Soo Area Office St. Marys Falls Canal

Sault Sainte Marie, MI

SOO LOCKS FACILITY ASBESTOS INVENTORY

Date: June 6, 2008, 2008 Prepared by: C. Paris, CTS Section

1. Building 6: UNIT 10 POWERHOUSE

• A cable tray located in the basement Switch Room contains asbestos and is labeled with an

ASBESTOS sticker.

2. Building 7: OLD STEAM PLANT

• All piping is asbestos wrapped;

• The fire brick in the North and South boilers contains asbestos.

• The brake pads in the winding drums of the boom hoist motors contains asbestos.

• The flue cover gaskets in the North and South boilers contains asbestos.

• ALL AREAS CONTAINING ASBESTOS IS LABELED WITH AN ASBESTOS STICKER.

3. Building 8: POE NORTHWEST OPERATING SHELTER

• The piping at the hot water heater in the locker room is wrapped in asbestos.

• The piping mounted on the ceiling of the gallery stairs is wrapped in asbestos.

4. Building 10: SABIN NORTHWEST OPERATING SHELTER

• Entrance doors contain asbestos.

• Electric heaters contain asbestos insulation in the heating coil.

• The doors and heaters ARE NOT marked with an ASBESTOS sticker.

5. Building 11: SABIN SOUTHWEST OPERATING SHELTER

• Entrance Doors contain asbestos.

• The doors and heaters ARE NOT marked with an ASBESTOS sticker.

6. Building 12: DAVIS NORTHWEST OPERATING SHELTER

• The doors and heaters ARE NOT marked with as ASBESTOS sticker.

7. Building 13: DAVIS SOUTHWEST OPERATING SHELTER

St. Marys Falls Canal Sault Sainte Marie, MI

SOO LOCKS FACILITY ASBESTOS INVENTORY

8. Building 14: SABIN NORTHWEST INTERMEDIATE SHELTER

9. Building 15: SABIN SOUTHWEST INTERMEDIATE SHELTER

10. Building 16: DAVIS NORTHWEST INTERMEDIATE SHELTER

11. Building 17: DAVIS SOUTHWEST INTERMEDIATE SHELTER

12. Building 26: POE NORTHEAST OPERATING SHELTER

• The piping at the hot water heater in the locker room is wrapped in asbestos.

13. Building 27: SABIN NORTHEAST INTERMEDIATE OPERATING SHELTER

14. Building 28: SABIN SOUTHEAST INTERMEDIATE OPERATING SHELTER

Sault Sainte Marie, MI

SOO LOCKS FACILITY ASBESTOS INVENTORY

15. Building 29: DAVIS NORTHEAST INTERMEDIATE OPERATING SHELTER

16. Building 30: DAVIS SOUTHEAST INTERMEDIATE OPERATING SHELTER

17. Building 35: NEW POWERHOUSE

• Ceiling mounted piping in the Cooling and Filtering Equipment room is wrapped in asbestos.

• Potable water piping the Supply Fan Room is wrapped in asbestos.

• Ceiling mounted piping near the stairwell at the Auxiliary Turbine Floor (Elev 587.5) is wrapped in asbestos.

• Raw water piping in the Battery Room is wrapped in asbestos.

• Transite in the cable trays in the Cable Trays room contains asbestos.

18. Building 36: SABIN NORTHEAST OPERATING SHELTER

19. Building 37: SABIN SOUTHEAST OPERATING SHELTER

20. Building 38: DAVIS NORTHEAST OPERATING SHELTER

Sault Sainte Marie, MI

SOO LOCKS FACILITY ASBESTOS INVENTORY

21. Building 39: DAVIS SOUTHEAST OPERATING SHELTER

22. Building 43: ADMINISTRATION BUILDING

• Emergency Diesel generator exhaust piping that runs from the generator room Eastward to the exterior of the Administration Building is wrapped in asbestos.

• Exhaust piping in the Emergency Diesel generator room in the Administration Building basement is also wrapped in asbestos.

• ALL AREAS CONTAING ASBESTOS IS LABELED WITH AN ASBESTOS STICKER.

23. Building 47: MAINTENANCE SUPPORT BUILDING (WAREHOUSE)

• All ceiling mounted heaters in the North wing contain asbestos.

• All ceiling mounted piping that supply the ceiling mounted heaters in the North wing are wrapped in asbestos.

• All ceiling mounted roof drains in the North wing is wrapped in asbestos.

• The Battery Room ceiling contains transite asbestos and is now friable

• The ceiling mounted piping in the hallway North of the Union Presidents Office and South of the

Men’s Rest Room is wrapped in asbestos.

• The hot and cold water piping mounted on the North and West ceiling of the Carpenter Shop is wrapped in asbestos.

• The ceiling mounted roof drain at the Carpenter Shop is wrapped in asbestos.

• The heating piping that supplies the ceiling mounted heater at the Carpenter Shop is wrapped in asbestos.

• The heating piping that supplies heat to the Paint Shop ceiling mounted heater is wrapped in asbestos.

• The roof drain piping at the Paint Shop is wrapped in asbestos.

• The slop sink located outside of the Paint Shop spray booth has drain pipes wrapped in asbestos.

• The hot and cold piping mounted on the East ceiling in the Machine Shop is wrapped in asbestos.

• The piping supplying the heat to the ceiling mounted heater at the Machine Shop is wrapped in asbestos.

• The roof drain piping at the ceiling of the South wall of the Machine Shop is wrapped in asbestos.

• The ceiling mounted piping on the North ceiling of the Machine Shop Welding Room is wrapped in asbestos.

• The roof drain piping in the Transformer Room is wrapped in asbestos.

• The ceiling mounted piping in the South Wing First Floor Hallway is wrapped in asbestos.

• The Boiler Room ceiling mounted steam piping is wrapped in asbestos.

Sault Sainte Marie, MI

SOO LOCKS FACILITY ASBESTOS INVENTORY

24. Building 47: MAINTENANCE SUPPORT BUILDING (WAREHOUSE)

• The ceiling mounted water and steam line piping on the East ceiling at the South Wing Warehouse Storage Area is wrapped in asbestos.

• The supply piping to the ceiling mounted heaters at the South Wing Warehouse Storage Area is wrapped in asbestos.

• The water and steam line piping on the South ceiling at the South Wing Warehouse is wrapped in asbestos.

• The roof drain piping in the 2nd Floor Attic is wrapped in asbestos.

• The heating piping in the 2nd Floor Attic is wrapped in asbestos.

• ALL AREAS CONTAING ASBESTOS IS LABELED WITH AN ASBESTOS STICKER.

25. PLNG: POE LOCK NORTH GALLERY

• The potable water piping in the Poe Lock North Gallery is wrapped in asbestos.

26. MLNG: MACARTHUR LOCK NORTH GALLERY

• The steam line piping running the entire length of the gallery is wrapped in asbestos.

• The ceiling cable ducts at the transformers contain transite asbestos.

27. MLSG: MACARTHUR LOCK SOUTH GALLERY

• There are two short runs of piping wrapped in asbestos at Monolith S-5.

• The ceiling cable ducts at the transformers contain transite asbestos.

Soo Area Office
Sault Sainte Marie, MI
Soo Area Office
Sault Sainte Marie, MI
Soo Area Office
Sault Sainte Marie, MI
Soo Area Office
Sault Sainte Marie, MI
Soo Area Office
Sault Sainte Marie, MI

File details come from the government source that posted it. Updated .