SOO Utility Line Replacement and Air Compressor Building RFI 080609 Posted.pdf
PDF 21 KB Posted
- Solicitation number
- W911XK-09-R-0028
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit 2.pdf | ||
| W911XK-09-R-0028 Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| SAOAsbestos_InventoryReport.pdf | ||
| SOO Utility Line Replacement and Air Compressor Building RFI 080709.pdf | ||
| Amendment 0002.pdf | ||
| SOO Utility Line Replacement and Air Compressor Building RFI 080409 Posted.pdf | ||
| Conformed with Amendment 0001.pdf | ||
| 01 22 00.00 10.pdf | ||
| Amendment 0001.pdf | ||
| 01 04 00.pdf | ||
| NSITE4.pdf | ||
| Sign in Sheet.pdf | ||
| SOO Utility Line Replacement Preproposal Present Final.pdf | ||
| SPECIAL NOTICE Site Visit change.doc | DOC document | |
| SPECIAL NOTICE Site Visit change.doc | DOC document | |
| Plans Drawings .zip | ZIP file | |
| Appendix.pdf | ||
| Solicitation SpecificationW911XK-09-R-0028.zip | ZIP file | |
| Exhibits A B C and D.zip | ZIP file | |
| SPECIAL NOTICE Site Visit.doc | DOC document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911XK-09-R-0028 Updated 6 August 2009 SOO Utility Line Replacement and Air Compressor Building
Questions and Answers as of 06 August 2009
This document will be continually updated with questions and answers. Please be sure to check www.fbo.gov for the latest Q&A document.
1. QUESTION: The specification calls for “oil-free air”. Can you please clarify this definition?
ANSWER: Oil must be absent from compressed air before it enters the air dryer system.
2. QUESTION: Can the compressor be oil-flooded units with high levels of filtration?
ANSWER: See answer for question 1
3. QUESTION: Can the compressors be oil-flooded compressors with food grade lubricant instead of oil?
ANSWER: No
4. QUESTION: Can you please point to an ISO 8753.1 Air Quality specification and the definition?
ANSWER: Air quality must be such that it will not cause problems with air dryer or cause environmental issues.
5. QUESTION: I have read through the electrical requirements section of this specification.
I have not found any designation in regards to the type of motor on the air compressors.
Industry standards and practices lean towards TEFC (Totally Enclosed Fan Cooled) motors vs. ODP (open drip proof) in regards to reliability and quality. Do you have a position in regards to this?
ANSWER: No position
6. QUESTION: When can another site visit and tour of the tunnels be scheduled??
ANSWER: See Amendment 0002.
7. QUESTION: Can the proposal due date be extended two weeks to 9/1/09?
8. QUESTION: Can the last day for questions be extended to 8/21/09??
http://www.fbo.gov/
9. QUESTION: When can another site visit for our design partner and prospective subcontractors be scheduled??
ANSWER: See Question 6.
10. QUESTION: Would there be a possibility for the USACE to issue a separate contract for the Asbestos Abatement with the prime contractor still managing the abatement contractor?
11. QUESTION: Per specification section 01 03 00.00 06, Subpart 3.1.1.1 Asbestos
Abatement, please provide a copy of the Soo Lock Facility Asbestos Inventory, dated June 6, 2008.
ANSWER: Under Review
12. QUESTION: Solicitation page 13 of 89, paragraph 1.4.3, indicates that the total number of pages for the proposal submitted may not exceed 100 pages – please advise if the Volume 2 Price/Cost Information is excluded from the page count.
ANSWER: Amendment 0001 increased the total page count to 125 pages. The 125 pages includes both Volume 1 and Volume 2 combined.
13. QUESTION: Per specification section 01 35 13.10, Subpart 1.4.2 Over-water Transport, the government will provide transportation for men, material, and equipment. Please clarify what type of vessel will be utilized, deck space, deck capacity, and capacity of the floating crane
14. QUESTION: Please specify the location of the government furnished loading dock and capacity of the land based loading crane.
15. QUESTION: Are we to assume that this service will be available at scheduled intervals throughout the duration of construction (1 May through 30 November) without limit?
16. QUESTION: Are there any stated limited loading zones near the existing lock walls, existing tunnels, abutments, pier walls, ect.? If so, please provide the surcharge loading capacity.
17. QUESTION: The question in regards to oil-free compressors vs. oil-flooded compressors should be at the core of this compressed air system. It clearly is the driving factor in what air compressors we propose for this system. The solicitation calls for an oil-free system but does not classify the "CLASS" of air quality. I imagine that this system should be as close to ISO 8573-1 CLASS 0 as possible
File details come from the government source that posted it. Updated .