that the Contractor include all anticipated adjustments and indirect costs in its coefficient. “Actual” market pricing is not relevant under this contract except when necessary for calculating non-pre-priced work tasks. Any difference between actual prices and UPB pricing shall not constitute grounds for failure to perform nor shall be grounds for any equitable adjustment in the price for the project order. The Contracting Officer will not negotiate or otherwise http://www.liggett.army.mil/rss_pao/images/UFGS_COMPLETE.pdf discuss differences between UPB and “actual” costs; the UPB is the cost source for the contract regardless of the actual costs of construction.
C.1.5.2.7 CLARIFICATIONS: When clarifications are required regarding content or scope of a UPB line item which is not clearly stated in the UPB and the issue is not covered elsewhere in this contract, the Contractor and COR will jointly contact RSMeans to obtain the necessary clarification.
C.1.5.3 Abbreviations: A list of abbreviations to be used is located in the RSMeans UPB.
C.1.6 CONTRACTOR QUALITY CONTROL:
C.1.6.1 GENERAL: The Contractor Quality Control Plan (QCP) with which the Contractor proposes to implement the requirements of the Section E contract clause 52.246-12 “Inspection of Construction,” shall identify personnel, procedures, instructions, records, and forms to be used. After contract award but prior to commencement of work under an individual task order, the Contractor’s QCP shall be received, reviewed and formally accepted in writing by the Contracting Officer. The Contractor shall not begin performance under an individual task order until the Contractor’s QCP has been accepted by the Contracting Officer. Delays in performance of any task order due to the Contractor’s failure to provide an acceptable QCP may be cause to assess liquidated damages under such task order.
C.1.6.2 COORDINATION MEETING: Within ten (10) calendar days of receipt of the Contractor’s QCP, the Contractor shall meet with the Contracting Officer and/or designated representatives to discuss the Contractor’s quality control system. During the meeting, a mutual understanding of the system details shall be developed, including the forms for recording the Contractor’s QC (CQC) operations, control activities, testing, administration of the system for both on-site and off-site work, and the interrelationship of the Contractor’s inspection and control with the…
This is the start of the file's text. The full file is on GovTribe.