Sheet1
| Refuel/Defuel | |||||
| SOLICITATION: W9124G18R0007 | |||||
| Industry Questions & Answers | |||||
| Sol. Pg. | Reference | Question(s) | Government Response | ||
| 57 | PWS | Is the requirement for +100 been removed for this contract as it is not mentioned anywhere in the PWS? Is it still a requirement when refueling the assigned aircraft? Please clarify as it has a big impact on pricing. | Yes, no aircraft will use +100 Fuel Additive. | ||
| 58 | PWS 5.8 | Please confirm that Refueling trucks and/or above ground storage tanks do not require +100 Additive system. | See response to question 1. | ||
| 59 | PWS 5.12 | Please clarify the requirement for the contractor to provide a fuel management system. DLA Energy provided Enterprise Business System does accounting and inventory for fuels received and issued. Is the Government requesting the contractor do double accounting and inventory of fuels? | No, DLA-E is responsible for DWCF Capitalized Fuel. This RFP speaks directly to the use of non-capitalized fuels used in support of this effort. The contractor is required to account for all fuels in their possession. | ||
| 60 | Attachment | Please provide workload associated with Gasoline and Diesel deliveries. | Please see response to question 11 in set one. | ||
| 61 | Attachment | We could not locate any workload associated with the Basefields. Please provide basefield workload so that offerors can accurately staff and equp the basefields. | See Attachment 15, Basefield Usage. | ||
| 62 | CBA | Please provide the Current CBA so that offerors can accurately price in labor rates, H&W etc. | Please see response to question 47 in set one. | ||
| 64 | Attachment | Please provide helicopters/aircraft by type to be serviced and the associated workload by type to be supported at each Basefield so that offerors can accurately staff and equip the basefields for support. | Please see response to question 30 in set one. | ||
| 65 | PWS | Please provide response times to support aircraft refueling at basefields. | 5.3 Refuel/Defuel at Base-fields The contractor shall ensure all Basefield aircraft (except those aircraft identified as not requiring fuel, or being unable to be refueled due to maintenance, safety, or other reasons) are at maximum fuel capacity permitted by mission design series (MDS) unless otherwise required. Priority and emphasis shall be given to those aircraft, including spares, declared flyable, and available for use by USAACE utilizing ARTS for each issue time, sortie, or flight period. Any aircraft failing to meet the requirements of this paragraph will be refueled within 30 minutes of notification. No aircraft requiring fuel shall be left at less than full capacity following the last mission of the training day for other than predetermined safety reasons. | ||
| 66 | Attachment_13 | Attachments 13 and 6 appear to be identical. Question; Was this intentional? | Please see response to question 45 in set one. | ||
| 67 | Attachment_13 | Does this data include maintenance flights? If not, would the Government post the statistics for maintenance flights? | No, stagefields only; maintenance test flights (MTF) are typically refueled on the basefields. No separate historical information for MTF refuels exists. | ||
| 68 | Attachment_13 | Does this data include the weekend counts seen in Attachments 11 and 12? | Inclusive, Attachment 13 stagefield usage; Attachment 11 usage by days; Attachment 12 usage by airacraft | ||
| 69 | Attachment_11 | The raw data tabs indicate weekend flights (since FY14) only occur on Saturdays. Will any weekend operations occur on Sundays? | Historically USAACE has only conducted training flights on Saturdays. Sunday flights are maintenance test flights only. | ||
| 70 | Attachment_8 | Is it the Government’s intent that these OT rates will be used for future weekend and special projects pricing? | Yes | ||
| 71 | Attachment_8 | Would the Government like the offeror to identify the applicable year for equipment in the price template? | Yes | ||
| 72 | Attachment_7 | Will the Government reword “a.” to indicate the 30 minutes is following “notification” versus “identification” of a Major Nonconformance (re-evaluation)? | Please see response to question 12 in set one. | ||
| 73 | CBA | Please provide most current Collective Bargaining Agreement with the solicitation. | Please see response to question 47 in set one. | ||
| 74 | CLIN 0006 | Please clarify which PoP is correct. | Corrected. | ||
| 75 | CLIN 0002 | Please clarify which PoP is correct. | Corrected. | ||
| 76 | CLIN 0003 (and OY CLINs X002) & CLIN 0004 (and OY CLINs X003) | Should those amounts be listed on the CLIN table when submitted? If yes, please confirm the Government agrees the total in the CLIN table will not match the Attachment 8 totals, which will not include the NTE amounts related to weekend and special projects and CAP. | Yes and Yes. | ||
| 77 | CLIN 0003 (and OY CLINs X002) | CLINS 0003, 1002, 2002, 6002 are described as “Option Year [Number]-Special Events” whereas CLINS 3002, 4002, 5002 are described as “Option Year [Number]-Weekend and Special Events” is there meant to be a distinction made when the Government includes the words “Weekend and”? | Corrected to remove the word "weekend". | ||
| 78 | CLIN 0003 | Is the CLIN FFP or Cost Reimbursable? Please clarify. | See response to question five in set one. | ||
| 79 | CLIN 0002 | Will the Government supply workload data to provide for expected weekend work to include number of airfields required to be open, during which flight periods, and for what number of aircraft (by type)? | This is "not seperately priced" and is inclusive of the FFP. See historical data provided in Attachments 11, 12, and 13. | ||
| 80 | 5.16.6 Grounds | Is the correct height four (4) or six (6) inches? | See PWS Changes 8JAN19; Six (6) | ||
| 81 | 5.10.14 Fuel Arrays | What is the basis for the “double wall piping” requirement? Is the Government’s fuel array at Goldberg double walled? | Double walled piping only required for underground (buried) piping due to environmental concerns. Goldberg "Fuel Array" is "NOT" double wall piping due to the piping being above ground. See PWS Changes 8JAN19; | ||
| 82 | 5.10.11 Aircraft Type | Will the Government share the projected number of each aircraft type (phase-in and phase-out) to be serviced over the next 7 years, so we can more accurately estimate the proper number of refueling FTEs, vehicles, and related equipment? | The aircraft flucuate, the projected numbers for FY20-21 are as follows based off current studentload requirements; AH-64-115; UH-60-135; CH-47-42; UH-72-229; TH-67 divesting to zero. This is a projection based on current requirements for student load and is subject to change. | ||
| 83 | 5.8.2 Vehicle | If all contractor vehicles meet all applicable DOT requirements, with service records and certifications maintained and available for Government inspection, why are fuel trucks limited to a five-year operational life? Eliminating the five-year operational life would significantly reduce the overall cost of equipment to the program. | Please see response to question 51 in set one. | ||
| 84 | 5.8.1 Basic Refuel Truck requirements | Due to the expected order and modification time of fuel trucks, will the customer allow a phased-in replacement schedule as trucks become available? | No, all fuel dispensing equipment must be in place and ready for operation at the end of the 120 day phase-in. | ||
| 85 | 5.7.19 Forward Area Refueling Point (FARP) | Will the Government provide the workload data, or projected workload for this requirement to enable this to be bid as FFP? | No prior or projected workload data available because this has not been used in the past and is only a contingency for the future; 5.7.19 Forward Area Refueling Point (FARP): The Contractor shall have the capability to establish up to two separate four point fuel only FARPs in the LFA. The Contractor may also be directed to provide refuel/defuel services at Molinelli Range in the event that the DLA Capitalized site is not operational for a period of time that will have an impact on training. This will be at the direction of the KO or COR. | ||
| 86 | 5.7.17 Metering of Refuel/Defuel transactions | Are the contractor furnished, temperature compensated meters only required on contractor furnished equipment? | No, as required to satisfy the PWS requirement. 5.7.17 Metering of Refuel/Defuel transactions: The Contractor shall ensure that all fuel sales and credits (issues and defuels) are metered with temperature compensated meters (contractor furnished) and recorded | ||
| 87 | 5.7.1 Refuel/Defuel Service Locations | Will the Government provide historic and projected workload for offerors to use to appropriately, and realistically, staff and equip for these changes? | Provided via Attachments 11, 12, 13 | ||
| 88 | 1.5.11.3 Driver/System Operator | Can the government clarify the requirement of two years of refueling experience for the Driver/System Operator? Is this requirement for senior workers only? | Yes, for the senior member of a team or crew and the senior employee desingated as the Driver/Syterm Operator. Offerors may propose an OJT Type Program that satifies the requirement. | ||
| 89 | 1.2 Background | With the number of aircraft (and aircraft Mission Design Series) changing throughout the contract, will the Government provide the current and projected aircraft changes that drive changes in contractor staffing and equipment in this FFP contract? How will the Government provide the aircraft MDS and aircraft changes that increase and/or decrease the numbers in the solicitation? | See response to question 82. | ||
| 90 | Validity Period | “Proposal validity period for 180 days from solicitation closing”, 17 January 2019, Volume III: Price Proposal; The last bullet states the prices in this offer will be held firm for 60 calendar days, Please clarify which validity period is correct. | See Amendment 03 to the RFP. The validity period of 180 days from solicitation closing is correct. | ||
| 91 | CLIN 0006 (and OY X005) | Will the Government publish the current number of Air Force aircraft by Mission Design Series (MDS), which Basefield and Stagefields they use, and each MDS refueling times? | 28-USAF TH-1; Currently, the Basefield is Cairns. The Stagefield vaires by training schedule. | ||
| 92 | Usage Data | There is no usage data annotated for the Base-fields (Cairnes, Hanchey, Knox, Lowe, Shell) Could you please provide similar data as reported for the stage-fields for each Base-field? | See Attachment 15, Basefield Usage | ||
| 93 | Operations Hours | Which Base-fields are required to be operational on weekends? | All base fields may be open on the weekends if lost training time requires their use. Regardless of lost training time, the Contractor shall be available on the weekends should maintenance efforts require. | ||
| 94 | Usage Data | What does the “usage by issue period” data represent? I’ve tried to reconcile between stage-field usage and all refueling last year to no avail. | "usage by issue period" represents the number of days that the associetd stagefield was used for each sortie period either AM, N1, or PM. | ||
| 95 | CTR & GFE Facilities | Operator and preventative maintenance requirements are ambiguous throughout the PWS as there are a mixture of CTR and GFE facilities and equipment. Is it correct to assume that operator maintenance is a responsibility of the CTR on both CTR and GFE facilities and equipment and preventative(recurring) maintenance is only required on CFE? | The Contractor is responsible for all operator-level and preventative maintenance on GFE facilities and equipment. | ||
| 96 | Fuel Additive | Has the aviation fuel additive requirement been deleted? | Yes | ||
| 97 | CLIN 0006 (and OY X005 | Will the Government publish the current number of Air Force aircraft by Mission Design Series (MDS), which Basefield and Stagefields they use, and each MDS refueling times? | See response to question number 91. | ||
| 98 | PWS; 1.2 Background | Will the Government publish the current number of aircraft by Mission Design Series (MDS), which Basefield and Stagefields they use, and each MDS refueling times? | Please see response to question 30 in set one; Stagefield usage varies by training schedule. | ||
| 99 | PWS; 1.5.1 Refuel Operating Hours | What are the current Stagefield ATC Tower operating hours, published by the 110th Aviation Training Brigade? If the operating hours vary by Stagefield, request the Government provide the hours by Stagefield. | Please see response to question 12 in set one. | ||
| 100 | PWS; 1.5.1 Refuel Operating Hours | Is N1 flying conducted at all Stagefields? If not, which Stagefields do not have N1 flying requirements? | Please see response to question 12 in set one. | ||
| 101 | PWS; 1.5.1 Refuel Operating Hours | What are the operating hours for each Basefield? | Please see response to question 15 in set one. | ||
| 102 | PWS; 1.5.2 Winter Exodus; | What is the exodus period the USAACE Headquarters published for 2018/2019? Request the Government provide an example schedule of the required contractor personnel support during the exodus period. | 2018 EXODUS Period - 20 December 2018- 2 January 2020; required contrator support will be coordinated as stated in PWS 1.5.2 | ||
| 103 | PWS; 1.5.11.3 Driver/System Operator | Will the Government allow a junior team member to have less than 2 years’ experience, when accompanied by a senior team member who has the required experience? This will enable offerors to onboard and train new personnel over the contract life. | As proposed and accepted by the SSEB. | ||
| 104 | PWS; 1.5.11.8 On-site Personnel; | What are the hours to properly staff this requirement for the primary manager or supervisor? How many additional supervisory personnel are required for all shifts? | That’s an evaluated area that is to be proposed by the Contractor. | ||
| 105 | PWS; 2.2 Above Ground Storage Tanks | Shall the contractor accept ASTs that meet the criteria in 2.2 are approved for placement at the fields? | PWS 2.2 provides the minimum standards for AST and PWS 2.2.1 provides the requirement for the placement of AST’s | ||
| 106 | PWS; 5.4 Refuel at Stagefields; | What times do each of the Stagefield towers become operational? | Please see response to question 36 in set one | ||
| 107 | PWS; 5.5 Defuel Service; | What is the historic workload data for this service? | Please see response to question 23 in set one. | ||
| 108 | PWS; 5.6 Fireguard | Which Stagefields will the AH-64 airframes use? | Please see response to question 35 in set one. | ||
| 109 | PWS; 5.6 Fireguard | Will the AH-64 airframes operate during all operational periods (AM, PM, and N1) at assigned Stagefield(s)? If not, please specify their operational times. | Yes | ||
| 110 | PWS; 5.7.1 Refuel/ Defuel Service Locations | Will hot, warm, and cold aircraft refueling/defueling services be required at all Supported Fields shown in Table A? | Please see response to question 7 in set one. | ||
| 111 | PWS; 5.7.4 Gasoline, Diesel and Aviation Fuels Deliveries; | What are the delivery locations, frequency, and quantities for Gasoline, Diesel, and Aviation Fuels? | Please see response to question 11 in set one. | ||
| 112 | PWS; 5.7.8 Fuel Quality Testing | What is the historic workload data for the Contractor accommodating the POL Laboratory? | Please see response to Question 24 in set one | ||
| 113 | PWS; 5.7.9 Contaminated Products Disposition | What is the historic workload data for this service over the last 3 years? | Please see response to Question 38 in set one | ||
| 114 | PWS; 5.7.9 Contaminated Products Disposition | Will there be a separate CLIN established to charge for the disposition of the contaminated fuel? | No | ||
| 115 | PWS; 5.7.10 Preflight Samples at FOD Containers | Who currently performs this function? Where is the FOD trash to be disposed? | Please reference, 5.16.5 Trash Removal: The Contractor shall be responsible for the pick-up of all trash and debris within and around fuel areas under its control, and shall dispose of all such trash and debris in Government-furnished containers/dumpsters. The Government will dispose of the trash and debris placed within the containers/dumpsters provided. | ||
| 116 | PWS; 5.7.12 Pit Operation | Which location(s) will hot refueling be accomplished? | All; See Table A | ||
| 117 | PWS; 5.8.1 Basic Refuel Truck requirements | Will the Government consider replacing this “five model year” requirement with the following; “All trucks used in performance of this contract shall meet current DOT standards, be inspected annually, and the inspection report provided to the KO”? | Please see response to question 51 in set one. | ||
| 118 | , PWS; 5.10.8 Engine Test Cell Support | What is the historic workload data for the last 3 years? | Please see response to question 29 in set one. | ||
| 119 | PWS; 5.10.11 Aircraft Typ | Will Attachment 5 be updated with the current quantities for each aircraft type listed so we can more accurately estimate the proper number of refueling FTEs, vehicles, and related equipment? | Please see response to question 30 in set one. | ||
| 120 | PWS; 5.10.12 Operation of Off-specification Fuel Tank | What is the historic workload data for the last 3 years (number of off-specification fuel collections, and gallons each time)? | Please see response to question 38 in set one. | ||
| 121 | PWS; 5.14. Bulk Issues | What is the historic workload data for the last 3 years? | Please see response to question 25 in set one. | ||
| 122 | PWS; 5.14. Bulk Issues | What is the historic workload data for the last 3 years? | Please see response to question 25 in set one. | ||
| 123 | PWS; 5.14.2 Ordering | Is this a requirement for each Basefield versus each Stagefield? | No | ||
| 124 | PWS; 5.14.3 Receipt | What is the historic workload data for the last 3 years? | Please see response to question 25 in set one. | ||
| 125 | PWS; 5.16 Maintenance - Facilities and Equipment | Please confirm that all maintenance for Facilities and Equipment (under all PWS 5.16 and sub paragraphs) is either for the facilities listed in Attachment 1 or Contractor provided equipment and not capitalized sites. | Please see response to question 20 in set one. | ||
| 126 | PWS; 5.16.20 Element Changes; | Is it the government’s intent to provide all needed filter elements? | No; See PWS Changes 8JAN19. | ||
| 127 | PWS; 5.16.34 Truck Fill Stands/Fill Points; | Does this only apply to Goldberg Stagefield? | No, however it does not apply to DLA Capitalized Bulk Fuel Sites. | ||
| 128 | Attachment_2; GFP_Listing | If the Contractor replaces the computers will the Government reload all FMD programs? | FMD will not be provided; Please reference, 5.12 Fuel Management System/Software | ||
| 129 | Attachment_2; GFP_Listing; | What is the size and location of the Fuel Dispensing Tanks? | Please see response to question 2 in set one. | ||
| 130 | Attachment_1;Facilities Listing; | What is the status of the buildings listed for Shell Army Heliport and Knox Army Heliport? Do they exist, or are in planning to be built? Please clarify | At present, there are no dedicated buildings for Shell and Knox Army Heliports. Administrative space will be coordinated in the near term and contractor will be notified at a later date. | ||
| 131 | Attachment_2; GFP_Listing; | Is the Gold Stagefield, Fuel Array System double walled as required by 5.10.14? If not, who is responsible for the fuel array’s compliance? | Please see response to question 81. | ||
| 132 | PWS; 5.16.12 Tank Maintenance; | Will the Government provide a listing of “all Government Capitalized/Non-Capitalized storage tanks”, including their specifications? | Capitalized tanks are the responsibility of DLA-E (Cairns AAF, Lowe AHP, Hanchey AHP and the Main Post Retail Point); the only non-capitalized AST's are Goldberg Staefield and the AST located at Bldg 7206 Engine Test Cell | ||
| 133 | 52.212-2 Addendum Evaluation, | Is the Government going to establish a subfactor to properly evaluate innovations? IF not how are innovations going to evaluated against Volume I Technical Capability? Is the government going to do a price trade off for innovations? Please explain how innovations proposed will be objectively evaluated? | No. Yes. See Addendum to FAR 52.212 Entitled "Evaluation - Commercial Items" | ||
| 134 | Previous Award | On 30 March 2018, the Government announced to offerors that an initial award of this contract was made to a company called B-3 Enterprises, LLC (B3). It appeared B-3 remained under contract for the same scope for a period of time until the Government announced to offerors (26 June 2018) that it was taking corrective action in response to a bid protest. Our questions are: Did the Government pay for the completion, partial completion, or work on any tanks, trucks or other equipment under the B-3 contract? If so, please describe the trucks, tanks or other equipment, portions thereof, or work completed or paid for under or related to the B-3 contract. Will those tanks, trucks and/or other equipment, portions thereof, or work completed or paid for be available, including as government-furnished equipment, to the awardee under this contract? | Yes, the Army paid the contractor' allowable terminatation contract cost in accordance with FAR 12.402. No equipment was purchased from B3 for the performance of this contract, because it was determined it was not in the Army's best interest. In addition, it is DOD's general policy not to furnish government equipment to contractors. | ||
| 135 | PWS 1.5.8 | Please confirm the Contractor provides staffing for DLA Capitalized Bulk Refuel Points. Also, please include the frequency of commercial tank truck deliveries of jet fuel to these bulk fuel storage areas. | No the contractor specifically does not man, operate or do maintenance on the DLA Capitalized Bulk Refuel Points, this makes the second question irrelevant. | ||
| 136 | Ref. Para. 2.1 | Is there any historical data on the fees for air permit applications? | Typically with regards to emergency electrical generators with diesel engines, ADEM issues a letter of non-applicability. This means that no permit is required; however, applicable state and federal air pollution regulations must still be followed. In the unlikely event a permit is required, the permitting fee is approximately $4,835.00. If multiple generators of the same type, size and for the same usage are required, they typically require only one permit. If additional permits are required, the fee is the same for each. | ||
| 137 | PWS 5.2 | Please confirm the FDSM is not responsible for changing out the elements at the capitalized sites. | Please see response to question 17 in set one | ||
| 138 | PWS 5.7.9 | Is the Contractor responsible for contracting disposal with an off-site vendor or does the Contractor schedule disposal through Government agencies? Who pays for the collection and disposition of contaminated fuel products? | No, the Contractor will monitor the amount of contaminated fuel in the Hanchey AAF off-spec fuel tank and will notify the LRC POL Section when the tank needs pumping (usually above 45 inches is sufficient). The LRC POL contact will notify the DPW Environmental Branch to schedule pumping by an off-site vendor. The cost of the pumping service (recycling of off-spec fuel) is provided by the Government. The Contractor does NOT pay for the disposition of the contaminated off-spec fuel. | ||
| 139 | PWS 5.7.16 | Provide the type of ATG system in use, i.e. Barton or ENRAF? | ENRAF | ||
| 140 | PWS 5.7.17 | Confirm the referenced fuel stands are those installed only on Contractor furnished fuel stands; our understanding is that the truck fuel stands at the capitalized storage areas have Government furnished temperature compensating meters. Also, is there a requirement for temperature compensating meters on Contractor provided trucks? | Temperature Compensated Meters (TCM) on receiving; fill stands not TCM (issued in gross); Yes, TCM are required, IAW 5.7.17 Metering of Refuel/Defuel transactions: The Contractor shall ensure that all fuel sales and credits (issues and defuels) are metered with temperature compensated meters (contractor furnished) and recorded. The Contractor shall provide meters for fuel stands. (CDRL 15) | ||
| 141 | PWS 5.7.19 | Does the Government provide any equipment for the four FARP fuel points? Our understanding was that the Contractor supported an existing FARP array with a truck. Please clarify. | No, the contractor will supply the capability to provide fuel only FARPs if needed IAW current standards. This is a contingency based need and not currently utilized. There is a FARP array at Mollinelli Range that is not under the PWS for this contract and when it is down for maintenance this contract refuels aircraft at the location with dispensing equipment but, it does not tie into the existing fuel array. | ||
| 142 | PWS 5.8.10 | Please clarify the reference for marking fuel vehicles. The paragraph references Mil Std 161, however this directive applies to storage systems versus vehicles. | Vehicles, 49 CFR - Transportation | ||
| 143 | PWS 5.16.6 | Please clarify the maximum height for grass as reference. The references show four (6) inches. | Please see response to Question 80 in set two | ||
| 144 | PWS 5.16.20 | Please clarify truck filters are funded by the Contractor and storage system filters are provided by the Government. | Funding for truck and storage system filters are the Contractor's responsibility | ||
| 145 | pg. 55 of 103 para (8) | Please clarify when the names of key personnel, resumes and letters of commitment are due. Since the Contractor is not allowed to interview incumbent employees until the Phase-in period (para. 1.5.13), it will make it hard to provide this information in advance of contract award. | The names of key personnel, resumes and letters of commitment are due upon proposal submission. There is no prohibition to interviewing incumbent personnel. | ||
| 146 | (no reference given) | Does the Contractor handle any fuel additives, for example +100? | No | ||
| 147 | (no reference given) | Please confirm that there is not a Collective Bargaining Agreement for this location. | Please see response to question 47 in set one. | ||
| 148 | Ref. Para. 1.5.10.3 | Please provide any additional information on what the Government would recognize as an accredited institution as it relates to the qualifications of the Environmental/Health and Safety Manager. | Accredited colleges or DOD schools. | ||
| 149 | Attach. 2 | Please confirm if there is any lab equipment, i.e. Aqua Glo tester, provided for Contractor use? | All laboratory equipment shall be provided by the Contractor. | ||
| 150 | (no reference given) | Does Ft Rucker fuels contract use the Fuel Manager Defense (FMD) program on post? | Fort Rucker Logistics Readiness Center will manage FMD with the point of sale being the Fuel Dispensing Equipment provided under this contract effort. | ||
| 151 | Amendment 1, Volume III | When would the Government release the CBA? | Please see response to question 47 in set one. | ||
| 152 | Amendment 1, PWS 5.8, Trucks/Fuel Dispensing Equipment | Did the Government remove the +100 requirement? We see no mention of it from the previously released solicitation? | Yes, +100 will no longer be used on Fort Rucker | ||
| 153 | Amendment 1 , PWS 2.1, Environmental Management | If we are using a self-contained Fuel trailer designed to refuel aircraft, do the rules still apply - especially considering that the trailer will be parked where trucks are in containment spaces and will not be left out all night at stage fields? | PWS 2.1 refers to permitting. Assuming the "self-contained fuel trailer" is a single-walled mobile unit, it must be parked in the designated parking area at each airfield. These parking areas at the airfields (not stage fields), have secondary containment catchment basins. An appropriately sized spill kit must be available on the truck that is towing this trailer, or on the trailer itself. All parking areas should also have an appropriately sized spill kit available. Please note that a double walled tank is preferred, but not required since it is a mobile unit. | ||
| 154 | PWS 5.7, Table A | Would the Government please clarify if this applies to vehicles going out on roads, or if it includes base vehicles that will not be leaving their areas? | Table A refers to the Basefields and Stagefields utilized for training. | ||
| 155 | Amendment 1, PWS 5.8.2, Vehicle | Would the Government please clarify if this applies to vehicles going out on roads, or if it includes base vehicles that will not be leaving their areas? | Applies to all Vehicles transporting Fuel | ||
| 156 | Amendment 1, PWS 5.8.9, Off-specification Truck/Trailer | Would the Government allow the use of a Trailer or bowser with a minimum capacity of 500 gals instead of a truck? | Yes, the government is open to innovative ideas. | ||
| 157 | Amendment 1, PWS 5.9.5, Required Flow Rate | Are the expectations the same for a 100 ft. hose? | Yes, especially considering the amount of fuel a CH-47F requires . | ||
| 158 | Amendment 1, Volume II, Factor 3 | Would the Government please specify how many past performance citations are required in our submission? Also, could the Government please specify how many citations should be submitted by the prime and how many should be submitted by each subcontractor? | The Offerror shall present relevant past performance information as defined in Volume II, Factor 3 for the prime and any subcontractor expected to perform at least 25% of the proposed effort. | ||
| 159 | Amendment 1 , PWS 1.5.8, DLA Capitalized Bulk Refuel Points | As the PWS currently reads, we are not going to be operating the Capitalized bulk storage areas on Ft Rucker. Would the Government please clarify? | The Logistics Readiness Center will operate the DLA Capitalized Bulk Fuel Points. The Contractor will use these sites to fill their Fuel dispensing equipment, sign for the fuel and is then responsible for the accountability of the fuel from their equipment to to the aircraft. | ||
| 160 | Schedule B & Amendment 1, Volume III bullet point 4 | Can the Government confirm if these CLINs are for the Airforce refueling services mentioned in Schedule B, or the eCMRA requirement? | CLINs 0006, 1005, 2005, 3005, 4005, 5005, and 6005 are for eCMRA billings. | ||
| 161 | Amendment 1, Volume III bullet point 4 & Amendment 1, PWS 1.2, Background | With the stated uncertainty in the number of aircraft to refuel, can the Government please provide a plug number for the Airforce refueling costs? | The Airforce Currently has appoximately 4.9% of the total aircraft to be serviced under this contract, but will reimburse the Army for the Service. Air Force refuel/defuel will be part of the overall FFP, since the same equipment will be utilized for both Army and Air Force aircraft. | ||
| 162 | PWS 1.3 | Will pricing be separate for any new work that is needed? | Yes if it is work not covered under this PWS | ||
| 163 | PWS 1.5.1 | Refuel Operating Hours - Is there any hours of work outside of zero 600 and midnight? | Please see response to question 12 in set one. | ||
| 164 | PWS 1.5.5 | Special Events - Is there a historical list of special events held at Fort Rucker? | No, special events could include things like aircraft evacuating to Fort Rucker from the East Coast for a Hurricane and is not predictive in nature. | ||
| 165 | PWS 1.5.8 | DLA Capitalised bulk re-fuel points - Does the contractor operate any of the DLA capitalised bulk refuel points? | No | ||
| 166 | PWS 1.5.8.1 | Capitalised bulk fuel points - Is there a list of alternative DLE sites should the capitalised sites be non-operational due to maintenance or other issues? | There are 4 DLA-E Capitalized Bulk sites on Fort Rucker, one each at Hanchey, Lowe, Cairns and the Main Post Retail Point. | ||
| 167 | PWS 1.5.9 | Personnel - Is the incumbent contractor personnel at Fort Rock are part of a labour union? | Yes | ||
| 168 | PWS 1.5.9.3 | Contractor Personal drug testing - can we have a copy of the AR | |||
| 600–85? | The AR can be found at https://armypubs.army.mil/epubs/DR_pubs/DR_a/pdf/web/AR600-85_WEB_Final.pdf | ||||
| 169 | PWS 1.5.11.7 | Environmental Officer - Can we have a copy of the AR 200–1? | The AR can be found at https://armypubs.army.mil/epubs/DR_pubs/DR_a/pdf/web/r200_1.pdf | ||
| 170 | PWS 2.5 | Hazardous Waste - Is there a facility on base we can dispose hazardous waste? | Yes. Fort Rucker has 3 facilities (90 Day Hazardous Waste Central Accumulation Areas [90-HWCAA]) were hazardous waste, universal waste and Non-RCRA waste may be turned in, as long a proper documentation is provided. They are located on Main Post, Cairns Army Airfield and Shell Army Heliport. The location you use depends on where the waste is generated. Waste cannot be transported across state roads without proper certifications. For more information on hazardous waste procedures, please reference the Hazardous Waste Management Plan, which is location on the Sustainable Fort Rucker Website (www.fortrucker-env.com) or call the Environmental Office. | ||
| 171 | PWS 5.10.7 | Transient Aircraft - Is there a list of locations with distance within a 50 mile radius of Fort Rucker? | No, but the locations would be areas like the stagefield listing in Table A. | ||
| 172 | (no reference given) | Can you provide a list of annual contacts for each site for cold, warm and hot refuels within this PWS? | The government is unaware of any list of annual contacts. | ||
| 173 | (no reference given) | Is it possible to arrange a site survey for this proposal. If not, can companies try to arrange a site visit with the base? | Please see response to question 53 in set one | ||
| 174 | (no reference given) | Are all refuel and defuel vehicles that are necessary for execution of the contract required to be in location at the onset of the contract? | Yes, must be present at the end of the 120 day phase-in period. | ||
| 175 | (no reference given) | Can you provide a list of all facilities and ancillary resources that will be made available for use by the contractor? | See Attachment 1 - Facility Listing | ||
| 176 | (no reference given) | At the stage fields, how many feet of piping is at each site? | Unknown; Piping is provided by the incumbent contractor with the exception of the Goldberg Stagefield Fuel Array, which is Government Furnished Property (GFP). Recommend using "Google Maps" and the provided attachments to discern current stagefield refuel footprints. | ||
| 177 | Reference PWS 1.5.10.1 and 1.5.10.2 | This reference does not refer to Fuels/Petroleum Operations, maintenance or Training like PWS 1.5.10.2 does for the ASM. Are we to understand that the PSM can have supervisory experience that is any type of related operations, maintenance or training and not just Fuels? petroleum. Please clarify. | Yes, the intent is for the PM to be a management expert not necessarily a Petroleum expert. |