A07.02-AMD_01_SF30_Block_14_Continuation.pdf

PDF 43 KB Posted

Attached to
Natomas Basin Reach I Contract I Improvement Project
Solicitation number
W91238-16-R-0049
Issued by

About this file

Amendment No. 01 - Description of Amendment Continuation

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Natomas Basin Reach I Contract 1

W91238-16-R-0049 Amendment 01

SF-30 Block 14 Continuation

G. Section 00 22 00 - Supplementary Instructions: Paragraph 5.3.1.3.a: REPLACE “The submission is limited to twenty (20) 8-1/2” x 11” or 11” x 17” double-sided pages…” WITH “The submission is limited to ten (10) 8-1/2” x 11” or 11” x 17” double-sided pages…”

H. Section 00 22 00 - Supplementary Instructions: Paragraph 5.3.2.2.a.iii: REPLACE “The narrative submission for brief introduction narrative and management plan is limited to twenty-five (25) 8-1/2” x 11” double-sided pages” WITH “The narrative submission for brief introduction narrative and management plan is limited to ten (10) 8-1/2” x 11” double-sided pages.”

I. Section 00 22 00 - Supplementary Instructions: Paragraph 5.3.3.3.G.a Additional Past Performance Information Requirements: REPLACE “This submission is limited to twenty (20) 8-1/2”x11” double-sided pages” WITH “This submission is limited to ten (10) 8-1/2”x11” double sided pages.”

J. Section 00 22 00 - Supplementary Instructions: Paragraph 2.5: the following is added to the list of evaluation factors: “(4) Factor 4: Small Business Participation.”

K. Section 00 22 00 - Supplementary Instructions: Paragraph 2.6: the following is added: “Factor 4 – Small Business Participation is weighted less than Factor 3.”

L. Section 00 22 00 - Supplementary Instructions: Paragraph 5.3.a: Strikethrough ‘s’ in “terms” and REPLACE “are” WITH “is.” The second sentence should read: “For purposes of this procurement, the term “key subcontractors” is used…”

M. Section 00 22 00 - Supplementary Instructions: Paragraph 5.3.1.4. – Evaluation Criteria, has been alphabetically reformatted to begin the list with “a.”

N. Section 00 22 00 - Supplementary Instructions: Paragraphs 2.7.i, and 5.3.3 have been revised to incorporate the three aspects of past performance evaluation in accordance with the new DOD Source Selection Procedures dated 1 April 2016.

O. Section 00 22 00 - Supplementary Instructions: Paragraph 5.3.4: Title: REPLACE “Socio-Economic Consideration” WITH “Small Business Participation.”

P. See Summary of Changes

----------------------------------------------------END OF AMENDMENT---------------------------------------------------------

File details come from the government source that posted it. Updated .