Submittal Register Amd 0002.pdf

PDF 140 KB Posted

Attached to
Multiple Award IDIQ Contract to Repair Military Family Housing at Beale AFB, CA
Solicitation number
W91238-10-R-0023
Issued by

About this file

Submittal Register

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 11 PAGES

Repair Mountain View Multi-Family Housing Units

01 33 00 SD-01 Preconstruction Submittals G ROSubmittal register G ROTracking Chart Sheet

01 35 26 SD-01 Preconstruction Submittals

1.7 G AAccident Prevention Plan (APP)

1.8 G AActivity Hazard Analysis (AHA)

1.7.1 G ACrane Critical Lift Plan

1.6.1.6 G ACrane Operators

SD-06 Test Reports 1.12Reports 1.12.1Accident Reports 1.12.3Monthly Exposure Reports 1.12.4Crane Reports

Gas Protection SD-07 Certificates Confined Space Entry Permit Hot work permit License Certificates

1.12.5Certificate of Compliance Machinery & Mechanized Equipment Certification Form

01 57 20.00 10 SD-01 Preconstruction Submittals

1.7 GEnvironmental Protection Plan

01 74 19 SD-01 Preconstruction Submittals 1.6Waste Management Plan

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

AM-02

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 11 PAGES

01 74 19 1.7Records 01 78 00 SD-03 Product Data

G REAs-Built Drawings;

As-Built Record of Equipment and Materials

GWarranty Management Plan;

RE

GWarranty Tags;

GFinal Cleaning;

06 61 16 SD-02 Shop Drawings 1.4.2Detail Drawings 3.1Installation

SD-03 Product Data 2.1Solid polymer material 1.4.1Qualifications 2.3Fabrications

SD-04 Samples

2.1 G ROMaterial

2.3.6 G ROCounter and Vanity Tops

SD-06 Test Reports 2.1Solid polymer material

SD-07 Certificates 2.3Fabrications 1.4.1Qualifications

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 11 PAGES

06 61 16 3.2Clean-up 07 92 00 SD-03 Product Data

2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops

SD-07 Certificates 3.3.6Sealant

08 11 13 SD-02 Shop Drawings

2.1 G RODoors

2.1 G RODoors

2.5Accessories 2.9Weatherstripping

SD-03 Product Data 2.1Doors 2.5Accessories 2.9Weatherstripping

08 53 00 SD-02 Shop Drawings

2.2.1 G ROWindows

2.2.1 G ROWindows

SD-03 Product Data

2.2.1 G ROWindows

2.4.8Fasteners 2.4.4Hardware 2.4.6Screens 2.4.5Weatherstripping

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 11 PAGES

08 53 00 2.4.9Accessories 2.2.5Adhesives

SD-04 Samples

2.2.1 G ROWindows

SD-06 Test Reports

2.2.1 G ROWindows

SD-07 Certificates 2.2.1Windows

SD-10 Operation and Maintenance Data

2.2.1 G ROWindows

08 81 00 SD-02 Shop Drawings

2.4.9Installation SD-03 Product Data

1.7.1Insulating Glass 1.3Glazing Accessories

SD-04 Samples 1.7.1Insulating Glass 2.4.2Glazing Compound 2.4.6Tape 2.4.3.1Sealant

SD-07 Certificates 1.7.1Insulating Glass

SD-08 Manufacturer’s Instructions 2.4Setting and sealing materials 3.2Glass setting

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 11 PAGES

09 24 23 SD-02 Shop Drawings 3.3Lath

SD-03 Product Data 1.4Materials

SD-04 Samples 2.2Colored Stucco Finish Coat 1.3Sample Panel

09 29 00 SD-03 Product Data 2.1.8Cementitious backer units 2.1.14Accessories

SD-07 Certificates 2.1Asbestos Free Materials

SD-10 Operation and Maintenance Data

3.9Waste Management 09 30 00 SD-02 Shop Drawings

1.4Detail Drawings SD-03 Product Data

2.1 G ROTile

2.4Mortar, Grout, and Adhesive

2.4.1 G ROConcrete Sealer

SD-04 Samples

2.1 G ROTile

1.4Accessories 2.4Grout

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 11 PAGES

09 30 00 2.1Tile 2.4Mortar, Grout, and Adhesive

09 62 19 SD-02 Shop Drawings

1.4 G RODrawings

SD-03 Product Data

2.1.1 G RODecorative Laminate Flooring

2.1.5 G ROConcrete Sealer

SD-04 Samples

2.1.1 G RODecorative Laminate Flooring

SD-07 Certificates 1.5Certificates of Compliance

SD-11 Closeout Submittals 3.5Maintenance Instructions

09 90 00 SD-02 Shop Drawings Piping identification stencil

SD-03 Product Data

2.1 GCoating

2.1Manufacturer's Technical Data

Sheets [Sealant]

SD-04 Samples

1.11 GColor

SD-07 Certificates 1.3Applicator's qualifications

1.4.1.2 GQualification Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 11 PAGES

09 90 00 SD-08 Manufacturer’s Instructions 3.4.1Application instructions 3.8.2Mixing 1.7.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

2.1 GCoatings:

10 28 13 SD-03 Product Data

2.1.2Finishes 2.2Accessory Items

SD-04 Samples 2.1.2Finishes 2.2Accessory Items 2.2.11Shower Curtain

SD-07 Certificates 2.2Accessory Items

12 32 00 SD-02 Shop Drawings 2.3fabrication 2.5fabrication 3.2Installation Drawings

SD-03 Product Data 2.10Cabinets 2.2Medium Density Fiberboard

(MDF)

2.2Hardwood

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 11 PAGES

12 32 00 2.2Hardwood Plywood 2.2Adhesives 2.2Filler Material 2.2Particle Board 2.2Turpentine 2.2Varnish 2.2Fasteners 2.2Service Fixtures 2.2Accessories and Hardware 2.9Accessories and Hardware

SD-04 Samples 2.2Accessories and Hardware 2.9Accessories and Hardware 2.1Manufacturer's Standard Color

Charts SD-07 Certificates

2.2Hardwood 2.2Adhesives 2.2Filler Material 2.2Particle Board 2.2Turpentine 2.2Varnish 2.2Fasteners 2.2Service Fixtures 2.2Accessories and Hardware 2.9Accessories and Hardware

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 11 PAGES

12 32 00 SD-08 Manufacturer’s Instructions 2.1Manufacturer's Instructions

22 00 00.23 SD-02 Shop Drawings

3.9.1 GPlumbing System

SD-03 Product Data 2.4Fixtures 2.4.8Flush tank water closets 2.4.11Countertop lavatories

GTub/Shower faucets 3.9.1Plumbing System

Exhaust Fan SD-06 Test Reports Tests, Flushing and Disinfection and Fan Operation

SD-07 Certificates 1.3Materials and Equipment 2.1.1Bolts

SD-10 Operation and Maintenance Data

3.9.1 GPlumbing System

26 51 00.00 40 SD-02 Shop Drawings

2.13Commercial Incandescent Lighting Fixtures

2.14Industrial Incandescent Lighting Fixtures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 11 PAGES

26 51 00.00 40 2.15Enclosed and Gasketed Vapor-Tight Fixtures

2.4.1Incandescent Lamps 2.16Incandescent Lamps 2.17Lowering Devices 3.4Lowering Devices

SD-03 Product Data

2.2 GFluorescent lighting fixtures

1.5.1 GFluorescent electronic ballasts

2.2.5 GFluorescent electromagnetic

ballasts

2.2.6 GFluorescent lamps

2.3 GHigh-intensity-discharge (HID)

lighting fixtures

2.3.1 GHID ballasts

2.3.2 GHigh-pressure sodium (HPS)

lamps

2.3.3 GLow-pressure sodium lamps

2.3.4 GMetal-halide lamps

2.4 GIncandescent lighting fixtures

2.4.1 GIncandescent lamps

2.4.1 GIncandescent lamps

2.16 GIncandescent lamps

2.16 GIncandescent lamps

2.8 GPower hook fixture hangers

2.2.2 GElectronic dimming ballast

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 11 PAGES

26 51 00.00 40 2.2.3 GDimming ballast controls

2.2.4 GLight Level Sensor

1.8.1Local/Regional Materials 1.8.2Environmental Data 1.5.4.3Energy Efficiency 2.13Commercial Incandescent

Lighting Fixtures 2.14Industrial Incandescent Lighting

Fixtures 2.15Enclosed and Gasketed

Vapor-Tight Fixtures 2.17Lowering Devices 3.4Lowering Devices

SD-04 Samples

1.5.2 GLighting fixtures

SD-06 Test Reports 3.3Operating test 3.4Operational Tests

SD-10 Operation and Maintenance Data

1.7Operational Service

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .