Attachment_4_PRS_Summary_18DEC18_1402.pdf

PDF 188 KB Posted

Attached to
REFUEL DEFUEL SERVICES Federal contract opportunity
Solicitation number
W9124G18R0007
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis

About this file

ATTACHMENT 04-REVISED

View the file

Other files for this federal contract opportunity

Other files attached to REFUEL DEFUEL SERVICES, newest first.
File Type Posted
W9124G18R0007_0006.pdf PDF
W9124G18R0007_0006_Conformed_Copy.pdf PDF
W9124G18R0007_0005.pdf PDF
W9124G18R0007_0005_Conformed.pdf PDF
Questions.xlsx XLSX spreadsheet
W9124G18R0007_0004.pdf PDF
Stagefield_Coordinates_and_Pictures.docx DOCX document
W9124G18R0007_0004_Conformed.pdf PDF
Attachment_15_Basefield_Usage.xlsx XLSX spreadsheet
W9124G18R0007_0003.pdf PDF
Attachment_14_Aircraft_Fuel_Sales_and_Defuel.docx DOCX document
Amendment_02.pdf PDF
Set_One_Q&A's.xlsx XLSX spreadsheet
Conform_Copy_inc_Amendment_02.pdf PDF
Attachment_13-Ft_Rucker_CBA_2018-2020.pdf PDF
Attachment_3_Publication_and_Form_Listing_18DEC18_0927.pdf PDF
Attachment_2_GFP_Listing_17DEC18_1400.pdf PDF
Attachment_5_Aircraft_Listing_by_MDS_17DEC18_1421.pdf PDF
Attachment_1_Facilities_Listing_4DEC18_1055.pdf PDF
Amendment_01.pdf PDF
Attachment_9_Performance_Assessment_Questionnaire.pdf PDF
Attachment_1_Facilities_Listing.docx DOCX document
Attachment_3_Publications_24OCT18_Final_with_MICC_EUSTIS_CHANGES.DOCX DOCX document
Attachment_8_Price_Spreadsheet.xlsx XLSX spreadsheet
Attachment_10_Wage_determination.pdf PDF
Attachment_4_Performance_Assessment_Questionnaire_-_Copy.pdf PDF
Attachment_5_Aircraft_Types_by_Mission_Design_Series.docx DOCX document
CDRL_11_DEC_18.pdf PDF
Attachment_2_Government_Furnished_Property.docx DOCX document
REFUEL_RFP.pdf PDF
Attachment_12_FY14-18_weekend_useage_by_aircraft_numbers.xlsx XLSX spreadsheet
Attachment_7_Performance_Requirement_Summary.doc DOC document
Attachment_11_FY14_FY18_weekend_usage_by_days_per_stagefield.xlsx XLSX spreadsheet
Attachment_13_FY18_Stagefield_Use_04Oct18_G4Final_(1).xlsx XLSX spreadsheet
Attachment_6_Stagefields.xlsx XLSX spreadsheet
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14.0 PERFORMANCE REQUIREMENTS SUMMARY (PRS)

14.1 General: This Performance Requirement Summary (PRS) is applicable to all contractor provided services. Services shall be inspected under the FAR 46.407 – Nonconforming Supplies or Services. The Contractors primary consideration when considering quality control as it relates to refuel and defuel in support of flight training is to ensure that aircraft are available for training or maintenance with the required fuel on board, and aircraft that are unable to meet the standards are identified early and accurately for administration by the Government.

14.2 Required Services: The contract service requirements subject to this PRS are listed in Table 1, Column 1 of the PRS.

14.2.1 Performance Measure and Standard: Contract service performance requirements are listed in Table 1, (Column 2 and 3).

14.2.2 Minimum Acceptable Standard (MAS): Table 1, Column 4 represents the MAS rate expressed as a percentage of aircraft that are rejected for nonconformance. A defect is defined as one nonconforming aircraft. When computing MAS all fractions will be rounded up to the next whole number.

14.3 Major Nonconformance:

a. The services listed in the PRS will be considered a major nonconformance when the number of aircraft at any Basefield or Stagefield rejected for noncompliance with the inspection criteria established for cold, warm or hot refueling or defueling exceeds the established MAS.

b. The services listed in the PRS will be considered a major nonconformance when either safety or environmental requirements are not being adhered to.

14.4 Critical Nonconformance:

a. The services listed in the PRS will be considered a critical nonconformance when the number of aircraft at any Basefield or Stagefield rejected for noncompliance 30 minutes following identification of a Major Nonconformance (re-evaluation) with the inspection criteria established for cold, warm or hot refueling or defueling exceeds the established MAS.

b. The services listing in the PRS will be considered a critical nonconformance when either safety or environmental requirements have been identified previously as a major nonconformance and during re-inspection the same issues still exist.

c. The services listed in the PRS will be considered a critical nonconformance when safety or environmental requirements have been willfully ignored and place aircraft, personnel or the environment at risk.

14.5 Non-PRS Nonconformance:

a. Any service requirement non-conformance not listed in the PRS, but referenced in the PWS will be subject to a CDR and the provisions stated in 9.0

CONTRACTOR NON-CONFORMING PERFORMANCE

14.6 Method of Surveillance: Table 1, Column 5 Outlines the evaluation tools and techniques utilized to assess the Contractor performance of the Work Requirements to establish and measure standards.

14.7 Determining Nonconformance:

14.7.1 General: Non-conformance will be broken down into two separate groups, one for aircraft not refueled or defueled to meet the established criteria, and another for those who fail to meet the established criteria for subsequent reevaluation.

14.7.2 Major Nonconformance: In the event the number of aircraft not receiving refuel/defuel which are rejected for noncompliance with the inspection criteria established for the Basefields/Stagefields or concerning safety and/or environmental criterion exceeds the established MAS.

14.7.3 Critical Nonconformance: Critical Nonconformance deductions apply only to major nonconformance areas being reevaluated which were previously identified due to nonconformance, or when safety of personnel, equipment or the environment is willfully put at risk.

14.7.4 Un-performable Task: For the purposes of nonconformance deductions an un-performable task is defined as a refueling/defueling mission that the contractor was never informed of or if there is an equipment malfunction on the equipment being serviced if it is not owned or under control of the contractor. Missions that are considered to be an un-performable task will not be considered as part of MAS computations for nonconformance.

14.7.5 For purposes of establishing acceptance and rejection criteria under 100% Lot size = Sample size.

Example 1 (100% Inspection)

Given

• A flight training period (see PWS 1.5.1) at a Base-Field has 90 aircraft issued including spares in support of USAACE flight operations.

• The MAS for major nonconformance for this requirement is 1%

• 4 of the 90 issued aircraft including spars do not meet the requirements of 5.3 of the PWS.

Then

• See Table 2, Acceptance and Rejection Table (Normal Inspection) under 1% Colum.

• Find the sample size. If the sample size falls between two values use the next greater value. In this case 125.

• 4 nonconforming aircraft meets the rejection criteria and is considered a major nonconformance.

Given

• Of the 4 nonconforming aircraft, 1 aircraft does not meet the requirements of 5.3

PWS.

• The MAS for critical nonconformance is 0%.

Then

• The MAS for re-evaluation is 0%. 0 is the maximum number of defects

• 1 nonconforming aircraft exceeds the MAS and is considered a critical nonconformance.

Example 2 (Planned Sampling Inspection Stagefields Hot Refuel)

• There is planned sampling of 5 Stagefields this week for Hot Refuel. The Government Quality Assurance Specialist (QAS) may go to any Stagefield listed in Table A, Supported Fields (PWS 5.7.1). Upon arrival at the Toth Stagefield.

The Stagefield is operational and has been for 30 minutes. The Refuel personnel show up 40 minutes later this is one hour and 10 minutes and is a Major Nonconformance.

• When the Refuel personnel show up it takes them one hour making it 2 hours and 10 minutes to be prepared to pump fuel and there have been aircraft ready for refuel for 30 minutes. This would be a Critical Nonconformance.

• If the QAS shows up at High Bluff Stagefield and the refuel personnel are present and ready to hot refuel aircraft within one hour of the tower becoming operational there is no nonconformance.

• If a QAS shows up at Hunt Stagefield and the refuel personnel are there but when aircraft land they are not immediately refueled then this in not in accordance with the PWS para 5.7 and an observation will be taken and passed through the COR to management.

Example 3 (100% Inspection for Fuel Dispensing Equipment Maintenance and Inspections)

• Every major item in use at the Basefields or Stagefields will be inspected by the QASs at least monthly.

• If during any given Calendar Week Sunday to Saturday the QASs find 2 or more items not properly maintained or without valid inspections this is Major Nonconformance.

• If the Items found are not corrected or taken out of service within 72 hours it will become a Critical Nonconformance. This does not alleviate any responsibility to provide refuel/defuel at any locations.

Example 4 (100% Inspection for Spill Prevention and Clean-up and Safety)

• This means that every time anything is inspected the QAS may ask to see the Spill Kit and required safety items. This will be part of every inspection but may be reduced if compliance becomes common place.

• If the QASs identify 3 safety issues but no Spill Prevention and Clean Up issues this would be a Major Nonconformance for safety.

• If these issues are not corrected within 48 hours it becomes a Critical Nonconformance.

TABLE 1 – Performance Requirements Summary (PRS) Required Service Listing.

Column 1 Column 2 Column 3 Column 4 Column 5 Required Services

Performance Measure

Performance Standard

MAS Method of Surveillance

Refuel/Defuel at Base- Fields

Quality IAW 5.3 of PWS First Evaluation (Major) 1% of aircraft, including spares, declared flyable, and available for use by

USAACE

(ARTS) for each issue time, sortie, or flight period

Re-Evaluation (Critical) 0% within 30 minutes of First Evaluation notification

100% Inspection of issued aircraft including spares.

Defuel Services

Quality IAW 5.5 of PWS

First Evaluation (Major) 1.5% of requests for the calendar month.

Re-Evaluation (Critical) 0% within 30

100% Inspection of requested defuel events.

minutes of First Evaluation failure notification

Emergency Defuel

Quality IAW 5.5.1 of PWS

First Evaluation 0%

Re-Evaluation 0%

100% Inspection of requested emergency defuel events.

Refuel at Stagefields

Quality IAW PWS 5.4 IAW Surveillance Guide #

Planned sampling

IAW

Surveillance Schedule

Fuel Dispensing Equipment Maintenance and Inspections

Quality Maintain all fuel dispensing equipment and vehicles IAW Regulatory guidance and OEM Standards

IAW 5.8

IAW

Surveillance Guide #

Planned sampling

IAW

Surveillance Schedule

Fuel Inventory Management and Accounting

Accountability IAW 5.13 of the

PWS

Reports and accountability completed on time and with 100% accuracy at least 95%of the time <95% is Major <90% accuracy and timeliness is Critical

100%

Safety Quality IAW Contractors Safety Program

(CDRL09), OSHA

standards and 1.5.14

IAW

Surveillance Guide #

Planned sampling

IAW

Surveillance Schedule

Spill Prevention and Clean-up

Quality IAW Contractors Environmental Protection/Response Plan (CDRL 08) and Part 2, Environmental Management, 2.0

IAW

Surveillance Guide #

Planned sampling

IAW

Surveillance Schedule

Table 2 - Acceptance and Rejection Sample Size