R0023 Non-ARRA TO Pricing Schedule.pdf
PDF 64 KB Posted
- Solicitation number
- W91238-10-R-0023
About this file
Non-ARRA Task Order Pricing Schedule
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91238-10-R-0023 Non- ARRA Task Order Pricing Schedule
CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH
IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
LINE ITEM UNIT OF UNIT TOTAL
NO. DESCRIPTION QUANTITY MEASURE PRICE PRICE
0001 66 Military Family Homes 1 LUMP SUM $_________
Non-ARRA Funded
Price Breakout:
0200 – Asbestos and Lead Testing 1 Lump Sum $________________
This line item includes all testing for the presence of asbestos and lead for all 66 houses. The testing shall be performed in accordance with all local, state and federal laws and regulations.
0201 – Mold Removal _____ per House for 66 Houses
This line item is for treatment and removal of all areas that have been identified and/or are suspected of having mold and/or mold growth in the listed houses. The costs include the demolition and replacement of sheetrock/gypsum up to 330 sf per house.
0202 – Additional Mold Removal _____ per sf up to 33,000 square feet
This line item is for treatment and removal of all areas that have been identified and/or are suspected of having mold and/or mold growth in the listed houses. The costs include the demolition and replacement of sheetrock/gypsum in these houses for quantities greater than 330 sf per house.
0203 – Window Replacement Housing Unit Type A _____ per house for 29 Houses
This line item is for the replacement of all 12 existing vinyl framed windows with new vinyl framed windows in the houses listed. The costs include the demolition and replacement of sheetrock/gypsum on the interior and stucco on the exterior in a 1 foot perimeter around each window.
0204 – Window Replacement Housing Unit Type B _____ per house for 29 Houses
This line item is for the replacement of all 14 existing vinyl framed windows with new vinyl sheetrock/gypsum on the interior and stucco on the exterior in a 1 foot perimeter around each window.
0205 – Window Replacement Housing Unit Type C _____ per house for 1 House
This line item is for the replacement of all 12 existing vinyl framed windows with new vinyl sheetrock/gypsum on the interior and stucco on the exterior in a 1 foot perimeter around each window.
0206 – Window Replacement Housing Unit Type D _____ per house for 5 Houses
This line item is for the replacement of all 13 existing vinyl framed windows with new vinyl sheetrock/gypsum on the interior and stucco on the exterior in a 1 foot perimeter around each window.
0207 – Window Replacement Housing Unit Type E _____ per house for 2 Houses
This line item is for the replacement of all 13 existing vinyl framed windows with new vinyl sheetrock/gypsum on the interior and stucco on the exterior in a 1 foot perimeter around each window.
0208 – Flooring Replacement Housing Unit Type A _____ per house for 29 Houses
This line item is for the demolition of all existing VCT flooring in the houses listed. The cost includes furnish and install of new ceramic tile flooring in the kitchen and laundry room; and new laminated flooring in the entry, hallways, bedrooms, dining area, and living room.
This line item also includes the demolition of all existing baseboards, and installation of new baseboards in all of the rooms, excluding bathrooms.
0209– Flooring Replacement Housing Unit Type B _____ per house for 29 Houses includes furnish and install of new ceramic tile flooring in the kitchen and laundry room; and new laminated flooring in the entry, hallways, bedrooms, dining area, and living room.
0210– Flooring Replacement Housing Unit Type C _____ per house for 1 House includes furnish and install of new ceramic tile flooring in the kitchen and laundry room; and new laminated flooring in the entry, hallways, bedrooms, dining area, and living room.
0211– Flooring Replacement Housing Unit Type D _____ per house for 5 Houses
This line item is for the demolition of all existing VCT flooring in the houses listed. The cost includes furnish and install of new ceramic tile flooring in the kitchen and laundry room; and new laminated flooring in the entry, hallways, bedrooms, dining area, and living room.
This line item also includes the demolition of all existing baseboards, and installation of new baseboards in all of the rooms, excluding bathrooms.
0212– Flooring Replacement Housing Unit Type E _____ per house for 2 Houses
This line item is for the demolition of all existing VCT flooring in the houses listed. The cost includes furnish and install of new ceramic tile flooring in the kitchen and laundry room; and new laminated flooring in the entry, hallways, bedrooms, dining area, and living room.
0213 – Seal Existing Concrete Housing Unit Type A _____ per house for 29 Houses
This line item is for sealing of all interior concrete surfaces which are to receive flooring. The cost includes the sealant and its application.
0214 – Seal Existing Concrete Housing Unit Type B _____ per house for 29 Houses
0215– Seal Existing Concrete Housing Unit Type C _____ per house for 1 House
0216– Seal Existing Concrete Housing Unit Type D _____ per house for 5 Houses
0217– Seal Existing Concrete Housing Unit Type E _____ per house for 2 Houses
0218– Bathroom Remodel Housing Unit Type A _____ per house for 29 Houses
This line item is for the complete demolition of all existing bathroom infrastructure, including up to 50 square feet of dry rot, and replacement with new items, including ceramic tile flooring and baseboards. This includes all full and partial bathrooms in the house.
0219– Bathroom Remodel Housing Unit Type B _____ per house for 29 Houses
0220 – Bathroom Remodel Housing Unit Type C _____ per house for 1 House
0221 – Bathroom Remodel Housing Unit Type D _____ per house for 5 Houses
0222– Bathroom Remodel Housing Unit Type E _____ per house for 2 Houses
0223 – Additional Dry Rot _____ per sf up to 660 square feet
This line item includes the removal of additional dry rot identified in any house, and installation of new wood as required. (Not to be used for the first 50 sf of dry rot encountered in bathrooms.)
0224 – Interior Painting Housing Unit Type A _____ per house 29 Houses
This line item includes the preparation and painting of all interior sheetrock/gypsum walls and ceiling surfaces and all doors.
0225 – Interior Painting Housing Unit Type B _____ per house for 29 Houses ceiling surfaces and all doors.
0226 – Interior Painting Housing Unit Type C _____ per house for 1 House ceiling surfaces, and all doors.
0227 – Interior Painting Housing Unit Type D _____ per house for 5 Houses
0228 – Interior Painting Housing Unit Type E _____ per house for 2 Houses
0229– Exterior Painting Housing Unit Type A _____ per house for 29 Houses
This line item includes the preparation and painting of all exterior stucco, wood trim and doors.
0230– Exterior Painting Housing Unit Type B _____ per house for 29 Houses
0231– Exterior Painting Housing Unit Type C _____ per house for 1 House
0232– Exterior Painting Housing Unit Type D _____ per house for 5 Houses
0233– Exterior Painting Housing Unit Type E _____ per house for 2 Houses
0234– Exterior Doors Housing Units Type A, B & C _____ per house for 59 Houses
This line item is for the removal and replacement of 5 exterior doors and frames per house for the hot water heater closet, furnace room, exterior bulk storage rooms, and exterior garage personnel door.
0235– Exterior Doors Housing Units Type D & E _____ per house for 7 Houses
This line item is for the removal and replacement of 6 exterior doors and frames per house for the hot water heater closet, furnace room, exterior bulk storage rooms, and exterior garage personnel door.
0236 – Splash Blocks _____ per splash block for 561 Splash Blocks
This line item is for new concrete splash blocks to be placed at the bottom of each and every downspout.
0237 – French Drain _____ per lf for 1,980 Lineal feet
This line item is for the complete installation of French Drains to be installed around the houses.
0238 – Remove Sod, Add Rock Housing Units Type A, B & C _____ per house for 59 Houses
This line item is for removal of sod for a distance of 4 feet from each house. Also includes the installation of the weed block fabric and decorative rock.
0239 – Remove Sod, Add Rock Housing Units Type D & E _____ per house for 7 Houses
This line item is for removal of sod for a distance of 4 feet from each house. Also includes the installation of the weed block fabric and decorative rock.
0240 – HVAC _____ per house for 66 Houses
This line item includes clean the existing plenum, apply sealant, and replace the drip pan.
File details come from the government source that posted it. Updated .