Exhibit_B003_Specifications.pdf
PDF 937 KB Posted
- Solicitation number
- W91248-17-R-0001
About this file
Task Order Project- Renovate Bldg 2604-Construction Specs
View the file
Other files
Show 40 more
Latest 50 of 60 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dreyer Park Renovation Issued For Construction
August 14, 2014 53380
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 83 13.00 20 LEAD IN CONSTRUCTION
DIVISION 03 - CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 - METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 25 14 TABS WALL SYSTEMS THIN VENEER PANEL SYSTEM
06 60 00 PLASTIC FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 BOARD AND BLOCK INSULATION
07 46 46 FIBER-CEMENT SIDING
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 60 00 FLASHING AND SHEET METAL
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 45 23 TRANSLUCENT WALL AND ROOF ASSEMBLIES
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 21 00 5/16 INCH CEMENT PANEL ACCESSORIES
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 01 EXTERIOR SIGNAGE
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
26 56 00 EXTERIOR LIGHTING
Dreyer Park Renovation Issued For Construction
August 14, 2014 53380
PROJECT TABLE OF CONTENTS Page 2
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 13 BITUMINOUS SEAL COATS
32 01 17.16 SEALING OF CRACKS IN BITUMINOUS PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 10 00 BITUMINOUS CONCRETE PAVEMENT
32 16 13 CONCRETE SIDEWALKS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
Dreyer Park Renovation August 14, 2014 Issued For Construction 53380
SECTION 02 41 00
DEMOLITION
05/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO M 145 (1991; R 2008) Standard Specification for Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes
AASHTO T 180 (2010) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition Operations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008; Errata 1-2010; Changes 1-3 2010;
Changes 4-6 2011; Change 7 2012) Safety and Health Requirements Manual
U.S. FEDERAL AVIATION ADMINISTRATION (FAA)
FAA AC 70/7460-1 (2007; Rev K) Obstruction Marking and Lighting
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 61 National Emission Standards for Hazardous Air Pollutants
1.2 PROJECT DESCRIPTION
1.2.1 Demolition/Deconstruction Plan
Prepare a Demolition Plan and submit proposed demolition, and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, a detailed description of methods and equipment to be used for each operation and of the sequence of operations.
Coordinate with Waste Management Plan. Include statements affirming
SECTION 02 41 00 Page 1
Contractor inspection of the existing roof deck and its suitability to perform as a safe working platform or if inspection reveals a safety hazard to workers, state provisions for securing the safety of the workers throughout the performance of the work. Provide procedures for safe conduct of the work in accordance with EM 385-1-1. Plan shall be approved by Structural PE prior to work beginning.
1.2.2 General Requirements
Do not begin demolition until authorization is received from the Contracting Officer. Remove rubbish and debris from the station daily ; do not allow accumulations inside or outside the building. The work includes demolition, salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections.
1.3 ITEMS TO REMAIN IN PLACE
Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer.
Coordinate the work of this section with all other work indicated.
Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract. Do not overload structural elements. Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.
1.3.1 Existing Construction Limits and Protection
Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove dust, dirt, and debris from work areas daily.
1.3.2 Weather Protection
For portions of the building to remain, protect building interior and materials and equipment from the weather at all times. Where removal of existing roofing is necessary to accomplish work, have materials and workmen ready to provide adequate and temporary covering of exposed areas.
1.3.3 Trees
Protect trees within the project site which might be damaged during demolition or deconstruction, and which are indicated to be left in place, by a 6 foot high fence. Erect and secure fence a minimum of 5 feet from the trunk of individual trees or follow the outer perimeter of branches or clumps of trees. Replace any tree designated to remain that is damaged during the work under this contract with like-kind or as approved by the Contracting Officer.
SECTION 02 41 00 Page 2
1.3.4 Utility Service
Maintain existing utilities indicated to stay in service and protect against damage during demolition and deconstruction operations. Prior to start of work, utilities serving each area of alteration or removal will be shut off by the Government and disconnected and sealed by the Contractor.
1.3.5 Facilities
Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Floors, roofs, walls, columns, pilasters, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, must remain standing without additional bracing, shoring, or lateral support until demolished or deconstructed, unless directed otherwise by the Contracting Officer. Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract.
1.4 BURNING
The use of burning at the project site for the disposal of refuse and debris will not be permitted.
1.5 SUBMITTALS
Government review and approval is required for all submittals. Submit the following in accordance with CONTRACT SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Existing Conditions
SD-07 Certificates
Demolition Plan Notification
1.6 QUALITY ASSURANCE
Submit timely notification of demolition and renovation projects to Federal, State, regional, and local authorities in accordance with 40 CFR 61, Subpart M. Notify the Fort Campbell air pollution control agency and the Contracting Officer in writing 10 working days prior to the commencement of work in accordance with 40 CFR 61, Subpart M. Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSE/SAFE A10.6. Comply with the Environmental Protection Agency requirements specified. Use of explosives will not be permitted.
1.6.1 Dust and Debris Control
Prevent the spread of dust and debris to occupied portions of the building and avoid the creation of a nuisance or hazard in the surrounding area. Do
SECTION 02 41 00 Page 3 not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Sweep pavements as often as necessary to control the spread of debris that may result in foreign object damage potential to aircraft.
1.7 PROTECTION
1.7.1 Traffic Control Signs
a. Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades with flashing lights. Anchor barricades in a manner to prevent displacement by wind. Notify the Contracting Officer prior to beginning such work.
Provide a minimum of 2 aviation red or high intensity white obstruction lights on temporary structures (including cranes) over 100 feet above ground level. Light construction and installation shall comply with FAA AC 70/7460-1. Lights shall be operational during periods of reduced visibility, darkness, and as directed by the Contracting Officer. Maintain the temporary services during the period of construction and remove only after permanent services have been installed and tested and are in operation.
1.7.2 Protection of Personnel
Before, during and after the demolition work continuously evaluate the condition of the structure being demolished and take immediate action to protect all personnel working in and around the project site. No area, section, or component of floors, roofs, walls, columns, pilasters, or other structural element will be allowed to be left standing without sufficient bracing, shoring, or lateral support to prevent collapse or failure while workmen remove debris or perform other work in the immediate area.
1.8 RELOCATIONS
Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Repair or replace items to be relocated which are damaged by the Contractor with new undamaged items as approved by the Contracting Officer.
1.9 EXISTING CONDITIONS
Before beginning any demolition or deconstruction work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the Contracting Officer showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs sized 4 inch will be acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to before starting work. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document. Submit survey results.
SECTION 02 41 00 Page 4
PART 2 PRODUCTS
2.1 FILL MATERIAL
a. Comply with excavating, backfilling, and compacting procedures for soils used as backfill material to fill basements, voids, depressions or excavations resulting from demolition or deconstruction of structures. Fill material shall be waste products from demolition or deconstruction until all waste appropriate for this purpose is consumed.
b. Fill material shall conform to the definition of satisfactory soil material as defined in AASHTO M 145, Soil Classification Groups A-1, A-2-4, A-2-5 and A-3. In addition, fill material shall be free from roots and other organic matter, trash, debris, frozen materials, and stones larger than 2 inches in any dimension.
c. Proposed fill material must be sampled and tested by an approved soil testing laboratory, as follows:
Soil classification AASHTO M 145
Moisture-density relations AASHTO T 180, Method B or D
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
Inspect and evaluate existing structures onsite for reuse. Existing construction scheduled to be removed for reuse shall be disassembled.
Dismantled and removed materials are to be separated, set aside, and prepared as specified, and stored or delivered to a collection point for reuse, remanufacture, recycling, or other disposal, as specified.
Materials shall be designated for reuse onsite whenever possible.
3.1.1 Structures
a. Remove existing structures indicated to be removed to grade.
b. Deconstruct structures in a systematic manner from the top of the structure to the ground. Demolish concrete and masonry walls in small sections.
c. Locate demolition and deconstruction equipment throughout the structure and remove materials so as to not impose excessive loads to supporting walls, floors, or framing.
3.1.2 Utilities and Related Equipment
3.1.2.1 General Requirements
Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by the Contracting Officer. Do not interrupt existing utilities serving facilities occupied and used by the Government except when approved in writing and then only after temporary utility services have been approved and provided. Do not begin demolition or deconstruction work until all utility disconnections have been made.
Shut off and cap utilities for future use, as indicated.
SECTION 02 41 00 Page 5
3.1.3 Chain Link Fencing
Remove chain link fencing, gates and other related salvaged items scheduled for removal and transport to designated areas. Remove gates as whole units. Cut chain link fabric to 25 foot lengths and store in rolls off the ground.
3.1.4 Paving and Slabs
Sawcut concrete and asphaltic concrete paving and slabs including aggregate base as indicated. Provide neat sawcuts at limits of pavement removal as indicated. Pavement and slabs not to be used in this project shall be removed from the Installation at Contractor's expense.
3.1.5 Roofing
Remove existing roof system and associated components in their entirety down to existing roof deck. Remove roofing system and insulation without damaging the roof deck. Sequence work to minimize building exposure between demolition or deconstruction and new roof materials installation.
3.1.5.1 Temporary Roofing
Install temporary roofing and flashing as necessary to maintain a watertight condition throughout the course of the work. Remove temporary work prior to installation of permanent roof system materials unless approved otherwise by the Contracting Officer. Make provisions for worker safety during demolition, deconstruction, and installation of new materials as described in paragraphs entitled "Statements" and "Regulatory and Safety Requirements."
3.1.5.2 Reroofing
When removing the existing roofing system from the roof deck, remove only as much roofing as can be recovered by the end of the work day, unless approved otherwise by the Contracting Officer. Do not attempt to open the roof covering system in threatening weather. Reseal all openings prior to suspension of work the same day.
3.1.6 Masonry
Sawcut and remove masonry so as to prevent damage to surfaces to remain.
3.1.7 Concrete
Saw concrete along straight lines to a depth of a minimum 2 inch. Make each cut in walls perpendicular to the face and in alignment with the cut in the opposite face. Break out the remainder of the concrete provided that the broken area is concealed in the finished work, and the remaining concrete is sound. At locations where the broken face cannot be concealed, grind smooth or saw cut entirely through the concrete.
3.1.8 Patching
Where removals leave holes and damaged surfaces exposed in the finished work, patch and repair these holes and damaged surfaces to match adjacent finished surfaces, using on-site materials when available. Where new work is to be applied to existing surfaces, perform removals and patching in a manner to produce surfaces suitable for receiving new work. Finished
SECTION 02 41 00 Page 6 surfaces of patched area shall be flush with the adjacent existing surface and shall match the existing adjacent surface as closely as possible as to texture and finish. Patching shall be as specified and indicated, and shall include:
a. Concrete and Masonry: Completely fill holes and depressions, left as a result of removals in existing masonry walls to remain, with an approved masonry patching material, applied in accordance with the manufacturer's printed instructions.
3.1.9 Locksets on Swinging Doors
Remove all locksets from all swinging doors indicated to be removed and disposed of. Deliver the locksets and related items to a designated location for receipt by the Contracting Officer after removal.
3.1.10 Items With Unique/Regulated Disposal Requirements
Remove and dispose of items with unique or regulated disposal requirements in the manner dictated by law or in the most environmentally responsible manner.
3.2 DISPOSITION OF MATERIAL
3.2.1 Title to Materials
Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition and deconstruction, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition, deconstruction, and removal procedures, and authorization by the Contracting Officer to begin demolition and deconstruction. The Government will not be responsible for the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.
3.2.2 Reuse of Materials and Equipment
Remove and store materials and equipment in the Demolition Plan to be reused or relocated to prevent damage, and reinstall as the work progresses.
3.2.3 Salvaged Materials and Equipment
Remove materials and equipment that are in the Demolition Plan specified to be removed by the Contractor and that are to remain the property of the Government, and deliver to a storage site, as directed.
a. Store all materials salvaged for the Contractor as approved by the Contracting Officer and remove from Government property before completion of the contract. On site sales of salvaged material is prohibited.
b. Remove salvaged items to remain the property of the Government in a manner to prevent damage, and packed or crated to protect the items from damage while in storage or during shipment. Items damaged during removal or storage must be repaired or replaced to match existing
SECTION 02 41 00 Page 7 items. Properly identify the contents of containers.
c. Remove historical items in a manner to prevent damage. Deliver the following historical items to the Government for disposition: Building plaques wherever located on the site.
3.3 CLEANUP
Remove debris and rubbish from basement and similar excavations. Remove and transport the debris in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.
3.4 DISPOSAL OF REMOVED MATERIALS
3.4.1 Regulation of Removed Materials
Dispose of debris, rubbish, scrap, and other nonsalvageable materials resulting from removal operations with all applicable federal, state and local regulations as contractually specified in the Waste Management Plan.
3.4.2 Burning on Government Property
Burning of materials removed from demolished and deconstructed structures will not be permitted on Government property.
3.4.3 Removal from Government Property
Transport waste materials removed from demolished and deconstructed structures, except waste soil, from Government property for legal disposal. Dispose of waste soil as directed.
3.5 REUSE OF SALVAGED ITEMS
Recondition salvaged materials and equipment designated for reuse before installation. Replace items damaged during removal and salvage operations or restore them as necessary to usable condition.
-- End of Section --
B&N LW 8/14/14
SECTION 02 41 00 Page 8
SECTION 02 83 13.00 20 Page 1
SECTION 02 83 13.00 20
LEAD IN CONSTRUCTION
Removal and disposal of lead-based paint materials shall be conducted in accordance with Ft. Campbell specification section 02 83 13.00 20, Lead in Construction, which shall be included in all projects containing or possibly containing lead-based products.
PART 1 GENERAL
1.1 INTENT
The intention of this specification is to summarize the requirements of the contractor to protect his workers in accordance with the OSHA Lead Construction Standard detailed in 29 CFR 1926.62. This standard is intended to reduce the occupational health hazard of lead exposure and must be applied to all occupational exposures to lead in construction work in any amount. The intent of this specification is also to summarize requirements for segregation and disposal of lead containing waste resulting from the demolition.
The contractor is required by 29 CFR 1926.62 to perform an exposure assessment to determine if any employee may be exposed to lead at or above the action level of 30 ug/m3 as an 8-hour TWA. As per the standard the contractor must perform initial air monitoring or present objective data, demonstrating that under any conditions or activity involving lead at or above the action level does not exist. During initial air monitoring activities, or until a negative exposure assessment has been achieved all employees must wear the appropriate respiratory protection when performing certain listed high exposure trigger tasks as defined by the standard.
This document only summarizes requirements of the OSHA standard for convenience purposes and is not all-inclusive. All requirements of 29 CFR
1926.62 are to be strictly followed along with all other applicable Federal, State and local regulations.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referenced within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI Z9.2 - 1979 Fundamentals Governing the Design and Operation of Local
Exhaust Systems ANSI Z88.2 - 1980 Respiratory Protection
CODE OF FEDERAL REGULATIONS (CFR)
29 CFR 1910.134 - Respiratory Protection 29 CFR 1910.1025 - Lead Standard for General Industry 29 CFR 1910.1200 - Hazard Communication 29 CFR 1926.55 - Gases, Vapors, Fumes, Dusts, and Mists 29 CFR 1926.57 - Ventilation
SECTION 02 83 13.00 20 Page 2
29 CFR 1926.62 - Lead Standard for General Industry 40 CFR 260 - Hazardous Waste Management Systems: General 40 CFR 261 - Identification and Listing of Hazardous Waste 40 CFR 262 - Generators of Hazardous Waste 40 CFR 263 - Transporters of Hazardous Waste 40 CFR 264 - Owners and Operators of Hazardous Waste Treatment, Storage, and
Disposal Facilities 40 CFR 265 - Owners and Operators of Hazardous Waste Treatment, Storage, and
Disposal Facilities 40 CFR 268 - Land Disposal Restrictions 49 CFR 172 - Hazardous Materials Tables and Hazardous Materials Communications
Regulations 49 CFR 178 - Shipping Container Specification
UNDERWRITERS LABORATORIES INC. (UL)
UL 586 - 1990 High-Efficiency, Particulate, Air Filter Units
1.3 DEFINITIONS
1.3.1 Action Level
Employee exposure, without regard to use of respirators, to an airborne concentration of lead of 30 micrograms per cubic meter ( g/m3) of air averaged over an 8-hour period. As used in this section, "30 micrograms per cubic meter of air" refers to the action level.
1.3.2 Area Monitoring
Sampling of lead concentrations within the lead control area and inside the physical boundaries which is representative of the airborne lead concentrations which may reach the breathing zone of personnel potentially exposed to lead.
1.3.3 Physical Boundary
Area physically roped or partitioned off around a lead control area to limit unauthorized entry of personnel. As used in this section, "inside boundary" will mean the same as "inside lead control area."
1.3.4 Certified Industrial Hygienist (CIH)
As used in this section, refers to an Industrial Hygienist employed by the Contractor and is certified by the American Board of Industrial Hygiene in comprehensive practice.
1.3.5 Change Rooms and Shower Facilities
Rooms within the designated physical boundary around the lead control area equipped with separate storage facilities for clean protective work clothing and equipment and for street clothes which prevent cross-contamination.
1.3.6 Decontamination Room
Room for removal of contaminated personal protective equipment (PPE).
SECTION 02 83 13.00 20 Page 3
1.3.7 Eight-Hour Time Weighted Average (TWA)
Airborne concentration of lead averaged over an 8-hour workday to which an employee is exposed.
1.3.8 High Efficiency Particulate Air (HEPA) Filter Equipment
HEPA filtered vacuuming equipment with a UL 586 filter system capable of collecting and retaining lead-contaminated paint dust. A high efficiency particulate filter means 99.97 percent efficient against 0.3 micron size particles.
1.3.9 Lead
Metallic lead, inorganic lead compounds, and organic lead soaps. Excluded from this definition are other organic lead compounds.
1.3.10 Lead Control Area
An area isolated by physical boundaries to prevent unauthorized entry of personnel. It may consist of an enclosed area or structure with full containment to prevent the spread of lead dust, paint chips, or debris of lead-containing paint removal/demolition operations or in those cases, when an enclosed lead control area is not practical, restriction of access into the area may be accomplished by roping off the area or by providing some other form of physical boundary constraint.
1.3.11 Lead Permissible Exposure Limit (PEL)
Fifty micrograms per cubic meter of air as an 8-hour time weighted average as determined by 29 CFR 1910.1025. If an employee is exposed for more than 8 hours in a work day, the PEL shall be determined by the following formula:
PEL (micrograms/cubic meter of air) = 400/No. hrs worked per day
1.3.12 Personal Monitoring
Sampling of lead concentrations within the breathing zone of an employee to determine the 8-hour time weighted average concentration in accordance with 29 CFR 1926.62. Samples shall be representative of the employee's work tasks.
Breathing zone shall be considered an area within a hemisphere, forward of the shoulders, with a radius of 6 to 9 inches and the center at the nose or mouth of an employee.
1.4 QUALITY ASSURANCE
1.4.1 Medical Examinations
Before exposure to lead-contaminated dust, provide workers with a comprehensive medical examination as required by 29 CFR 1926.62 and 29 CFR
1910.1200. The examination will not be required if adequate records show that employees have been examined as required by 29 CFR 1926.62 within the last year.
SECTION 02 83 13.00 20 Page 4
1.4.1.1 Medical Records
Maintain complete and accurate medical records of employees for a period of at least 40 years or for the duration of employment plus 20 years, whichever is longer.
1.4.2 CIH or Their Designated Representative Responsibilities:
a. Certify training.
b. Review and approve lead-containing paint demolition plan for conformance to the applicable referenced standards.
c. Inspect the demolition work for conformance with the approved plan. d. Direct monitoring.
e. Ensure work is performed in strict accordance with specifications at all times.
f. Ensure hazardous exposure to personnel and to the environment are adequately controlled at all times.
1.4.3 Training
Train each employee performing paint demolition, disposal, and air sampling operations prior to the time of initial job assignment, in accordance with 29
CFR 1926.62.
1.4.3.1 Training Certification
Submit certificates signed and dated by the CIH and by each employee stating that the employee has received training.
1.4.4 Respiratory Protection Program
a. Furnish each employee required to wear a negative pressure respirator or other appropriate type with a respirator fit test at the time of initial fitting and at least every 6 months thereafter as required by 29 CFR 1926.62.
b. Establish and implement a respiratory protection program as required by
ANSI Z88.2, 29 CFR 1910.134, 29 CFR 1910.1025, CFR 1926.62, and 29
CFR 1926.55.
1.4.5 Hazard Communication Program
Establish and implement a Hazard Communication Program as required by 29 CFR 1910.1200.
1.4.6 NOT USED
1.4.7 Safety and Health Compliance
In addition to the detailed requirements of this specification, comply with laws, ordinances, rules, and regulations of federal, state, and local authorities regarding removing, handling, storing, transporting, and disposing of lead waste materials. Comply with the applicable requirements of the current issue of 29 CFR 1926.62.
SECTION 02 83 13.00 20 Page 5
1.4.8 Pre-Construction Conference
Along with the CIH, meet with the Contracting Officer to discuss in detail the lead- containing paint demolition work plan, including work procedures and precautions for the work plan.
1.5 SUBMITTALS
Submit the following in accordance with Section C-01300, "Submittals." The testing laboratory qualifications and lead-containing demolition plan shall be approved by the government. All other submittals will be for informational purposes only.
1.5.1 Manufacturer's Catalog Data
a. Vacuum filters
b. Respirators
1.5.2 NOT USED
1.5.3 Statements
a. Qualifications of CIH
b. Exposure assessment documentation
c. Testing laboratory qualifications
d. Lead-containing paint demolition plan
e. Rental equipment notification
f. CIH approval of work plan (signature, date, and certification number)
g. Respiratory protection program
h. Hazard communication program
1.5.3.1 CIH Qualifications
Submit name, address, and telephone number of the CIH selected to perform responsibilities in paragraph entitled "CIH Responsibilities." Provide previous experience of the CIH. Submit proper documentation that the Industrial Hygienist is certified by the American Board of Industrial Hygiene in comprehensive practice, including certification number and date of certification/recertification.
1.5.3.2 Testing Laboratory
The contractor will provide documentation which includes the name, address and telephone number of the laboratories to be providing services. In addition, the documentation will indicate that each laboratory is an EPA National Lead Laboratory accreditation Program (NLLAP) accredited laboratory that each is rated proficient in the NIOSH/ EPA Environmental Lead Proficiency Analytical Testing Program (ELPAT) and will document the date of current accreditation. Certification will include accreditation for heavy metal analyses, list of experience relevant to analyses of lead in air, and a Quality Assurance and Quality Control Program.
SECTION 02 83 13.00 20 Page 6
1.5.3.3 Written Compliance Plan
In accordance with 29 CFR 1926.62 (e)(2)(I), the contractor shall submit a detailed job- specific plan of the work procedures to be used in the demolition of the buildings. The written compliance plan should include but is not limited to:
a. Details of the planned exposure assessment or a discussion of the objective data utilized from a previous project.
b. A description of equipment and materials, controls, crew size, job responsibilities, and operations and maintenance procedures for each activity in which lead is emitted.
c. A description of specific control methods (e.g., abatement process selection, wet methods). For engineering controls, include supporting engineering plans and studies used to select methods.
d. Technology considered in meeting the PEL.
e. Air monitoring data documenting sources of lead emissions.
f. A detailed implementation schedule for the compliance plan, including the schedule for inspections by a competent person.
g. A description of the lead work practice program that will be used to control worker exposures. (This includes the use of protective work clothing and equipment, hygiene facilities and practices, and housekeeping practices.
h. A description of arrangements made among contractors on multi-contractor work sites to inform affected employees (including bystanders) of potential lead exposures, and to clarify responsibilities with regard to control of those exposures.
1.5.4 Air Monitoring
Submit monitoring results to the Contracting Officer within 3 working days, signed by the testing laboratory employee performing the air monitoring, the employee that analyzed the sample, and the CIH.
1.5.5 NOT USED
1.5.6 SD-18, Records
a. Certification of medical examinations
b. Employee Training certification
1.5.7 Within 48 hours prior to beginning lead-based paint (LBP) disturbance (excluding building demolitions), the contractor will submit to the Contracting Officer Representative (COR) and Environmental Division / Compliance Branch written notification which shall include: Such notification shall include the following:
• Building number
• Anticipated start and end dates
SECTION 02 83 13.00 20 Page 7
• Description of surface being disturbed or abated
• Quantity of surface being disturbed or abated including units
(e.g. SF, LF, number of components, etc.)
• Description of approximate location of work (e.g. latrines, NW corner of building, 2nd floor, etc.)
• Type of removal activity (e.g. surface preparation, stripping, etc.)
If needed, a copy of the LBP survey may be obtained at the DPW Environmental Division. Within 48 hours of being received, the COR will in-turn forward a copy of the survey annotation to the Fort Campbell / Directorate of Public Works / Environmental Division / Compliance Branch / TSCA Program Manager, IMSE-CAM-PWE, Building 2182, 13 ½ Street, Fort Campbell, Kentucky 42223- 5130. Within 48 hours after LBP removal, the contractor will provide the CA a written description of the surfaces that were abated and the type of removal action (surface preparation, stripping of paint from the surface, component removal). The CA will forward a copy of the survey annotation to the DPW Environmental Division.
1.6 REMOVAL
1.6.1 Title to Materials
Lead containing materials resulting from demolition work, except those classified as hazardous waste, will become the property of the Contractor and will be disposed in accordance with section 3.5 of this specification.
1.7 EQUIPMENT
The contractor shall furnish the Contracting Officer with one complete set of personal protective equipment daily, as required by the CIH, for entry into and inspection of the demolition work within the lead controlled area.
Required personal protective equipment may include, but is not limited to fitted respirators and whole body covering including appropriate foot, head, and hand protection. PPE shall be provided by the contractor and will remain the property of the contractor.
1.7.1 Respirators
Respirators will comply with the requirements of 29 CFR 1910.134. Furnish appropriate respirators approved by the NIOSH, Department of Health and Human Services, for use in atmospheres containing lead dust.
1.7.2 Special Protective Clothing
Special protective clothing will be worn as per the Lead Protection Plan (sec 1.5.3.3) and in accordance with OSHA 29 CFR 1910 .132. Reduction of levels of protective clothing can only be performed after approval from the
CIH.
1.7.2.1 Furnished Clothing
Protective clothing shall be provided in a clean and dry condition at least weekly, and daily to employees whose exposure levels without regard to use of a respirator are over 200 g/m3 of lead as an 8-hour TWA. The contractor shall provide for the cleaning, laundering, and disposal of protective clothing and
SECTION 02 83 13.00 20 Page 8 equipment as needed.
1.7.2.2 Protective Clothing Handling
The contractor shall assure that contaminated protective clothing which is to be cleaned, laundered, or disposed of, is placed in a closed container in the change area which prevents dispersion of lead outside the container.
The container shall be labeled as follows:
"CAUTION: Clothing contaminated with lead. Do not remove dust by blowing or shaking. Dispose of lead contaminated wash water in accordance with applicable local, state, or federal regulations."
1.7.3 Rental Equipment Notification
If rental equipment is to be used during lead-containing paint handling, removal, or demolition, notify the rental agency in writing concerning the intended use of the equipment. Furnish a copy of the written notification to the Contracting Officer.
1.7.4 Vacuum Filters
UL 586 labeled HEPA filter must be used.
PART 2 NOT USED
PART 3 EXECUTION
3.1 PROTECTION
3.1.1 Notification
Notify the Contracting Officer 20 days prior to the start of any demolition work where elements with lead containing coatings or paint are present.
3.1.2 NOT USED
3.1.3 Protection of Existing Work to Remain
Perform demolition work without damage or contamination of adjacent areas.
Where existing work is damaged or contaminated, restore work to its original condition or better.
3.1.4 Boundary Requirements
Establish a lead control area to prevent the spread of lead dust, paint chips, or debris of lead-containing paint and restrict access to the area. Provide physical boundaries around the lead control area by roping off the area or providing curtains, portable partitions or other enclosures to ensure that airborne concentrations of lead will not reach 30 micrograms per cubic meter of air outside of the lead control area.
3.1.5 NOT USED
3.1.6 NOT USED
SECTION 02 83 13.00 20 Page 9
3.1.7 Change Room and Shower Facilities
Item 3.1.7 will only be required in case of a positive exposure assessment according to Section 3.1.11 of this specification. Provide clean change rooms and shower facilities (if feasible), within the physical boundary around the designated lead control area in accordance with requirements of 29
CFR 1926.62.
3.1.8 Mechanical Ventilation System
Item 3.1.8 will only be required in case of a positive initial determination according to Section 3.1.11 of this specification. If exposure is in excess of the PEL, the following control devices may be implemented:
a. Use adequate ventilation to control personnel exposure to lead in accordance with 29 CFR 1926.57.
b. To the extent feasible, use fixed local exhaust ventilation connected to HEPA filters or other collection systems, approved by the certified industrial hygienist. Local exhaust ventilation systems shall be designed, constructed, installed, and maintained in accordance with ANSI Z9.2.
c. If air from exhaust ventilation is recirculated into the workplace, the system shall have a high efficiency filter with reliable back-up filter and controls to monitor the concentration of lead in the return air and to bypass the recirculation system automatically if it fails. Air may be recirculated only where exhaust to the outside is not feasible.
3.1.9 Personnel Protection
Item 3.1.9 will only be required in case of a positive initial determination according to Section 3.1.11 of this specification. Personnel shall wear and use protective clothing and equipment as specified herein. Eating, smoking, or drinking is not permitted in the lead control area. No one will be permitted in the lead control area unless they have been given appropriate training and protective equipment.
3.1.10 Warning Signs
Item 3.1.10 will only be required in case of a positive initial determination, according to Section 3.1.11 of this specification. Provide warning signs at approaches to lead control areas, if the exposure will be above the PEL.
Locate signs at such a distance that personnel may read the sign and take the necessary precautions before entering the area. Signs shall comply with the requirements of 29 CFR 1926.62.
3.1.11 Exposure Assessment
The contractor shall comply with all provisions of 29 CFR 1926.62 (d). Until the contractor performs an employee exposure assessment, the contractor shall implement appropriate protective measures in accordance with 29 CFR 1926.62.
See Table 1, which lists applicable paragraphs of the standard that must be addressed during the exposure assessment. It also lists requirements for when
SECTION 02 83 13.00 20 Page 10 exposures are above the action level, the permissible exposure level and at any level.
The personal protective clothing and controls shall be used as long as employee exposure is greater than the PEL. The CIH will be responsible for determining the exposure level and appropriate personal protective equipment.
3.1.12 Exposure Assessment Requirements
Until an exposure assessment has been performed, the contractor shall provide the employees with the interim protection outlined in 29 CFR 1926.62.
The personal protective clothing, controls, and hygiene facilities shall be used as long as employee exposure is greater than the PEL.
3.1.13 Additional Exposure Assessment
After the initial exposure assessment, additional assessments shall be conducted whenever there has been a change of equipment, process, control, personnel, or a new task has been initiated.
3.2 WORK PROCEDURES
The contractor shall perform demolition in accordance to the demolition plan (sec 02050), and the written compliance plan (sec 1.5.3.3). Use procedures and equipment required to limit occupational and environmental exposure to lead when lead-containing paint material is removed in accordance with 29 CFR
1926.62. Dispose of paint chips, demolition debris, and associated waste in compliance with federal, state, and local requirements.
3.2.1 Personnel Exiting Procedures
Whenever personnel exit the lead-controlled area, they shall perform the following procedures and shall not leave the work place wearing any clothing or equipment worn during the work day:
a. Vacuum themselves off using the HEPA vacuum.
b. Remove protective clothing in the decontamination room, and place them in an approved container.
c. Shower(if required by CIH).
d. Change to clean clothes prior to leaving the physical boundary designated around the lead-contaminated job site.
3.2.2 Monitoring
Monitoring of airborne concentrations of lead shall be in accordance with 29 CFR 1926.62 and as specified herein. Air monitoring, testing, and reporting shall be performed by a CIH or an Industrial Hygiene (IH) Technician who is under the direction of the CIH.
a. The CIH or the IH Technician under the direction of the CIH shall be on the job site directing the monitoring, and inspecting the work to ensure that the requirements of the Contract have been satisfied during the entire demolition operation.
SECTION 02 83 13.00 20 Page 11
b. Take personal air monitoring samples on employees who are anticipated to have the greatest risk of exposure as determined by the CIH. In addition, take air monitoring samples on at least 25 percent of the work crew or a minimum of two employees, whichever is greater, during each work shift.
c. Submit results of air monitoring samples, signed by the CIH, within 72 hours after the air samples are taken. Notify the Contracting Officer within 2 hours of exposure to lead at or in excess of the action level of 30 micrograms per cubic meter of air outside of the lead control area. Contractor must notify each employee in writing of the results which represent the employees exposure as per 29 CFR 1926.62.
3.2.2.1 Monitoring During Paint Disturbance
Perform personal and area monitoring during demolition activities as required by 29 CFR 1926.62. Sufficient area monitoring shall be conducted at the physical boundary to ensure unprotected personnel are not exposed above 30 micrograms per cubic meter of air at all times. If the outside boundary lead levels are at or exceed 30 micrograms per cubic meter of air, work shall be stopped and the CIH shall immediately correct the condition(s) causing the increased levels and notify the Contracting Officer immediately. The CIH shall review the sampling data collected on that day to determine if condition(s) requires any further change in work methods. Work shall resume when approval is given by the CIH. The Contractor shall control the lead level outside of the work boundary to less than 30 micrograms per cubic meter of air at all times. At least one sample on each shift shall be taken on the downwind side of the lead control area. If adjacent areas are contaminated, clean and visually inspect contaminated areas. The CIH shall certify that the area has been cleaned of lead contamination.
3.3 NOT USED
3.4 NOT USED
3.5 CLEANUP AND DISPOSAL
3.5.1 Cleanup
Maintain surfaces of the lead control area free of accumulations of paint chips and dust. Restrict the spread of dust and debris; keep waste from being distributed over the work area. Do not dry sweep or use compressed air to clean up the area.
3.5.2 Certification
The CIH shall certify the following in writing: air monitoring results are less than 30 micrograms per cubic meter inside and outside the lead control area, the respiratory protection for the employees was adequate, the work procedures were performed in accordance with 29 CFR 1926.62, and that there were no visible accumulations of lead- contaminated paint and dust at the worksite. Do not remove the lead control area or roped-off boundary and warning signs prior to the Contracting Officer's receipt of the CIH's certification. Reclean areas showing dust or residual paint chips.
SECTION 02 83 13.00 20 Page 12
3.5.3 Testing of Lead-Containing Paint Debris
Waste Products shall be separated into the following categories:
a. Old woodwork, walls, roofing, plaster, windows, doors, concrete block debris, (all the debris associated with the demolition of the building).
b. Rags, sponges, mops, HEPA filters, air monitoring cartridges, scrapers, and other materials used for testing, and cleanup
c. Disposable work clothes and respirator filters
The waste produced by demolition (only aforementioned point a) has been determined to be non hazardous waste; therefore, testing is not required and may be disposed at the Woodlawn Landfill. The Contractor must evaluate, in accordance with 40 CFR 261 for hazardous waste, the waste described on points
b. and c. to determine if they are hazardous. For initial pricing purposes, it will be assumed that the items described in b. and c. above are non-hazardous, lead containing waste. If the Toxic Characteristic Leaching Procedure (TCLP) as required by 40 CFR 261 reveals that any items in b. or c.
above as hazardous, an appropriate price adjustment will be negotiated in accordance with the Changes Clause.
Prior to initiation of the work and subsequent to final demolition and cleanup of the work site, soil testing will be performed to determine if the demolition project has contaminated the surface soils with lead. Remediation of contaminated soil resulting from the demolition is the sole responsibility of the contractor.
3.5.4 Disposal of Lead Contaminated Hazardous Waste
a. Collect lead-contaminated hazardous waste, scrap, debris, bags, containers, equipment, and lead-contaminated clothing which may produce airborne concentrations of lead particles. Label the containers in accordance with 49 CFR 172. Dispose of lead-contaminated waste material at an EPA permitted hazardous waste treatment, storage, or disposal facility off Government property after first coordinating with and having HW manifest signed by P2 Branch.
b. Store waste materials in U.S. Department of Transportation (49 CFR
178) approved 55-gallon drums. Properly label each drum to identify the type of waste (49 CFR 172) and the date the drum was filled. The Contracting Officer or an authorized representative will assign an area for interim storage of waste-containing drums.
Do not store hazardous waste drums in interim storage longer than 90 calendar days from the date affixed to each drum.
c. Handle, store, transport, and dispose lead or lead-contaminated waste in accordance with 40 CFR 260, 40 CFR 261, 40 CFR 262, 40 CFR 263, 40 CFR 264, and 40 CFR 265. Comply with land disposal restriction notification requirements as required by 40 CFR 268.
SECTION 02 83 13.00 20 Page 13
3.5.4.1 Disposal Documentation
Submit written evidence that the hazardous waste treatment, storage, or disposal facility (TSD) is approved for lead disposal by the EPA and state or local regulatory agencies. Submit one copy of the completed manifest, signed and dated by the initial transporter in accordance with 40 CFR 262. Manifest must be signed by the HW manager as well as transporter before leaving the installation.
3.5.5 Disposal of Lead Contaminated Non-Hazardous Waste
Any portion of the segregated waste products which does not test as hazardous by the testing requirements stated above, may be disposed at the Woodlawn Landfill.
3.5.6 Payment for Hazardous Waste Disposal
Payment for disposal of hazardous waste will not be made until a signed copy of the manifest from the treatment or disposal facility certifying the amount of lead-containing materials delivered is returned and a copy is furnished to the Government.
Table 1: Lead Contamination Levels
Table 1
------ END OF SECTION ----
SECTION 03 30 53
MISCELLANEOUS CAST-IN-PLACE CONCRETE
05/14
PART 1 GENERAL
1.1 SUMMARY
Perform all work in accordance withACI 318.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .