Amd_0007_to_W91248-17-R-0001.pdf

PDF 21 KB Posted

Attached to
Mutiple Award Indefinite Delivery Indefinite Quantity (MAIDIQ) CONTRACTS
Solicitation number
W91248-17-R-0001
Issued by

About this file

Amd 0007

View the file

Other files

File Type Posted
Atch_006_-_Questions-Answers_R3.pdf PDF
Amd_0009_to_W91248-17-R-0001_(8_Dec_2017).pdf PDF
Conformed_W91248-17-R-0001_(8_Dec_2017).pdf PDF
Site_Visit.xlsx XLSX spreadsheet
KY170102.pdf PDF
Conformed_(Amd_0008_to_W91248-17-R-0001).pdf PDF
TN170098.pdf PDF
Amd_0008_to_W91248-17-R-0001.pdf PDF
Bldg._00039_LBPInspection_28_May_15.pdf PDF
Atch_006_-_Questions-Answers_R2.pdf PDF
DSCN1223.JPG JPG image
DSCN1224.JPG JPG image
DSCN1222.JPG JPG image
Conformed_(Amd_0007_to_W91248-17-R-0001).pdf PDF
RUBEROID_GAFGLAS_Roofing_Details_Manual-red.pdf PDF
Atch_006_-_Questions-Answers.pdf PDF
Amd_0006_to_W91248-17-R-0001.pdf PDF
39-OMA_Asbestos_Report-2015.pdf PDF
Conformed_(Amd_0006_to_W91248-17-R-0001).pdf PDF
Roof_Color_Chart.pdf PDF
Exhibit_B3.pdf PDF
Roof_System_data.pdf PDF
As-built_Drawing.pdf PDF
Amd_0004_to_W91248-17-R-0001.pdf PDF
Conformed_W91248-17-R-0001_(Amd_0003).pdf PDF
Conformed_copy.pdf PDF
Amendment_0002.pdf PDF
Atch_006_-_Questions-Answers.pdf PDF
Atch_005_-_Questions-Answers.pdf PDF
Amendment_0001.pdf PDF
Exhibit_C001_-_C007.pdf PDF
Exhibit_B007.pdf PDF
Exhibit_B004.pdf PDF
Solicitation.pdf PDF
Atch_004.xlsx XLSX spreadsheet
Exhibit_B001.docx DOCX document
Atch_003.pdf PDF
Exhibit_A001_-_A012.docx DOCX document
Atch_005.docx DOCX document
Atch_002.pdf PDF
Exhibit_B006.pdf PDF
Exhibit_B005.pdf PDF
Exhibit_B003_Specifications.pdf PDF
Exhibit_D001_-_D007.pdf PDF
Exhibit_B002_Drawings.pdf PDF
Atch_001.pdf PDF
Exhibit_B002_Drawings.pdf PDF
Exhibit_B001.docx DOCX document
Atch_002.pdf PDF
W91248-17-R-0001.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Referenced Amendment is to answ er questions and provide more manuals.

Closing date remains 11 December 2017 12:00 (noon).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Nov-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91248-17-R-0001

X 9B. DATED (SEE ITEM 11)

10-Aug-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Nov-2017

CODE

MICC - FORT CAMPBELL

BLDG 6923 38TH AND DESERT STORM

FORT CAMPBELL KY 42223

W91248 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91248-17-R-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

DOCUMENT LIST

EXHIBITS AND ATTACHMENTS

EXHIBITS Description

A CONTRACT DATA REQUIREMENTS LIST (CDRL)

1. CDRL -0001 - Proposals

2. CDRL -0002 - Site Safety & Health Plan

3. CDRL -0003 - Quality Control Plan

4. CDRL -0004 - Pre-Work Conference

5. CDRL -0005 - Work Schedule

6. CDRL -0006 - System/Equipment Testing

7. CDRL -0007 – Operation & Maintenance Manuals

8. CDRL -0008 – Training Program

9. CDRL -0009 – Equipment & Construction Warranties

10. CDRL -0010 – As-Built Final Drawings

11. CDRL -0011- Weekly Progress Reports

B Task Order Project- Renovate Bldg 39

1. Statement of Work

2. Drawing (Bldg 39)

3. Technical Design Guide

4. Submittal Register

5. Section 01580 – Project Construction Sign

6. FTCKY Hazmat Inventory Form

7. Waste Management Report

C Wage Determination – Kentucky: (The latest Wage Determinations are hereby incorporated).

1. Wage Determination – KY170001 - Heavy Dredging

2. Wage Determination – KY170145 – Heavy – Christian County

3. Wage Determination – KY170168 – Building – Christian County

4. Wage Determination – KY170102 - Highway

5. Wage Determination – KY170013 – Residential

6. Wage Determination – KY170176 – Building – Trigg County

7. Wage Determination – KY170157 – Heavy – Trigg County

D Wage Determination – Tennessee: (The latest Wage Determinations are hereby incorporated).

1. Wage Determination – TN170001 – Heavy Flood Control

2. Wage Determination – TN170105 – Building Stewart County

3. Wage Determination – TN170098 – Building Montgomery County

4. Wage Determination – TN170030 - Residential

5. Wage Determination – TN170136 – Heavy - Stewart County

6. Wage Determination – TN170148 - Highway

7. Wage Determination – TN170133 – Heavy – Montgomery County

W91248-17-R-0001

ATTACHMENTS

1. Reserved

2. Specific Relevant Contracts Sheets

3. Past Performance Questionnairre

4. IDIQ Pricing Schedule

5. Task Order Pricing Schedule

6. Questions and Answers (Update 27 Nov 2017)

(End of Summary of Changes)

File details come from the government source that posted it.