American River Common Features (ARCF) Spec No. 2079 Natomas Basin - Reach I Contract 1

TIME CONSTRAINTS FOR REACH I - CONTRACT 1

Mobilization 1 April through 15 April

The Contractor shall construct cutoff wall (including bike path, access road near I-5 bridges and all paving) from the west end of the project through Natomas Park Drive Intersection.

15 April through 31 July

Construct drainage blanket under I-5.

31 July through 31 August

The Contractor shall construct cutoff wall from Natomas Park Drive through Truxel Road Intersection including repaving.

31 July through 15 August

The Contractor shall construct cutoff wall from Truxel Road to Northgate Boulevard including repaving.

15 August through 31 October

Traffic Control Garden Highway between Gateway Oaks Drive and I-5 shall be open to traffic during construction to the greatest extent practicable.

Closure of Garden Highway between Gateway Oaks Drive and I-5 shall only occur after substantial cutoff wall construction is completed between Gateway Oaks Drive and I-5.

The portion of cutoff wall construction on Garden Highway from Truxel Road to the east end of the project (STA. 113+00) shall remain open to public traffic to the greatest extent practicable.

This portion of Garden Highway shall be closed for construction only after work on Garden Highway west of and including Truxel intersection is substantially complete and the Garden Highway in this area has been reopened to traffic.

Erosion Control Seeding, Site Cleanup, and Demobilization

1 November through 30 November

Bike Path The bike path shall remain open, to the greatest extent possible, throughout the duration of work using temporary detours as shown on the Plans.