A07.02-16R0049_AMD_03.pdf

PDF 49 KB Posted

Attached to
Natomas Basin Reach I Contract I Improvement Project
Solicitation number
W91238-16-R-0049
Issued by

About this file

Amendment No. 03

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to clarify that in Section 01 33 00, paragraph 1.1: Government has 30 days to review any Government approved submittals, except for the cutoff w all mix design submittals, w hich w ill be review ed w ithin 10 business days.

See summary of changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Nov-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91238-16-R-0049

X 9B. DATED (SEE ITEM 11)

28-Sep-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Nov-2016

CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91238-16-R-0049

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CLIN 0001 Exhibit(s) 1

Attachment 01 List of Drawings 6

Attachment 02 Supplementary Condition

Requirements for Reach 1

Contract 1

Attachment 03 Specifications 485

Attachment 04 Natomas Basin Reach I

Contract 1 Design Plans

142 02-SEP-2016

Attachment 05 Page 5 from Section 00

73 05

1 17-OCT-2016

Attachment 06 Page 2 from Section 01

11 00

1 17-OCT-2016

Attachment 07 Page 7 from Section 01

22 00.00 10

1 17-OCT-2016

Attachment 08 Page 9 from Section 01

22 00.00 10

1 17-OCT-2016

Attachment 09 Page 11 from 01 22 00.00

1 17-OCT-2016

Attachment 10 Revised Sheet Reference

Number C-304 Sheet 54 of 136

1 10-OCT-2016

Attachment 11 Fehr & Peers Traffic

Analysis

464 18-JUL-2016

Attachment 12 Geotechnical Data Report 883 30-JUL-2011

Attachment 13 AMD 01 SF30 Block 14

Continuation

1 19-OCT-2016

Attachment 14 Section 33 11 00

Paragraph 2.4.1.1.a

1 15-NOV-2016

Attachment 15 Section 31 56 13 37 15-NOV-2016

Attachment 16 Section 31 00 00

Paragraph 2.2.2

1 15-NOV-2016

Attachment 17 Section 02 32 13.13

Paragraph 3.3.3

1 15-NOV-2016

Attachment 18 Section 01 57 20

Paragraph 3.4.4

1 15-NOV-2016

Attachment 19 Section 01 57 20

Paragraph 1.9

1 15-NOV-2016

Attachment 20 Section 01 45 04

Paragraph 3.6.4

1 15-NOV-2016

Attachment 21 Section 01 33 00

Paragraph 1.1

1 15-NOV-2016

Attachment 22 Section 01 22 00.00 10 24 15-NOV-2016

Attachment 23 Section 01 11 00 1 15-NOV-2016

Paragraph 1.1.1

Attachment 24 Section 00 73 05 20 15-NOV-2016

Attachment 25 Natomas Basin Reach I

Contract 1 Amended

Plans

18 01-SEP-2016

Attachment 27 AMD 02 SF30 Block 14

Continuation

3 16-NOV-2016

Attachment 28 Davis Bacon Wage

Determination

45 11-NOV-2016

Attachment 29 Section 00 73 05

Paragraph 1.3.44

1 16-NOV-2016

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CLIN 0001 Exhibit(s) 1

Attachment 01 List of Drawings 6

Attachment 02 Supplementary Condition

Requirements for Reach 1

Contract 1

Attachment 03 Specifications 485

Attachment 04 Natomas Basin Reach I

Contract 1 Design Plans

142 02-SEP-2016

Attachment 05 Page 5 from Section 00

73 05

1 17-OCT-2016

Attachment 06 Page 2 from Section 01

11 00

1 17-OCT-2016

Attachment 07 Page 7 from Section 01

22 00.00 10

1 17-OCT-2016

Attachment 08 Page 9 from Section 01

22 00.00 10

1 17-OCT-2016

Attachment 09 Page 11 from 01 22 00.00

1 17-OCT-2016

Attachment 10 Revised Sheet Reference

Number C-304 Sheet 54 of 136

1 10-OCT-2016

Attachment 11 Fehr & Peers Traffic

Analysis

464 18-JUL-2016

Attachment 12 Geotechnical Data Report 883 30-JUL-2011

Attachment 13 AMD 01 SF30 Block 14

Continuation

1 19-OCT-2016

Attachment 14 Section 33 11 00

Paragraph 2.4.1.1.a

1 15-NOV-2016

Attachment 15 Section 31 56 13 37 15-NOV-2016

Attachment 16 Section 31 00 00

Paragraph 2.2.2

1 15-NOV-2016

Attachment 17 Section 02 32 13.13

Paragraph 3.3.3

1 15-NOV-2016

Attachment 18 Section 01 57 20

Paragraph 3.4.4

1 15-NOV-2016

Attachment 19 Section 01 57 20

Paragraph 1.9

1 15-NOV-2016

Attachment 20 Section 01 45 04

Paragraph 3.6.4

1 15-NOV-2016

Attachment 21 Section 01 33 00

Paragraph 1.1

1 15-NOV-2016

Attachment 22 Section 01 22 00.00 10 24 15-NOV-2016

Attachment 23 Section 01 11 00

Paragraph 1.1.1

1 15-NOV-2016

Attachment 24 Section 00 73 05 20 15-NOV-2016

Attachment 25 Natomas Basin Reach I

Contract 1 Amended

Plans

18 01-SEP-2016

Attachment 27 AMD 02 SF30 Block 14

Continuation

3 16-NOV-2016

Attachment 28 Davis Bacon Wage

Determination

45 11-NOV-2016

Attachment 29 Section 00 73 05

Paragraph 1.3.44

1 16-NOV-2016

Attachment 30 Revised Section 01 33 00

Paragraph 1.1

1 18-NOV-2016

(End of Summary of Changes)

ARCF Natomas Reach I Contract 1 1793

SECTION 01 33 00

SUBMITTAL PROCEDURES

05/11

PART 1 GENERAL

1.1 SUMMARY

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.

Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.

Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.

Contractor's Quality Control (CQC) System Manager and the Designer of Record, if applicable, to check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited

to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications;

warranties; and other such required submittals.

Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.

Construction delays due to late or disapproved submittals must be made up by the Contractor at no additional cost to the Government. Government has 30 days to review any Government approved submittals, except for the cutoff wall mix design submittals, which will be reviewed within 10 business days.

1.2 DEFINITIONS

1.2.1 Submittal Descriptions (SD)

Submittals requirements are specified in the technical sections.

Submittals are identified by Submittal Description (SD) numbers and titles as follows:

SD-01 Preconstruction Submittals

Submittals which are required prior to start of construction (work) issuance of contract notice to proceed. or commencing work on site or the start of the next major phase of the construction on a multi-phase contract, includes schedules, tabular list of data, or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work.

SECTION 01 33 00 Page 2 Amendment 0003

A07.02-16R0049 AMD 03
A07.05-Section 01 33 00 Paragraph 1.1

File details come from the government source that posted it. Updated .