Exhibit_D001_-_D007.pdf

PDF 77 KB Posted

Attached to
Mutiple Award Indefinite Delivery Indefinite Quantity (MAIDIQ) CONTRACTS
Solicitation number
W91248-17-R-0001
Issued by

About this file

Wage Determination Tennessee

View the file

Other files

File Type Posted
Atch_006_-_Questions-Answers_R3.pdf PDF
Amd_0009_to_W91248-17-R-0001_(8_Dec_2017).pdf PDF
Conformed_W91248-17-R-0001_(8_Dec_2017).pdf PDF
Site_Visit.xlsx XLSX spreadsheet
KY170102.pdf PDF
Conformed_(Amd_0008_to_W91248-17-R-0001).pdf PDF
TN170098.pdf PDF
Amd_0008_to_W91248-17-R-0001.pdf PDF
Amd_0007_to_W91248-17-R-0001.pdf PDF
Bldg._00039_LBPInspection_28_May_15.pdf PDF
Atch_006_-_Questions-Answers_R2.pdf PDF
DSCN1223.JPG JPG image
DSCN1224.JPG JPG image
DSCN1222.JPG JPG image
Conformed_(Amd_0007_to_W91248-17-R-0001).pdf PDF
RUBEROID_GAFGLAS_Roofing_Details_Manual-red.pdf PDF
Atch_006_-_Questions-Answers.pdf PDF
Amd_0006_to_W91248-17-R-0001.pdf PDF
39-OMA_Asbestos_Report-2015.pdf PDF
Conformed_(Amd_0006_to_W91248-17-R-0001).pdf PDF
Roof_Color_Chart.pdf PDF
Exhibit_B3.pdf PDF
Roof_System_data.pdf PDF
As-built_Drawing.pdf PDF
Amd_0004_to_W91248-17-R-0001.pdf PDF
Conformed_W91248-17-R-0001_(Amd_0003).pdf PDF
Conformed_copy.pdf PDF
Amendment_0002.pdf PDF
Atch_006_-_Questions-Answers.pdf PDF
Atch_005_-_Questions-Answers.pdf PDF
Amendment_0001.pdf PDF
Exhibit_C001_-_C007.pdf PDF
Exhibit_B007.pdf PDF
Exhibit_B004.pdf PDF
Solicitation.pdf PDF
Atch_004.xlsx XLSX spreadsheet
Exhibit_B001.docx DOCX document
Atch_003.pdf PDF
Exhibit_A001_-_A012.docx DOCX document
Atch_005.docx DOCX document
Atch_002.pdf PDF
Exhibit_B006.pdf PDF
Exhibit_B005.pdf PDF
Exhibit_B003_Specifications.pdf PDF
Exhibit_B002_Drawings.pdf PDF
Atch_001.pdf PDF
Exhibit_B002_Drawings.pdf PDF
Exhibit_B001.docx DOCX document
Atch_002.pdf PDF
W91248-17-R-0001.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: TN170001 01/06/2017 TN1

Superseded General Decision Number: TN20160001

State: Tennessee

Construction Type: Heavy Flood Control

Counties: Tennessee Statewide.

RIVER, HARBOR AND FLOOD CONTROL PROJECTS ON THE MISSISSIPPI

RIVER AND TRIBUTARIES (excluding any contracts for any phase of construction of a Lock and Dam) EXCEPT THE METROPOLITAN AREAS

OF MEMPHIS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017

SUTN2010-001 09/01/1997

Rates Fringes

CARPENTER........................$ 7.25

Laborers:

Air Tool Operator...........$ 7.25

CHAIN SAW OPERATOR OR FILER.$ 7.25

REVETMENT & DIKES...........$ 7.25

UNSKILLED...................$ 7.25

Power equipment operators:

ASPHALT PLANT DRYER OPR.,

ASPHALT DISTRIBUTOR,

ASPHALT ROLLER, BULLDOZER

(ROUGH, INCL. DISC, PLOW,

OR ROLLER), MOTOR PATROL

(HAUL ROADS), TRENCHING

MACHINE (18" & UNDER),

SELF-PROPELLED ROLLER

(EXCEPT ASPHALT, END DUMP

EQUIP. (OFF HIGHWAY),

MIXER (CONCRETE UP TO 21

CU. FT.), BOTTOM DUMP

EUCLIDS (AND LIKE

EQUIPMENT)..................$ 7.25 .05

BULLDOZER (FINISHER, PUSH

CAT & ON BARGES), MOTOR

PATROL FINISHER, SCRAPER &

LIKE EQUIP., FRONT END

LOADER, BACKHOE TRACTOR

MOUNTED) ASPHALT FINISHER

OR SPREADING MACHINE, WELL

POINT SYSTEM OPR., SELF

PROPELLED LOADER (CONVEYOR

TYPE).......................$ 7.25 .05

FIREMAN (HEAVY

CONSTRUCTION), PILEDRIVER,

LEADSMAN, WINCHMAN..........$ 7.25 .05

OILER, PUMP, GREASER,

TRACTOR (FARM TYPE INCL.

DISC, PLOW OR ROLLER).......$ 7.25 .05

PILEDRIVER OPR., MECHANIC

(HEAVY EQUIP.), CRANES,

DERRICKS, DRAGLINES,

WELDER, POWER SHOVELS &

BACKHOES, MIXER (CONCRETE,

21 CU. FT. & OVER),

ASPHALT PLANT OPR.,

TRENCHING MACHINE (OVER

18")........................$ 7.75 .05

Truck drivers:

1 1/2 TONS OR LESS..........$ 7.25

OVER 1 1/2 TONS.............$ 7.25

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: TN170105 01/06/2017 TN105

Superseded General Decision Number: TN20160105

State: Tennessee

Construction Type: Building

County: Stewart County in Tennessee.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker

BOIL0455-001 01/01/2013

Rates Fringes

Boilermaker....................$ 24.91 20.03

* BRTN0005-009 05/01/2016

Rates Fringes

BRICKLAYER.......................$ 23.62 2.07

* CARP0223-004 05/01/2016

Rates Fringes

CARPENTER (Scaffold Builder Only)............................$ 23.95 11.36

ENGI0369-008 05/01/2013

Rates Fringes

OPERATOR: Forklift..............$ 24.47 10.85 OPERATOR: Grader/Blade..........$ 19.46 10.85

IRON0492-008 05/01/2016

Rates Fringes

IRONWORKER, STRUCTURAL AND

REINFORCING......................$ 24.35 13.35

LABO0386-001 05/01/2015

Rates Fringes

LABORER: Common or General.......$ 17.42 6.05

PLUM0572-002 05/01/2016

Rates Fringes

PIPEFITTER (Including HVAC Work) Work at power plants, petro chemical plants, ore reduction, paper mills and refineries........$ 38.55 16.42 All other work..............$ 36.55 16.42

SHEE0177-005 05/01/2013

Rates Fringes

SHEET METAL WORKER, Includes Metal Roof Installation..........$ 24.50 11.85

SUTN2009-103 09/21/2009

Rates Fringes

CARPENTER, Excludes Scaffold Building.........................$ 15.42 0.00

CEMENT MASON/CONCRETE FINISHER...$ 16.68 2.75

ELECTRICIAN......................$ 18.00 1.40

LABORER: Landscape..............$ 9.60 0.80

LABORER: Mason Tender - Brick...$ 12.90 0.00

LABORER: Roof Tearoff...........$ 9.75 0.49

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 15.00 0.00

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 15.00 0.00

OPERATOR: Bulldozer.............$ 15.32 0.00

OPERATOR: Crane.................$ 17.64 8.00

OPERATOR: Mechanic..............$ 18.66 3.39

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 14.25 0.00

OPERATOR: Roller................$ 13.02 0.00

PAINTER: Brush, Roller and Spray............................$ 13.10 0.00

PLUMBER..........................$ 20.03 9.00

ROOFER: Built up Roof...........$ 12.74 0.00

ROOFER: Rubber Roof.............$ 16.82 4.77

ROOFER: Single Ply Roof.........$ 16.50 0.32

TILE FINISHER....................$ 10.00 0.74

TRUCK DRIVER: Dump Truck........$ 12.16 0.00

TRUCK DRIVER: Material Truck....$ 12.16 1.66

TRUCK DRIVER: Pickup Truck......$ 11.70 3.92

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

General Decision Number: TN170098 01/06/2017 TN98

Superseded General Decision Number: TN20160098

State: Tennessee

Construction Type: Building

County: Montgomery County in Tennessee.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker

BOIL0455-001 01/01/2013

Rates Fringes

Boilermaker....................$ 24.91 20.03

* BRTN0005-009 05/01/2016

Rates Fringes

BRICKLAYER.......................$ 23.62 2.07

* CARP0223-004 05/01/2016

Rates Fringes

CARPENTER (Scaffold Builder Only)............................$ 23.95 11.36

ENGI0369-007 05/01/2013

Rates Fringes

OPERATOR: Forklift..............$ 24.47 10.85

IRON0492-008 05/01/2016

Rates Fringes

IRONWORKER, STRUCTURAL AND

REINFORCING......................$ 24.35 13.35

SUTN2009-096 09/21/2009

Rates Fringes

CARPENTER, Excludes Scaffold Building.........................$ 14.94 0.00

CEMENT MASON/CONCRETE FINISHER...$ 16.68 2.75

ELECTRICIAN......................$ 18.00 0.88

LABORER: Common or General......$ 12.44 0.00

LABORER: Landscape..............$ 9.60 0.80

LABORER: Mason Tender - Brick...$ 12.90 0.00

LABORER: Roof Tearoff...........$ 9.75 0.49

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 15.00 0.00

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 15.00 0.00

OPERATOR: Bulldozer.............$ 15.32 0.00

OPERATOR: Crane.................$ 17.64 8.00

OPERATOR: Mechanic..............$ 18.66 3.39

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 14.25 0.00

OPERATOR: Roller................$ 13.02 0.00

PAINTER: Brush, Roller and Spray............................$ 13.10 0.00

PLUMBER..........................$ 20.03 9.00

ROOFER: Built up Roof...........$ 12.74 0.00

ROOFER: Rubber Roof.............$ 16.82 4.77

ROOFER: Single Ply Roof.........$ 16.50 0.32

TILE FINISHER....................$ 10.00 0.74

TRUCK DRIVER: Dump Truck........$ 12.16 0.00

TRUCK DRIVER: Material Truck....$ 12.16 1.66

TRUCK DRIVER: Pickup Truck......$ 11.70 3.92

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

General Decision Number: TN170030 01/06/2017 TN30

Superseded General Decision Number: TN20160030

State: Tennessee

Construction Type: Residential

Counties: Montgomery and Stewart Counties in Tennessee.

RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker

SUTN2009-028 09/10/2009

Rates Fringes

BRICKLAYER.......................$ 12.72 0.00

CARPENTER........................$ 17.52 1.83

CEMENT MASON/CONCRETE FINISHER...$ 16.00 0.00

ELECTRICIAN......................$ 16.63 0.51

LABORER: Common or General......$ 10.61 1.04

LABORER: Landscape..............$ 12.33 0.30

OPERATOR: Backhoe...............$ 13.17 0.00

PLUMBER..........................$ 17.50 0.00

ROOFER, Including Shake and Shingle..........................$ 10.25 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

General Decision Number: TN170136 01/06/2017 TN136

Superseded General Decision Number: TN20160136

State: Tennessee

Construction Type: Heavy Including Water and Sewer Line Construction

County: Stewart County in Tennessee.

HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker

* ELEC0429-007 06/01/2016

Rates Fringes

Electrician.....................$ 25.42 12.17

ENGI0369-015 05/01/2013

Rates Fringes

Operating Engineers:

Backhoe, Excavator, Trackhoe, Bulldozer, Crane, and Forklift.........$ 24.47 10.85

SUTN2009-134 12/02/2009

Rates Fringes

LABORER: Common or General......$ 10.07 0.00

LABORER: Flagger................$ 8.73 0.00

LABORER: Pipelayer..............$ 11.42 0.00

OPERATOR: Loader................$ 13.50 0.00

TRUCK DRIVER: Dump Truck........$ 10.76 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current

1.) Has there been an initial decision in the matter? This can be:

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

General Decision Number: TN170148 01/06/2017 TN148

Superseded General Decision Number: TN20160148

State: Tennessee

Construction Type: Highway

Counties: Tennessee Statewide.

HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker

SUTN2016-001 07/13/2016

Rates Fringes

BRICKLAYER.......................$ 14.26

CARPENTER........................$ 17.52

CEMENT MASON/CONCRETE FINISHER...$ 15.55

ELECTRICIAN......................$ 24.08

IRONWORKER

Reinforcing.................$ 16.29 Structural..................$ 16.89

LABORER

Common/Unskilled............$ 13.11 Skilled Air Tool Operator, Asphalt Raker, Chain Saw Operator, Concrete Mixer (less than 1 yd), Concrete Rubber, Edger, Fence Erector, Form Setter (steel), Guard Rail Erector, Mechanic's

Tender (tire changer or oiler), Mortar Mixer, Nozzleman or Gun Operator (gunite), Pipelayer, Sign Erector...............$ 15.27

PAINTER (INCLUDES SANDBLASTER)...$ 26.36

POWER EQUIPMENT OPERATOR:

GROUP 1

Backhoe/Hydraulic Excavator (3/4 yd & over), Crane (less than 20 Tons), End Loader (3 yd & over), Motor Patrol (finish),Piledriver, Dragline...................$ 19.14

GROUP 1A

Drill Operator (Caisson)...$ 25.26 Farm Tractor Operator (Power Broom)..............$ 13.50

GROUP 2

Backhoe/Hydraulic Excavator (less than 3/4 yd), Bulldozer or Push Dozer, End Loader (less than 3 yd), Motor Patrol (rough), Tractor (crawler/ utility), Truck Driver (Heavy Duty, Off Road) Scraper, Shovel, or Trenching Machine..........$ 17.08

GROUP 3

Asphalt Paver, Concrete Finishing Machine, Concrete Paver, Scale, Spreader (self-propelled), Concrete Grinder, Asphalt Milling Machine, Boring Machine (horizontal)...............$ 17.75

GROUP 4

Bobcat, Central Mining Plant, Concrete Pump, Concrete Saw, Curb Machine (automatic or manual), Dozer or Loader (stockpile), Drill (piling), Mulcher or Seeder, Rock Drill (truck mounted), Roller (asphalt), Roller (compaction self-propelled), Soil Stabilization Machine, Tractor (boom and hoist), Bituminous Distributor

Machine, pump, Track Drill, Striping Machine....$ 16.48 Heavy Duty Mechanic........$ 20.33 Light Duty Mechanic........$ 19.53 Sweeping Machine (Vacuum) Operator...................$ 15.56

GROUP 5

Crane (over 20 Tons).......$ 20.44

TRUCK DRIVER

2 axles.....................$ 15.36 3-4 axles...................$ 14.86 5 or more axles.............$ 16.27

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is…