A0002 SUBMITTAL REGISTER.pdf
PDF 1012 KB Posted
- Attached to
- AIT Barracks Fort Eustis VA (Amendment 0004) Federal contract opportunity
- Solicitation number
- W9123620B0015
About this file
This submittal register outlines the required submittals for a construction project to build AIT Barracks at Fort Eustis, Virginia. Key submittals include shop drawings, product data, samples, design calculations, test reports, certificates, manufacturer instructions, and closeout documentation for various construction specifications involving site work, concrete, masonry, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, specialties, equipment, furnishings, special construction, conveying systems, mechanical, and electrical work. The submittals are to be provided by the construction contractor and reviewed by the government approving authority according to the schedule in the document.
View the file
Other files for this federal contract opportunity
Show all 50
AIT Barracks Fort Eustis VA (Amendment 0004) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 101 PAGES
FORT EUSTIS AIT BARRACKS PH4
01 11 00.00 50 SD-01 Preconstruction Submittals
1.12 GSalvage Plan
01 22 00.00 10 SD-03 Product Data
Weight Certificates
01 30 00.00 50 SD-01 Preconstruction Submittals
1.3 GView location map
1.4 GProgress and completion pictures
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.1 GPreliminary Sustainability
Notebook
1.5.3.1Preliminary High Performance and Sustainable Building Checklist
SD-11 Closeout Submittals
1.5.3.1 GFinal Sustainability Notebook
1.5.3.1 GFinal High Performance and
Sustainable Building Checklist
GAmended Final Sustainability
Notebook
01 35 26.00 50 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
E4BRIJLW
Polygon
REMOVED SPEC SECTION 31 31 16.19 - TERMITE CONTROL BARRIERS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 101 PAGES
01 35 26.00 50 1.6 G AAccident Prevention Plan (APP)
1.7 G AActivity Hazard Analysis (AHA)
1.6.1 G ACrane Critical Lift Plan
1.5.1.2 G ACrane Operators
SD-06 Test Reports
1.11Notifications and Reports
1.11.2 G AAccident Reports
1.11.3Crane Reports
SD-07 Certificates
1.8 G AConfined Space Entry Permit
1.8 G AHot work permit
1.13License Certificates
01 45 00.00 50 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9.2Verification Statement
01 45 35 SD-01 Preconstruction Submittals
GSIOR Letter of Acceptance
GProject Manual
Written Practices
SD-06 Test Reports
3.1.2Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1Fabrication Plant
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 101 PAGES
01 45 35 Steel Joist Institute Membership
2.1Certified Plant
2.1Certificate of Compliance
GSpecial Inspector of Record
1.5 GSpecial Inspector
Qualification Records
SD-11 Closeout Submittals
Interim Final Report
2.1 GComprehensive Final Report
3.1.2 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.5.1 GTraffic Control Plan
SD-06 Test Reports
2.2.5Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
1.10 GSolid Waste Management Permit
1.5.2 GRegulatory Notifications
1.6 GEnvironmental Protection Plan
1.6.9.1 GDirt and Dust Control Plan
1.5.5 GEmployee Training Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 101 PAGES
01 57 19 1.5.4 GEnvironmental Manager
Qualifications
3.2.1.2Virginia DEQ Registration
Statement
3.2.1.1 GStormwater Pollution Prevention
Plan
3.2.1.2Coverage Under The
Construction General Permit
SD-06 Test Reports
3.7.1.1.2Laboratory Analysis
3.2.1.3Inspection Reports
3.7.2.1 GSolid Waste Management Report
SD-07 Certificates
1.5.5 GEmployee Training Records
Certificate of Competency
1.5.5Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.2.1.4 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 GStormwater Notice of Termination
3.7.1 GWaste Determination
Documentation
3.7.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 101 PAGES
01 57 19 1.5.5 GAssembled Employee Training
Records
1.10 GSolid Waste Management Permit
3.7.2.1 GSolid Waste Management Report
3.7.3.1 GHazardous Waste/Debris
Management
1.5.2 GRegulatory Notifications
3.7.2.1 GSales Documentation
3.7.2.1Contractor Certification
3.2.1.5As-Built Topographic Survey
01 58 00 SD-02 Shop Drawings
GPreliminary One Line
1.3.1 GSign Legend Orders
SD-04 Samples
GFinal Rendering
GFinal Framed Rendering
01 74 19 SD-01 Preconstruction Submittals
1.6 GWaste Management Plan
SD-11 Closeout Submittals
1.7Records
01 75 00.00 40 SD-01 Preconstruction Submittals
1.2.1 GVerification of Prior Experience
1.2.1 GDocumentation of Manufacturer's
Prior Experience
1.2.1 GQuality Control Plan
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 101 PAGES
01 75 00.00 40 1.2.2 GDrawings, Diagrams and
Schedules
1.2.2 GDiagrams and Instructions
1.2.2 GCoordination Drawings
SD-03 Product Data
1.2.3 GCatalog Cuts
1.2.1 GManufacturer's Sample Warranty
1.2.3 GSamples of Warranty Language
SD-05 Design Data
1.2.3 GDesign Calculations
SD-06 Test Reports
1.2.4.1 GFactory Tests
1.2.4.3 GFunctional Field Test
1.2.4.4 GFinal Acceptance Test
1.2.4.2 GTest Procedures
SD-07 Certificates
1.2.1 GQualification of Manufacturer
1.2.1 GQualification of Installer
1.2.1 GUnited States Manufacture
SD-08 Manufacturer’s Instructions
1.2.1 GManufacturer's Administrative
Requirements
1.2.1 GDemonstration and Training
Information
1.2.1 GManufacturer's Procedural
Requirements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 101 PAGES
01 75 00.00 40 SD-09 Manufacturer’s Field
Reports
1.2.4.3 GDocumentation of the Testing and
Verification Actions
SD-10 Operation and Maintenance
Data
1.2.3 GOperation and Maintenance Data
1.2.3 GSafety and Security Data or
Posters
01 78 00 SD-03 Product Data
1.3.2As-Built Record of Equipment and Materials
1.7.1Warranty Management Plan
1.7.5Warranty Tags
1.4Spare Parts Data
SD-08 Manufacturer’s Instructions
1.5Preventative Maintenance
1.5Condition Monitoring (Predictive
Testing)
1.5Inspection
1.7.1Instructions
SD-10 Operation and Maintenance
Data
1.8Operation and Maintenance
Manuals
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 101 PAGES
01 78 00 1.3.1Record Drawings
1.10 GInterim Form DD1354
1.10 GChecklist for Form DD1354
01 91 00.15 SD-01 Preconstruction Submittals
1.7 G DOCommissioning Firm
1.7.1 G DOLead Commissioning Specialist
1.7.2 G DOTechnical Commissioning
Specialists
1.7 G DOCommissioning Firm's Contract
SD-06 Test Reports
3.1.3 G DODesign Review Report
3.1.2.1 G DOInterim Construction Phase
Commissioning Plan
3.1.2.2 G DOFinal Construction Phase
Commissioning Plan
3.1.2.1.3 G DOTemplate Building Envelope
Inspection Checklists
3.1.5.2 G DOBuilding Envelope Inspection
Checklists
3.1.5.3 G DOPre-Functional Checklists
1.9Issues Log
3.2 G DOCommissioning Report
3.3.1 G DOPost-Construction Trend Log
Report
SD-07 Certificates
1.10 G DOCertificate of Readiness
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 101 PAGES
01 91 00.15 SD-10 Operation and Maintenance
Data
3.1.6 G ROTraining Plan
3.1.6 G ROTraining Attendance Rosters
3.1.7 G DOSystems Manual
3.1.8 G DOMaintenance and Service Life
Plans
SD-11 Closeout Submittals
3.1.2.1 S DOConstruction Phase
Commissioning Plan
3.2 S DOFinal Commissioning Report
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.10Existing Conditions
SD-07 Certificates
1.2.1 GDemolition Plan
1.6 GNotification
SD-11 Closeout Submittals
Receipts
02 65 00 SD-01 Preconstruction Submittals
1.4.3 GWork Plan
1.4.3.1 GSite Safety and Health Plan
1.4.3.2 GExcavation and Material Handling
Plan
1.4.3.3 GField Sampling and Laboratory
Testing Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 101 PAGES
02 65 00 1.4.3.4 GTank and Piping Removal And
Disposal Plan
1.4.3.5 GSpill and Discharge Control Plan
1.4.1 GQualifications
GLaboratory Services
3.12.3State Licensed Waste
Transporter
SD-06 Test Reports
Laboratory and Field Testing
Reports
2.1Backfill Material
3.2Tank Contents Verification
3.5.2Contaminated Water Disposal
3.10Soil Examination, Testing, and
Analysis
3.11 GBackfilling
SD-11 Closeout Submittals
3.12.4 GSalvage Rights
3.12.7Tank Closure Report
3.15Tank Closure Report
Building permit, inspection permits, and other permits
GResults of excavation
GTank disposal paperwork
GContaminated soil disposal paperwork
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 101 PAGES
02 65 00 GContaminated water disposal paperwork
GIdentification of tanks removed and disposed of
Cumulative quantities of soil excavated
02 81 00 SD-03 Product Data
2.1.1Packaging Notifications
3.1 GHazardous Waste Management
Plan
3.2 GOnsite Hazardous Waste
Management
3.3Notices of Non-Compliance and
Notices of Violation
SD-06 Test Reports
3.6 GRecordkeeping
3.6 GException Report
3.7Spill Response
SD-07 Certificates
1.4.1 GTransportation and Disposal
Coordinator
1.4.2 GTraining
1.4.3Certification
3.3.3 GShipping Documents and
Packagings Certification
3.3.4Security Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 101 PAGES
02 81 00 3.3.5Certificates of Disposal
3.5Waste Minimization
03 11 13.00 10 SD-02 Shop Drawings
2.2.1 GFormwork
3.1.1 GFormwork
2.2.1 GForm Removal Schedule
SD-03 Product Data
2.2Form Materials
SD-05 Design Data
2.1Calculations
SD-06 Test Reports
3.2Inspection
03 15 00.00 10 SD-02 Shop Drawings
2.4 GWaterstops
SD-03 Product Data
2.2Preformed Expansion Joint Filler
2.3Sealant
2.4Waterstops
SD-04 Samples
2.3.2Lubricant for Preformed
Compression Seals
2.3.3Field-Molded Type
SD-07 Certificates
2.2Preformed Expansion Joint Filler
2.3Sealant
2.4Waterstops
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 101 PAGES
03 20 00.00 10 SD-02 Shop Drawings
3.1Reinforcement
SD-07 Certificates
2.3Reinforcing Steel
03 30 00.00 10 SD-01 Preconstruction Submittals
1.5.2 GQuality Control Plan
1.5.1Laboratory Accreditation
3.8.5.4 GSampling Plan
SD-03 Product Data
Part 2Recycled Content Products
2.2Cementitious Materials
2.10Vapor Retarder
2.1.5Floor Finish
2.4Chemical Admixtures
SD-05 Design Data
2.1.1 GMixture Proportions
SD-06 Test Reports
2.1.1 GMixture Proportions
3.8 GTesting and Inspection for CQC
2.2.3Fly Ash
2.3Aggregates
3.8.5.1Air Content
3.8.5.2Slump
3.8.5.4Compressive Strength
2.5Water
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 101 PAGES
03 30 00.00 10 1.5Contractor Quality Control personnel
3.2.1Ready-Mix Plant
03 35 00.00 10 SD-03 Product Data
Part 2Recycled Content Products
SD-04 Samples
1.3.1Field Test Panels
1.3.1.1Sample Wall Panels
1.3.1.2Slab Panels
03 39 00.00 10 SD-03 Product Data
2.1Curing Materials
SD-06 Test Reports
3.2Testing and Inspection for CQC
SD-08 Manufacturer’s Instructions
2.1Curing Compound
03 45 00 SD-01 Preconstruction Submittals
1.12.5Pre-Installation Meeting
SD-02 Shop Drawings
1.12.1 GPrecast Drawings
SD-03 Product Data
2.3 GCast-In Embedded Items And
Connectors
2.3.2 GConnection Devices
2.2.5Admixtures
2.5Gasket
Thin Brick Veneer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 101 PAGES
03 45 00 2.6Bearing Pads
SD-04 Samples
1.12.2 GConcrete Wall Panel Surface
Finish
1.12.4Mock-up
Brick Color Chips
Form Liner
1.12.2Full Size Sample Wall Panel
SD-05 Design Data
1.5.4 GDesign Calculations
2.1.1 GContractor-Furnished Mix Design
2.4.9 GRepair of Surface Defects
1.5.5 GThermal Calculations
SD-06 Test Reports
1.11.2 GStrength Tests
1.11.2Slump
1.11.2Air Content
1.11.1Test for Concrete Materials
2.2.6Water
3.6.4Testing Precast Units for Strength
SD-07 Certificates
1.4 GManufacturer's Qualifications
1.8.1Fabricator Quality Certifications
1.9Erector Certification
SD-08 Manufacturer’s Instructions
3.3 GInstallation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 101 PAGES
03 45 00 3.8 GCleaning
Thin Brick
SD-11 Closeout Submittals
1.12.3 GBatch Ticket Information
2.2.1 SRecycled Content for Fly Ash and
Pozzolan
2.2.1 SRecycled Content for Ground Iron
Blast-Furnace Slag
2.2.1 SRecycled Content for Silica Fume
04 20 00 SD-02 Shop Drawings
3.3.4.1 GCut CMU
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2 GClay or Shale Brick
2.2.3.2.1 GCement
2.4.1.1 GCementitious Materials
SD-04 Samples
1.3.1.1 GMock-Up Panel
2.2.2 GClay or Shale Brick
2.2.3.2 GConcrete Masonry Units (CMU)
2.4.1.4Admixtures for Masonry Mortar
2.6.2 GAnchors, Ties, and Bar
Positioners
2.6.3 GJoint Reinforcement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 101 PAGES
04 20 00 2.6.6Clay Masonry Expansion-Joint
Materials
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
2.2.3.4Fire-Rated Concrete Masonry
Units
3.2.5 GBracing Calculations
SD-06 Test Reports
2.2.2.1.4Efflorescence Test
2.2.3.4Fire-Rated Concrete Masonry
Units
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
3.6.1.4Prism Tests
SD-07 Certificates
1.3.2Special Masonry Inspector
Qualifications
2.2.2Clay or Shale Brick
2.2.3.2Concrete Masonry Units (CMU)
Precast Concrete Units
2.4.1.1Cementitious Materials
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 101 PAGES
04 20 00 SD-08 Manufacturer’s Instructions
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
SD-11 Closeout Submittals
2.2.2.1.3 SClay Units
2.2.3.2 SConcrete Masonry Units (CMU)
2.2.3.2.2 SRecycled Content
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 GFabrication Drawings
SD-03 Product Data
2.5.2Shop Primer
2.4.1Welding Electrodes and Rods
2.4.2Non-Shrink Grout
2.2.1 SRecycled Content for Structural
Steel
2.2.2 SRecycled Content for Structural
Steel Tubing
2.2.3 SRecycled Content for Steel Pipe
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 101 PAGES
05 12 00 1.4.3 GDesign Calculations for Steel
Connections
1.4.2 GShoring and Temporary Bracing
SD-06 Test Reports
2.3Bolts, Nuts, and Washers
3.6.1.2Weld Inspection Reports
3.6.2.1Bolt Testing Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
1.3AISC Structural Steel Fabricator
Quality Certification
1.3AISC Structural Steel Erector
Quality Certification
1.4.4.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.6.1.1Certified Welding Inspector
3.6.1.2NDT Technician
3.4Welding Procedure Specifications
(WPS)
05 30 00 SD-02 Shop Drawings
1.3.4 GFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 101 PAGES
05 30 00 2.1.4Galvanizing Repair Paint
2.2.14Mechanical Fasteners
2.1.4Touch-Up Paint
Sound Absorbing Materials
1.3.2Welding Equipment
1.3.2Welding Rods and Accessories
2.1 SRecycled Content of Steel
Products
SD-04 Samples
2.1.1Metal Roof Deck Units
Cellular Metal Floor Deck Units
2.2.4Flexible Closure Strips
Acoustical Material
SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
Powder-Actuated Tool Operator
1.3.2Welder Qualifications
1.3.2Welding Procedures
Fire Safety
1.3.3.1Wind Storm Resistance
1.3.1Manufacturer's Certificate
Stud Manufacture's Certification
Stud Manufacture's Test Reports
05 40 00 SD-02 Shop Drawings
1.7.1 GFraming Components
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 101 PAGES
05 40 00 1.5 GCold Formed Steel Trusses
SD-03 Product Data
2.1Studs, Trusses, Joists
2.1 SRecycled Content of Steel
Products
SD-05 Design Data
1.7.2 GCold Formed Steel Truss
Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
3.3.1Welds
05 50 13 SD-03 Product Data
Access Panels and Doors
05 51 00 SD-02 Shop Drawings
2.1 G NAOIron and Steel Hardware
2.1 G NAOSteel Shapes, Plates, Bars, and
Strips
2.2.1 G NAOMetal Stair System
SD-03 Product Data
2.4.1 GStructural-Steel Plates, Shapes, and Bars
2.4.2 GStructural-Steel Tubing
2.4.5 GHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 GCold-Finished Steel Bars
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 101 PAGES
05 51 00 2.4.3 GHot-Rolled Carbon Steel Bars
2.4.6 GCold-Rolled Carbon Steel Sheets
2.4.7 GGalvanized Carbon Steel Sheets
2.4.8 GCold-Drawn Steel Tubing
2.4.9 GGray Iron Castings
2.4.10 GMalleable Iron Castings
2.3.2 GConcrete Inserts
2.3.3 GMasonry Anchorage Devices
2.2.3 GProtective Coating
2.2.2 GSteel Pan Stairs
2.3.1 GSteel Stairs
SD-07 Certificates
1.3.1 GWelder Qualification
SD-08 Manufacturer’s Instructions
2.4.1 GStructural-Steel Plates, Shapes, and Bars
2.4.2 GStructural-Steel Tubing
2.4.5 GHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 GCold-Finished Steel Bars
2.4.3 GHot-Rolled Carbon Steel Bars
2.4.6 GCold-Rolled Carbon Steel Sheets
2.4.7 GGalvanized Carbon Steel Sheets
2.4.8 GCold-Drawn Steel Tubing
2.4.9 GGray Iron Castings
2.4.10 GMalleable Iron Castings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 101 PAGES
05 51 00 2.2.3 GProtective Coating
2.3.3 GMasonry Anchorage Devices
05 51 33 SD-02 Shop Drawings
2.3Ladders
Ship's Ladder
SD-03 Product Data
2.3Ladders
Ship's Ladder
Ladder Safety Devices
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
1.3Fabricator Certification for Ships
Ladder Assembly
06 20 00 SD-02 Shop Drawings
1.3 G NAODetail Drawings Indicating All
Wood Assemblies
SD-03 Product Data
2.1 G NAOWood Products
2.3 G NAOHardware and Accessories
SD-04 Samples
1.5 GSamples
SD-07 Certificates
1.7.1.1 GCertificates of Grade
SCertified Sustainably Harvested
Hardboard
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 101 PAGES
06 20 00 Indoor Air Quality for Hardwood
Plywood
06 41 16.00 10 SD-02 Shop Drawings
2.12Shop Drawings
3.1Installation
SD-03 Product Data
2.1Wood Materials
2.10Wood Finishes
2.12.7.3Finish Schedule
1.5.2Certification
SD-04 Samples
2.3Plastic Laminates
2.7Cabinet Hardware
SD-07 Certificates
1.5Quality Assurance
2.10Laminate Clad Casework
3.1Laminate Clad Casework
SD-11 Closeout Submittals
1.3LEED Documentation
06 61 16 SD-02 Shop Drawings
GDetail Drawings
3.1 GInstallation
SD-03 Product Data
2.1Solid Polymer Material
1.5.1Qualifications
2.3Fabrications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 101 PAGES
06 61 16 2.2.4 SIndoor air quality for solid surface seam and sealant products
SD-04 Samples
2.1 GMaterial
2.3.5 GCounter and Vanity Tops
SD-06 Test Reports
2.1Solid Polymer Material
SD-07 Certificates
2.3Fabrications
1.5.1Qualifications
2.1 SIndoor Air Quality for solid
surface fabrication products
SD-10 Operation and Maintenance
Data
3.2Clean-up
07 05 23 SD-01 Preconstruction Submittals
1.4 GWork Plan
SD-03 Product Data
2.2 GThermal Imaging Camera
SD-05 Design Data
GEnvelope Surface Area
Calculations
SD-07 Certificates
1.6.2.1Pressure Test Agency
1.6.2.2Thermographer Qualifications
1.6.3Test Instruments
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 101 PAGES
07 05 23 1.6.3Date Of Last Calibration
SD-06 Test Reports
3.5 GPressure Test Procedures
3.5.8 GAir Leakage Test Report
3.6.5 GDiagnostic Test Report
07 13 53 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.2 GElastomeric Waterproofing Sheet
Material
GProtection Board
1.4 GPrimers, Adhesives, and Mastics
2.2 GPrimers, Adhesives, and Mastics
SD-06 Test Reports
2.2 GElastomeric Waterproofing Sheet
Material
3.6 GField Quality Control
3.7 GProtective Covering
SD-07 Certificates
2.2Elastomeric Waterproofing Sheet
Material
1.4 GPrimers, Adhesives, and Mastics
2.2 GPrimers, Adhesives, and Mastics
1.8 GSpecial Warranties
1.8 GSpecial Warranties
2.1.1 GCertificates Of Compliance
2.1.2 GCertificates Of Compliance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 101 PAGES
07 13 53 SD-08 Manufacturer’s Instructions
1.4 GPrimers, Adhesives, and Mastics
2.2 GPrimers, Adhesives, and Mastics
SD-11 Closeout Submittals
2.1.1 GCertificates Of Compliance
2.1.2 GCertificates Of Compliance
07 21 13 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.1 GBlock or Board Insulation
2.2 GVapor Retarder
SD-07 Certificates
2.1 GBlock or Board Insulation
2.2 GVapor Retarder
SD-08 Manufacturer’s Instructions
2.1Block or Board Insulation
2.5.1Adhesive
07 21 16 SD-03 Product Data
2.1Blanket Insulation
2.1.2 SRecycled Content for Insulation
Materials
2.2Sill Sealer Insulation
2.4Vapor Retarder
2.5Pressure Sensitive Tape
2.6Accessories
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 101 PAGES
07 21 16 SIndoor Air Quality for Insulation
Materials
2.6.1 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.3.1Insulation
07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
1.3 GVerification of Existing Conditions
SD-03 Product Data
2.1 GInsulation
1.4 GCover Board
2.4 GFasteners
GSheathing Paper
2.3 GMoisture Control
2.1.3 SRecycled Content For Insulation
SD-06 Test Reports
1.7.1 GFlame Spread Rating
SD-07 Certificates
1.6 GInstaller Qualifications
1.6 GCertificates Of Compliance For
Felt Materials
2.1.4 SIndoor Air Quality For Insulation
SD-08 Manufacturer’s Instructions
2.4 GFasteners
2.1 GInsulation
07 26 30 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 101 PAGES
07 26 30 2.1 GAir Barrier
NAO A/E
1.6.8 GMock-up
SD-03 Product Data
2.1Materials
3.1Peel-adhesion
1.6.4VOC
1.3.1Local/Regional Content Materials
SD-04 Samples
2.1Materials
SD-06 Test Reports
1.6.8Mock-up
SD-07 Certificates
Contractor Qualifications
1.6Quality Assurance
07 27 10.00 10 SD-04 Samples
3.1.2 GMock-Up
SD-06 Test Reports
1.8 G DODesign Review Report
3.1.3 G ROTesting and Inspection
SD-07 Certificates
1.7 G ROAir Barrier Inspector
07 27 26 SD-01 Preconstruction Submittals
1.9.1 GQualifications of Manufacturer
1.9.2 GQualifications of Installer
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 101 PAGES
07 27 26 1.4 GFluid-Applied Membrane Air
Barrier
SD-03 Product Data
1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
2.2 GPrimers, Adhesives, and Mastics
2.6 GReinforcement
1.4.2 GSafety Data Sheets
SD-04 Samples
1.4.3 GMockup
SD-06 Test Reports
1.6 GCapillary Moisture Test
1.4.4 GField Peel Adhesion Test
1.4.4 GFlame Propagation of Wall
Assemblies
1.4.4 GFlame Spread and Smoke
Developed Index Ratings
3.4.1 GSite Inspections
SD-07 Certificates
1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
1.9.1 GQualifications of Manufacturer
1.9.2 GQualifications of Installer
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 101 PAGES
07 27 26 1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
2.2 GPrimers, Adhesives, and Mastics
07 42 63 SD-01 Preconstruction Submittals
1.5.3Qualification of Manufacturer
1.5.4Qualification of Installer
1.5.4.1Qualifications for Welding Work
SD-02 Shop Drawings
1.5.1Fabrication and Installation drawings
1.5.1Wall Panel Assemblies
1.5.1Flashing and Accessories
1.5.1Anchorage Systems
SD-03 Product Data
Certification
1.5.1sustainable acquisition
1.5.1Manufacturer's catalog data
1.5.1Factory Color Finish
1.5.1Sub-girts and Formed Shapes
1.5.1Closure Materials
1.5.1Insulation
1.5.1Pressure Sensitive Tape
2.4.4.1Sealants and Caulking
1.5.1Rated Wall Assembly
Galvanizing Repair Paint
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 101 PAGES
07 42 63 Enamel Repair Paint
Aluminized Steel Repair Paint
1.5.1Accessories
SD-04 Samples
1.5.1Wall Panel Assemblies
1.5.1Fasteners
1.5.1Metal Closure Strips
1.5.1Insulation
1.5.1manufacturer's color charts and chips
SD-05 Design Data
1.5.1Wind Design Analysis
SD-06 Test Reports
3.7.2Leakage Tests
1.3.2Wind Load Tests
1.3.2Seismic Tests
1.5.1Factory Color Finish
SD-07 Certificates
1.5.1Fasteners
Galvanizing Repair Paint
Enamel Repair Paint
1.5.3Qualification of Manufacturer
1.5.4Qualification of Installer
1.5.1wall system assembly wind load and fire rating classification listings
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 101 PAGES
07 42 63 1.5.1Installation of Wall Panels
SD-11 Closeout Submittals
Warranty
1.5.1Instructions
1.5.1Safety Data Sheets
1.5.120 year 'No-Dollar-Limit' Warranty
07 52 00 SD-02 Shop Drawings
1.4.7 GRoof plan
SD-03 Product Data
2.2 GModified Bitumen Sheets
2.4 GPrimer
2.5 GModified Bitumen Roof Cement
2.7 GFasteners And Plates
1.9 GWarranty
SD-05 Design Data
1.4.6 GWind Uplift Calculations
SD-07 Certificates
1.4.1Qualification of Manufacturer
1.4.2Qualification of Applicator
1.4.4Qualification of Engineer of
Record
1.5.1Bill of Lading
1.4.6 GWind Uplift Resistance
1.4.5 GFire Resistance
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 101 PAGES
07 52 00 3.3.5 GModified Bitumen Membrane
Application
3.3.6 GFlashing
2.4Primer
2.7.1Fasteners
Ventilating Base Sheets
1.6 GCold Weather Installation
SD-11 Closeout Submittals
1.9Warranty
3.9Information Card
3.8Instructions To Government
Personnel
07 60 00 SD-02 Shop Drawings
2.2.1 GExposed Sheet Metal
3.1.17 GGutters
3.1.18 GDownspouts
3.1.26 GExpansion Joints
2.2.1 GGravel Stops and fascia
3.1.22 GSplash Pans
3.1.19 GFlashing for Roof Drains
3.1.11 GBase Flashing
3.1.12 GCounterflashing
3.1.27 GFlashing at Roof Penetrations
and Equipment Supports
2.2.15 GReglets
3.1.20 GScuppers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 101 PAGES
07 60 00 3.1.30 GCopings
3.1.16 GDrip Edges
3.1.21 GConductor Heads
3.1.23 GOpen Valley Flashing
3.1.24 GEave Flashing
2.1 SRecycled Content
SD-03 Product Data
2.2.12 GCool Roof
SD-04 Samples
1.4.2 GFinish Samples
SD-08 Manufacturer’s Instructions
1.4.3 GInstructions for Installation
3.5 GQuality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3 GCleaning and Maintenance
07 61 14.00 20 SD-02 Shop Drawings
1.2.5 GRoofing
SD-03 Product Data
2.1 GRoofing Panels
2.1 SEnergy Star Label for Steel
Roofing Product
2.1.1 SRecycled Content for Steel
Roofing Product
SHeat Island Reduction
2.3Attachment Clips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 101 PAGES
07 61 14.00 20 2.4.1Closures
2.4Accessories
2.4.2Fasteners
2.4.3Sealants
2.5Insulation
1.7 GWarranty
SD-04 Samples
2.1Panel
2.4Accessories
2.4.3Sealants
2.2Intermediate Support
SD-05 Design Data
1.5Design Calculations
SD-06 Test Reports
3.6Field Inspection
1.3.3Structural Performance
1.6.6Finish
SD-07 Certificates
1.6.3Manufacturer's Technical
Representative
1.6.4Installer's Qualifications
SD-08 Manufacturer’s Instructions
3.3 GInstallation
SD-11 Closeout Submittals
3.8Information Card
1.7Warranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 101 PAGES
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
3.1 GField Adhesion
SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
2.1.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.1.4 SIndoor Air Quality For Interior
Acoustical Sealants
2.5 SIndoor Air Quality For Interior
Caulking
08 11 13 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 101 PAGES
08 11 13 2.1 GDoors
2.1 GDoors
2.7 GFrames
2.7 GFrames
2.5Accessories
2.9Weatherstripping
SD-03 Product Data
2.1 GDoors
2.7 GFrames
2.5Accessories
2.9Weatherstripping
SD-04 Samples
GFactory-applied enamel finish
08 11 16 SD-02 Shop Drawings
1.5.1 GDoor and Frame Assembly
SD-03 Product Data
1.5.1 GDoor and Frame Assembly
2.2.3 SRecycled Content of Aluminum
Material
SD-04 Samples
1.5.2 GFinish Samples
1.2.2 GAir Infiltration
1.2.3 GWater Penetration
GNFRC Project Label Certificates for Fenestration
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 101 PAGES
08 11 16 1.5.1 GDoor and Frame Assembly
1.5.3 GAdjustments, Cleaning, and
Maintenance
GNFRC Project Label Certificates for Fenestration
08 14 00 SD-02 Shop Drawings
2.1 GDoors
SD-03 Product Data
2.1 GDoors
2.2Accessories
2.3.7Water-resistant Sealer
1.5Warranty
2.1.2 GSound Transmission Class
Rating
2.1.3 GFire Resistance Rating
SD-04 Samples
2.1Doors
2.3.6.4 GDoor Finish Colors
SD-06 Test Reports
2.4Cycle-Slam
2.4Hinge Loading Resistance
1.5Warranty
08 17 00 SD-02 Shop Drawings
GDoor and Frame Types
GDoor Elevations
08 33 13 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 101 PAGES
08 33 13 1.3 GDetail Drawings
SD-03 Product Data
1.5Warranty
2.1Rolling Counter Doors
3.1Installation
3.5Cleaning
SD-06 Test Reports
3.3Drop-test
SD-11 Closeout Submittals
2.3Rolling Counter Door
(Non-Rated)
2.4Fire-Rated Rolling Counter Door
08 33 23 SD-02 Shop Drawings
2.2.1 G A/EOverhead Coiling Doors
2.2.3 GCounterbalancing Mechanism
2.2.4 GManual Door Operators
2.2.1.3 GBottom Bars
2.1.1.1 GGuides
2.2.3.1 GMounting Brackets
2.2.1.8 GOverhead Drum
3.3.2 GHood
2.1.1.1 GInstallation Drawings
SD-03 Product Data
2.2.1 GOverhead Coiling Doors
2.2.2 GHardware
2.2.3 GCounterbalancing Mechanism
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 101 PAGES
08 33 23 2.2.4 GManual Door Operators
SD-05 Design Data
2.2.1 GOverhead Coiling Doors
2.2.2 GHardware
2.2.3 GCounterbalancing Mechanism
2.2.4 GManual Door Operators
SD-10 Operation and Maintenance
Data
3.3.2Operation and Maintenance
Manuals
3.3.2Materials
3.3.2Devices
3.3.2Procedures
3.3.2Manufacture's Brochures
3.3.2 GParts Lists
SD-11 Closeout Submittals
3.3.1 GWarranty
08 34 59 SD-02 Shop Drawings
2.1 G A/EVault Door Unit
2.3 G A/EDay Gate
SD-03 Product Data
2.2Vault Door and Frame
SD-07 Certificates
2.2Vault Door and Frame
SD-08 Manufacturer’s Instructions
3.1Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 101 PAGES
08 34 59 SD-11 Closeout Submittals
1.2LEED Documentation
08 41 13 SD-01 Preconstruction Submittals
1.2.1 GSample Warranty
1.2.1 GList of Product Installations
SD-02 Shop Drawings
3.3 GInstallation Drawings
2.2 GFabrication Drawings
SD-03 Product Data
1.2.1 GManufacturer's Catalog Data
GFinish
2.1.1.2 SRecycled Content of Aluminum
Material
SD-04 Samples
1.2.1 GFinish and Color Samples
SD-06 Test Reports
1.2.1 GCertified Test Reports
3.4.3Deflection
3.4.1Air Infiltration
3.4.4Condensation Resistance and
Thermal Transmittance
3.4.5Water Infiltration
SD-08 Manufacturer’s Instructions
3.3Manufacturer's Instructions
SD-11 Closeout Submittals
3.6Manufacturer's Product Warranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 101 PAGES
08 44 00 SD-02 Shop Drawings
1.5Glazed Curtain Wall System
1.12Installation Drawings
2.4.2Shop-Painting Aluminum
2.4.3Shop-Painting Steel
SD-03 Product Data
1.5Glazed Curtain Wall System
1.13Preventive Maintenance and
Inspection
2.2Metals For Fabrication
2.3Nonskinning Sealing Compound
2.4.1Metal Accessories
2.5Curtain-Wall Framing Members
2.6Aluminum Doors and Frames
2.7.1Curtain Wall Frame
Panels
Thermal Insulation Materials
2.8Sealants and Caulkings
2.9Curtain-Wall Installation Materials
2.9.2Masonry Anchorage Devices
1.8.1Warranties
1.8.1Warranties
SD-05 Design Data
1.3Calculations
2.4.5Finish
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T…