AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FY09 Design Build SOO Asset Recapitalization Project - Air, Steam, Water Utility System Repairs and Improvements, Soo Area Office, Soo Locks, Sault Ste. Marie, Michigan.
This Amendment is being issued to change the Bid Schedule to include options, change Section 00110, change the Specifications and add Clauses FAR 52.217-5 Evaluation of Options and FAR 52.217-7 Option for Increased Quantity - Separately Priced Line Item. This amemdment also extends the Request for Information period, increases the number of proposal pages from 100 to 125 and updates the Wage Determinations. No other changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 37
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Aug-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-09-R-0028
X 9B. DATED (SEE ITEM 11)
17-Jul-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Aug-2009
CODE
CONTRACTING DIVISION
DETROIT DISTRICT, USAED
477 MICHIGAN AVENUE, RM 700
DETROIT MI 48226
W911XK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911XK-09-R-0028
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by reference:
52.217-5 Evaluation Of Options JUL 1990
The following have been added by full text:
AMENDMENT 0001
DELETE: Bid Schedule
ADD: BID SCHEDULE
Item 0001 - Mobilization and Demobilization Lump Sum
Item 0002 - Asbestos Survey for Steam Line Lump Sum
Item 0003 - Design Distribution System For Steam and Underground Connecting Gallery 1.
Item 0004 - Construct Steam Distribution System located at Lump Sum MacArthur Lock
Item 0005 - Construct Steam Distribution System located at Poe Lock, Lump Sum Davis Building, Administration Building and Construct Underground Connecting Gallery 1.
OPTION 1: Item 0006 - Design New Building, Underground Lump Sum Connecting Gallery 2, Compressed Air Generation and Distribution Systems
OPTION 2: Item 0007 - Construct New Building, Underground Lump Sum Connecting Gallery 2, Compressed Air Generation and Distribution Systems
OPTION 3: Item 0008 - Asbestos Survey for the Remaining Facility Lump Sum
OPTION 4: Item 0009 - Design Potable Water Distribution System Lump Sum
OPTION 5: Item 0010 – Construct Potable Water Distribution System Lump Sum
OPTION 6: Item 0011 - Design Four New Stair Structures Lump Sum
OPTION 7: Item 0012 - Construct Four New Stair Structures Lump Sum
DELETE: SECTION 0100 PARAGRAPH 1.6 FORMAL COMMUNICATION, OFFEROR
EXPLANATIONS, FIRST PARAGRAPH
ADD: SECTION 0100 PARAGRAPH 1.6 FORMAL COMMUNICATION, OFFEROR
EXPLANATIONS, FIRST PARAGRAPH
Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, for proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their proposals. All questions and requests for information (RFIs) must be received NOT LATER THAN 7 August 2009 and answers will be posted not later than 11 August 2009 at the FedBizOpps website (www.fbo.gov). Questions and RFIs may be submitted to:
LRE-Quotes@usace.army.mil
SECTION 00110 PROPOSAL PREPARATION INSTRUCTIONS TO OFFERERS, 1.4
PROPOSAL FORMAT, 1.4.3 CHANGE “may not exceed 100 pages” to read “may not exceed 125 pages”
DELETE: SECTION 00110 PROPOSAL PREPARATION INSTRUCTIONS TO
OFFERERS, 2.0 PROPOSAL VOLUME CONTENTS, 2.1.1 SECTION A, TAB 4 – Schedule
ADD: TAB 4 - Schedule Provide two schedules in chart format for design, equipment procurement, construction and equipment installation. Two schedules shall be provided: schedule 1 – base bid schedule and Schedule 2 – Base Bid and all options.
SECTION 01 03 11, SPECIFIC ELECTRICAL REQUIREMENTS SOO LOCKS UTILITY
LINE REPLACEMENT AND AIR COMPRESSOR BUILDING, PARAGRAPH 2.2 - POWER,
2nd paragraph, 2nd line DELETE: “(or approved equal)”
SECTION 01 03 11, SPECIFIC ELECTRICAL REQUIREMENTS SOO LOCKS UTILITY
LINE REPLACEMENT AND AIR COMPRESSOR BUILDING, PARAGRAPH 2.2 POWER,
6th paragraph, 7th line DELETE: “or approved equal”
SECTION 01 03 11, SPECIFIC ELECTRICAL REQUIREMENTS SOO LOCKS UTILITY
LINE REPLACEMENT AND AIR COMPRESSOR BUILDING, PARAGRAPH 2.2 POWER,
8th paragraph, 2nd line DELETE: “or approved equal”
SECTION 01 03 12, ELECTRICAL EQUIPMENT / SYSTEM REQUIREMENTS, 8.4 POWER
MONITORING DEVICE (PMD)
DELETE: “or approved equal”
SECTION 01 03 12, ELECTRICAL EQUIPMENT / SYSTEM REQUIREMENTS, 11.1.1.2
SUBSTITUTION TO REDUCE RISK TO PERSONNEL, 6TH paragraph, 8th line:
DELETE: “or approved equal”
SECTION 01 03 12, ELECTRICAL EQUIPMENT / SYSTEM REQUIREMENTS, 11.2.1.2
SUBSTITUTION TO REDUCE RISK TO PERSONNEL, 8th paragraph, 8th line DELETE: “or approved equal”
SECTION 01 03 00.00 06 PROJECT INFORMATION AND DESIGN SUBMISSION REQUIREMENTS
AFTER AWARD,
DELETE: 1.1 INTRODUCTION
ADD: 1.1 INTRODUCTION
This section contains information needed after the successful Offeror has been selected. This information is provided to all Offerors as an outline of the Design requirements to be anticipated after award.
Design and construct steam distribution system and a connecting gallery connecting the existing MacArthur Lock north gallery with the existing Poe Lock south gallery. As well as the removal of the existing steam lines.
Design and construct the Compressed Air Distribution System. The compressed air distribution system consists of the air compressors, air dryers, air lines, compressed air building, and an underground gallery starting from the existing Poe Lock north gallery extending approximately 50’ north. In addition, removal of the existing air lines in the Poe and Mac Arthur Lock gallery, in the deep service tunnel from shaft 3 to shaft 5 and in shaft 3, shaft 4 and shaft 5 is included.
Design and construct the replacement of the portable water system, including the removal of existing water lines both active and inactive.
Design and construct the replacement of four (4) stair structures and re-anchor the existing medium voltage cables located within the vertical stairwell. The stair structures are located within the monoliths of the Poe Lock at four separate locations.
All construction work will take place at the Soo Area Office in Sault Sainte Marie, Michigan.
DELETE: SECTION 01 04 00 THE DESIGN/BUILD PROCESS
ADD: SECTION 01 04 00 THE DESIGN/BUILD PROCESS (ATTACHED)
DELETE: SECTION 01 22 00.00 10 MEASUREMENT AND PAYMENT
ADD: SECTION 01 22 00.00 10 MEASUREMENT AND PAYMENT (ATTACHED)
DELETE: WAGE DETERMINATION MI4 DATED 07/03/2009
ADD: WAGE DETERMINATION MI4 DATED 07/24/2009
DELETE: WAGE DETERMINATION MI90 DATED 06/05/2009
ADD: WAGE DETERMINATION MI4 DATED 07/24/2009
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 60 days. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of clause)
SECTION 00010 - SOLICITATION CONTRACT FORM
CLIN 0003
The CLIN description has changed from Asbestos Survey For The Remaining to Design Distribution System for Steam and.
The CLIN extended description has changed from Facility (i.e. water lines, fixtures) to Undeground Connecting Gallery 1.
CLIN 0004
The CLIN description has changed from Design New Distribution System for Steam to Construct Steam Distribution System.
The CLIN extended description located at MacArthur Lock has been added.
CLIN 0005
The CLIN description has changed from Design New Building, Two Underground to Construct Steam Distribution System.
The CLIN extended description has changed from Connecting Galleries, Compress Air Generation System, Distribution System For Air and Potable Water to located at Poe Lock, Davis Building, Administration Building and Construct Underground Connecting Gallery 1..
CLIN 0006
The CLIN description has changed from Construct Steam Distribution System to OPTION 1 Design New Building,.
The CLIN extended description has changed from MacArthur Lock to Underground Connecting Gallery 2, Compressed Air Generation and Distribution Systems.
The option status has changed from No Status to Option.
CLIN 0007
The CLIN description has changed from Construct Steam Distribution System Poe to OPTION 2 Construct New Building,.
The CLIN extended description has changed from Lock, Davis Building, Administration Building to Underground Connecting Gallery 2, Compressed Air Generation and Distribution Systems.
CLIN 0008
The CLIN description has changed from Construct Air Distribution System to OPTION 3 Asbestos Survey for the.
The CLIN extended description Remaining Facility has been added.
CLIN 0009
The CLIN description has changed from Construct Water Distribution System to OPTION 4 Design Potable Water.
The CLIN extended description Distribution System has been added.
CLIN 0010
The CLIN description has changed from Construct New Air Compressor Building to OPTION 5 Construct Potable Water.
The CLIN extended description Distribution System has been added.
CLIN 0011
The CLIN description has changed from Construct Two Underground Connecting to OPTION 6 Design Four New Stair.
The CLIN extended description has changed from Galleries to Structures.
CLIN 0012 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0012 Lump Sum OPTION OPTION 7 Construct Four New Stair
FFP
Structures FOB: Destination
NET AMT
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0012:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
WAGE DETERMINATION
General Decision Number: MI080004 07/24/2009 MI4
Superseded General Decision Number: MI20070004
State: Michigan
Construction Type: Building
Counties: Alger, Chippewa, Delta, Dickinson, Luce, Mackinac, Marquette, Menominee and Schoolcraft Counties in Michigan.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 03/21/2008 3 04/04/2008 4 04/11/2008 5 05/02/2008 6 06/06/2008 7 06/13/2008 8 06/20/2008 9 07/11/2008 10 07/25/2008 11 08/08/2008 12 08/15/2008 13 08/22/2008 14 09/05/2008 15 10/17/2008 16 10/31/2008 17 11/28/2008 18 12/05/2008 19 12/12/2008 20 01/16/2009 21 05/01/2009 22 05/08/2009 23 06/05/2009 24 07/03/2009 25 07/24/2009
ASBE0047-001 07/01/2009
CHIPPEWA, LUCE AND MACKINAC COUNTIES:
Rates Fringes
ASBESTOS WORKER/INSULATOR
Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems..........$ 28.42 15.41
ASBE0127-003 06/01/2008
ALGER, DELTA, DICKINSON, MARQUETTE, MENOMINEE AND SCHOOLCRAFT
COUNTIES:
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR
Includes the application of all insulating materials; protective coverings, coatings, and finishings to all types of mechanical systems..........$ 27.17 15.80
BOIL0169-001 07/01/2008
Rates Fringes
BOILERMAKER......................$ 31.953 20.869
BRMI0006-001 06/01/2008
Rates Fringes
Bricklayer; plasterer;
marble, terrazzo and tile setter...........................$ 24.30 13.70
CEMENT MASON/CONCRETE FINISHER...$ 24.30 13.70
Pointer, caulker and cleaner.....$ 24.30 13.70
FOOTNOTES: Stacks: Work on industrial and powerhouse stacks shall receive $2.00 per hour above the journeyman bricklayer rate.Industrial: Refinishing work on digesters, tanks, lime kilns, chests, boilers, and boiler tubes shall receive $2.00 per hour above the journeyman bricklayer rate.
CARP1510-001 05/01/2009
ALGER, CHIPPEWA, DELTA, DICKINSON, LUCE, MACKINAC AND MARQUETTE
COUNTIES; MENOMINEE COUNTY (except for that part south of County Road K at Amberg, Wisconsin, starting on the west at the Menominee River and ending on the east at the Bay of Green Bay); AND SCHOOLCRAFT COUNTIES:
CARPENTER (Includes concrete forms; Does not include drywall finisher)
DRYWALL HANGER; SOFT FLOOR
LAYER.......................$ 26.27 12.18
MILLWRIGHT.......................$ 30.78 12.40
Piledriver.......................$ 26.47 12.18
FOOTNOTES:
Waterfront work on the Great Lakes or connecting water navigable to Lake carriers: $0.20 per hour additional.
Work on industrial construction, defined as industrial manufacturing and processing plants such as ore plants, paper mills, power houses, foundries, saw mills, wood processing plants, or other industrial complexes: $.25 per hour additional.
ELEC0158-001 06/02/2008
MENOMINEE COUNTY (Townships of Ingallston, Melon and Menominee)
Rates Fringes
ELECTRICIAN......................$ 27.27 7.62+26.25%
FOOTNOTE: Work 40 or more ft. above the floor or ground, if not working on approved equipment, for the time when work is performed; also, work in tunnels under construction and where gas accumulaton rquires the use of protective equipmnet: 20% of the regular straight time rate of pay, additional.
* ELEC0219-001 06/01/2009
DICKINSON COUNTY:
Rates Fringes
ELECTRICIAN (Does not include low-voltage work) Electrical contracts of $90,000 or less.............$ 26.19 15.74 Electrical Contracts over $90,000.....................$ 28.39 15.80
FOOTNOTES: All industrial work over 30 ft. above the ground, unless on solid flooring or grating permanently attached in place: 10% per hour additional.Over 60 ft.: 20% per hour additional.Over 90 ft.: 30% per hour additional.Work performed within 3 ft. of an unguarded opening at the above-mentioned heights to receive the above-mentioned premiums.Work in underground mines, except mine shaft work:
10% per hour additional.
ELEC0979-001 06/01/2008
DELTA COUNTY; MENOMINEE COUNTY (does not include the townships of Ingallston, Melon and Menominee); AND SCHOOLCRAFT COUNTY:
ELECTRICIAN......................$ 29.20 13.20+4%
FOOTNOTES: Work on chimneys, stacks, or towers where the worker is required to work at a distance of twenty-five
(25) feet but less than fifty (50) feet from the ground or floor to the working area (catwalks are not to be considered as a permanent floor): 10% additional.Work as defined above over fifty (50) feet but less than seventy-five (75) feet from the ground or floor: 20% additional.Work as defined above over seventy-five (75) feet but less than one hundred (100) feet from the ground or floor: 30% additional.Work as defined above over one hundred (100 feet from the ground or floor: to be paid at the double time rate.
ELEC1070-002 06/01/2008
Rates Fringes
ELECTRICIAN
Contracts $130,000 and under.......................$ 26.50 15.22+1% Contracts over $130,000.....$ 28.50 15.28+1%
ELEV0085-005 01/01/2009
Rates Fringes
ELEVATOR MECHANIC................$ 41.50 18.285
FOOTNOTE: Vacation Pay: 8% with 5 or more years of service, 6% for 6 months to 5 years service. Paid Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day,Thanksgiving Day and Friday after, and Christmas Day.
ENGI0324-009 05/01/2009
Rates Fringes
POWER EQUIPMENT OPERATOR
(Including underground work) Crane operator, main boom & jib 120' or longer........$ 27.88 17.55 Crane operator, main boom & jib 140' or longer........$ 28.13 17.55 Crane operator, main boom & jib 220' or longer........$ 28.38 17.55
GROUP 1.....................$ 27.38 17.55
GROUP 2.....................$ 24.13 17.55
GROUP 3.....................$ 23.55 17.55
GROUP 4.....................$ 22.61 17.55
Mechanic with truck and tools.......................$ 28.88 17.55
FOOTNOTES: Swing boom truck operator over 15 tons:$.50 per hour additional. Hydraulic crane operator 75 tons and under:$.75 per hour additional. Hydraulic crane operator over 75 tons:$1.00 per hour additional. Lattice boom crane operator:$1.50 per hour additional. Crusher pits, shafts and tunnel workers:$2.00 per hour additional. Premium rate:
main boom and jib 300 feet or longer is $1.50 per hour above the 220 ft. boom and jib rate. Premium rate: main boom and jib 400 feet or longer is $3.00 per hour above the 220 ft. boom and jib rate.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Regular equipment operator , backhoe, crane, dozer, front end loader, job mechanic, pumpcrete and squeezecrete, welder, concrete pump, excavator, milling and pulverizing machines,scraper (self-propelled and tractor drawn), welder
GROUP 2: Air track drill, boom truck (non-swing), concrete mixer, material hoist and tugger, pump 6" and over, beltcrete, sweeping machine, trencher, winches, well points and freeze systems
GROUP 3: Air compressor, conveyor, concrete saw, farm tractor (without attachments), fork truck, generator, guard post driver, mulching machine, pumps under 6-in., welding machine and grease person
GROUP 4: Oiler, fire tender, heater operator, brock concrete breaker, elevators (other than passenger), end dumps and skid steer.
Crane Operator with main boom and jib 300' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 220' of boom and jib wage rate.
Crane Operator with main boom and jib 400' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 300 foot of boom wage rate ($3.00)
ENGI0325-006 10/01/2008
ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON,
IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE,
ONTONAGON, SCHOOLCRAFT
Power equipment operators -hazardous waste removal:
LEVEL A:
Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator...................$ 30.99 16.75 Engineer when operating crane with boom and jib or leads 140' or longer....$ 32.67 16.75
Engineer when operating or leads 220' or longer....$ 32.97 16.75
GROUP 1....................$ 30.02 16.75
GROUP 2....................$ 25.62 16.75
LEVEL B AND C:
Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operators..................$ 30.04 16.75 Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.61 16.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 31.93 16.75
GROUP 1....................$ 29.07 16.75
GROUP 2....................$ 24.68 16.75
LEVEL D WHEN CAPPING
LANDFILL:
Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operators..................$ 28.49 16.75 Engineer when operating crane with boom and jib or leads 140' or longer....$ 30.17 16.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.47 16.75
GROUP 1....................$ 27.52 16.75
GROUP 2....................$ 23.13 16.75
LEVEL D:
Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operators..................$ 28.74 16.75 Engineer when operating crane with boom and jib or leads 140' or longer....$ 30.42 16.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.72 16.75
GROUP 1....................$ 27.77 16.75
GROUP 2....................$ 23.38 16.75
HAZARDOUS WASTE REMOVAL CLASSIFICATIONS
GROUP 1: Backhoe, batch plant operator, clamshell, concrete breaker when attached to hoe, concrete cleaning decontamination machine operator, concrete pump, concrete paver, crusher, dozer, elevating grader, endloader, farm tractor (90 h.p. and higher), gradall, grader, heavy equipment robotics operator, loader, pug mill, pumpcrete machines, pump trucks, roller, scraper (self- propelled or tractor drawn), side boom tractor, slip form paver, slop paver, trencher, ultra high pressure waterjet cutting tool system operator, vactors, vacuum blasting machine operator, vertical lifting hoist, vibrating compaction equipment (self-propelled), well drilling rig, slope paver, hydro excavator
GROUP 2: Air compressor, concrete breaker when not attached to hoe, elevator, end dumps, equipment decontamination operator, farm tractor (less than 90 h.p), forklift, generator, heater, mulcher, pigs (portable reagent storage tanks), power screens, pumps (water), stationary compressed air plant, sweeper, welding machine and water wagon
ENGI0326-019 05/01/2009
Rates Fringes
POWER EQUIPMENT OPERATOR
(Steel Erection) Compressor, welder and forklift....................$ 24.53 17.55 Crane operator, main boom & jib 120' or longer........$ 28.28 17.55 Crane operator, main boom & jib 140' or longer........$ 28.53 17.55 Crane operator, main boom & jib 220' or longer........$ 28.78 17.55 Mechanic with truck and tools.......................$ 29.28 17.55 Oiler and fireman...........$ 23.23 17.55 Operator....................$ 27.78 17.55
Crane Operator with main boom and jib 300' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 220' of boom and jib wage rate.
Crane Operator with main boom and jib 400' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 300 foot of boom wage rate ($3.00)
IRON0008-008 06/01/2008
Rates Fringes
IRONWORKER (Metal Building Erection)........................$ 22.70 6.60 IRONWORKER (Reinforcing and Structural)
Contracts $10,000,000 or greater.....................$ 26.13 18.72 Contracts less than $10,000,000.................$ 23.69 18.72
IRON0008-010 06/01/2008
Rates Fringes
IRONWORKER (Metal Building Erection)........................$ 22.70 6.60 IRONWORKER (Reinforcing and Structural) Contracts $10,000,000 or more........................$ 26.13 18.72 Contracts less than $10,000,000.................$ 23.69 18.72
LABO0005-004 10/01/2008
Rates Fringes
Laborers - hazardous waste abatement:
Work performed inside the building and up to and including 5 ft. outside the building:
Level A, B or C............$ 22.18 10.35 Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D..............$ 21.18 10.35 Work performed over 5 ft.
outside the building:
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D..............$ 19.44 9.80 Level A, B or C............$ 20.44 9.80
LABO0259-009 08/01/2008
Rates Fringes
Asbestos Laborer Includes removing and disposing of all insulation materials from walls, ceilings, floors, columns, and all other non-mechanical surfaces; and removal of insulating materials from mechanical systems that are to be demolished;
loading/unloading of bagged and tagged materials at the disposal site (includes lead paint abatement clean-up).........$ 24.53 9.45
LABO0334-013 07/01/2008
Rates Fringes
Landscape Laborer
GROUP 1.....................$ 18.63 5.80
GROUP 2.....................$ 14.43 5.80
LANDSCAPE LABORER CLASSIFICATIONS
GROUP 1: Landscape specialist, including air, gas and diesel equipment operator and lawn sprinkler installer
GROUP 2: Landscape laborer: small power tool operator, material mover, truck driver and lawn sprinkler installer tender
LABO1329-001 05/01/2009
Rates Fringes
Laborers:
Commercial Construction
GROUP 1....................$ 20.12 11.00
GROUP 2....................$ 20.52 11.00
GROUP 3....................$ 20.87 11.00
GROUP 4....................$ 18.17 11.00
GROUP 5....................$ 22.17 11.00
Industrial Construction
GROUP 1....................$ 21.78 11.00
GROUP 2....................$ 22.18 11.00
GROUP 3....................$ 22.53 11.00
GROUP 4....................$ 18.37 11.00
GROUP 5....................$ 23.83 11.00
FOOTNOTE: Work on waterfront work (working over water) on the Great Lakes or connecting waters navigable to lake carriers: $0.75 per hour additional.
LABORER CLASSIFICATIONS
GROUP 1: All construction laborers on building and heavy construction work, storm and sanitary sewers, tool crib attendant, Civil Engineer helper, rodman, oxi-gun operator, workers using propane or acetylene cutting torch, motor-driven buggies, chipping hammers, tamping machines, green cutting (whether run by air, electric or gas), sandblasters, mason tenders, Mortar mixer, material mixer (whether done by hand or machine), vibrator operator, concrete mixer, laborer with concrete crew, mixer to pour, including pour from trucks
GROUP 2: Cement gun nozzle operator, blaster, miner, driller, buster operator, layer of all non-metallic pipe
GROUP 3: Caisson worker and airtrack
GROUP 4: Watchman, Fire watch and Hole watch
GROUP 5: Digester, tanks & kilns
* PAIN1011-001 06/01/2009
Rates Fringes
Drywall Finisher and foam applicator.......................$ 25.18 8.25
PAINTER
Work on iron ore processing plants, water tanks, petroleum tanks, chemical tanks or vessels, towers, bridges, radio and television towers, church steeples, blast furnaces, smoke stacks, flag poles, aircraft hangers, power plants, heating plants, water treatment plants and buildings affixed to or included in an industrial complex and paper mills.....$ 19.61 8.25 Work on multiple housing units and all housing units over 4 stories, offices, stores , banks, cammercial garages, gas stations, restaurants, motels, hotels, theaters, depots, churches, commercial warehouses, marinas, schools, dormatories, funeral homes and all other like structures..................$ 14.02 8.25
FOOTNOTES: High pay (bridges, overpasses, watertowers): 30 to 80 ft.: $.65 per hour additional. 80 ft. and over: $1.30 per hour additional.
PLUM0506-002 06/01/2008
CHIPPEWA, DELTA, LUCE, MACKINAC, MENOMINEE AND SCHOOLCRAFT
COUNTIES:
PLUMBER/PIPEFITTER (Includes HVAC piping).....................$ 28.11 16.25
FOOTNOTES: Welders working on Chrome Moly or PP Stamp work:
$.50 per hour additional. Workers working in a confined space as defined in Title 29 Code of Federal Regulations 1910.146, and required to wear a selfcontained breathing apparatus: $1.00 per hour additional. Workers working with or around hazardous materials as specified in Title 29 Code of Federal Regulations 1926.62, and required to wear protective rubber gloves, boots and a self contained breathing apparatus or a complete hazardous materials protective bodysuit (Level B or more protective): $1.00 per hour additional.
PLUM0506-005 06/01/2008
DICKINSON COUNTY:
Rates Fringes
PLUMBER/PIPEFITTER (Includes HVAC piping).....................$ 28.11 16.25
FOOTNOTES: Welders working on Chrome Moly or PP Stamp work:
$.50 per hour additional. Workers working in a confined space as defined in Title 29 Code of Federal Regulations 1910.146, and required to wear a selfcontained breathing apparatus: $1.00 per hour additional. Workers working with or around hazardous materials as specified in Title 29 Code of Federal Regulations 1926.65, and required to wear protective rubber gloves, boots and a selfcontained breathing apparatus or a complete hazardous materials protective bodysuit (Level B or more protective): $1.00 per hour additional.
PLUM0506-006 06/01/2008
Rates Fringes
PLUMBER/PIPEFITTER (Includes HVAC piping) All other work..............$ 28.11 16.25
FOOTNOTES: Welders working on Chrome Moly or PP Stamp work:
$.50 per hour additional. Workers working in a confined space as defined in Title 29 Code of Federal Regulations 1910.146, and required to wear a selfcontained breathing apparatus: $1.00 per hour additional. Workers working with or around hazardous materials as specified in Title 29 Code of Federal Regulations 1926.65, and required to wear protective rubber gloves, boots and a selfcontained breathing apparatus or a complete hazardous materials protective bodysuit (Level B or more protective): $1.00 per hour additional.
ROOF0149-014 05/01/2008
Rates Fringes
ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 17.63 9.80 Slater...........................$ 19.63 9.80
SFMI0669-005 04/01/2008
Rates Fringes
SPRINKLER FITTER.................$ 31.46 14.30
SHEE0007-006 06/01/2008
Rates Fringes
SHEET METAL WORKER (Includes HVAC duct work)..................$ 27.96 17.04
SUMI2001-001 08/10/2001
Rates Fringes
Power Equipment Operator
EXCAVATOR...................$ 17.62 3.28
TEAM0328-001 05/01/2003
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 19.62 3.76/hr.+ a GROUP 2.....................$ 19.77 3.76/hr.+ a GROUP 3.....................$ 19.83 3.76/hr.+ a GROUP 4.....................$ 19.98 3.76/hr.+ a
FOOTNOTE:
a. $17.80 per day
PAID HOLIDAYS: Memorial Day, Fourth of July, Labor Day and Thanksgiving Day, if the regular work day immediately preceding or following the holiday is either worked or an excused absence.
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: All other trucks
GROUP 2: Heavy duty, double axle and semi trucks
GROUP 3: Truck repair and maintenance
GROUP 4: Euclid type equipment
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
WAGE DETERMINATION
General Decision Number: MI080090 07/24/2009 MI90
Superseded General Decision Number: MI20070090
State: Michigan
Construction Type: Heavy
County: Chippewa County in Michigan.
HEAVY CONSTRUCTION PROJECTS (does not include airport or bridge construction projects, or sewer or water line work if it is incidental to a highway construction project)
Modification Number Publication Date 0 02/08/2008
1 03/21/2008 2 04/11/2008 3 05/02/2008 4 06/06/2008 5 06/13/2008 6 06/20/2008 7 07/25/2008 8 08/15/2008 9 08/22/2008 10 10/17/2008 11 10/31/2008 12 11/28/2008 13 12/05/2008 14 12/12/2008 15 01/16/2009 16 01/23/2009 17 02/20/2009 18 03/06/2009 19 05/01/2009 20 05/08/2009 21 06/05/2009 22 07/24/2009
BOIL0169-005 07/01/2008
Rates Fringes
BOILERMAKER (Excluding tank building)........................$ 31.953 20.869
BRMI0006-002 06/01/2008
Rates Fringes
Bricklayer; marble, terrazzo and tile setter..................$ 24.30 13.70
CEMENT MASON/CONCRETE FINISHER...$ 24.30 13.70
Pointer, caulker and cleaner.....$ 24.30 13.70
FOOTNOTES: Stacks: Work on industrial and powerhouse stacks shall receive $2.00 per hour above the journeyman bricklayer rate.
Industrial: Refinishing work on digesters, tanks, lime kilns, chests, boilers, and boiler tubes shall receive $2.00 per hour above the journeyman bricklayer rate.
CARP1510-002 05/01/2009
Rates Fringes
CARPENTER
(Includes concrete form work).......................$ 26.27 12.18
MILLWRIGHT.......................$ 30.78 12.40
Piledriver.......................$ 26.47 12.18
FOOTNOTES:
Waterfront work on the Great Lakes or connecting water navigable to Lake carriers: $0.20 per hour additional.
Work on industrial construction, defined as industrial manufacturing and processing plants such as ore plants, paper mills, power houses, foundries, saw mills, wood processing plants, or other industrial complexes: $.30 per hour additional.
ELEC0876-004 06/02/2008
Rates Fringes
Line Construction: cable splicer..........................$ 33.85 4.75+23.75% Line Construction: light equipment operator/ground person/truck driver/ground pe winch, A-frame, diggers when used for distribution line truck and used for distribution work.
Distribution truck driver, 5th wheel type trucks, bucket trucks, ladder trucks and all live boom trucks, all equipment 85 hp or under.................$ 21.42 4.75+23.75% Line Construction: line technician.......................$ 32.51 4.75+23.75% Line Construction:
operator/ground person digger, tractor and setting rig with tracks or rough terrain vehicle, large bombardier, backhoe over 85 hp, hydraulic crane 10 ton or over........$ 24.45 4.75+23.75% Line Construction: truck driver/ground person trucks with winch or boom or dump, other than distribution work...........$ 20.39 4.75+23.75%
FOOTNOTE:
Operators of 5/8 yd. rated capacity backhoe or over, and operators of 25 ton, rated capacity, crane or over, and operators of heavy duty tension or pulling machinery on 345 KV and above, shall receive the line technician rate of pay.
ELEC1070-004 06/01/2008
ELECTRICIAN
Contracts $130,000 and under.......................$ 26.50 15.22+1% Contracts over $130,000.....$ 28.50 15.28+1%
ENGI0324-012 05/01/2009
Rates Fringes
POWER EQUIPMENT OPERATOR
(Steel Erection) Compressor, welder and forklift....................$ 24.53 17.55 Crane operator, main boom & jib 120' or longer........$ 28.28 17.55 Crane operator, main boom & jib 140' or longer........$ 28.53 17.55 Crane operator, main boom & jib 220' or longer........$ 28.78 17.55 Mechanic with truck and tools.......................$ 29.28 17.55 Oiler and fireman...........$ 23.23 17.55 Regular operator............$ 27.78 17.55
PREMIUM RATES:
A. Swing boom truck operator over 15 tons-$.50 per hour.
B. Hydraulic crane operator 75 tons and under-$.75 per hour.
C. Hydraulic crane operator over 75 tons-$1.00 per hour.
D. Lattice boom crane operator-$1.50 per hour.
* ENGI0326-001 05/01/2009
Rates Fringes
POWER EQUIPMENT OPERATOR (Gas Distribution and Duct Installation Work)
GROUP 1.....................$ 25.07 16.75
GROUP 2-A...................$ 24.97 16.75
GROUP 2-B...................$ 24.75 16.75
GROUP 3.....................$ 23.97 16.75
GROUP 4.....................$ 23.47 16.75
SCOPE OF WORK:
The construction, installation, treating and reconditioning of pipelines transporting gas vapors within cities, towns, subdivisions, suburban areas, or within private property boundaries, up to and including private meter settings of private industrial, governmental or other premises, more commonly referred to as "distribution work," starting from the first metering station, connection, similar or related facility, of the main or cross country pipeline and including duct installation.
POWER EQUIPMENT - GAS DISTRIBUTION CLASSIFICATIONS
GROUP 1: Mechanic, crane (over 1/2 yd. capacity), backhoe (over 1/2 yd. capacity), grader (Caterpillar 12 equivalent or larger)
GROUP 2-A: Trencher(except service), backhoe (1/2 yd.
capacity or less)
GROUP 2-B: Crane (1/2 yd. capacity or less), compressor (2 or more), dozer (D-4 equivalent or larger), endloader (1 yd.
capacity or larger), pump (1 or 2 six-inch or larger), side boom (D-4 equivalent or larger)
GROUP 3: Backfiller, boom truck (powered), concrete saw (20 hp or larger), dozer (less than D-4 equivalent), endloader (under 1 yd. capacity), farm tractor (with attachments), pump (2-4 under six-inch capacity), side boom tractor (less than D-4 equivalent), tamper (self-propelled), trencher service and grader(maintenance)
GROUP 4: Oiler, grease person, hydrostatic testing operator
ENGI0326-014 05/01/2009
Rates Fringes
POWER EQUIPMENT OPERATOR
(Includes Underground Construction) Crane operator, main boom & jib 120' or longer........$ 27.88 17.55 Crane operator, main boom & jib 140' or longer........$ 28.13 17.55 Crane operator, main boom & jib 220' or longer........$ 28.38 17.55
GROUP 1.....................$ 27.38 17.55
GROUP 2.....................$ 24.13 17.55
GROUP 3.....................$ 23.55 17.55
GROUP 4.....................$ 22.61 17.55
Mechanic with truck and tools.......................$ 28.88 17.55
FOOTNOTES:
Swing boom truck operator over 15 tons: $.50 per hour additional. Hydraulic crane operator 75 tons and under:
$.75 per hour additional. Hydraulic crane operator over 75 tons: $1.00 per hour additional. Lattice boom crane operator: $1.50 per hour additional. Crusher pit, shaft and tunnel workers: $2.00 per hour additional. Premium rate:
main boom and jib 300 feet or longer is $1.50 per hour above the 220 ft. boom and jib rate. Premium rate: main boom and jib 400 feet or longer is $3.00 per hour above the 220 ft. boom and jib rate.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Regular equipment operator, crane, dozer, front end loader, job mechanic, pumpcrete and squeezecrete, welder, concrete pump, excavator, milling and pulverizing machines, scraper (self-propelled and tractor drawn), welder
GROUP 2: Air track drill, boom truck (non-swing), concrete mixer, material hoist and tugger, pump 6" and over, beltcrete, sweeping machine, trencher, winches, well points and freeze systems
GROUP 3: Air compressor, conveyor, concrete saw, farm tractor (without attachments), fork truck, generator, guard post driver, mulching machine, pumps under 6-in., welding machine and grease person
GROUP 4: Oiler, fire tender, heater operator, brock concrete breaker, elevators (other than passenger, end dumps and skid steer
Crane Operator with main boom and jib 300' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 220' of boom and jib wage rate.
Crane Operator with main boom and jib 400' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 300 foot of boom wage rate ($3.00)
ENGI0326-016 10/01/2008
Rates Fringes
POWER EQUIPMENT OPERATOR
(Sewer Relining)
GROUP 1.....................$ 27.82 11.35
GROUP 2.....................$ 26.29 11.35
SEWER RELINING CLASSIFICATIONS
GROUP 1: Operation of audio-visual closed circuit TV system, including remote in-ground cutter and other equipment used in connection with the CCTV system
GROUP 2: Operation of hot water heaters and circulation systems, water jetters and vacuum and mechanical debris removal systems
ENGI0326-017 10/01/2008
Power equipment operators -hazardous waste removal:
LEVEL A:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 32.67 16.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 32.97 16.75
GROUP 1....................$ 30.02 16.75
GROUP 2....................$ 25.62 16.75
Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 30.99 16.75
LEVEL B AND C:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.61 16.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 31.93 16.75
GROUP 1....................$ 29.07 16.75
GROUP 2....................$ 24.68 16.75
Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 30.04 16.75
LEVEL D WHEN CAPPING
LANDFILL:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 30.17 16.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.47 16.75
GROUP 1....................$ 27.52 16.75
GROUP 2....................$ 23.13 16.75
Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 28.49 16.75
LEVEL D:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 30.42 16.75 Engineer when operating or leads 220' or longer....$ 30.72 16.75
GROUP 1....................$ 27.77 16.75
GROUP 2....................$ 23.38 16.75
Regular crane operator, mechanic, dragline operator, boom truck operator, concrete pump with boom operator, power shovel operator............$ 28.74 16.75
HAZARDOUS WASTE REMOVAL CLASSIFICATIONS
GROUP 1: Backhoe, batch plant operator, clamshell, concrete breaker when attached to hoe, concrete cleaning decontamination machine operator, concrete pump, concrete paver, crusher, dozer, elevating grader, endloader, farm tractor (90 h.p. and higher), gradall, grader, heavy equipment robotics operator, loader, pug mill, pumpcrete machines, pump trucks, roller, scraper (self- propelled or tractor drawn), side boom tractor, slip form paver, slope paver, trencher, ultra high pressure waterjet cutting tool system operator, vactors, vacuum blasting machine operator, vertical lifting hoist, vibrating compaction equipment (self-propelled), well drilling rig and hydro excavator
GROUP 2: Air compressor, concrete breaker when not attached to hoe, elevator, end dumps, equipment decontamination operator, farm tractor (less than 90 h.p), forklift, generator, heater, mulcher, pigs (portable reagent storage tanks), power screens, pumps (water), stationary compressed air plant, sweeper, welding machine and water wagon
IRON0008-006 06/01/2008
Rates Fringes
IRONWORKER (Metal Building Erection)........................$ 22.70 6.60 IRONWORKER (Reinforcing and Structural) General contracts $10,000,000 or greater......$ 26.13 18.72 General contracts less than $10,000,000............$ 23.69 18.72
IRON0008-009 06/01/2008
Rates Fringes
IRONWORKER (Metal Building Erection)........................$ 22.70 6.60 IRONWORKER (Reinforcing and Structural) Contracts $10,000,000 or greater.....................$ 26.13 18.72
Contracts less than $10,000,000.................$ 23.69 18.72
* LABO0005-021 10/01/2008
Rates Fringes
Laborers - hazardous waste abatement:
Work performed inside the building and up to and including 5 ft. outside the building:
Level A, B or C............$ 22.18 10.35 Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D..............$ 21.18 10.35 Work performed over 5 ft.
outside the building:
Level A, B or C............$ 20.44 9.80 Work performed in onjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D..............$ 19.44 9.80
LABO0259-004 09/01/2008
Rates Fringes
Laborers - tunnel, shaft and caisson:
GROUP 1.....................$ 22.32 9.80
GROUP 2.....................$ 22.41 9.80
GROUP 3.....................$ 22.51 9.80
GROUP 4.....................$ 22.67 9.80
GROUP 5.....................$ 22.93 9.80
GROUP 6.....................$ 23.24 9.80
GROUP 7.....................$ 15.51 9.80
TUNNEL LABORER CLASSIFICATIONS
GROUP 1: Tunnel, shaft and caisson laborer, dump, shanty, hog house tender, testing (on gas)
GROUP 2: Manhole, headwall, catch basin builder, bricklayer tender, mortar, material mixer, fence erector and guard rail builder
GROUP 3: Air tool operator (jackhammer, bush hammer and grinder), first bottom, second bottom, cage tender, car pusher, carrier, concrete, concrete form, concrete repair, cement invert laborer, cement finisher, concrete shoveler, conveyor, floor, gasoline and electric tool operator, gunite, grout operator, welder, heading dinky person, inside lock tender, pea gravel operator, pump, outside lock tender, scaffold, top signal person, switch person, track, tugger, utility person, vibrator, winch operator, pipe jacking, wagon drill and air track operator and concrete saw operator (under 40 h.p.)
GROUP 4: Tunnel, shaft and caisson mucker, bracer, liner plate, long haul dinky driver and well point
GROUP 5: Tunnel, shaft and caisson miner, drill runner, key board operator, power knife operator, reinforced steel or mesh (e.g. wire mesh, steel mats, dowel bars, etc.)
GROUP 6: Dynamite and powder
GROUP 7: Restoration laborer, seeding, sodding, planting, cutting, mulching and top soil grading; and the restoration of property such as replacing mailboxes, wood chips, planter boxes, flagstones, etc.
SCOPE OF WORK: Tunnel, shaft and caisson work of every type and descripton and all operations incidental thereto, including, but not limited to, shafts and tunnels for sewers, water, subways, transportation, diversion, sewerage, caverns, shelters, aquafers, reservoirs, missile silos and steel sheeting for underground construction.
LABO0260-008 08/01/2008
Rates Fringes
Asbestos Laborer Includes removing and disposing of all insulation materials from walls, ceilings, floors, columns, and all other non-mechanical surfaces; and removal of insulating materials from mechanical systems that are to be demolished;
loading/unloading of bagged and tagged materials at the disposal site (includes lead paint abatement clean-up).........$ 24.53 9.45
LABO0334-002 09/01/2008
Laborers - open cut:
GROUP 1.....................$ 19.40 9.80
GROUP 2.....................$ 19.54 9.80
GROUP 3.....................$ 19.67 9.80
GROUP 4.....................$ 19.72 9.80
GROUP 5.....................$ 19.77 9.80
GROUP 6.....................$ 17.15 9.80
GROUP 7.....................$ 15.26 9.80
LABORER CLASSIFICATIONS
GROUP 1: Construction laborer
GROUP 2: Mortar and material mixer, concrete form person, signal person, well point person, manhole, headwall and catch basin builder, guard rail builder, headwall, seawall, breakwall, dock builder and fence erector
GROUP 3: Air, gasoline and electric tool operator, vibrator operator, driller, pump person, tar kettle operator, bracer, rodder, reinforced steel or mesh person (e.g., wire mesh, steel mats, dowel bars, etc.), welder, pipe jacking and boring person, wagon drill and air track operator and concrete saw operator (under 40 h.p.), windlass and tugger person and directional boring person, cement finisher
GROUP 4: Trench or excavating grade person
GROUP 5: Pipe layer (including crock, metal pipe, multi-plate or other conduits)
GROUP 6: Grouting person, audio-visual television operations and all other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work, installation and repair of water service pipe appurtenances
GROUP 7: Restoration laborer, seeding, sodding, planting, cutting, mulching and top soil grading; and the restoration of property such as replacing mailboxes, wood chips, planter boxes, flagstones, etc.
SCOPE OF WORK:
Open cut construction work shall be construed to mean work which requires the excavation of earth including industrial, commercial and…