American River Common Features (ARCF) Spec No. 2079 Natomas Basin - Reach I Contract 1 all labor, materials, equipment and incidentals and doing all work necessary to complete removal of stumps and root balls including removal of the related debris and stump grinding as shown in the plans, excavation, benching, fill and compaction, disposal or salvage of materials, and placement and removal of temporary protective fencing.
1.1.6.2 Unit of Measure
Unit of measure: job.
1.1.7 Stripping
1.1.7.1 Payment
Payment for Stripping will be made at the Contract bid price for "STRIPPING". This price shall constitute full compensation for all equipment, labor, materials and incidentals necessary to complete the Work as shown or specified in the Section 31 11 00 Clearing, Grubbing and Stripping, shown in the plans, or as directed by the Contracting Officer.
No separate or direct payment will be made for stockpiling, transportation to an offsite disposal facility, loading, unloading, respreading on levee slopes and other areas as directed by the Contracting Officer,or for dust control of stripped materials. All costs in connection therewith shall be included in the unit price for "STRIPPING".
1.1.7.2 Unit of Measure
Unit of measure: job.
1.1.8 Remove and Replace Traffic Light Posts and Electrical
1.1.8.1 Payment
Payment shall be made at the Contract lump-sum price for item "REMOVE AND REPLACE TRAFFIC LIGHT POSTS AND ELECTRICAL"; for all costs associated with removal and replacement of existing Traffic Lights and related electrical components as shown or specified in the Contract documents including 02 41 00 DEMOLITION, and as directed by the Contracting Officer.
1.1.8.2 Unit of Measure
Unit of measure: job.
1.1.9 Remove Existing Concrete Slope Paving under I-5
1.1.9.1 Payment
Measurement and payment for removing existing concrete slope paving under I-5, and for all other work covered by the Project Specifications shall be made at the Contract lump sum price for item "REMOVE EXISTING CONCRETE SLOPE PAVING UNDER I-5"; which payment shall constitute full compensation for all the Work involved in removing existing concrete slope paving under I-5 as shown or specified in the Contract documents including 02 41 00 DEMOLITION, and directed by the Contracting Officer.
1.1.9.2 Unit of Measure
Unit of measure: job.
SECTION 01 22 00.00 10 Page 7