American River Common Features (ARCF) Spec No. 2079 Natomas Basin - Reach I Contract 1
1.2.2 Remove Existing Pavement Material
1.2.2.1 Measurement
Measurement for removal of existing pavement material will be based on the cubic yard, as shown or specified in the Contract documents including 02 41 00 DEMOLITION, and to the lines and limits shown on the Plans or as directed by the Contracting Officer.
1.2.2.2 Payment
Payment will be made for removal of existing AC, AB, and concrete at the Contract bid price for "REMOVE EXISTING PAVEMENT MATERIAL"; as defined in Section 31 11 00 CLEARING, GRUBBING, AND STRIPPING. The price shall include full compensation for all equipment, labor, transportation, materials, excavation, hauling to waste sites, and incidentals necessary to complete the work as shown in the plans, or as directed by the Contracting Officer.
1.2.2.3 Unit of Measure
Unit of measure: cubic yard.
1.2.3 Remove and Dispose 4-inch Sewer Force Main
1.2.3.1 Payment
Payment will be made for removing and disposing 4-inch Sewer Force Main at the Contract bid price for "REMOVE AND DISPOSE 4-INCH SEWER FORCE MAIN";
which shall include full compensation for all equipment, labor, transportation, materials, excavation, removal of the existing force main, backfilling, hauling to waste sites, dewatering, containment, removal of material in the utility line and incidentals necessary to complete the work as shown or specified in the Contract documents including 02 41 00 DEMOLITION, or as directed by the Contracting Officer.
1.2.3.2 Measurement
Remove and Dispose 4-inch Sewer Force Main will be measured for payment by the linear foot. The basis for measurement will be the sewer force main removed to the limits shown on the plans.
1.2.3.3 Unit of Measure
Unit of measure: linear foot.
1.2.4 Remove and Dispose Post and Cable Fence
1.2.4.1 Payment
Payment will be made for removing and Post and Cable Fence at the Contract bid price for "REMOVE AND DISPOSE POST AND CABLE FENCE"; which shall include full compensation for all equipment, labor, transportation, and all other costs involved in removing and wasting at an offsite location.
1.2.4.2 Measurement
Remove and Dispose Post and Cable Fence will be measured for payment by the existing fence linear foot. The basis for measurement will be as shown or specified in the Contract documents including 02 41 00 DEMOLITION, the
SECTION 01 22 00.00 10 Page 11