RFPAttachment17(SampleTask).doc

DOC document 25 KB Posted

Attached to
Job Order Contract (JOC), Fort Hunter Liggett, California
Solicitation number
W9124J12R0015
Issued by

About this file

Attachment 17

View the file

Other files

File Type Posted
W9124J-12-R-0015_Amendment_0002.docx DOCX document
RFPAttachment12SiteVisitAgendaFHL.doc DOC document
W9124J-12-R-0015-0001.pdf PDF
RFPAttachment15PPQuestionnaire.doc DOC document
RFPAttachment18FHL_QAs.doc DOC document
RFPAttachment11aWDCA29.doc DOC document
RFPAttachment8FHLForm6A.PDF PDF
RFPAttach5ENGForm93.pdf PDF
RFPAttachment13ConsentLetterFHL.doc DOC document
Pre-Proposal.ppt PPT presentation
RFPAttachment16PriceEvalExample.doc DOC document
RFPAttachment7aJOCSiteLocation.pdf PDF
RFPAttachment4ENGForm4026.pdf PDF
RFPAttachment11bWDCA30.doc DOC document
RFPAttachment14SpecificRelevantKs.doc DOC document
Site_Visit_PreProposal_Sign_In_Roster_3_Oct_2012.pdf PDF
RFPAttachment2DDForm1354.pdf PDF
W9124J12R0015_Pre-proposal_Conf_Version_Highlighted_Pages_Only.pdf PDF
RFPAttachment6ENGForm93A.pdf PDF
RFPAttach1LocalAgencyRecordCheck.pdf PDF
RFPAttachment9ENGForm2440.pdf PDF
RFPAttachment3ENGForm4025R.pdf PDF
RFPAttachment10ENGForm2538-1.pdf PDF
W9124J12R0015_21_Sept_2012.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 17

SAMPLE TASK

W9124J-12-R-0015

We require a 30’ x 50’ metal building to be used as a classroom. The building design shall meet all applicable construction and safety codes and design standards. The following is all the information on the sample project that will be provided [see Section L, Technical/Management Approach, Subfactor 1E entitled Acceptable Comprehension of Requirements].

The contractor’s proposal shall identify major design considerations (e.g., foundation cross section and piers, electrical loading and subsequent panel / service entrance sizes, etc.), and, assuming the design has been approved, provide a resultant proposed major item quantity take-offs. The final part of the proposal will be the cost proposal pulling cost line items from 2012 RS MEANS cost data and applying a fictitious coefficient of 1.10. For the purposes of this exercise, P.E. prepared documentation is not required.

The following are the requirements:

Pre-engineered metal building. 30’ x 50’, 26 gauge metal walls and roof, 12 ft. eave height, roof live load 30 psf, 20 psf snow load, and 2 psf dead load. Wind speed 100 MPH. 4 to 12 roof pitch, insulated building concrete floor, reinforced, over compacted gravel base.

2 personnel doors 3’ x 7’ Std. Panic hardware, locksets, and trim, one door at each end of the building finishes:

walls- drywall and painted doors and frames - metal and painted floors – VCT w/ 4” vinyl wall base

6 insulated windows, DH operable 2’x 3’

Suspended lay-in ceiling with 2x2 fluorescent lighting for classroom use

1 unisex latrine with standard accessories (handicap accessible) i.e. sink, mirror, toilet paper dispenser, etc.

heated and A/C all utilities are within 50’ of the building