About this file

Drawing handed out at Site Visit

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revisions

Symbol Descriptions Date Approved

Designed by:

Drawn by:

Checked by:

DETROIT, MICHIGAN

DRAWING NUMBER

SCALE :

SAULT STE. MARIE

MICHIGAN

SUBMITTED TO:

OFSHEET

AS SHOWN

5 D.M. 12/1470

SMK

WDM

BM

FY09 SOO UTILITY LINE REPLACEMENT

& COMPRESED AIR SYSTEM

CHIEF, CONSTRUCTION, COST & GENERAL ENG BR

REMOVAL LOCATION OF EXISTING

COMPRESED AIR SYSTEM

WILLIAM D. MERTE

SOLICATION NUMBER: W911XK-09-R-0028

L

606.17

DIP

A A

N

MH

MH

MH MH

MH

MH

L L

L

L

L

L

L

L

L L

L

L

L

L

L

L L

L

L

L

L

L

L

L

L

L

L

L

L

L

LL

L

L

L L

L

L

L

L

L

L

L

L

L

L

L L

L L L

L

L

L L L

L

L L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

LL

L L

L

L

L

L L

L

L

L

L L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L L L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L L

L

L

L

L

L

L

L

L

LL

L

L

L

SIGN

MH MH

L

L

L L

L

605 605

590 595

MAGAZINE

STREET

L

L

L

L

L

L

L

L

L

L

L

L L

L

L

L

L

SHAFT NO. 1

SHAFT NO. 3

SHAFT NO. 2

DEEP SERVICE TUNNEL

CITY WATER MAIN CONNECTION

GALLERY STAIRS

GALLERY STAIRS

EXISTING STEAM PLANT

GALLERY STAIRS

GALLERY STAIRS

NOTE:

AIR LINE SIZE RANGE FROM 1" TO 4" DIA.

REMOVE AND DISPOSE OF THE EXISTING AIR LINES

IN SHAFT #2, SHAFT #3, SHAFT #4, SHAFT #5 AND

ALONG THE DEEP SERVICE TUNNEL BETWEEN

SHAFT #2 TO SHAFT #5 (NOT SHOWN ON THIS

DWG.)

LEGEND

FINISH GRADE AT

EXISTING AIR LINE

- TO BE REMOVED

EXISTING AIR LINE LOCATION

IN LOCK GALLERY, CROSS OVER

TUNNEL OR DEEP SERVICE TUNNEL

SCALE: 1’’= 200’-0"

200’ 100’ 0 200’ 400’ 600’

SITE PLAN

NEW UTILITY TUNNEL

STEAM LINE TIE IN

AIR LINE TIE IN

LIGHT POLE

MOORING BOLLARD

RAILING

BLDG. CORNER (IGLD)

DUCTILE IRON PIPE

LOCK GALLERY

CROSS OVER TUNNEL

- TO BE REMOVED

A

A

B

C

B

C

TOUR A INCLUDING NEW

COMPRESSOR BUILDING

TOUR B INCLUDING

NEW UTILITY TUNNEL

TOUR C INCLUDING

INCLUDING DEEP SERVICE

TUNNEL AT SHAFT 3

File details come from the government source that posted it. Updated .