Soo Area Office St. Marys Falls Canal
Sault Sainte Marie, MI
SOO LOCKS FACILITY ASBESTOS INVENTORY
Date: June 6, 2008, 2008 Prepared by: C. Paris, CTS Section
1. Building 6: UNIT 10 POWERHOUSE
• A cable tray located in the basement Switch Room contains asbestos and is labeled with an
ASBESTOS sticker.
2. Building 7: OLD STEAM PLANT
• All piping is asbestos wrapped;
• The fire brick in the North and South boilers contains asbestos.
• The brake pads in the winding drums of the boom hoist motors contains asbestos.
• The flue cover gaskets in the North and South boilers contains asbestos.
• ALL AREAS CONTAINING ASBESTOS IS LABELED WITH AN ASBESTOS STICKER.
3. Building 8: POE NORTHWEST OPERATING SHELTER
• The piping at the hot water heater in the locker room is wrapped in asbestos.
• The piping mounted on the ceiling of the gallery stairs is wrapped in asbestos.
4. Building 10: SABIN NORTHWEST OPERATING SHELTER
• Entrance doors contain asbestos.
• Electric heaters contain asbestos insulation in the heating coil.
• The doors and heaters ARE NOT marked with an ASBESTOS sticker.
5. Building 11: SABIN SOUTHWEST OPERATING SHELTER
• Entrance Doors contain asbestos.
• The doors and heaters ARE NOT marked with an ASBESTOS sticker.
6. Building 12: DAVIS NORTHWEST OPERATING SHELTER
• The doors and heaters ARE NOT marked with as ASBESTOS sticker.
7. Building 13: DAVIS SOUTHWEST OPERATING SHELTER
St. Marys Falls Canal Sault Sainte Marie, MI
SOO LOCKS FACILITY ASBESTOS INVENTORY
8. Building 14: SABIN NORTHWEST INTERMEDIATE SHELTER
9. Building 15: SABIN SOUTHWEST INTERMEDIATE SHELTER
10. Building 16: DAVIS NORTHWEST INTERMEDIATE SHELTER
11. Building 17: DAVIS SOUTHWEST INTERMEDIATE SHELTER
12. Building 26: POE NORTHEAST OPERATING SHELTER
• The piping at the hot water heater in the locker room is wrapped in asbestos.
13. Building 27: SABIN NORTHEAST INTERMEDIATE OPERATING SHELTER
14. Building 28: SABIN SOUTHEAST INTERMEDIATE OPERATING SHELTER
Sault Sainte Marie, MI
SOO LOCKS FACILITY ASBESTOS INVENTORY
15. Building 29: DAVIS NORTHEAST INTERMEDIATE OPERATING SHELTER
16. Building 30: DAVIS SOUTHEAST INTERMEDIATE OPERATING SHELTER
17. Building 35: NEW POWERHOUSE
• Ceiling mounted piping in the Cooling and Filtering Equipment room is wrapped in asbestos.
• Potable water piping the Supply Fan Room is wrapped in asbestos.
• Ceiling mounted piping near the stairwell at the Auxiliary Turbine Floor (Elev 587.5) is wrapped in asbestos.
• Raw water piping in the Battery Room is wrapped in asbestos.
• Transite in the cable trays in the Cable Trays room contains asbestos.
18. Building 36: SABIN NORTHEAST OPERATING SHELTER
19. Building 37: SABIN SOUTHEAST OPERATING SHELTER
20. Building 38: DAVIS NORTHEAST OPERATING SHELTER
Sault Sainte Marie, MI
SOO LOCKS FACILITY ASBESTOS INVENTORY
21. Building 39: DAVIS SOUTHEAST OPERATING SHELTER
22. Building 43: ADMINISTRATION BUILDING
• Emergency Diesel generator exhaust piping that runs from the generator room Eastward to the exterior of the Administration Building is wrapped in asbestos.
• Exhaust piping in the Emergency Diesel generator room in the Administration Building basement is also wrapped in asbestos.
• ALL AREAS CONTAING ASBESTOS IS LABELED WITH AN ASBESTOS STICKER.
23. Building 47: MAINTENANCE SUPPORT BUILDING (WAREHOUSE)
• All ceiling mounted heaters in the North wing contain asbestos.
• All ceiling mounted piping that supply the ceiling mounted heaters in the North wing are wrapped in asbestos.
• All ceiling mounted roof drains in the North wing is wrapped in asbestos.
• The Battery Room ceiling contains transite asbestos and is now friable
• The ceiling mounted piping in the hallway North of the Union Presidents Office and South of the
Men’s Rest Room is wrapped in asbestos.
• The hot and cold water piping mounted on the North and West ceiling of the Carpenter Shop is wrapped in asbestos.
• The ceiling mounted roof drain at the Carpenter Shop is wrapped in asbestos.
• The heating piping that supplies the ceiling mounted heater at the Carpenter Shop is wrapped in asbestos.
• The heating piping that supplies heat to the Paint Shop ceiling mounted heater is wrapped in asbestos.
• The roof drain piping at the Paint Shop is wrapped in asbestos.
• The slop sink located outside of the Paint Shop spray booth has drain pipes wrapped in asbestos.
• The hot and cold piping mounted on the East ceiling in the Machine Shop is wrapped in asbestos.
• The piping supplying the heat to the ceiling mounted heater at the Machine Shop is wrapped in asbestos.
• The roof drain piping at the ceiling of the South wall of the Machine Shop is wrapped in asbestos.
• The ceiling mounted piping on the North ceiling of the Machine Shop Welding Room is wrapped in asbestos.
• The roof drain piping in the Transformer Room is wrapped in asbestos.
• The ceiling mounted piping in the South Wing First Floor Hallway is wrapped in asbestos.
• The Boiler Room ceiling mounted steam piping is wrapped in asbestos.
Sault Sainte Marie, MI
SOO LOCKS FACILITY ASBESTOS INVENTORY
24. Building 47: MAINTENANCE SUPPORT BUILDING (WAREHOUSE)
• The ceiling mounted water and steam line piping on the East ceiling at the South Wing Warehouse Storage Area is wrapped in asbestos.
• The supply piping to the ceiling mounted heaters at the South Wing Warehouse Storage Area is wrapped in asbestos.
• The water and steam line piping on the South ceiling at the South Wing Warehouse is wrapped in asbestos.
• The roof drain piping in the 2nd Floor Attic is wrapped in asbestos.
• The heating piping in the 2nd Floor Attic is wrapped in asbestos.
• ALL AREAS CONTAING ASBESTOS IS LABELED WITH AN ASBESTOS STICKER.
25. PLNG: POE LOCK NORTH GALLERY
• The potable water piping in the Poe Lock North Gallery is wrapped in asbestos.
26. MLNG: MACARTHUR LOCK NORTH GALLERY
• The steam line piping running the entire length of the gallery is wrapped in asbestos.
• The ceiling cable ducts at the transformers contain transite asbestos.
27. MLSG: MACARTHUR LOCK SOUTH GALLERY
• There are two short runs of piping wrapped in asbestos at Monolith S-5.
• The ceiling cable ducts at the transformers contain transite asbestos.
| Soo Area Office |
| Sault Sainte Marie, MI |
| Soo Area Office |
| Sault Sainte Marie, MI |
| Soo Area Office |
| Sault Sainte Marie, MI |
| Soo Area Office |
| Sault Sainte Marie, MI |
| Soo Area Office |
| Sault Sainte Marie, MI |
File details come from the government source that posted it. Updated .