A0002 SHEET MI802.pdf
PDF 82 KB Posted
- Attached to
- AIT Barracks Fort Eustis VA (Amendment 0004) Federal contract opportunity
- Solicitation number
- W9123620B0015
About this file
This document contains a sequence of operation and control diagram for a condenser water cooling system at Fort Eustis, Virginia. Key details include specifications for a cooling tower system consisting of one cooling tower, two inline centrifugal pumps operating in lead-standby configuration, and one plate and frame heat exchanger. The system sequence and controls are defined, including parameters for enabling and disabling the cooling tower based on condenser water supply temperature and outside air wet bulb temperature. Alarms and shutdown conditions are also specified. Additionally, the document provides information on a related federal contract opportunity through the Army Corps of Engineers for the AIT Barracks project at Fort Eustis, with solicitation number W9123620B0015. Interested parties are directed to contact specified Army Corps representatives for drawings related to the opportunity.
View the file
Other files for this federal contract opportunity
Show all 50
AIT Barracks Fort Eustis VA (Amendment 0004) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEQUENCE OF OPERATION:
CONDENSER WATER SYSTEM COOLING POINTS LIST:
(CONDENSER WATER SYSTEM COOLING)
COOLING TOWER SYSTEM CONSISTS OF ONE (1) COOLING TOWER, TWO (2) TOWER
INLINE CENTRIFUGAL PUMPS (P-3 & P-4) OPERATING IN LEAD-STANDBY
CONFIGURATION, AND ONE PLATE AND FRAME HEAT EXCHANGER.
RUN CONDITIONS:
THE COOLING TOWER SYSTEM SHALL BE ENABLED BY THE BAS TO RUN
WHENEVER:
- THE MAIN CONDENSER SYSTEM IS ENABLED
- AND THE OUTSIDE AIR WET BULB TEMPERATURE IS GREATER THAN 37°F (ADJ.)
THE BAS SHALL MONITOR THE CONDENSER WATER SUPPLY TEMPERATURE AND
ON A RISE IN TEMPERATURE ABOVE 93°F (ADJ.) FOR 5 MINUTES (ADJ.) THE
COOLING TOWER SYSTEM SHALL BE ENERGIZED, THE TOWER ISOLATION VALVE
(V-1) SHALL OPEN, THE HEAT EXCHANGER TOWER WATER ISOLATION VALVE (V-4)
SHALL OPEN, LEAD TOWER PUMP (P-3 OR 4) SHALL BE ENERGIZED. UPON PROOF
OF TOWER WATER TEMPERATURE BELOW 87°F (ADJ.) THE HEAT EXCHANGER
CONDENSER WATER ISOLATION VALVE (V-4) SHALL BE OPENED AND CONDENSER
WATER DIVERTING VALVE (V-5) SHALL BE MODULATED OPEN TO MAINTAIN
DIFFERENTIAL PRESSURE FOR HEAT EXCHANGER. UPON A DROP IN CONDENSER
WATER SUPPLY WATER TEMPERATURE TO BELOW 87°F (ADJ.) THE LEAD TOWER
WATER PUMP (P-3 OR 4) SHALL BE DE-ENERGIZED, HEAT EXCHANGER ISOLATION
VALVES (TOWER V-3 AND CONDENSER V-4) SHALL BE CLOSED.
ON A DROP IN THE CONDENSER WATER RETURN TEMPERATURE BELOW 90°F (ADJ.)
FOR 5 MINUTES (ADJ.) THE COOLING TOWER SYSTEM SHALL BE DE-ENERGIZED
AND THE TOWER PUMPS (P-3 OR P-4) SHALL BE DE-ENERGIZED, TOWER ISOLATION
VALVE (V-1) SHALL CLOSE, TOWER BY-PASS VALVE (V-2) SHALL OPEN TO BY-PASS,
HEAT EXCHANGER ISOLATION VALVES (TOWER V-3) AND (CONDENSER V-4) SHALL
CLOSE, AND DIVERTING VALVE (V-5) SHALL OPEN TO HEAT EXCHANGER BY-PASS
TOWER BASIN TEMPERATURE SHALL BE RESET TO AMBIENT WET BULB PLUS 5
DEGREES (ADJ.) TO A MAXIMUM OF 85°F (ADJ.) AND MINIMUM OF 45°F (ADJ.). UPON
A RISE IN BASIN TEMPERATURE ABOVE SET POINT TOWER BY-PASS VALVE (V-2)
SHALL BE OPENED TO FLOW OVER TOWERS. UPON A CONTINUED RISE IN BASIN
TEMPERATURE FOR 5 MINUTES (ADJ.), COOLING TOWER FAN (CT-1) SHALL BE
ENERGIZED AND FAN SPEED MODULATED TO MAINTAIN BASIN TEMPERATURE
SETPOINT.
TO PREVENT SHORT CYCLING, THERE SHALL BE A USER DEFINABLE DELAY (10 MIN
ADJ) BETWEEN ENERGIZING AND DE-ENERGIZING THE COOLING TOWER SYSTEM.
ON FAILURE OF TOWER FAN OR EXCESSIVE VIBRATION THE FAILED TOWER FAN SHALL
BE DE-ENERGIZED, TOWER ISOLATION VALVE SHALL BE CLOSED, AND ALARM SENT TO
OPERATOR.
THE CONTROLLER SHALL MONITOR THE COLD WATER BASIN LEVEL THROUGH A SERIES
OF WATER LEVEL SWITCHES:
-IF THE BASIN LEVEL RISES ABOVE THE HIGH WATER LEVEL SWITCH, TURNING IT
ON, AN ALARM SHALL BE GENERATED.
-IF THE BASIN LEVEL DROPS BELOW THE LOW WATER MAKEUP SWITCH, TURNING
IT ON, AN ALARM SHALL BE GENERATED AND THE MAKEUP VALVE SHALL OPEN.
-IF THE BASIN LEVEL DROPS BELOW THE LOW WATER LEVEL SWITCH, TURNING IT
ON, AN ALARM SHALL BE GENERATED AND THE COOLING TOWER AND CHILLER
SHALL BE SHUTDOWN.
ON FAILURE OF ANY DUTY PUMP THE STANDBY PUMP SHALL BE ENERGIZED AND THE
FAILED PUMP SHALL BE DE-ENERGIZED AND ALARM GENERATED.
ON FAILURE (HIGH OR LOW DIFFERENTIAL PRESSURE) OF HEAT EXCHANGER, HEAT
EXCHANGER ISOLATION SHALL BE CLOSED, THE COOLING TOWER SYSTEM SHALL BE
DE-ENERGIZED, AND ALARM GENERATED.
THE DESIGNATED LEAD PUMP SHALL ROTATE UPON ONE OF THE FOLLOWING USER
SELECTABLE CONDITIONS:
- MANUALLY THROUGH A SOFTWARE SWITCH
- IF RUNTIME (ADJ.) IS EXCEEDED
- DAILY
- WEEKLY
- MONTHLY
SIDESTREAM FILTER SYSTEM
FILTER SYSTEM (SSF-1) SHALL RUN CONTINUOUSLY WHENEVER COOLING TOWER
SYSTEM IS ENABLED. FILTER FLUSH CYCLE SHALL BE ENABLED WHENEVER FILTER
DIFFERENTIAL PRESSURE IS GREATER THAN 7 PSI (ADJ.).
TANK CIRCULATION:
BAS SHALL MONITOR SYSTEM OPERATION. IF THE PUMP HX SYSTEM HAS NOT
OPERATED FOR ONE (1) WEEK (ADJ.) HX ISOLATION VALVE (V-3) AND TOWER ISOLATION
VALVE (V-1) SHALL BE OPENED AND LEAD PUMP SHALL BE ENERGIZED. AFTER A
RUNTIME OF 30 MINUTES (ADJ.) PUMP SHALL BE DE-ENERGIZED AND ISOLATION VALVE
CLOSED.
EMERGENCY SHUTDOWN:
THE BAS SHALL SHUT DOWN SYSTEM UPON RECEIVING AN EMERGENCY SHUTDOWN
SIGNAL FROM AN EMERGENCY SHUTDOWN SWITCH. RESET SHALL BE MANUAL BY A
CENTRAL STATION DDC COMMAND SIGNAL
ALARMS:
- FAN
FAILURE: COMMANDED ON, BUT THE STATUS IS OFF
IN HAND: COMMANDED OFF, BUT THE STATUS IS ON
RUNTIME EXCEEDED: STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT
FAN VFD FAULT
- PUMP(S)
FAILURE: COMMANDED ON, BUT THE STATUS IS OFF
IN HAND: COMMANDED OFF, BUT THE STATUS IS ON
RUNTIME EXCEEDED: STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT
PUMP VFD FAULT
- BASIN
HIGH WATER LEVEL
LOW MAKEUP WATER LEVEL
LOW WATER LEVEL
- HEAT EXCHANGER(S)
FAILURE: HIGH DIFFERENTIAL PRESSURE
FAILURE: LOW DIFFERENTIAL PRESSURE
-FILTER SYSTEM
FAILURE: COMMANDED ON, BUT THE STATUS IS OFF
IN HAND: COMMANDED OFF, BUT THE STATUS IS ON
RUNTIME EXCEEDED: STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT
HIGH FILTER DIFFERENTIAL PRESSURE: DIFFERENTIAL PRESSURE EXCEEDS A
USER DEFINABLE LIMIT
- HIGH TOWER WATER SUPPLY TEMPERATURE
- LOW TOWER WATER SUPPLY TEMPERATURE
- HIGH TOWER BASIN TEMPERATURE
- LOW TOWER BASIN TEMPERATURE
- EXCESSIVE TOWER VIBRATION
CONDENSER WATER SYSTEM COOLING CONTROL DIAGRAM
SCALE: NTS
COOLING TOWER YARDMECHANICAL ROOM
CT-1
V-1
VM
CT
V F D
CT
V F D
TOWER WATER SUPPLY (TWS)
TOWER WATER RETURN (TWR)
H X
1 DP
V-3
DP
V-4
(C D
W R
(TWR)
(TWS)
(C D
W S)
(C D
W S)
V-5
(C D
W R
BASIN HEAT
ELEMENT
P-3
P-4
V-2
CT
V F D
TREND
X X
X
INPUT
DI1
DI2
DI3
DI4
ANALOG
AO1
DIGITAL
DO1
DO2
DIGITAL
OUTPUT
DI6
DI9
X X
DO3
DI10
TOWER WATER SUPPLY TEMPERATURE
HX-1 DIFFERENTIAL PRESSURE (BUILDING LOOP)
TOWER WATER RETURN TEMPERATURE
TOWER BASIN TEMPERATURE
HX CONDENSER WATER LEAVING TEMPERATURE
CONDENSER WATER SUPPLY TEMPERATURE
CONDENSER WATER RETURN TEMPERATURE
AI1
AI2
AI3
AI4
AI5
AI6
AI7
X X
X
HEAT EXCHANGER DIFFERENTIAL PRESSURE
SETPOINT (FOUR REQUIRED)
OUTSIDE AIR TEMPERATURE DRY BULB
OUTSIDE AIR TEMPERATURE WET BULB
PUMP STATUS P-3
FAN SPEED STATUS CT-1
PUMP STATUS P-4
CT-1 VIBRATION STATUS
EMERGENCY SHUTDOWN
PUMP ENABLE/DISABLE P-3
PUMP ENABLE/DISABLE P-4
FAN ENABLE/DISABLE CT-1
X X X
AO1
DO3
DI5 TOWER STATUS CT-1 X
DI6
DI2
AO2
DO1
DI3
ANALOG XAO2 PUMP SPEED STATUS P-3
XAO3 PUMP SPEED STATUS P-4AO3
DO2
DI4
AI1
AI2
AI7
HX-1 DIFFERENTIAL PRESSURE (TOWER LOOP)AI8
(CDWR)
(CDWS)
AI8
AI6
T AI4
TAI3
T
T
T
X
SSF-1
DO4
DI11
DI11 FILTER STATUS SSF-1
DO4 FILTER ENABLE/DISABLE SSF-1
DI12
DI13
HIGH WATER LEVEL SWITCH
LOW WATER MAKE-UP SWITCH
DI14 LOW WATER LEVEL SWITCH
X X X
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
N
AO
F
IL
E N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
7/
/2
4:
:1
PM
MI802
BCOF
N O
R
FO
LK
D
IS
TR
IC
T
N O
R
FO
LK
, V
A
Z.
G
R O
SE
E.
M
O R
TO
N
R . N
AG
EL
Z.
G
R O
SE
FE
BR
U
AR
Y
R
TA
S U
BM
IT
TA
L
C O
N
TR
O
LS
JB
LE
FO
R T
EU
ST
IS
, V
IR
G
IN
IA
AI
T
BA
R
R
AC
KS
C
O M
PL
EX
P H
AS
E
-B
C O
F
PN
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
E N D
M
EN
T #2
J
U L
| Sheets |
| MI802 - CONTROLS |