This amendment to the solicitation for the AIT Barracks Complex Phase IV project at Fort Eustis provides updated drawings. The Army Corps of Engineers Norfolk District issued Amendment 0004, which transmits revised design plans for the construction of new barracks at the Army installation. Bids are due by August 6, 2020 at 5:00 PM EDT. The solicitation seeks a contractor to build additional soldier housing in accordance with design drawings that have been revised through a series of amendments.
View the file
Other files for this federal contract opportunity
Show all 50
AIT Barracks Fort Eustis VA (Amendment 0004) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
W91236-20-0015 AIT Barracks Complex Phase IV, Barracks Only Fort Eustis, VVA (Construction)
Please see continuation page for full breakout.
Contracting POC: Allen Scott Brainerd email: allen.s.brainerd@usace.army.mil (757) 201-7668. cc'd dianne.k.grimes@usace.army.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 71
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123620B0015
X 9B. DATED (SEE ITEM 11)
12-Jun-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Aug-2020
CODE
USACE, NORFOLK DISTRICT OFFICE
CONTRACTING OFFICE
803 FRONT STREET
NORFOLK VA 23510-1011
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123620B0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 3
W91236-20-B-0015 AIT Barracks Complex Phase IV, Barracks Only, Fort Eustis, VA (Construction) is hereby
Amended as follows:
1. Block 13A. Receipt of Offer is hereby extended from 04 August 2020 at 5:00 p.m. Eastern Day Time
(EDT) to 06 August 2020 at 5:00 p.m. EDT.
2. Section 00 10 00 – Solicitation NOTICE TO BIDDERS Electronic Bid Submissions in DoD Safe or
Electronic Mail (E-Mail) “all bids must be uploaded to the Government system described below not later than 05:00 p.m. Eastern Day Time (EDT) August 04 2020” date is extended to 05:00 p.m. Eastern Day
Time (EDT) August 06 2020”.
3. Section 00 10 00 – Solicitation NOTICE TO BIDDERS Electronic Bid Submission is DoD Safe or
Electronic Mail (e-Mail) “The bidder should submit the email request for the “request code” NLT August
04, 2020, at 5:00 p.m. EDT.” Date is extended to “NLT August 06, 2020, at 5:00 p.m. EDT.
4. Section 00 10 00 – Solicitation NOTICE TO BIDDERS Electronic Bid Opening “public bid opening conducted by Government via teleconference on August 05, 2020 at 10:00 a.m. EDT” date is extended to
August 07, 2020 at 1000 a.m. EDT.
5. Incorporate new Bid Schedule. Option CLINs 0004, 0005 and 0006 deleted.
6. Bidder Inquiries and Corresponding Government Responses are hereby incorporated.
Bidder Inquirie 8729718 A file was issued for Amendment 1 drawings A121 thru A151. None of the drawings in this file had any revisions? Was there an intent to issue revisions in these drawings?
Government Response The sheets A121 thru A151 have indeed been revised. The original sheets did not have the wall types called out. The wall types are now tagged on the revised sheets.
Bidder Inquirie 8729721 Several drawings issued in Amendment 2 are actually Amendment 1 version. These would be A114, A401, A402, A403, A405, A406, A407, A602, A611 and LP501. Not sure if there was an intent to issue revisions to these drawings in Amendment 2?
Government Response There were a number of inquiries submitted after Amendment 1 was posted but before
Amendment 2 was posted. Some of these inquiries raised questions that had already been answered by
Amendment 1. The relevant sheets were reuploaded with Amendment 2 to ensure that nothing fell through the cracks.
To be clear, the sheets mentioned in this inquiry were not revised between Amendments 1 and 2. This was intentional.
Bidder Inquirie 8729732 Reposnses to Bid Questions 8658908, 8658915 and 8712464 have made reference to revised bid cost schedule to be used in amendment but none yet have been issued? Will this be issued or do we leave vurrent form line items blank?
Government Response The utility CLINS have been removed from the bid schedule. The revised bid schedule will be included in an amendment.
Bidder Inquirie 8730135 Amendment 2 drawings A114,A401, A402, A403, A405, A406, A407, A601 and
A602 are labeled amendment 1 dated 7.13.2020 and LP 501 is labeled amendment 1 7.16.2020. Can you please confirm that these are the correct drawings, and there is no amendment 2 drawings for these files?
Government Response. That is correct. There were a number of inquiries submitted after Amendment 1 was posted but before Amendment 2 was posted. Some of these inquiries raised questions that had already been answered by Amendment 1. The relevant sheets were reuploaded with Amendment 2 to ensure that nothing fell through the cracks.
To be clear, the sheets mentioned in this inquiry were not revised between Amendments 1 and 2. This was intentional.
Bidder Inquirie 8730171 Amendment 1 drawings A121, A123, A124, A131, A132, A133, A141-143, and
A151 are not labeled Amendment 1 and have no revision date or clouds. Can you please confirm that these are the correct drawings for Amendment 1? If they are correct, would it be possible to reissue with clouds?
Government Response. Those are the correct drawings for Amendment 1. Revision dates and clouds have since been added to these sheets. The sheets are otherwise UNCHANGED from Amendment 1
Bidder Inquirie 8730548 Will a new bid form be issued reflecting the CLINs that were deleted?
Government Response. The utility CLINS have been removed from the bid schedule. The revised bid schedule will be included in an amendment.
Bidder Inquirie 8730885 Concerning the PRC-4 in typical 2PN and 3PN bathrooms, is it acceptable for contractor to designate the vertical seam locations to allow for least material waste possible? PRC-4 is a costly material and waste factor can range widely depending on panel layout. Is this acceptable or will a drawing be issued showing the required panel layout for bidding?
Government Response. Locate vertical joints as shown on sheet A-405 and in accordance with Specifications.
Any proposed deviations in panel layouts shall be included in shop drawings for consideration, but bids shall be based on the design shown in contract documents.
Bidder Inquirie 8731807 A-531 shows several details for expansion joint systems and covers. No specification was issued for these. Can you provide a Basis of Design make and model for each of the system components shown on this drawing.
Government Response. No basis of design is provided. Provide products as shown on drawings to meet requirements indicated.
Bidder Inquirie 8732525 Per Spec Section 09 51 00 Paragraph 2.2.2.4 Minimum NRC- 0.70 is required in all rooms other troop gathering rooms which require 0.75. The tile listed on the finish schedule I-002 Armstrong
Dune 1774 only has an NRC of 0.5. Please confirm if the BOD tile is acceptable.
Government Response. Specifications take precedence; ceiling tile must meet minimum NRC as specified.
Basis of design product is to indicate look, pattern, texture, etc.
Bidder Inquirie 8732546 Verification is required regarding the documents required to be submitted with proposals. The front end IFB does not clearly outline what is required to be submited including:
1) Will a Small Business Plan be required?
2) Financial and Bonding Information?
3) Past Performance information?
4) Will original bid bonds need to be sent in prior to bid date and if so to whom?
Government Response.
1. No Small Business Plan is required
2. Financial will be requested if needed
3. Bonds / Bid Guarantee are required
4. Bid Bonds can be sent via electronic means
Bidder Inquirie 8733367 Sheet I-002: For the WP-1 sheets, the finish schedule calls out the color to be
'Cypress' but this is not a color option available for Koroguard Wall Protection Sheets. Please advise.
Government Response. Selected finish must match the color as indicated in the schedule. Basis of design product is to indicate look, pattern, texture, etc.
Bidder Inquirie 8733369 Sheet I-002: For the Chair Rail CR-1, the finish schedule lists Koroseal CH20 as the product. However this product has a vinyl retainer, but the specs call for a chair rail with an aluminum retainer.
Please advise.
Government Response. Specifications take precedence; chair and retainer must meet material requirements as specified. Basis of design product is to indicate look, pattern, texture, etc
The following have been modified:
AMENDMENT 2
W91236-20-B-0015 AIT Barracks Complex Phase IV, Barracks Only, Fort Eustic, VA (Construction) is hereby
Amended as follows:
1. Block 13A. Receipt of Offer is hereby extended from 28 July 2020 at 5:00 p.m. Eastern Day Time (EDT) to 04 August 2020 at 5:00 p.m. EDT
2. Section 00 10 00 – Solicitation NOTICE TO BIDDERS Electronic Bid Submission in DoD Sefe or
Electronic Mail (E-Mail) “all bids must be uploaded to the Government system described below not later than 05:00 p.m. Eastern Day Time (EDT July 28 2020” date is extended to 05:00 p.m. Eastern Day Time
(EDT) August 04 2020”
3. Section 00 10 00 – Solicitation NOTICE TO BIDDERS Electronic Bid Submission in DoD Sefe or
Electronic Mail (E-Mail) “All bids may be uploaded into DoD SAFE infrastructure as early as June 15, 2020, but in no event later than the date and time provided above” date is extended to “as early as July 29, 2020.
4. Section 00 10 00 – Solicitation NOTICE TO BIDDERS Electronic Bid Submission is DoD Safe or
Electronic Mail (e-Mail) “The bidder should submit the email request for the “request code” NLT July 28, 2020 at 5:00 p.m. EDT.” Date is extended to “NLT August 04, 2020, at 5:00 p.m. EDT.
5. Section 00 10 00 – Solicitation NOTICE TO BIDDERS Electronic Bid Opening “public bid opening conducted by Government via teleconference on July 29, 2020 at 1000 a.m. EDT” date is extended to
August 05, 2020 at 1000 a.m. EDT
6. Section 00 10 00 – Solicitation NOTICE TO BIDDERS Electronic Bid Uploading “Any questions regarding bid submissions should be directed to Mr. Alexander Loi in ProjNET. “ Changed to Allen Scott
Brainerd.
7. Section 00 10 00 – Solicitation Notice to Bidder __5__ Subcontracting Plane (Construction)
Adding Electronic Subcontracting Reporting System (eSRS) Goals
Small Business 30%
Small Disadvantaged Business 5%
Woman Owned Small Business 4%
Historically Underutilized Business Zone 3%
Service Disabled Veteran Owned Small Business 3%
8. Bidder Inquiries and Corresponding Government Responses are hereby incorporated.
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contracting Officers Report All Inquiries
Project: Ft. Eustis AIT Barracks Complex Phase 4 Review: AIT Barracks Phase 4 (BCOF) - Bidder Inquiry
(00001) (sorted by CommentID ) Displaying 174 inquiries.
Id Discipline Sheet Detail Spec
8656865 Antiterrorism-Force
Protection N/A N/A 085113 - Aluminum Windows
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Paragraphs 1.3 Submittals along with paragraphs 1.4.3 Design Data Requirements and 1.4.4 Test Report Requirements make reference to "MINIMUM ANTITERRORISM PERFORMANCE", "MINIMUM ANTITERRORISM PERFORMANCE CRITERIA" and "Minimum Antiterrorism windows."We have been unable to find the find the standoff distance and charge weight required for this building. Please review and advise accordingly.
1-1 Government Response. Refer to UFC 4-010-01 MINIMUM ANTITERRORISM STANDARDS FOR
BUILDINGS (2018) for information regarding ATFP requirements. By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: Jul 10 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8658908 Civil C-001, CD101 & CU101
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Notes on these drawings state that demolition and construction of new site water and sanitary will be performed by American States Utility Services (ASUS), however on the current Bid Form, Item 0004, Bid Option 002 – Privatized Utility- Water & Sanitary Sewer, is shown, is this option asking for the cost from ASUS to perform this work or pricing from a separate utility subcontractor?
1-1 Government Response. Bid Form, Item 0004, Bid Option 002 Privatized Utility - Water and Sanitary
Sewer is being removed by amendment. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 23
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8658915 Civil CU101
Note 12 states that Virginia Natural Gas (VNG) is responsible for the new gas line to include setting the meter and pressure regulator, however on the current Bid Form, Item 0006, Bid Option 004 – Privatized Utility-Natural Gas, is shown, is this option asking for the cost from VNG to perform this work or pricing from a separate utility subcontractor?
1-1 Government Response. Bid Form, Item 0006, Bid Option 004 – Privatized Utility-Natural Gas is being removed by amendment. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 23 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8658926 Environmental 02 65 00 Underground Storage
Tank Removal para 1.2 states "No tanks are known to exist but there is a high probability that they may be encountered based on construction of Phases I and II", what is to be included in the bid? If underground tanks are encountered, will the removal and disposal be the tanks be handled by change order?
1-2 Government Response. Tanks that are not identified on the drawings for removal will be considered a differing site condition. A modification will be issued for removal if required. By: Dianne Grimes; CECT- NAO-M; (7572017839) On: Jul 24 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8658938 Civil 32 11 23, 32 12 16, 32 17 24 & 33
40 00
These spec sections refer to payment based on measured quantities and unit prices, no unit prices are called for on the bid form, please clarify.
1-2 Government Response. For the Specification sections referenced, payment will be lump sum as part of
CLIN 0002, or lump sum for anything identified as part of option CLIN 0003. By: Dianne Grimes; CECT- NAO-M; (7572017839) On: Jul 24 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8662818 Contracting 01 45 00.00 50
Item 3.4.3 references 'experience matrix listed herein' but no such matrix or table is included. Please provide.
1-1 Government Response. The Matrix will be incorporated by amendment 0002 as an attachment By:
Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 24 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8663131 General Bid form
Line Item 007, the Bid Option for FF & E confirm if this is to provide all items noted in the F series drawings and also found in the FFE-RTA Submittal file. F-series drawings do not mention these as an option but that will be procured under seperate contract.
1-2 Government Response. Line item 007, is an optional bid item for the FF&E and should be priced in accordance with the F-series drawings and FFE-RTA submittal file. By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: Jul 24 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8666913 Structural S-102
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Regarding the portion of Slab Area B bounded by Column Lines 3 to 10 and E to N; this area is shown as a 14" Mat Foundation slab and there are construction/contraction joints shown at this slab area, is this correct? (joints are shown cutting through the integral footings) Should this slab area be a 6" slab on grade?
1-1 Government Response. No, the area is indeed 14" deep as noted. The 6" slab on grade is shaded gray on S-102, starting above Column Line F.
Also it should be noted that what this inquiry notes as "footings" are actually thickened slabs that lay below the mat foundation. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 10 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8666914 Structural S-001
Concrete Note 2 states cast-in-place concrete to be 4000 psi UNO, whereas Spec Sect 03 30 00, para 2.1.6 states slab on grade to be 5000 psi, please clarify concrete strength of slab on grade.
1-1 Government Response. Strength of concrete for slab-on-grade shall be 4000 psi. By: Dianne
Grimes; CECT-NAO-M; (7572017839) On: Jul 10 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8667679 Fire Protection/Life
Safety
Section 28 31 76 Interior Fire Alarm And Mass Notification System
Paragraph 2.3.2.k. indicates "the system shall be capable of being programmed from the panels keyboard." This seems exceptionally proprietary as we find only one major manufacturer is capable of this requirement. Is it the intent of this specification to limit this project to one manufacturer? Is EST an acceptable product?
1-1 Government Response. The revised spec will be issued in Amendment 0001
Paragraph 2.3.2.k will be removed from the specifications, as written. An Amendment is forthcoming to include this change. In response to the 2nd question in this bidder inquiry, any manufacturer that is acceptable would have to meet the contract documents. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 17 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8667683 Fire Protection/Life
Safety
Section 28 31 76 Interior Fire Alarm
Reference paragraph 2.16 AMPLIFIERS, PREAMPLIFIERS, TONE GENERATORS. This paragraph includes instructions to "submit data to indicate that the amplifiers have sufficient capacity to simultaneously drive all notification speakers at the maximum rating plus 50 percent spare capacity. This appears to an excessive requirement. Please note the following example. Most manufacturers have multiple taps from 1/8 , 1/4, 1/2 , 1, 2, 4 & 8 watts. A project with 10 speakers tapped at 1/2 watt is sufficient to achieve a passing intelligibility score at 5 watts total. Plus 50% is 7.5 watts. If this same system was computed following the specification it could possibly be as high as 120 watts. What is the actual intent with regard to amplifier sizing?
1-1 Government Response. Bid as written. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 14
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8667684 Fire Protection/Life
Safety
Section 28 31 76 Interior Fire Alarm And Mass Notification System
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference Paragraph 2.16.4 Tone Generator, which indicates "the tone generator shall be of the modular, plug-in type. ...... " This requirement appears to be taken from outdated technology. We find messages and tones are stored digitally across all major manufacturers. Is the digital storage of tones acceptable?
2-1 Government Response. The technical amendment will be included in amendment 0001
Digital storage of tones is acceptable. An Amendment is forthcoming to include this change. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 17 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8667690 Fire Protection/Life
Safety
Section 28 31 76 Interior Fire Alarm
Reference Paragraph 2.19.1 Fire Alarm/Mass Notification Speaker. Sub-Paragraph a. includes the requirement "speakers shall incorporate a high efficiency speaker for maximum output at minimum power across a frequency range of 150 Hz to 10,000 Hz. ................. " We find no Fire Alarm Manufacturer with a speaker in this frequency range. All speakers are listed, and tested, to UL requirements which are 400 to 4000Hz and passing intelligibility can be achieved within this range. Is 400 to 4000 Hz frequency range acceptable for this project?
1-1 Government Response. The technical amendment 0001.
Since testing is typically over a 400 to 4,000Hz range, this paragraph will be revised from "150Hz to 10,000 Hz" to "400Hz to 4,000Hz". An Amendment is forthcoming to include this change. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 17 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8667695 Fire Protection/Life
Safety
Section 28 31 76 Interior Fire Alarm
Reference Paragraph 2.19.2 Visual Notification Appliances. This paragraph indicates Notification Appliances are to have xenon flash tubes. It appears most manufacturers are transitioning away from xenon strobes and moving to LED strobes which provide for a much lower current draw. Are LED strobes acceptable?
1-1 Government Response. The technical amendment 0001 will provided the revised specification.
Listed LED strobes are acceptable. An Amendment is forthcoming to include this change. By: Dianne
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8667704 Antiterrorism-Force
Protection S-001
Section 08 51 13 Aluminum Windows
Note "G" under Design Criteria on Plan Sheet S-001 references a 2018 blast standard (UFC 4-010-01 Minimum Antiterrorism Standards For Buildings). However, Paragraph 1.1 of Section 08 51 13 includes a 2017 and 2012 ASTM blast standard. Please review what appears to be a conflict and advise accordingly.
1-1 Government Response. Technical Amendment 0001 will provide the technical revision
UFC 4-010-01 Minimum Antiterrorism Standards For Buildings is the governing criteria. The language in spec Section 08 51 13 was inadvertently not updated to reflect the latest UFC. By: Dianne Grimes; CECT- NAO- M; (7572017839) On: Jul 17 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8669082 Architectural 03 45 00
The architectural precast on page A-504 falls under the spec section 03-45-00, which is cast precast. Is it acceptable to dry tamp the architectural precast to provide a better finish?
1-1 Government Response. Dry tamp architectural precast is acceptable. By: Dianne Grimes; CECT-
NAO-M; (7572017839) On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8669136 Specifications Specifications Pages 808 - 858
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
08 41 13 Aluminum Framed Entrances and Storefronts - Please provide a basis of design.
08 44 00 Curtain Wall and Glazed Assemblies - Please provide a basis of design.
08 51 13 Aluminum Windows - Please provide a basis of design.
1-1 Government Response. Basis of Design is no longer permitted by UFC. Provide products meeting specifications as indicated. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8671299 Architectural A-601
Door schedule includes additional door types that are not detailed. For example D56, D16, D45, D24, D25, D36. A- 603 only shows D1-D7. Please clarify the additional door types.
1-1 Government Response. Technical Amendment 0001 will provide the revision
Door types listed are not part of the project and there may be some typos. A revised door schedule will be issued as an amendment. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 17 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8671392 Civil G-002
Are the Civil documents identified on Plan Sheet G-002 (C-001 through C-517) available in CAD format?
1-1 Government Response. Release of CAD files normally occurs after award By: Dianne Grimes; CECT-
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8671398 Specifications 08 51 13 Aluminum Windows
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Fixed windows are called out in the specs. Can storefront be used in lieu of fixed window if it meets performance requirements?
1-1 Government Response. Provide fixed windows as indicated. By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: Jul 16 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8671401 Specifications All Glass Anti-Terrorism Requirements
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please provide the appropriate standoff distances and the charge weights based off the anti-terrorism requirements.
1-1 Government Response. Refer to UFC 4-010-01 MINIMUM ANTITERRORISM STANDARDS FOR
BUILDINGS (2018) for information regarding ATFP requirements. By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: Jul 13 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8671425 Architectural F-101 1
Please clarify the dimensions of the M11 full length mirrors & if they are to be framed or unframed mirrors in the 2 & 3 PN units.
1-1 Government Response. Provide 18" x 48" beveled edge frameless mirror. By: Dianne Grimes; CECT-
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8671937 Specifications 08 33 13 Coiling Counter Doors
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
There are no coiling counter doors on the door schedule, but there is a spec for these. Please clarify where these are located.
1-1 Government Response. Technical Amendment 0001 will provide the revision
An amendment is forthcoming to address this. The locations of the coiling doors will be clouded on the plan. They will be in the company supply rooms: rooms 1092 and 1105. By: Dianne Grimes; CECT- NAO-M; (7572017839) On: Jul 17 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8671981 Sustainability 013329.1.5.1.2
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Specification notes, "Where not included as attachment to this specification section, use the following as HPSB Checklist...".
URL list points to a webpage that has been removed, revised, or deleted. Please provide the referenced HPSC checklist.
1-1 Government Response. Technical Amendment 0001 will be issued to provide the revised specification
The Army Energy & Sustainability Record Card (which contains the High Performance Sustainable Buildings worksheet) can be found at the following URL:
https://www.wbdg.org/ffc/army-coe/policies-and-guidance-army-design-and-construction/army-energy-sustain-record-card By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 17 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8672043 General 014500.0050.3.10
Sample forms indicated to be enclosed at the end of this specification section (ref. Attachments 1 thru 6) are not included. Please provide.
1-1 Government Response. The sample forms will be added on amendment 0002 as attachments By:
Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 24 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8677228 Architectural Door Schedule Door Types
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Multiple door types are listed on the door schedule that are not listed on the door and frame types (D56, D45, D25, D38, etc) Please clarify what these doors are.
1-0 http://www.wbdg.org/ffc/army-coe/policies-and-guidance-army-design-and-construction/army-energy-sustain-http://www.wbdg.org/ffc/army-coe/policies-and-guidance-army-design-and-construction/army-energy-sustain-http://www.wbdg.org/ffc/army-coe/policies-and-guidance-army-design-and-construction/army-energy-sustain-
1-1 Government Response. Technical Amendment 0001 will provided the revision
The listed door types are not used. A revised door schedule will be sent out as an amendment. By: Dianne
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8680445 Structural 05 12 00 - Structural Steel
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The Specifications call for the fabricator and erector to hold the AISC certification. Will 3rd party inspections of the structural steel fabrication and/or erection to confirm that steel is erected and fabricated to meet or exceed AISC certification standards be acceptable also in lieu of the AISC certification?
1-1 Government Response. No, certification as noted in the spec is required. By: Dianne Grimes; CECT-
NAO-M; (7572017839) On: Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8680558 Architectural 08 71 00 - Door Hardware
The following doors are on the door schedule but not in the hardware set section of the specifications - 1001A, 1001B, 1002A, 1003, 1016A, 1052G, 1089C, 1089D, 1110B-D-E-F-G-H-J, 1112B-C-D-E-F-G, 1113B-C-D-E-F-G-H-J, 1115B-C-D-E-F-G-J, 1120, 1121, 1123, 1124, 1125A, 2077B-C-D-E-F-G-J, 2079B-C-D-E-F-G-H-J, 2080B-C-D-E-F-G- H-J, 2082B-C-D-E-F-G-J, 3077B-C-D-E-F-G-H, 3079B-C-D-E-F-G-H-J, 3080B-C-D-E-F-G-H-J, 3082B-C-D-E-F-G-J, 4077B-C-D-E-F-G-H, 4079B-C-D-E-F-G-H-J, 4080B-C-D-E-F-G-H-J, 4082B-C-D-E-F-G-J. Please confirm hardware types.
1-1 Government Response. Technical Amendment 0001 will provided the revised drawings
Provide the hardware sets for the following doors as indicated: 1001A,1001B(HDW Set 13), 1002A-(HDW Set 16), 1003-(HDW Set 23), 1016A-(HDW SET 27), 1052G-(cased opening, no HDW required), 1089C-(Mech room HDW Set 4), 1089D(Mech Courtyard – HDW set 4).
Note: the following doors are for the mechanical closets serving the sleeping quarters. Provide HDW set 14 for the following doors (typ.): 1110B-D-E-F-G-H-J), 1112B-C-D-E-F-G, 1113B-C-D-E-F-G-H-J,1115B-C-D-E- F-G-J, 1120, 1121, 1123, 1124, 1125A, 2077B-C-D-E-F-G-J, 2079B-C-D-E-F-G-H-J, 2080B-C-D-E-F-GH-J, 2082B-C-D-E-F-G-J, 3077B-C-D-E-F-G-H, 3079B-C-D-E-F-G-H-J, 3080B-C-D-E-F-G-H-J, 3082B-C-D-E-F- G-J,4077B-C-D-E-F-G-H, 4079B-C-D-E-F-G-H-J, 4080B-C-D-E-F-G-H-J, 4082B-C-D-E-F-G-J. By: Dianne
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8680560 Architectural A-601 08 71 00 - Door Hardware
The following doors are not in the hardware set specifications and do not have any information about the type of door or frame - 1120A, 1121A, 1123A, 1124A. Please provide.
1-1 Government Response. Technical Amendment 0001 will provide the revisited design
The following doors are not in the hardware set specifications and do not have any information about the type of door or frame - 1120A, 1121A, 1123A, 1124A. Please provide. By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: Jul 17 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8680561 Architectural A-601 08 71 00 - Door Hardware
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The following doors have conflicting hardware sets between the specifications and door schedule or are not listed on the door schedule - 1092B, 1090, 1091, 1092, 1096, 1124B, 1001, 1011B, 1052F, 1006, 1068, 1016, 3041, 2001, 1013, 1052H. Please confirm or provide.
1-1 Government Response. Technical Amendment 0001 will provided the revised drawings
Provide the following hardware sets for the doors as indicated: 1092B (HDW Set 4), 1090 – (HDW Set 5), 1091(not on plan), 1092 (Coiling door), 1096 (not on plan), 1124B(Not on plan will revise schedule), 1001 (HDW Set 7), 1011B (cased opening), 1052F (Need to revise plan), 1006 (HDW Set 27), 1068 (HDW Set 25), 1016 (HDW Set 24), 3041 (HDW Set 31), 2001 (HDW Set 21),1013 (HDW Set 24), 1052H (HDW Set 14). By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 17 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8680667 Environmental 01 57 19
Para 3.1, Regarding endangered species, the specification states that the Gov't will remove major trees of concern from the site, however if additional tress have to be removed , removal must be during acceptable seasons.
Demolition plans CD101 – CD102 show trees to be removed, will the Gov't remove any of these trees and what is the acceptable time period to remove trees from the site?
1-2 Government Response. All trees indicated to be removed on the drawings shall be removed by the contractor, in accordance with contract requirements. Trees have to be removed between September and April. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 24 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8680727 Architectural 31 31 16.19
What thickness of basaltic sand is required under the slabs on grade and foundations?
1-1 Government Response. Please refer to foundations note 8 on sheet S-001 of drawings. By: Dianne
Grimes; CECT-NAO-M; (7572017839) On: Jul 16 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8680778 Civil 32 17 24.00 10
Thermoplastic is included in the specification but not found on the civil details, are any pavement markings required to be thermoplastic?
1-1 Government Response. All pavement markings shall be painted as per the plans. By: Dianne
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8685168 Construction Management
I-221
10 26 00 Wall & Door Protection
On sheet I-221 it shows the Entry & Corridor Wall Finishes. The detail shows CR-1 as Schluter Designline Satin Copper/Bronze Anodized Aluminum Profile.
Schluter Designline Trim is designed for ceramic and porcelain tile and not for vinyl wall protection sheets. I have attached the function of this trim per the Schluter Systems website: Schluter®-DESIGNLINE is a border profile for producing decorative designs in interior wall coverings.
The profile is available in stainless steel, stainless steel with structured finish, chrome plated solid brass, and anodized aluminum and is designed to coordinate with RONDEC and QUADEC profiles for outside wall corners.
DESIGNLINE has a 1" (25 mm)-wide surface area and a thickness of 1/4" (6 mm). It is anchored in the mortar bond coat between tile courses via its cross-sectional shape and can be used with thicker tiles by building up the setting material behind the profile.
There are 3D trims available for the vinyl wall protection. Please provide me with some direction on what type of trim would be acceptable.
1-1 Government Response. Technical Amendment 0001 will provide the revised drawings.
CR-1 will be revised to "Schluter Designline Satin Copper/Bronze Anodized Aluminum Profile with Koroseal Wall Protection Systems. CH20 Chair rail, COLOR: CREAM." An amendment is forthcoming to include this change. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 17 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8685503 Utilities Engineering
CD101, CU101, ES101,
ES102, ES 103 and EP701
Section 00 10 00 Solicitation
The pricing schedule provided within the Solicitation includes CLIN 0005 (Bid Option 003) described as "Construction of new and demolition of existing electrical lines on the project site in conflict with proposed buildings and the installation of new services, outside the 5 foot line, excluding the work described. .................... " Demolition Note 3 on Plan Sheet CD101 indicates "All light and power poles are to be removed by dominion power (DVP)." Sheet Note 9 on Plan Sheet CU101 indicates "Dominion Energy (DE) will relocate and install new electrical services.
Coordinate ........ " Plan Sheets ES101 and ES102 include Demolition Note 1 which indicates "All light poles and associated fixtures will be demolished by Dominion Energy." Plan Sheets ES101, ES102 and ES103 included New Work Note 1 which states Pad Mounted Transformer provided by Dominion Energy. Additionally, the Power Riser Diagram on Plan Sheet EP701 indicates "XMFR By DVP" and "Contractor to stub conduit out 5'-0" from building."
Note 2 on the Feeder Schedule, found on EP701, includes "Secondary conductors and conduits up to 5'-0" from the building to be provided by Dominion Energy." We have been unable to find any additional information regarding construction of new electrical lines or demolition of existing electrical lines nor any new services information other that what appears to be Dominion Power/Dominion Energy provided work. Please review and confirm Dominion Power/Dominion Energy is providing the work described in CLIN 0005 (Bid Option 003) and this work shall be paid for by the Government or provide a description of what the Contractor is responsible for. Also please confirm Dominion Power/Dominion Energy will provide both the Primary conducts and conductors along with Secondary conduits to 5'-0" from building and ALL Secondary conductors as it would be extremely unusual for Dominion Power/Dominion Energy to terminate the Secondary conductors 5'-0" form the building.
1-1 Government Response. Dominion Energy will provide all site lighting, primary, and secondary cabling.
The contractors responsibility is to provide conduit extended 5'-0" past the exterior of the building. Dominion will terminate their secondary cabling into the CT Cabinet in the electrical room. By: Dianne Grimes; CECT- NAO- M; (7572017839) On: Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8685535 Electrical ES101
New Work Notes 2 & 3, on Plan Sheet ES101, indicated the pedestrian site lighting fixtures and the parking light fixtures are to be provided by Dominion Energy. Please confirm Dominion Energy will be installing the pathways/rough-in for the lighting as well as the lighting and this work shall be paid for by the Government. If the contractor is responsible for installing the lighting provided by Dominion Energy, please confirm they are all intended to be on the single circuit found in the panel scheduled for Exterior Lighting (Panel HVL11-5), a detail of the pole installation (pole base diagram, direct bury, etc) and provide how the site lighting is controlled (time clock, photo cell, etc).
1-1 Government Response. Power, lighting control, poles, and fixtures will all be installed and provided by
Dominion Energy. Circuit HVL11-5 is for exterior lighting on the building (shown on plans EL111-114) and will be the contractors responsibility to install. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 14
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8685543 Electrical ES101
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
New Work Notes 2 & 3, on Plan Sheet ES101, indicated the pedestrian site lighting fixtures and the parking light fixtures are both to be mounted 30' above finish grade. This mounting height appears reasonable for the parking light fixtures, but not for the pedestrian site light. Please review and advise accordingly.
1-1 Government Response. Dominion will be installing both the pedestrian lights and parking lot lights. This was the information for pole heights to match the existing site design and fixtures and it what we have been given from Dominion Energy. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8685551 Electrical ES102
New Work Note 2, on Plan Sheet ES102, indicated the pedestrian site lighting fixtures are to be provided by Dominion Energy. Please confirm Dominion Energy will be installing the pathways/rough-in for the lighting and this work shall be paid for by the Government. New Work Note 3, on this same Sheet (ES102) indicates the lighting is to be provided as a bid option. If this work is to be completed by Dominion Energy and payment will be by the Government, it would appear the Contractor would not be able to include the value in CLIN 0005 – Bid Option 001.
Please confirm this value is not required to be included in the parking lot bid option identified on Plan Sheets CS101 and CS101A.
1-1 Government Response. This additional parking lot is a bid item for the overall contract. Only if this parking lot will be provided, will these lights be necessary, and if so Dominion Energy will provide them. This will not be a part of the contractors bid item. By: Dianne Grimes; CECT-NAO-M; (7572017839) On:
Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8685560 Civil 31 00 00 Earthwork
Reference Paragraph 1.1.d. of Specification Section 31 00 00 Earthwork. Included in this paragraph is the requirement to remove four (4) feet of existing uncontrolled fill to 5 feet beyond the building's footprint. Paragraph 1.1.e. goes on to describe the requirement for the contractor to include a contingency for additional unsuitable soils encountered. This leads to a couple of questions. 1. Typically we would see a line item entry on the Pricing Schedule for the Contingency. We have found no entry on the Pricing Schedule 2. The Contingency amount would be provided so all Contractors would carry the same value. We have found no "Allowance" indicated for unsuitable soil. Please review and advise accordingly.
1-2 Government Response. Specification section 31 00 00 Paragraph 1.1.d requires the removal of four feet on uncontrolled fill to a point five feet beyond the building footprint. Removal of uncontrolled fill to a greater depth (below 4 feet) should be expected in isolated locations. Please refer to the Geotechnical Report included in the specifications for further information regarding noted depth and composition of uncontrolled fill. Any unsuitable material discovered outside of these requirements shall be identified and will be processed through the changes clause. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 24 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8685567 Civil C-001
General Note 1, on Plan Sheet C-001 appears to indicate American States Utility Services (ASUS) will be responsible for all Sanitary Sewer & Water Line work. Sanitary Sewer Note 1 indicates the work will be paid for by the Government. Water Line Note 3 appears indicate all Domestic & Fire Water work will be paid for by the Government.
Plan sheet C-001 also references CD101, CD101A & CS102 for demolition of Water and Sanitary Sewer. Notes on these drawings appear to indicate ASUS will be responsible for demolition of Water & Sanitary Sewer. Please review and confirm the Government is responsible for paying ASUS for all demolition, rework and new work of Water and Sanitary Sewer.
1-1 Government Response. The Government is responsible for this work. By: Dianne Grimes; CECT-
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8685582 Civil CU101, CU102 and C-517
Reference detail A7/C-517 (Lint Interceptor). Will ASUS be responsible for providing the Lint Interceptors shown on CU101 and CU102?
1-1 Government Response. Yes. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 16 2020
Information for this report is procurement sensitive.
8685589 Civil CU102
Plan Sheet CU102 indicates the requirement for a Sanitary Lift Station and associated Force Main. Will ASUS be responsible for providing the Lift Station and Force Main.
1-1 Government Response. Yes By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 16 2020
8685665 Landscape Architecture LP101A
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm that the bubbled area is the bid option, with the remaining unbubbled area being the base bid.
(Attachment: 794_AIT_PH4_RTA_DWGS_-_Copy_59.pdf)
1-1 Government Response. The bubbled area identified in LP101A is the bid option. The project limits on
LP101 is the demarcation between base bid and bid option. By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8688866 Electrical EG111, EG501, EG502 and
EG901
There appears to be a discrepancy in the size of the electrical ground loop. Plan Sheet EG501 includes two (2) details (Ground Rod Detail & Pad Mounted Transformer Detail) which indicated a #1/0 ground wire. Plan sheet EG111 indicates a #4/0 ground wire As well as the Grounding Detail on EG502 and the Covered Assembly Lighting Protection plan on EG901. Please review and advise which wire size is correct.
1-1 Government Response. Amendment 0001 will provide the revised drawings.
Ground wire cabling should all be 4/0 cable. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 17
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8688964 Civil CG107
Should the storm pipe run from Structure 1-5A to 1-5 and Structure 1-5A be listed as part of the Bid Option?
1-1 Government Response. Amendment 0001 will provided the revised drawings
Structure & pipe table will be revised to reflect bid option work. By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: Jul 17 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8690319 Environmental 31 00 00
Per para 1.1 d; the uncontrolled fill material that is being removed may contain asbestos containing materials (ACM).
Since the quantity of ACM can not be quantified, will removal and disposal of any ACM be handled by an allowance or by change order?
1-2 Government Response. If Asbestos containing material is discovered within the excavated material the material will be processed through the changes clause. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 24 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8690344 Construction
A111
12 31 00 Metal Casework
See Attached
(Attachment: Nycom_RFI__7-8-2020.pdf)
1-1 Government Response. 1. Spec section 10 11 00 (Visual Display Units) will be added as an amendment.
2. Concur.
3. Elevation #8 is correct, provide 4', 3' and 4' stainless steel cabinets on both sides of the room (east and west) with 11'-0" solid surface countertop and the ice machine will be located at the end as shown dashed on elevation 8.
4. Provide KCMA stainless steel casework as indicated. By: Dianne Grimes; CECT-NAO-M; (7572017839) On:
Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8690827 Landscape Architecture LP501
The proposed plant schedule/bid option quantities do not match the quantities shown on the plans. Please advise.
1-2 Government Response. The schedules on sheet LP501 have been updated, and will be addressed by amendment 0002 By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 24 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8690995 Energy Mon & Controls 00100 - Solicitation
The solicitation references requirements to interface with the Base's existing ECMS; however, there is no specification section outlining the requirements for ECMS integration. Is the cost tp integrate the building's new HVAC control system into the existing JCI ECMS system part of this project?
2-1 Government Response. Yes By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jul 16 2020
Information for this report is procurement sensitive.
8691007 Energy Mon & Controls 230923 and 250511.01
Must control devices have a Certificate of Networthiness (CoN)and an Authority to Operate (ATO)on the Joint-Base Langley Eustis Local Area Network." Please confirm the Eustis. Local Area Network is the Ft. Eustis Network Enterprise Center (NEC)? What documentation is required to prove CoN and ATO for the Ft. Eustis NEC? Thank you.
1-2 Government Response. The text below appends or clarifies ALL previous replies.
The previous reply referred to the amended specification as section 23 09 00. This figure is incorrect, and the actual amended specification is section 23 09 13. By: Michael Esry; CENAO-EC-ED Engineering Design Management Section; (757-201-7888) On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8691014 Energy Mon & Controls 230923 and 250511.01
Please confirm the…