A0002 SHEET MI802.pdf

PDF 82 KB Posted

Attached to
AIT Barracks Fort Eustis VA (Amendment 0004) Federal contract opportunity
Solicitation number
W9123620B0015
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

This document contains a sequence of operation and control diagram for a condenser water cooling system at Fort Eustis, Virginia. Key details include specifications for a cooling tower system consisting of one cooling tower, two inline centrifugal pumps operating in lead-standby configuration, and one plate and frame heat exchanger. The system sequence and controls are defined, including parameters for enabling and disabling the cooling tower based on condenser water supply temperature and outside air wet bulb temperature. Alarms and shutdown conditions are also specified. Additionally, the document provides information on a related federal contract opportunity through the Army Corps of Engineers for the AIT Barracks project at Fort Eustis, with solicitation number W9123620B0015. Interested parties are directed to contact specified Army Corps representatives for drawings related to the opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to AIT Barracks Fort Eustis VA (Amendment 0004), newest first.
File Type Posted
B.01.02_ KO signed IFB Abstract of Offerors.pdf PDF
Amendment 4.pdf PDF
W9123620B0015 Amendment 0003.pdf PDF
A0002 SHEET A423.pdf PDF
A0002 SPEC 09 30 10.pdf PDF
A0002 SPEC 06 61 16.pdf PDF
A0002 SHEET I002.pdf PDF
A0002 SHEET F103.pdf PDF
A0002 SHEET A407.pdf PDF
A0002 SHEET A401.pdf PDF
W91236-20-B-0015 Amend 0002.pdf PDF
A0002 SPECS TOC.pdf PDF
A0002 Revised FFE Package.pdf PDF
A0002 SPEC 08 33 23.pdf PDF
A0002 SPEC 07 26 30.pdf PDF
A0002 SHEET F104.pdf PDF
A0002 SHEET A402.pdf PDF
A0002 SHEET A406.pdf PDF
A0002 SHEET A006.pdf PDF
A0002 SPEC 12 31 00.pdf PDF
A0002 SHEET A331.pdf PDF
A0002 SHEET A405.pdf PDF
A0002 SUBMITTAL REGISTER.pdf PDF
A0002 SHEET A404.pdf PDF
A0002 SHEET A114.pdf PDF
A0002 SHEET A002.pdf PDF
A0002 SPEC 10 11 00 .pdf PDF
A0002 SHEET A605.pdf PDF
A0002 SHEET A611.pdf PDF
A0002 SHEET A601.pdf PDF
A0001 SHEET C516.pdf PDF
A0001 SHEET A401.pdf PDF
A0001 SPEC 28 31 76.pdf PDF
A0001 SHEET EG501.pdf PDF
A0001 SHEET A602.pdf PDF
A0001 SHEET LP501.pdf PDF
A0001 SHEET A406.pdf PDF
A0001 SHEET A402.pdf PDF
A0001 SHEET A114.pdf PDF
A0001 SHEET A121 THRU A151.pdf PDF
A0001 SHEET A601.pdf PDF
Amendment 1.pdf PDF
A0001 SHEET I002 AND I221.pdf PDF
A0001 SHEET A322.pdf PDF
A0001 SPEC 07 61 1400 20.pdf PDF
A0001 SHEET A611.pdf PDF
H.01.01 794_AIT_PH4_SID_RTA_SUBMITTAL.pdf PDF
H.01.01 794_AIT_PH4_SPEC_RTA_SUBMITTAL.pdf PDF
H.01.01 794_AIT_PH4_FFE_RTA_SUBMITTAL.pdf PDF
20-B-0015 Barracks AIT.pdf PDF
Show all 50

AIT Barracks Fort Eustis VA (Amendment 0004) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEQUENCE OF OPERATION:

CONDENSER WATER SYSTEM COOLING POINTS LIST:

(CONDENSER WATER SYSTEM COOLING)

COOLING TOWER SYSTEM CONSISTS OF ONE (1) COOLING TOWER, TWO (2) TOWER

INLINE CENTRIFUGAL PUMPS (P-3 & P-4) OPERATING IN LEAD-STANDBY

CONFIGURATION, AND ONE PLATE AND FRAME HEAT EXCHANGER.

RUN CONDITIONS:

THE COOLING TOWER SYSTEM SHALL BE ENABLED BY THE BAS TO RUN

WHENEVER:

- THE MAIN CONDENSER SYSTEM IS ENABLED

- AND THE OUTSIDE AIR WET BULB TEMPERATURE IS GREATER THAN 37°F (ADJ.)

THE BAS SHALL MONITOR THE CONDENSER WATER SUPPLY TEMPERATURE AND

ON A RISE IN TEMPERATURE ABOVE 93°F (ADJ.) FOR 5 MINUTES (ADJ.) THE

COOLING TOWER SYSTEM SHALL BE ENERGIZED, THE TOWER ISOLATION VALVE

(V-1) SHALL OPEN, THE HEAT EXCHANGER TOWER WATER ISOLATION VALVE (V-4)

SHALL OPEN, LEAD TOWER PUMP (P-3 OR 4) SHALL BE ENERGIZED. UPON PROOF

OF TOWER WATER TEMPERATURE BELOW 87°F (ADJ.) THE HEAT EXCHANGER

CONDENSER WATER ISOLATION VALVE (V-4) SHALL BE OPENED AND CONDENSER

WATER DIVERTING VALVE (V-5) SHALL BE MODULATED OPEN TO MAINTAIN

DIFFERENTIAL PRESSURE FOR HEAT EXCHANGER. UPON A DROP IN CONDENSER

WATER SUPPLY WATER TEMPERATURE TO BELOW 87°F (ADJ.) THE LEAD TOWER

WATER PUMP (P-3 OR 4) SHALL BE DE-ENERGIZED, HEAT EXCHANGER ISOLATION

VALVES (TOWER V-3 AND CONDENSER V-4) SHALL BE CLOSED.

ON A DROP IN THE CONDENSER WATER RETURN TEMPERATURE BELOW 90°F (ADJ.)

FOR 5 MINUTES (ADJ.) THE COOLING TOWER SYSTEM SHALL BE DE-ENERGIZED

AND THE TOWER PUMPS (P-3 OR P-4) SHALL BE DE-ENERGIZED, TOWER ISOLATION

VALVE (V-1) SHALL CLOSE, TOWER BY-PASS VALVE (V-2) SHALL OPEN TO BY-PASS,

HEAT EXCHANGER ISOLATION VALVES (TOWER V-3) AND (CONDENSER V-4) SHALL

CLOSE, AND DIVERTING VALVE (V-5) SHALL OPEN TO HEAT EXCHANGER BY-PASS

TOWER BASIN TEMPERATURE SHALL BE RESET TO AMBIENT WET BULB PLUS 5

DEGREES (ADJ.) TO A MAXIMUM OF 85°F (ADJ.) AND MINIMUM OF 45°F (ADJ.). UPON

A RISE IN BASIN TEMPERATURE ABOVE SET POINT TOWER BY-PASS VALVE (V-2)

SHALL BE OPENED TO FLOW OVER TOWERS. UPON A CONTINUED RISE IN BASIN

TEMPERATURE FOR 5 MINUTES (ADJ.), COOLING TOWER FAN (CT-1) SHALL BE

ENERGIZED AND FAN SPEED MODULATED TO MAINTAIN BASIN TEMPERATURE

SETPOINT.

TO PREVENT SHORT CYCLING, THERE SHALL BE A USER DEFINABLE DELAY (10 MIN

ADJ) BETWEEN ENERGIZING AND DE-ENERGIZING THE COOLING TOWER SYSTEM.

ON FAILURE OF TOWER FAN OR EXCESSIVE VIBRATION THE FAILED TOWER FAN SHALL

BE DE-ENERGIZED, TOWER ISOLATION VALVE SHALL BE CLOSED, AND ALARM SENT TO

OPERATOR.

THE CONTROLLER SHALL MONITOR THE COLD WATER BASIN LEVEL THROUGH A SERIES

OF WATER LEVEL SWITCHES:

-IF THE BASIN LEVEL RISES ABOVE THE HIGH WATER LEVEL SWITCH, TURNING IT

ON, AN ALARM SHALL BE GENERATED.

-IF THE BASIN LEVEL DROPS BELOW THE LOW WATER MAKEUP SWITCH, TURNING

IT ON, AN ALARM SHALL BE GENERATED AND THE MAKEUP VALVE SHALL OPEN.

-IF THE BASIN LEVEL DROPS BELOW THE LOW WATER LEVEL SWITCH, TURNING IT

ON, AN ALARM SHALL BE GENERATED AND THE COOLING TOWER AND CHILLER

SHALL BE SHUTDOWN.

ON FAILURE OF ANY DUTY PUMP THE STANDBY PUMP SHALL BE ENERGIZED AND THE

FAILED PUMP SHALL BE DE-ENERGIZED AND ALARM GENERATED.

ON FAILURE (HIGH OR LOW DIFFERENTIAL PRESSURE) OF HEAT EXCHANGER, HEAT

EXCHANGER ISOLATION SHALL BE CLOSED, THE COOLING TOWER SYSTEM SHALL BE

DE-ENERGIZED, AND ALARM GENERATED.

THE DESIGNATED LEAD PUMP SHALL ROTATE UPON ONE OF THE FOLLOWING USER

SELECTABLE CONDITIONS:

- MANUALLY THROUGH A SOFTWARE SWITCH

- IF RUNTIME (ADJ.) IS EXCEEDED

- DAILY

- WEEKLY

- MONTHLY

SIDESTREAM FILTER SYSTEM

FILTER SYSTEM (SSF-1) SHALL RUN CONTINUOUSLY WHENEVER COOLING TOWER

SYSTEM IS ENABLED. FILTER FLUSH CYCLE SHALL BE ENABLED WHENEVER FILTER

DIFFERENTIAL PRESSURE IS GREATER THAN 7 PSI (ADJ.).

TANK CIRCULATION:

BAS SHALL MONITOR SYSTEM OPERATION. IF THE PUMP HX SYSTEM HAS NOT

OPERATED FOR ONE (1) WEEK (ADJ.) HX ISOLATION VALVE (V-3) AND TOWER ISOLATION

VALVE (V-1) SHALL BE OPENED AND LEAD PUMP SHALL BE ENERGIZED. AFTER A

RUNTIME OF 30 MINUTES (ADJ.) PUMP SHALL BE DE-ENERGIZED AND ISOLATION VALVE

CLOSED.

EMERGENCY SHUTDOWN:

THE BAS SHALL SHUT DOWN SYSTEM UPON RECEIVING AN EMERGENCY SHUTDOWN

SIGNAL FROM AN EMERGENCY SHUTDOWN SWITCH. RESET SHALL BE MANUAL BY A

CENTRAL STATION DDC COMMAND SIGNAL

ALARMS:

- FAN

FAILURE: COMMANDED ON, BUT THE STATUS IS OFF

IN HAND: COMMANDED OFF, BUT THE STATUS IS ON

RUNTIME EXCEEDED: STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT

FAN VFD FAULT

- PUMP(S)

FAILURE: COMMANDED ON, BUT THE STATUS IS OFF

IN HAND: COMMANDED OFF, BUT THE STATUS IS ON

RUNTIME EXCEEDED: STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT

PUMP VFD FAULT

- BASIN

HIGH WATER LEVEL

LOW MAKEUP WATER LEVEL

LOW WATER LEVEL

- HEAT EXCHANGER(S)

FAILURE: HIGH DIFFERENTIAL PRESSURE

FAILURE: LOW DIFFERENTIAL PRESSURE

-FILTER SYSTEM

FAILURE: COMMANDED ON, BUT THE STATUS IS OFF

IN HAND: COMMANDED OFF, BUT THE STATUS IS ON

RUNTIME EXCEEDED: STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT

HIGH FILTER DIFFERENTIAL PRESSURE: DIFFERENTIAL PRESSURE EXCEEDS A

USER DEFINABLE LIMIT

- HIGH TOWER WATER SUPPLY TEMPERATURE

- LOW TOWER WATER SUPPLY TEMPERATURE

- HIGH TOWER BASIN TEMPERATURE

- LOW TOWER BASIN TEMPERATURE

- EXCESSIVE TOWER VIBRATION

CONDENSER WATER SYSTEM COOLING CONTROL DIAGRAM

SCALE: NTS

COOLING TOWER YARDMECHANICAL ROOM

CT-1

V-1

VM

CT

V F D

CT

V F D

TOWER WATER SUPPLY (TWS)

TOWER WATER RETURN (TWR)

H X

1 DP

V-3

DP

V-4

(C D

W R

(TWR)

(TWS)

(C D

W S)

(C D

W S)

V-5

(C D

W R

BASIN HEAT

ELEMENT

P-3

P-4

V-2

CT

V F D

TREND

X X

X

INPUT

DI1

DI2

DI3

DI4

ANALOG

AO1

DIGITAL

DO1

DO2

DIGITAL

OUTPUT

DI6

DI9

X X

DO3

DI10

TOWER WATER SUPPLY TEMPERATURE

HX-1 DIFFERENTIAL PRESSURE (BUILDING LOOP)

TOWER WATER RETURN TEMPERATURE

TOWER BASIN TEMPERATURE

HX CONDENSER WATER LEAVING TEMPERATURE

CONDENSER WATER SUPPLY TEMPERATURE

CONDENSER WATER RETURN TEMPERATURE

AI1

AI2

AI3

AI4

AI5

AI6

AI7

X X

X

HEAT EXCHANGER DIFFERENTIAL PRESSURE

SETPOINT (FOUR REQUIRED)

OUTSIDE AIR TEMPERATURE DRY BULB

OUTSIDE AIR TEMPERATURE WET BULB

PUMP STATUS P-3

FAN SPEED STATUS CT-1

PUMP STATUS P-4

CT-1 VIBRATION STATUS

EMERGENCY SHUTDOWN

PUMP ENABLE/DISABLE P-3

PUMP ENABLE/DISABLE P-4

FAN ENABLE/DISABLE CT-1

X X X

AO1

DO3

DI5 TOWER STATUS CT-1 X

DI6

DI2

AO2

DO1

DI3

ANALOG XAO2 PUMP SPEED STATUS P-3

XAO3 PUMP SPEED STATUS P-4AO3

DO2

DI4

AI1

AI2

AI7

HX-1 DIFFERENTIAL PRESSURE (TOWER LOOP)AI8

(CDWR)

(CDWS)

AI8

AI6

T AI4

TAI3

T

T

T

X

SSF-1

DO4

DI11

DI11 FILTER STATUS SSF-1

DO4 FILTER ENABLE/DISABLE SSF-1

DI12

DI13

HIGH WATER LEVEL SWITCH

LOW WATER MAKE-UP SWITCH

DI14 LOW WATER LEVEL SWITCH

X X X

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S D

R

AW

N B

Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

D

AT

E

TI

M

E

ST

AM

P:

IS

SU

E D

AT

E:

N

AO

F

IL

E N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

7/

/2

4:

:1

PM

MI802

BCOF

N O

R

FO

LK

D

IS

TR

IC

T

N O

R

FO

LK

, V

A

Z.

G

R O

SE

E.

M

O R

TO

N

R . N

AG

EL

Z.

G

R O

SE

FE

BR

U

AR

Y

R

TA

S U

BM

IT

TA

L

C O

N

TR

O

LS

JB

LE

FO

R T

EU

ST

IS

, V

IR

G

IN

IA

AI

T

BA

R

R

AC

KS

C

O M

PL

EX

P H

AS

E

-B

C O

F

PN

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AM

E N D

M

EN

T #2

J

U L

Sheets
MI802 - CONTROLS

File details come from the government source that posted it. Updated .