B08 W9123822R0006 Attachment 09 B1286 KRSM Drawings pages 51 - 102 - 19660203.pdf

PDF 42 MB Posted

Attached to
USACE SPK DB Construction - Building 1286 Steam Plant Upgrades at Hill AFB, UT
Solicitation number
W9123822R0006
Issued by

About this file

This solicitation is for design-build construction services to upgrade the Steam Plant at Building 1286 on Hill Air Force Base in Utah. The U.S. Army Corps of Engineers Sacramento District seeks to replace three existing boilers with new dual-fuel boilers meeting BACT requirements, install an emergency boiler for redundancy, upgrade supporting equipment, and complete seismic retrofitting. The existing underground fuel oil storage tanks will be replaced with aboveground tanks sized for seven-day peak heating season storage. Contractors shall develop designs and complete construction for the new boilers and related facility upgrades within the specified buildable area boundary. The estimated value of construction is between $10-25 million. Interested vendors should monitor SAM.gov for updates and self-identify as interested on the site, as the Corps will not review capabilities statements or coordinate partnering arrangements.

View the file

Other files

File Type Posted
B08 W9123822R0006 Attachment 01 - HAFB B1286 Specifications Volume 1 - 20220726.pdf PDF
B08 W9123822R0006-0007 HAFB B1286 Steam Plant - 20220727.pdf PDF
B08 W9123822R00060006 Attachment 02 HAFB B1286 Specifications Volume 2 Appendices - 20220719.pdf PDF
B08 W9123822R00060006 Attachment 01 HAFB B1286 Specifications Volume 1 - 20220719.pdf PDF
B08 W9123822R0006-0006 - 20220721.pdf PDF
B08 W9123822R0006-0005 - 20220715.pdf PDF
B08 W9123822R0006-0004 - 20220714.pdf PDF
B08 W9123822R0006 Attachment 13 Appendix K_Hill AFB-Rpair Boilers-Final Feasability Report.pdf PDF
B08 W9123822R0006 Amendment 0003 BLDG1286 Steam Plant Upgrades.pdf PDF
B08 W9123822R0006 Attachment 06 Past Performance Questionaire 20220122.pdf PDF
B08 W9123822R0006 Attachment 05 Pre Award Survey Dated 20 January 2022.pdf PDF
B07 W9123822R0006 Site Visit Sign In Sheet.pdf PDF
B08 W9123822R0006 Attachment 06 Pre-Award Survey - 20220122.pdf PDF
B08 W9123822R0006 Attachment 4 Contractors Project Experience Dated 28 January 2022.pdf PDF
B08 W9123822R0006 Attachment 08 B1286 KRSM Drawings Part 2 pages 26-50 - 19840816.pdf PDF
B08 W9123822R0006 Attachment 11 Price Schedule - 20220527.pdf PDF
B08 - W9123822R00060002 - 20220527.pdf PDF
B08 W9123822R0006 Attachment 12 Site Visit Map.pdf PDF
B08 W9123822R0006 Attachment 02 HAFB B1286 Steam Plant Specifications Vol 1 - 20220318.pdf PDF
B08 W9123822R0006 Attachment 05 Pre-Award Survey Dated 20 January 2022.pdf PDF
B08 W9123822R0006 Attachment 07 CWRR UT20220083 - 20220401.pdf PDF
B08 W9123822R0006 Attachment 03 HAFB B1286 Steam Plant Specifications Vol 2 - 20220318.pdf PDF
B08 W9123822R0006 Attachment 01 HAFB B1286 Steam Plant Plans - 20220318.pdf PDF
B08 W9123822R0006 Attachment 10 B1286 Existing UST Drawings - 19921101.pdf PDF
B08 W9123822R0006 Attachment 08 B1286 KRSM Drawings Part 1 pages 1 - 25 - 19840816.pdf PDF
B08 W9123822R0006 Attachment 5 HAFB B1286 Concept Drawing Set.pdf PDF
B08 W9123822R0006-0001 B1286 Steam Plant - 20220328.pdf PDF
B08 W9123822R0006 Attachment 6 Pre-Award Survey Dated 20 January 2022.pdf PDF
B08 W9123822R0006 Attachment 4 Contractors Project Experience Dated 28 January 2022.pdf PDF
B08 - W9123822R0006 HAFB B1286 Steam Plant Upgrades - 20220302.pdf PDF
B08 W9123822R0006 Attachment 1 Summary of Work dated 21 November 2021.pdf PDF
B08 W9213822R0006 Attachement 2 CWRR UT 20220083 02252022.pdf PDF
B08 W9123822R0006 Attachment 3 Past Performance Questionnaire Dated 28 January 2022.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9123822R0006 B1286 KRSM Drawings 51

W9123822R0006 B1286 KRSM Drawings 52
W9123822R0006 B1286 KRSM Drawings 53
W9123822R0006 B1286 KRSM Drawings 54
W9123822R0006 B1286 KRSM Drawings 55
W9123822R0006 B1286 KRSM Drawings 56
W9123822R0006 B1286 KRSM Drawings 57
W9123822R0006 B1286 KRSM Drawings 58
W9123822R0006 B1286 KRSM Drawings 59
W9123822R0006 B1286 KRSM Drawings 60
W9123822R0006 B1286 KRSM Drawings 61
W9123822R0006 B1286 KRSM Drawings 62
W9123822R0006 B1286 KRSM Drawings 63
W9123822R0006 B1286 KRSM Drawings 64
W9123822R0006 B1286 KRSM Drawings 65
W9123822R0006 B1286 KRSM Drawings 66
W9123822R0006 B1286 KRSM Drawings 67
W9123822R0006 B1286 KRSM Drawings 68
W9123822R0006 B1286 KRSM Drawings 69
W9123822R0006 B1286 KRSM Drawings 70
W9123822R0006 B1286 KRSM Drawings 71
W9123822R0006 B1286 KRSM Drawings 72
W9123822R0006 B1286 KRSM Drawings 73
W9123822R0006 B1286 KRSM Drawings 74
W9123822R0006 B1286 KRSM Drawings 75
W9123822R0006 B1286 KRSM Drawings 76
W9123822R0006 B1286 KRSM Drawings 77
W9123822R0006 B1286 KRSM Drawings 78
W9123822R0006 B1286 KRSM Drawings 79
W9123822R0006 B1286 KRSM Drawings 80
W9123822R0006 B1286 KRSM Drawings 81
W9123822R0006 B1286 KRSM Drawings 82
W9123822R0006 B1286 KRSM Drawings 83
W9123822R0006 B1286 KRSM Drawings 84
W9123822R0006 B1286 KRSM Drawings 85
W9123822R0006 B1286 KRSM Drawings 86
W9123822R0006 B1286 KRSM Drawings 87
W9123822R0006 B1286 KRSM Drawings 88
W9123822R0006 B1286 KRSM Drawings 89
W9123822R0006 B1286 KRSM Drawings 90
W9123822R0006 B1286 KRSM Drawings 91
W9123822R0006 B1286 KRSM Drawings 92
W9123822R0006 B1286 KRSM Drawings 93
W9123822R0006 B1286 KRSM Drawings 94
W9123822R0006 B1286 KRSM Drawings 95
W9123822R0006 B1286 KRSM Drawings 96
W9123822R0006 B1286 KRSM Drawings 97
W9123822R0006 B1286 KRSM Drawings 98
W9123822R0006 B1286 KRSM Drawings 99
W9123822R0006 B1286 KRSM Drawings 100
W9123822R0006 B1286 KRSM Drawings 101
W9123822R0006 B1286 KRSM Drawings 102

File details come from the government source that posted it. Updated .