B08 W9123822R0006 Attachment 11 Price Schedule - 20220527.pdf

PDF 77 KB Posted

Attached to
USACE SPK DB Construction - Building 1286 Steam Plant Upgrades at Hill AFB, UT
Solicitation number
W9123822R0006
Issued by

About this file

This document contains a price schedule and description for a federal contract opportunity for building renovation services at Hill Air Force Base in Utah. The U.S. Army Corps of Engineers Sacramento District is seeking design-build construction services to upgrade three existing boilers and supporting equipment at Building 1286. The project scope involves replacing the boilers with new dual-fuel boilers, removing underground fuel storage tanks and replacing them with aboveground tanks, seismic retrofitting, and upgrading supporting equipment. Pricing is provided for design and construction services, fuel removal and disposal, and optional line items for roof and lighting replacement. The estimated value of the construction is between $10-25 million. Interested vendors are responsible for self-identifying on SAM.gov. The sole point of contact is USACE-SPK.

View the file

Other files

File Type Posted
B08 W9123822R0006 Attachment 01 - HAFB B1286 Specifications Volume 1 - 20220726.pdf PDF
B08 W9123822R0006-0007 HAFB B1286 Steam Plant - 20220727.pdf PDF
B08 W9123822R00060006 Attachment 02 HAFB B1286 Specifications Volume 2 Appendices - 20220719.pdf PDF
B08 W9123822R00060006 Attachment 01 HAFB B1286 Specifications Volume 1 - 20220719.pdf PDF
B08 W9123822R0006-0006 - 20220721.pdf PDF
B08 W9123822R0006-0005 - 20220715.pdf PDF
B08 W9123822R0006-0004 - 20220714.pdf PDF
B08 W9123822R0006 Attachment 13 Appendix K_Hill AFB-Rpair Boilers-Final Feasability Report.pdf PDF
B08 W9123822R0006 Amendment 0003 BLDG1286 Steam Plant Upgrades.pdf PDF
B08 W9123822R0006 Attachment 06 Past Performance Questionaire 20220122.pdf PDF
B08 W9123822R0006 Attachment 05 Pre Award Survey Dated 20 January 2022.pdf PDF
B07 W9123822R0006 Site Visit Sign In Sheet.pdf PDF
B08 W9123822R0006 Attachment 06 Pre-Award Survey - 20220122.pdf PDF
B08 W9123822R0006 Attachment 4 Contractors Project Experience Dated 28 January 2022.pdf PDF
B08 W9123822R0006 Attachment 08 B1286 KRSM Drawings Part 2 pages 26-50 - 19840816.pdf PDF
B08 - W9123822R00060002 - 20220527.pdf PDF
B08 W9123822R0006 Attachment 12 Site Visit Map.pdf PDF
B08 W9123822R0006 Attachment 02 HAFB B1286 Steam Plant Specifications Vol 1 - 20220318.pdf PDF
B08 W9123822R0006 Attachment 05 Pre-Award Survey Dated 20 January 2022.pdf PDF
B08 W9123822R0006 Attachment 07 CWRR UT20220083 - 20220401.pdf PDF
B08 W9123822R0006 Attachment 03 HAFB B1286 Steam Plant Specifications Vol 2 - 20220318.pdf PDF
B08 W9123822R0006 Attachment 01 HAFB B1286 Steam Plant Plans - 20220318.pdf PDF
B08 W9123822R0006 Attachment 09 B1286 KRSM Drawings pages 51 - 102 - 19660203.pdf PDF
B08 W9123822R0006 Attachment 10 B1286 Existing UST Drawings - 19921101.pdf PDF
B08 W9123822R0006 Attachment 08 B1286 KRSM Drawings Part 1 pages 1 - 25 - 19840816.pdf PDF
B08 W9123822R0006 Attachment 5 HAFB B1286 Concept Drawing Set.pdf PDF
B08 W9123822R0006-0001 B1286 Steam Plant - 20220328.pdf PDF
B08 W9123822R0006 Attachment 6 Pre-Award Survey Dated 20 January 2022.pdf PDF
B08 W9123822R0006 Attachment 4 Contractors Project Experience Dated 28 January 2022.pdf PDF
B08 - W9123822R0006 HAFB B1286 Steam Plant Upgrades - 20220302.pdf PDF
B08 W9123822R0006 Attachment 1 Summary of Work dated 21 November 2021.pdf PDF
B08 W9213822R0006 Attachement 2 CWRR UT 20220083 02252022.pdf PDF
B08 W9123822R0006 Attachment 3 Past Performance Questionnaire Dated 28 January 2022.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9123822R0006 Price Schedule Page 1 of 1

W9123822R0006

Building 1286 (B1286) Steam Plant Renovation Hill Air Force Base (HAFB), Utah (UT)

Price Schedule

Contract Line Item Number (CLIN) 0001: Building 1286 Design-Build Construction Services

PRICING

ELEMENT

DESCRIPTION QTY

UNIT OF

MEASURE

UNIT PRICE TOTAL PRICE

01 Design and Construction 1 Job

Special Construction and Selective Building Demolition

1 Job

03 Site Preparation 1 Job

04 Site Improvements 1 Job

Site Civil and Mechanical Utilities

1 Job

CLIN 0001 TOTAL COST

CLIN 0002: Fuel Removal, Delivery, and Waste Disposal

ELEMENT

DESCRIPTION QTY

UNIT OF

MEASURE

UNIT PRICE TOTAL PRICE

Fuel Removal, Delivery and Waste Disposal

42,000 Gallons

CLIN 0002 TOTAL COST

Optional CLINs

ELEMENT

DESCRIPTION QTY

UNIT OF

MEASURE

UNIT PRICE TOTAL PRICE

1001 Roof Replacement 1 Job

1002 Lighting Replacement 1 Job

OPTION CLIN TOTAL COST

TOTAL PROPOSED COST (including all options)

File details come from the government source that posted it. Updated .