American River Common Features (ARCF) Spec No. 2079 Natomas Basin - Reach I Contract 1
1.1.14 Sump 58 - Remove Existing Pipelines
1.1.14.1 Measurement and Payment
Measurement and payment for all costs associated with the removal and demolition of the existing discharge pipelines shall be made at the Contract JOB price for item "SUMP 58 - REMOVE EXISTING PIPELINES"; which payment shall constitute full compensation for all the Work involved in demolishing the existing discharge pipelines, including excavation, as shown or specified in the Contract documents and directed by the Contracting Officer.
1.1.14.2 Unit of Measure
Unit of measure: job.
1.1.15 Sump 58 - Landside Vault with Siphon Breaker
1.1.15.1 Measurement and Payment
Measurement and payment for all costs associated with the construction of the landside vault with siphon breaker shall be made at the Contract JOB price for item "SUMP 58 - LANDSIDE VAULT WITH SIPHON BREAKER"; which payment shall constitute full compensation for all the Work involved in the construction of the landside vault with siphon breaker as shown or specified in the Contract documents and directed by the Contracting Officer.
1.1.15.2 Unit of Measure
Unit of measure: job.
1.1.15 Sump 58 - Waterside Vault with Positive Closure and Siphon Breaker
1.1.15.1 Measurement and Payment
Measurement and payment for all costs associated with the construction of the waterside vault with positive closure and siphon breaker shall be made at the Contract JOB price for item "SUMP 58 - WATERSIDE VAULT WITH POSITIVE CLOSURE AND SIPHON BREAKER"; which payment shall constitute full compensation for all the Work involved in the construction of the waterside vault with positive closure and siphon breaker as shown or specified in the Contract documents and directed by the Contracting Officer.
1.1.15.2 Unit of Measure
Unit of measure: job.
1.1.16 Striping
1.1.16.1 Payment
Payment will be made for all costs associated with striping as defined in Section 32 17 24 Pavement Markings, shown in the plans, and as directed by the Contracting Officer at the contract lump sum price for item "STRIPING";
which payment shall constitute full compensation for all work involved in striping to include materials, equipment and labor.
SECTION 01 22 00.00 10 Page 9