About this file

Appendix

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12345

D

C

B

A

5 4 3 2 1

A

B

C

D

U.S.ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

Revisions

Symbol Descriptions Date Approved

Sheet of

DRAWING INDEX

DRAWING TITLE REFERENCE CONVENTIONS

X

X X

SHEET NUMBER

OF VIEW DRAWN

SHEET NUMBER

OF VIEW TAKEN

DRAWING NUMBER

DETROIT, MICHIGAN

SCALE:

CHIEF, ENGINEERING MANAGEMENT BRANCH

COL. E.N. DISTRICT ENGINEER

SCALE IN FEET

(TYPICAL ALL SHEETS)

SCALE IN MILES

0 5050 100

2505007501000 500 1000

APPROVAL RECOMMENDED BY:SUBMITTED TO:

APPROVED BY:

N

SIGNATURES AFFIXED

BELOW INDICATE

OFFICAL RECOMM-

ENDATION AND

APPROVAL OF ALL

DRAWINGS IN THIS

SET AS INDEXED

ON THIS SHEET.

N/A

SHT NO

(TYPICAL ALL SHEETS)

GENERAL NOTES

ABBREVIATIONS

(TYPICAL ALL SHEETS)

CL

VIEW IDENTIFICATION

DESIGNATION

ST. JOSEPH

LUDINGTON

KEWAUNEE

CHICAGO

L A

K E

M I

C H

I G

A N

MICHIGAN

WISC.

L A

K E

S U P E R I

O R

A

H

U R

O N

L

L A

R

I

LOCATION MAP

SAULT STE. MARIE, MICHIGAN

S

A

A

FEY

Y

T

P S

CORPS OF ENGINEERS

DETROIT DISTRICT

SAULT STE. MARIE

MICHIGAN

MILWAUKEE

SOO LOCKS COMPLEX

SAULT STE. MARIE

WHITEFISH ISLAND

IN

TER

N A

TIO

N

A L B

O U

N D

A R

Y

EDISON

SAULT

ELECTRIC CO POWER

ED

ISO

N

SA

U

LT ELEC

TR

IC

PO

W

ER PLA

N T

SAULT STE. MARIE

MICHIGAN

PORTAGE AVENUE

EMELINE ST

GROS CAP AVE

T R

E M

P E

S G

R A

N D

F O

T

T

SPRUCE ST

RIDGE ST

ARLINGTON ST

PORTAGE AVE

M

APLE ST

SPRUCE ST

B

IN

G H

A

V E

A S H

M U

M S

T

J O

H N

S T

O N

S T

IN

T

E R

N A

T

IO

N A

L H

IG

H

W A

Y B

R

ID

G E

ST. MARYS RIVER

I N

T E

R N

A T

I O

N

L

B

R I D

G E

NORTHWEST PIER

SOUTHEAST PIER

SABIN LOCK

DAVIS LOCK

POE LOCK

MAC ARTHUR LOCK

COMPENSATING WORKS

N

NORTHEAST PIER

SAULT STE.

MARIE

ONTARIO

CANADA

EAST CENTER

PIER

VICINITY MAP

CA

N

A L

POUNDS PER SQUARE FOOT....... PSF

REINFORCED...................REINF

REMOTELY OPERATED VEHICLE..... ROV

REQUIRED................... REQ’D

W

ATER ST

NAV CANAL SIDE

E.S.E.C. P

OWER

CANAL SIDE

ASPHALT...................... ASP

AVENUE....................... AVE

CENTER LINE

CENTER TO CENTER.......... C TO C

COMPANY....................... CO

CONCRETE.................... CONC

CONSTRUCTION............... CONST

SOLICITATION NUMBER: DACW35-95-B-0019

SOO LOCKS COMPLEX

EMERGENCY DAM STEAMPLANT REPLACEMENT

PROJECT

LIMIT

C O

V E

R .D

G N

D.M. 12/1469

CHIEF, ENGINEERING AND PLANNING DIVISION

EMERGENCY DAM STEAMPLANT REPLACEMENT

COVER SHEET, LOCATION & VICINITY MAPS,

& GENERAL NOTES

US Army Corps of Engineers

Increase Profit...Submit VECP’S

Value Engineering

1120 MAY STREET, LANSING, MICHIGAN 48906

TELEPHONE (517) 374-6800

A DLZ Company

DODSON-LINDBLOM

ASSOCIATES

INC.

1. THE CONTRACTOR SHALL LOCATE ALL UTILITIES

PRIOR TO STARTING WORK AND SHALL CONDUCT

HIS OPERATIONS IN SUCH A MANNER AS TO ENSURE THAT

THOSE UTILITIES NOT REQUIRING RELOCATION WILL NOT

BE DISTURBED.

2. THE EXISTING INFORMATION DEPICTED ON THESE

DRAWINGS REPRESENT THE RESULTS OF RECENT INSPECTIONS

AND CAN ONLY BE CONSIDERED AS INDICATING THE GENERAL

CONDITIONS EXISTING AT THE TIME OF THE INSPECTION.

3. ALL ELEVATIONS PROVIDED ON DRAWINGS ARE REFERENCED

TO I.G.L.D. 1955.

EDISON SUALT ELECTRIC

COMPANY................. E.S.E.C.

FEET.......................... FT

ELEVATION..................... EL

FINISHED FLOOR.............. F.F.

INTERNATIONAL GREAT

LAKES DATUM............. I.G.L.D.

LOW WATER DATUM.............. LWD

MAXIMUM...................... MAX

MINIMUM...................... MIN

NAVIGATIONAL................. NAV

NORTH.......................... N

NOT APPLICABLE.................N/A

NUMBER........................ NO

SECTION...................... SEC

STATION...................... STA

STREET........................ ST

TYPICAL...................... TYP

UNITED STATES............... U.S.

UNITED STATES

GEOLOGICAL SURVEY.........U.S.G.S.

WEST........................... W

GENERAL

COVER SHEET, LOCATION & VICINITY MAPS, & GENERAL NOTES

SITE WORK

SITE PLAN

MANHOLE DETAILS

ARCHITECTURAL

FLOOR PLAN, ROOF PLAN, & SCHEMATICS

FLOOR PLAN, FOUND PLAN, ROOF PLAN, ELEVATIONS, & SECTIONS

WALL SECTIONS

DETAILS

STRUCTURAL

FOUNDATION PLAN, ROOF, FRAMING PLAN, & SECTIONS

STRUCTURAL SECTIONS & DETAILS

MECHANICAL

SYMBOLS, GENERAL NOTES, & ABBREVIATIONS

AREA PLANS 1, 2, & 3

AREA PLAN 4 & ENLARGED PLAN

ENLARGED PLAN - ELECTRIC SERVICE TUNNEL ENTRANCE

STEAMPLANT MECHANICAL FLOOR PLAN, BOILER PIPING PLAN,

& SECTION

PIPING DIAGRAMS

SCHEDULES & DETAILS

ONE LINE DIAGRAM

POWER SCHEDULES

ELECTRICAL

SYMBOLS, GENERAL NOTES, & ABBREVIATIONS

SITE KEY PLAN & AREA PLAN 4

AREA PLANS 1, 2, & 3

STEAMPLANT POWER PLAN

STEAMPLANT LIGHTING PLAN AND LIGHTING FIXTURE SCHEDULE

G-1

C-1

C-2

A-1

A-1A

A-3

A-4

S-1

S-2

M-1

M-2

M-3

M-4

M-5

M-6

M-7

E-1

E-2

E-3

E-4

E-5

E-6

E-7

IN THE TABLE LABLED DRAWING INDEX THE ROW "A-2

BUILDING ELEVATIONS" WAS REPLACED WITH "A-1A FLOOR

PLAN, FOUND PLAN, ROOF PLAN, ELEVATIONS, AND SECTIONS".

AS-BUILT

APR 1997

G-1

100 0 100 200 300

N

N 638,500

N 638,000

N 637,500

MH

MH

MH MH

MH

MH

MH

MH

D

C

B

A

5 4 3 2 1

A

B

C

D

Revisions

Symbol Descriptions Date Approved

Designed by:

Drawn by:

Checked by:

DETROIT, MICHIGAN

CHIEF, ENGINEERING MANAGEMENT BRANCH

JJB

DRAWING NUMBER

SCALE :

SAULT STE. MARIE

MICHIGAN

SUBMITTED TO:

OFSHEET

1120 MAY STREET, LANSING, MICHIGAN 48906

TELEPHONE (517) 374-6800

A DLZ Company

DODSON-LINDBLOM

ASSOCIATES

INC.

AS SHOWN

EMERGENCY DAM STEAMPLANT REPLACEMENT

KJB

ALF

SITE PLAN

SITE PLAN

C-1 2

DAVIS LOCK SOUTH

WEST OPERATING SHELTER

MARINE

LIBRARY

VISITORS

CENTER

DAVIS

BUILDING

ADMINISTRATION

BUILDING

REQUIRED GAS METER

LOCATION BY LOCAL

GAS COMPANY

3" GAS PIPING

UNDER PORTAGE

AVENUE

L L

L

L

L

L

L

L

L L

L

L

L

L

L

L L

L

L

L

L

L

L

L

L

L

L

L

N 638,000

L

L

L

LL

L

L

L L

L

L

L

L

L

L

L

L

L

L

L L

L L L

L

L

L L L

L

L L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

LL

L L

L

L

L

L

L

L

L

L L

L

L

L

L L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L L L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L L

L

L

L

L LL

L

L

L

L

LL

L L

L

L

SIGN

FOUNTAIN

L

MH MH

L

L

L

L

L L

L

605 605

590 595

CONTRACTOR TO VERIFY

EXISTING UNDERGROUND

UTILITIES WITHIN

CONSTRUCTION LIMITS

LEGEND

L

606.17

NOTE:

CONTRACTOR SHALL BE RESPONSIBLE FOR

CONTACTING AND COORDINATING GAS

COMPANY REQUIRED SERVICE. CONTRACTOR

TO INCLUDE ALL REQUIRED CHARGES BY THE

GAS COMPANY IN THE CONTRACT PRICE.

CONTACT: MICHIGAN CONSOLIDATED GAS COMPANY

MR. RICK A. WATZEL

616-929-2267

MAIN GATE

FOR SITE ACCESS

12" CITY SEWER

SEE NOTE 3.

6" PVC SANITARY

FROM NEW MANHOLE

TO 12" SANITARY.

(SEE NOTE 2)

COMPRESSED AIR

PIPING TO BE

CAPPED AND

ABANDONED

EXISTING UNDERGROUND FUEL OIL

AND COMPRESSED AIR PIPING

REQUIRED STEAMPLANT

WORK AREA

AND STAGING

SEE SPECIFICATION SECTION 01999

FOR SOIL BORING REPORT LOCATIONS

EXISTING

EMERGENCY DAM

STEAMPLANT

D.M. 12/1470

REQUIRED 2" GAS

PIPING TO GAS METER

BY LOCAL GAS CO.

ENLARGED SITE PLAN

0 30 30 60FT

SCALE: 1’’= 30’

LAWN AREA

LAWN AREA

606.17 606.17

606.17

606.17

606.40

DAVIS LOCK SOUTH

WEST OPERATING

SHELTER

WALKS TO MATCH EXISTING

SIDEWALK GRADES

SEE CABLE GALLERY PIPING

DIAGRAM, DRAWING M-2

L

L

L

L

L

L

L

L

L L

L

L

L

MAGAZINE

STREET

PROJECT STAGING AREA-

OLD RAILROAD STATION,

SOUTH OF PORTAGE AVE.

AND WEST OF MAGAZINE ST.

EXISTING FUEL OIL MANHOLE

TO BE DEMOLISHED. SEE STR.

NO. 10 MANHOLE DETAIL,

DRAWING C-2

LIGHT POLE

MOORING BOLLARD

RAILING

FINISH GRADE AT

BLDG. CORNER (IGLD)

DUCTILE IRON PIPEDIP

LOW WATER DATUM

(LWD=599.5)

EMERGENCY DAM STEAMPLANT

FINISH FLOOR ELEVATION

= 100.00 (606.50 IGLD)

SEPTIC

TANK DISP.

FIELD

5’ DEEP

SEPTIC TANK

DISPOSAL FIELD

5’ DEEP

SEWER LINE

CONTRACT NUMBER: DACW35-95-C-0040

SEE CABLE GALLERY PIPING

DIAGRAM, DRAWING M-2A

NOTES:

1. EXISTING PUMPED FUEL OIL PIPING SYSTEM TO BE ABANDONED

AND USED AS STEAM PLANT SANITARY DRAIN SYSTEM (FORCE MAIN).

2. 6" GRAVITY PIPE FROM STRUCTURE NO. 10 TO CITY SANITARY TO BE

POLYVINYL CHLORIDE PIPING AND FITTINGS IN ACCORDANCE WITH

ASTM D3034.5DR35. THE PIPING SHALL BE JOINED WITH AN INTEGRAL

BELL, BELL AND SPIGOT TYPE RUBBER JOINT. GASKETS TO CONFORM

WITH ASTM F477. FITTINGS SHALL CONFORM TO ASTM D3 212.

3. CONNECTION TO CITY SANITARY SYSTEM SHALL BE MADE BY A

’BONDED’, LICENSED DRAIN LAYER. A TAP INSPECTION PERMIT IS

REQUIRED BY THE CITY OF SAULT SAINTE MARIE. 6" CONNECTION

TO CITY MAIN SHALL BE A GASKETED SADDLE WYE WITH STAINLESS

STEEL CLAMPS. ALL TRAFFIC CONTROL, STREET AND SIDEWALK WORK

SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

4. THE REQUIRED 5 PSIG GAS SERVICE IS TO BE PROVIDED BY THE LOCAL

NATURAL GAS UTILITY COMPANY.

PIER WALL THICKNESS

16’-0"

NOTES:

1. UTILITY LOCATIONS SHOWN ARE APPROXIMATE,

CONTRACTOR TO FIELD VERIFY ALL UTILITIES PRIOR

TO BEGINNING CONSTRUCTION ACTIVITY.

2. ALL DISTURBED AREAS TO BE RESTORED TO AN

EQUAL OR BETTER THAN PRE-CONSTRUCTION CONDITION.

3. SLOPE UNIFORMLY TO MATCH EXISTING GRADES AT

PROJECT LIMITS, TYPICAL.

4. IF CONCRETE IS REMOVED, CONTRACTOR SHALL

REPLACE WITH 6" MINIMUM CONCRETE AS SPECIFIED. BACKFILL

AND COMPACTION AS SPECIFIED.

5. ALL LAWN AREAS DISTURBED BY CONSTRUCTION ARE

TO BE RE-ESTABLISHED AS SPECIFIED.

6. ALL PIPING MATERIAL IS PER CONTRACT SPECIFICATION.

7. DELETED

8. SEE DRAWING C-2 FOR MANHOLE DETAILS.

9. ALL TRENCHING, BACKFILLING, AND INSTALLATION OF

PIPING TO BE PER MANUFACTURER’S RECOMMENDATIONS

AND ASTM D2321, WHICHEVER IS MORE STRINGENT.

SRJ

CHANGES PER AMENDMENT 0001: (1) NOTE 4 WAS ADDED TO THE SITE

PLAN NOTES. CHANGES PER AMENDMENT 0004: (1) STR. NO. 12, 13 &

14 ARE DELETED. (2) THE 10" ABS WATER INTAKE PIPING IS DELETED.

AND THE 4" UNDERGROUND DUCTILE IRON PIPE IS SUBSTITUTED. (3)

THE LOCATION OF STR. NO. 11 IS CHANGED FROM THE SOUTH WALL TO

THE NORTH WALL OF THE WEST CENTER PIER. (4) THE 8" INTAKE

PIPE IS REVISED TO GO THROUGH THE NORTH PIER WALL. (5) THE

THICKNESS OF THE NORTH WALL OF THE WEST CENTER PIER THROUGH

WHICH THE 12" DIAMETER CORE IS TO BE CONSTRUCTED IS 16’-0".

(6) THE N. INV. ELEVATION OF 595.00 AND THE S. INV. ELEVATION

OF 593.00 FOR STR. NO. 11 ARE DELETED AND THE N. INV. ELEVATION

OF 593.00 AND S. INV. ELEVATION OF 599.00 ARE SUBSTITUTED. (7)

THE DESIGNATION "N-12" IS DELETED FROM ALL PIPE NOTATIONS. (8)

ON THE ENLAGED SITE PLAN NOTE 4 THE DIMENSION 4" IS DELETED

AND THE DIMENSION 6" IS ADDED. (9) ON THE ENLARGED SITE PLAN

NOTE 6 THE WORDS "N-12 PIPE FROM ADVANCED DRAINAGE SYSTEMS,

INC" ARE DELETED AND THE WORDS "INSIDE-DIAMETER CORRUGATED

POLYETHYLENE PIPE WITH NON-CORRUGATED SMOOTH WALL, ASTM F405

OR AASHTO M252, TYPE S" ARE ADDED. (10) ON THE ENLARGED

SITE PLAN NOTE 9 THE WORDS "N-12 ADS" ARE DELETED AND THE

WORDS "AND ASTM D2321, WHICHEVER IS THE MORE STRINGENT" ARE

ADDED. (11) ON BOTH VIEWS THE EXISTING SEPTIC FIELD IS ADDED.

(12) SKETCH C-1A IS ADDED TO THIS DRAWING TO REFLECT THESE

CHANGES.

CHANGES PER MODIFCATION P00006: (1) SKETCH C-1A (ADDED BY

AMENDMENT 0004) IS DELETED AND SKETCH SK-95-40-02-02 IS SUB-

STITUTED.CHANGES PER MODIFICATION P00008: (1) SK-95-40-02-02 IS

DELETED AND SKETCH C-1A IS SUBSTITUTED. CURRENT REVISION

CHANGES: (1) DELETE SKETCH C-1A. (2) STR. NO. 11 IS DELETED.

(3) THE 4" UNDERGROUND DUCTILE IRON PIPE IS DELETED. (4) ON

THE ENLARGED SITE PLAN THE EXISTING NOTE 6 IS DELETED AND THE

FOLLOWING NOTE 6 IS SUBSTITUTED: "UNLESS OTHERWISE NOTED, ALL

PIPING MATERIAL SHALL BE PER THE CONTRACT SPECIFICATION." (5) ON

THE ENLARGED SITE PLAN NOTE 7 IS DELETED. (6) ON THE SITE PLAN

NOTE 3, DELETE THE SENTENCE "THIS WORK SHALL BE PERFORMED

BEFORE MAY 15, 1995 AS NOT TO INTERFERE WITH HIGH TRAFFIC

VOLUME". (7) ON THE ENLARGED SITE PLAN DELETE THE DIMENSIONS

BETWEEN THE SOUTH WALL AND THE WATER PIPE. (8) ON THE

ENLARGED SITE PLAN, ON THE WEST END OF THE BUILDING, PIPING

(2" CITY WATER, 3" NON-POTABLE WATER AND STEAM LINE) ARE

SHOWN. ALSO, THE NOTATION "SEE CABLE GALLERY PIPING DIAGRAM,

DRAWING M-2" ARE ADDED.

CUTOFF WALL

(REF DWG

D2-6-1)

(9) AT THE SITE PLAN THE PIER CUTOFF

WALL IS ADDED WEST OF THE DAVIS LOCK SOUTHWEST OPERATING SHELTER

28NOV95

C

B

A

5 4 3 2 1

A

B

C

D

U.S.ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

Revisions

Symbol Descriptions Date Approved

Designed by:

Drawn by:

Checked by:

US Army Corps of Engineers DETROIT, MICHIGAN

CHIEF, ENGINEERING MANAGEMENT BRANCH

RWE

DRAWING NUMBER

SCALE :

SAULT STE. MARIE

MICHIGAN

SUBMITTED TO:

OFSHEET

1120 MAY STREET, LANSING, MICHIGAN 48906

TELEPHONE (517) 374-6800

A DLZ Company

DODSON-LINDBLOM

ASSOCIATES

INC.

AS SHOWN

EMERGENCY DAM STEAMPLANT REPLACEMENT

KJB

ALF

C-2 2

1. UNDERGROUND PUMPED FUEL OIL PIPING TO BE UTILIZED

AS STEAMPLANT DRAIN SYSTEM (FORCE MAIN).

2. All Concrete To Be Class "A" Except As Noted.

3. Manhole Steps Shall Be Installed In Vertical Wall. Top Step To Be

A Maximum Of 1’-6" Below Grade, Remaining Steps In Line At 15" O.C.

Down To A Maximum Distance Of 1’-6" Above Sewer C.

4. Sewer Pipe May Be Laid Through Manhole And Invert Shaping Roughed

In During Construction To Approximately 2" Below Finished Elevation.

Complete Manhole By Breaking Out Top Half Of Pipe And Steel, Troweling Rich Grout To Finish Shelf Contours.

Waterproof Coating.

6. COPOLYMER PLASTIC M.H. STEPS WITH�" GRADE 60 STEEL

Finished Grade

L

4’-0"

O .C

EXISTING 2" FUEL OIL PIPING

TO BECOME REQ’D FORCE MAIN

CONNECT REQ’D 2"

TO EXISTING 2"

ROUTE REQ’D 2" FORCE MAIN

THRU MANHOLE

6"

6" GRAVITY LINE

2" TEE

NOTES:

D.M. 12/1498

MANHOLE DETAILS

STR. NO. 10 MANHOLE DETAIL

NOT TO SCALE

#5 @ 12" O.C. EACH WAY

PRECAST REINFORCED

CONCRETE MANHOLE

SECTION A.S.T.M. C478

5. Exterior Of Manholes Should Be Waterproofed With A Bituminous

COMPRESSION GASKET

FOR PVC PIPE

FILL ANNULAR SPACE

W/ NON-SHRINK

GROUT

Standard Manhole Ring & Cover

With Built-up Type Frame.

REINFORCING. PSI-PF OR EQUAL.

7. ALL UNDERGROUND PIPE TURNS TO BE PROVIDED WITH RESTRAINED

FITTING PER THE RESTRAINED PIPE DETAIL.

MINIMUM FOOTAGE OF RESTRAINED PIPE

STANDARD JOINT

NOT RESTRICTEDRESTRAINED JOINT

ELBOW

RESTRAINING ROD PARAMETERS

PRESSURE - 2000 PSI

SAFETY FACTOR - 2.5

THREAD TYPE - AMERICAN COURSE

RESTRAINED PIPE SYSTEM PARAMETERS

PRESSURE - 200 PSI

SOIL TYPE - GW(ASTM STD. D2487)

BEDDING - NATIVE

TRENCH TYPE - 3

SAFETY FACTOR - 2

CONSULT WITH ENGINEER FOR ANY VARIATIONS

ENCOUNTERED FROM THESE PARAMETERS.

DEGREE OF ELBOW

MINIMUM FOOTAGE (IN FEET) OF RESTRAINED PIPE

DIAM

COVER

1" TO 4"

6"

8"

10"

11 1/4

4’ 5’ 8’

1 1 1

2 2

3 3

10’

22 1/2

4’ 5’ 8’ 10’

3 3

2 1 1

4’ 5’ 8’ 10’

6 5 3 3

11 9 6 5

671114

4’ 5’ 8’ 10’

15 12 8 6

9111721

28 22 14 12

14172733

NUMBER AND SIZE AND RESTRAINING RODS TO USE FOR

VARIOUS DEGREES OF ELBOWS AND DIAMETER OF PIPES

DIAM 11 1/4 22 1/2 45

2 1/2 "

2 1/2 "

4 1/2 "; 4 5/8 "; 2 3/4 "

8 1/2 "; 6 5/8 "; 4 3/4 "

2 1/2 "

2 1/2 "

2 1/2 "

2 1/2 "2 1/2 "

2 1/2 "

2 1/2 "6"

1" TO 4"

8"

10"

NONENONE

NONE

NONE

NONE

NOT TO SCALE

RESTRAINED PIPE DETAIL

N S

IT

E

D T

.D G

N

CONTRACT NUMBER: DACW35-95-C-0040

SRJ

29 JUNE 95

90 OR DEAD END

90 OR DEAD END MAIN

CHANGES PER AMENDMENT 0004: (1) DELETED STRUCTURE NO. 11,12,

AND 13, MANHOLE DETAILS. (2) ADDED STRUCTURE NO. 11,

PUMP MANHOLE AND VALVE VAULT DETAIL ELEVATION, PLAN AND

NOTES (FROM DRAWING C-2A.1). (3) ADDED THE RESTRAINED PIPE

DETAIL (FROM DRAWING C-2A.2).

CHANGES PER AMENDMENT 0004: (1) DELETED STRUCTURE NO. 14

TO STR. NO. 10, MANHOLE DETAIL. CHANGES PER MODIFICATION

P00006: (1) DELETED DRAWING C-2A.1. CHANGE PER MODIFICATION

P00008: (1) ADDED DRAWING C-2A.1. CURRENT REVISION CHANGES:

MANHOLE DETAIL. (2) DELETED BRAND NAMES. (3) ADDED NOTE 7

(1) DELETED DRAWING C-2A.1 (DELETE STR NO. 11 PUMP MANHOLE

AND VALVE VAULT DETAIL). (2) DELETE DRAWING C-2A.2.

(3) AT THE TITLE BLOCK, REVISION 1, THE DETAILED DESCRIPTION

IS ADDED.

28 NOV 95

CHANGES PER MODIFICATION P00014: (1) DELETE COMPRESSED AIR

PIPING FROM DRAWING.

AS-BUILT APRIL 1997

C

B

A

5 4 3 2 1

A

B

C

D

U.S.ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

Revisions

Symbol Descriptions Date Approved

Designed by:

Drawn by:

Checked by:

DETROIT, MICHIGAN

CHIEF, ENGINEERING MANAGEMENT BRANCH

RWE

DRAWING NUMBER

SCALE :

SAULT STE. MARIE

MICHIGAN

SUBMITTED TO:

N

OFSHEET

1120 MAY STREET, LANSING, MICHIGAN 48906

TELEPHONE (517) 374-6800

A DLZ Company

DODSON-LINDBLOM

ASSOCIATES

INC.

EMERGENCY DAM STEAMPLANT REPLACEMENT

FLOOR PLAN

SCALE: 1/4" = 1’-0"

KJB

RLB

EQUIPMENT ROOM

MAINTENANCE

ROOM

F.F. ELEV.

100’-0"

FINISH FLOOR ELEV. 100’-0"

A

A-1

(IGLD 606.5)

LEGEND

D O O R S C H E D U L E

MK SIZE MTLTYPE LOUVER

HDWE

SETMTL TYPE HEAD JAMB SILL SPECIAL

FIRE

RATING

D O O R S F R A M E S R E M A R K S

LABEL

A

A

B OVERHEAD ROLLING DOOR

HM

HM

MAINTENANCE ROOM

EQUIPMENT ROOM

R O O M F I N I S H S C H E D U L E

MK ROOM NAME FLOOR BASE

WALLS

N E S W

M F C M F C M F C M F C M F C M F C M F C HT

CEILING REMARKS

R O O M F I N I S H E S L E G E N D

F I N I S H E S (F)M A T E R I A L S (M) C O L O R S (C)

* BOTTOM OF DECK

4" RUBBER MOULDING

PRE-CAST CONCRETE

SEALED CONCRETEC

B

A

D

E

5/8" GYPSUM BOARD

C - - - - - E 1 - E 1 - E 1 - E 1 - B 1 -

C - - - - - E 1 - E 1 - E 1 - E 1 - B 1 -

1 PAINT

2 EXPOSED

HM

HM

D.M 12/1471

CONCRETE MASONRY UNITS

A

11’-0"

EXISTING CONCRETE WALK

MATCH EX. GRADES

D

A-1 S-2

A-1 A-4

A-1 A-4

3/4

A-1 A-4

A-1 A-4

3/4

A-1 A-4

3/4

CONCRETE MASONRY UNIT WALL

EPDM ETHYLENE PROPYLENE DIENE

TERPOLYMER MEMBRANE

EX. EXISTING

FF ELEV FINISH FLOOR ELEVATION

IGLD

O.D. OUTSIDE DIAMETER

MIN. MINIMUM

EL. ELEVATION

CONC. CONCRETE

A

WINDOW MARKER

DOOR MARKER

ABBREVIATIONS

HM HOLLOW METAL

LAWN AREA LAWN AREA

8" CONCRETE APRON

CONTROL JOINT,

TYPICAL

NOTES:

1.SEE SHEET S-1 FOR FLOOR SLOPES AND DRAIN

LOCATIONS.

WITH #4 @ 12" EW

O.C. ON CENTER

DIA. DIAMETER

CONTROL JOINT

A-1 S-2

D

INTERNATIONAL GREAT LAKES DATUM

2. ALL BOILER EQUIPMENT PAD SIZES AND ACTUAL

LOCATIONS, FLOOR DRAINS, AND TRENCH DRAIN

LOCATION TO BE COORDINATED WITH THE MECHANICAL

CONTRACTOR.

* BOTTOM OF DECK

LOUVER

OVERHEAD DOOR

T

R E

N C

H

TRENCH

5’-6"

S L

O P

E

2% CROSS

SLOPE

TYP.

5’-0"

/2

T Y

P

A

A

E X

T E

N D

T O

S

ID

E W

A L

K

C

O N

C R

E T

E W

A L

K

FLOOR PLAN AND SCHEDULES

EQUIP. EQUIP. EQUIP.

PAD PAD PAD

EQUIP.

PAD

1 1

1BLOCK, AT REVISION THE WORDS "VALUE

ENGINEERING CHANGE 1" ARE DELETED AND THE

29JUN95

19DEC95

SRJ

SRJCURRENT REVISION CHANGES: (1) AT THE TITLE

DETAILED CHANGE DESCRIPTION IS ADDED. (2)

ADDED SECTION SYMBOLS TO FLOOR PLAN

(A/A-1/A-3 AND 5/A-1/A-3).

A

A

A-1

A-1

A-3

A-3

A-3A-1

CHANGES MADE BY AMENDMENT 0004: (1) AT THE

ROOM FINISH SCHEDULE, AT ROOM NO 101, AT

THE COLUMN LABELED CEILING, IN COLUMN F THE

NUMBER "1" IS ADDED AND IN COLUMN "HT" THE

DIMENSION "8’-0" " IS DELETED. (2) IN THE

REMARKS COLUMN, THE WORDS "BOTTOM OF DECK"

ARE ADDED. CHANGES MADE BY MODIFICATION

P00004: (1) NOTE 3 IS DELETED. (2) THE ROOF

PLAN DETAIL IS DELETED. (3) THE DIMENSIONS

HAVE BEEN REMOVED FROM THE FLOOR PLAN

DETAIL. DIMENSIONS ARE NOW PROVIDED ON

DRAWING A-1A ISSUED WITH MODIFICATION

P00004.

A-1

BDETAIL

SCALE: 3" = 1’-0"

ISOLATION JOINT

SUMP COVER

SUMP WALL

A-1A

ADETAIL

SCALE: 3" = 1’-0"

TRENCH COVER

SUMP COVER

INSOLATION JOINT

EQUIP PAD

BOILER SUPPORT BEAM

0’-6"

A-1A

B

NOTED

2-2670

APR1997

NOTE: SEE SHEET A-1A FOR DIMENSIONS

S

T .D

G

ADDED DETAIL A; ADDED DETAIL B; IN THE TABLE

LABLED ’ROOM FINISH SCHEDULE’ THE LETTERS

"D" IN THE MAINTENANCE ROOM ROW WERE

REPLACED WITH THE LETTER "E" ALSO THE

NUMBER "2" IN THE EQUIPMENT ROOM ROW WERE

REPLACED WITH THE NUMBER "1"; IN THE TABLE

LABLED ’DOOR SCHEDULE’ THE NUMBER "4070" WAS

REPLACED WITH "2-2670".

BRS

A-1A

O R

T H

W O

O D

S

IN

C

S

U R

V E

Y O

N G

IN

E

E R

S

CFH

c o n te n ts p r o j e c t sheet no:

checked by:

drawn by:

d e s ig n b y job no:

-6

-1 f a x a s h m u n s tr e e t s a u lt s te m a r ie m i date/issued for

2010-04

201004A1.DGN 19 MAY 1995 11:20

hold down at side walk hold down at conc.

apron control joint c o n t r o l j o i n t exhaust fan boiler flue stacks rd

1/8 "=1’-0"

1/8 "=1’-0"

1/8 "=1’-0"

1/8 "=1’-0"

1/8 "=1’-0"

1/8 "=1’-0"

1/8 "=1’-0"

FD

FD

8"CONCRETE

FLOOR SLAB

4’-0"

PANEL

TYP.

PRECAST

LOUVER

1’-4"

BOND BEAM

PREFORMED

EXPANSION

JOINT

overhead rolling door assembly aluminum frame window

3/8 "=1’-0"

3/8 "=1’-0"

3/8 "=1’-0" 3/8 "=1’-0"

5" 5"14"

T Y

P

ROOF MEMBRANE OVER

R19 RIGID INSUL. OVER

8"X4’X28’ PRECAST CONC.

PANELS

hard board BEARING STRIP

1 1/2" RIGID INSUL.

4" limestone veneer

2 1/2" limestone veneer

VAPOR BARRIER

OVER COMP. Sub grade

24"X12"

CONC STRIP FT’G

W/ 3-#4

B

E A

R

IN

G S

O U

T H

B

E A

R

IN

G N

O R

T H

2. REINFORCEMENT IN MASONRY WALLS SHALL BE GROUTED SOLID.

notes:

1. items not shown or detailed shall remain as shown on contract documents.

EQUIP.

PAD EQUIP.

PAD

EQUIP.

PAD

EQUIP.

PAD

T R

E N

C H

TRENCH

LIMESTONE

PARAPeT CAP

8" CMU W/

HORIZONTAL JOINT

RIENF @16" O.C. AND

#6 @ 32" vert. reinf.

8" CONC. SLAB ON GRADE

W/ #4 @ 12" EACH WAY

13 1/2" CONC. WALL

#4 @ 12" EACH WAY

S

O U

T H

N

O R

T H

8"X16" CONC. LINTEL

W/2#8 TOP AND

BOTTOM AND

#3 TIES @ 6" O.C.

8"X16" CONC. LINTEL

W/2#7 TOP AND

BOTTOM AND

#3 TIES @ 6" O.C.

BOND BEAM

WITH 2#4

rodded mortar or con. fill

15 # asphalt impregnated felt required one side of cavity n.t.s.

control jointcontrol joint control joint control joint control joint

#3 AT 48" grouted into keyway and into 2 courses

5-19-95 OWNER REVIEW

6-13-95 OWNER REVIEW

premolded expn. joint filler caulk w/ sealant s-3 over backer rod, both sides of wall

TRANSFORMER

PAD

4’-6"

1’-6" 6’-0"

1’-6"

E

S-1

SEE SPEC 02221

2" rigid insulation (TYP.)

(TYP.)

EPDM MEMBRANE

SEE SPEC 07530

BACKER ROD

AND CAULK

1/2" DIA STEEL DOWEL, 8" LONG AT 2’-0" O.C.

DRAIN FROM DOWNSPOUT

EXTEND OUT 2’

DRAIN FROM DOWNSPOUT

NOTE: COORDINATE LOCATION OF DRAIN W/ MECHANICAL CONTRACTOR

3. ALL ROOF PENETRATIONS TO BE COORDINATED WITH

MECHANCIAL CONTRACTOR.

4. SEE SHEET A-4 FOR ROOFING DETAILS

5. SEE MECHANICAL SHEETS M-5, M-7 FOR

ROOF PENETRATION DETAILS

N

A-3

A-1A

A-1A

A-1A

LOUVER

A-1A

1’-8"

OVERHEAD DOOR

T R

E N

C H

TRENCH

c.j. c.j.

c .j c.j.

c .j

59’-1"

/2

10’-8"

11’-10 1/2 "

CJ CJ CJ CJ

C J

C J

C J

C J

FD

FD

FD

FD

18’-6 1/2 "10’-0"

15’-1 1/2 " 15’-0" 17’-1"

4’-5"

SUMP

59’-1"

4’-3 1/2 "

13"X13" OPG

2’-11"

4"

T Y

P 12" DIA

12’-3 1/2 "

4"

4"

/2

6"

4"

4"

4"

1’-8"

2’ 2’

10’-0" 10’-0" 8’-4 1/2 "

1’-8" 1’-8" rd

12" DIA

TYPICAL FOR THREE

22"

DIA

12’-4 1/2 "

HOLE

PATCHED

exhaust fan

27"X27" OPG

8’-6"

/2

1’-2 1/2"

3’-6 1/2 "

4’-0" 23’-0" 10’-0" 11’-0" 4’-0"

3’-6 1/2 "

11’-10 1/2 " 47’-2 1/2 "

59’-1"

11’-10 1/2 " 12’-0" 33’-6 1/2 "

/2

/2

1’-6"

3’-1" 5’-0"

1’-0" 1’-6"

4’-6 1/2 " 5’-0" 5’-0" 5’-0" 5’-0" 5’-0" 5’-10 1/2 "

/2 " 4

/2

1’-2 1/2 "

5’-0"

A

A-1A

LEGEND

ISOLATION JOINT

CONTROL JOINT (CJ)

NOTES

1. EQUIPMENT PADS SHALL BE CONSTRUCTED PRIOR TO FLOOR SLAB.

2. SEE FLOOR PLAN FOR EQUIPMENT PAD LOCATIONS.

REVISIONS

SYMBOL DESCRIPTIONS DATE APPROVED

REVISED FOUNDATION PLAN DIMENSIONS TO REFLECT AS-BUILT

DIMENSIONS; REVISED FLOOR PLAN DIMENSIONS TO REFLECT AS-BUILT

DIMENSIONS; REVISED ROOF PLAN DIMENSIONS TO REFLECT AS-BUILT

DIMENSIONS; ADDED A-1A DESIGNATION TO SHEET NUMBER

BRS

A-1A

O R

T H

W O

O D

S

IN

C

S

U R

V E

Y O

N G

IN

E

E R

S

CFH

c o n te n ts p r o j e c t sheet no:

checked by:

drawn by:

d e s ig n b y job no:

-6

-1 f a x a s h m u n s tr e e t s a u lt s te m a r ie m i date/issued for

2010-04

201004A1.DGN 19 MAY 1995 11:20

hold down at side walk hold down at conc.

apron control joint c o n t r o l j o i n t exhaust fan boiler flue stacks rd

1/8 "=1’-0"

1/8 "=1’-0"

1/8 "=1’-0"

1/8 "=1’-0"

1/8 "=1’-0"

1/8 "=1’-0"

1/8 "=1’-0"

FD

FD

8"CONCRETE

FLOOR SLAB

4’-0"

PANEL

TYP.

PRECAST

LOUVER

1’-4"

BOND BEAM

PREFORMED

EXPANSION

JOINT

overhead rolling door assembly aluminum frame window

3/8 "=1’-0"

3/8 "=1’-0"

3/8 "=1’-0" 3/8 "=1’-0"

5" 5"14"

T Y

P

ROOF MEMBRANE OVER

R19 RIGID INSUL. OVER

8"X4’X28’ PRECAST CONC.

PANELS

hard board BEARING STRIP

1 1/2" RIGID INSUL.

4" limestone veneer

2 1/2" limestone veneer

VAPOR BARRIER

OVER COMP. Sub grade

24"X12"

CONC STRIP FT’G

W/ 3-#4

B

E A

R

IN

G S

O U

T H

B

E A

R

IN

G N

O R

T H

2. REINFORCEMENT IN MASONRY WALLS SHALL BE GROUTED SOLID.

notes:

1. items not shown or detailed shall remain as shown on contract documents.

EQUIP.

PAD EQUIP.

PAD

EQUIP.

PAD

EQUIP.

PAD

T R

E N

C H

TRENCH

LIMESTONE

PARAPeT CAP

8" CMU W/

HORIZONTAL JOINT

RIENF @16" O.C. AND

#6 @ 32" vert. reinf.

8" CONC. SLAB ON GRADE

W/ #4 @ 12" EACH WAY

13 1/2" CONC. WALL

#4 @ 12" EACH WAY

S

O U

T H

N

O R

T H

8"X16" CONC. LINTEL

W/2#8 TOP AND

BOTTOM AND

#3 TIES @ 6" O.C.

8"X16" CONC. LINTEL

W/2#7 TOP AND

BOTTOM AND

#3 TIES @ 6" O.C.

BOND BEAM

WITH 2#4

rodded mortar or con. fill

15 # asphalt impregnated felt required one side of cavity n.t.s.

control jointcontrol joint control joint control joint control joint

#3 AT 48" grouted into keyway and into 2 courses

5-19-95 OWNER REVIEW

6-13-95 OWNER REVIEW

premolded expn. joint filler caulk w/ sealant s-3 over backer rod, both sides of wall

TRANSFORMER

PAD

4’-6"

1’-6" 6’-0"

1’-6"

E

S-1

SEE SPEC 02221

2" rigid insulation (TYP.)

(TYP.)

EPDM MEMBRANE

SEE SPEC 07530

BACKER ROD

AND CAULK

1/2" DIA STEEL DOWEL, 8" LONG AT 2’-0" O.C.

DRAIN FROM DOWNSPOUT

EXTEND OUT 2’

DRAIN FROM DOWNSPOUT

NOTE: COORDINATE LOCATION OF DRAIN W/ MECHANICAL CONTRACTOR

3. ALL ROOF PENETRATIONS TO BE COORDINATED WITH

MECHANCIAL CONTRACTOR.

4. SEE SHEET A-4 FOR ROOFING DETAILS

5. SEE MECHANICAL SHEETS M-5, M-7 FOR

ROOF PENETRATION DETAILS

N

A-3

A-1A

A-1A

A-1A

LOUVER

A-1A

1’-8"

OVERHEAD DOOR

T R

E N

C H

TRENCH

c.j. c.j.

c .j c.j.

c .j

59’-1"

/2

10’-8"

11’-10 1/2 "

CJ CJ CJ CJ

C J

C J

C J

C J

FD

FD

FD

FD

18’-6 1/2 "10’-0"

15’-1 1/2 " 15’-0" 17’-1"

4’-5"

SUMP

59’-1"

4’-3 1/2 "

13"X13" OPG

2’-11"

4"

T Y

P 12" DIA

12’-3 1/2 "

4"

4"

/2

6"

4"

4"

4"

1’-8"

2’ 2’

10’-0" 10’-0" 8’-4 1/2 "

1’-8" 1’-8" rd

12" DIA

TYPICAL FOR THREE

22"

DIA

12’-4 1/2 "

HOLE

PATCHED

exhaust fan

27"X27" OPG

8’-6"

/2

1’-2 1/2"

3’-6 1/2 "

4’-0" 23’-0" 10’-0" 11’-0" 4’-0"

3’-6 1/2 "

11’-10 1/2 " 47’-2 1/2 "

59’-1"

11’-10 1/2 " 12’-0" 33’-6 1/2 "

/2

/2

1’-6"

3’-1" 5’-0"

1’-0" 1’-6"

4’-6 1/2 " 5’-0" 5’-0" 5’-0" 5’-0" 5’-0" 5’-10 1/2 "

/2 " 4

/2

1’-2 1/2 "

5’-0"

A

A-1A

LEGEND

ISOLATION JOINT

CONTROL JOINT (CJ)

NOTES

1. EQUIPMENT PADS SHALL BE CONSTRUCTED PRIOR TO FLOOR SLAB.

2. SEE FLOOR PLAN FOR EQUIPMENT PAD LOCATIONS.

REVISIONS

SYMBOL DESCRIPTIONS DATE APPROVED

REVISED FOUNDATION PLAN DIMENSIONS TO REFLECT AS-BUILT

DIMENSIONS; REVISED FLOOR PLAN DIMENSIONS TO REFLECT AS-BUILT

DIMENSIONS; REVISED ROOF PLAN DIMENSIONS TO REFLECT AS-BUILT

DIMENSIONS; ADDED A-1A DESIGNATION TO SHEET NUMBER

C

B

A

5 4 3 2 1

A

B

C

D

U.S.ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

Revisions

Symbol Descriptions Date Approved

Designed by:

Drawn by:

Checked by:

DETROIT, MICHIGAN

CHIEF, ENGINEERING MANAGEMENT BRANCH

RWE

DRAWING NUMBER

SCALE :

SAULT STE. MARIE

MICHIGAN

SUBMITTED TO:

OFSHEET

1120 MAY STREET, LANSING, MICHIGAN 48906

TELEPHONE (517) 374-6800

A DLZ Company

DODSON-LINDBLOM

ASSOCIATES

INC.

AS SHOWN

EMERGENCY DAM STEAMPLANT REPLACEMENT

KJB

RLB

S E

C .D

G

NWALL SECTIONS

SCALE: 3/4" = 1’-0"

WALL SECTION5

100’-0"

VARIES

NEOPRENE GASKET

CAULK

BOND BEAM WITH (2) NO. 4 DEFORMED

STEEL REINFORCING RODS SET IN CONCRETE

8" CONCRETE SLAB ON GRADE

A-3

A-3A-1

CAULK

ROOF MEMBRANE

EL. 114’-8"

12"

0.25"

EL. 114’-0"

18"W x 12"H

TRENCH

EL. 100’-0"

SCALE: 1/4" = 1’-0"

14" THICK CONCRETE PAD

COMBUSTION AIR

LOUVER

A-1 A-3

TRANSVERSE SECTIONA-A

LEGEND

ELEVATION MARKER

R19 RIGID

INSULATION

D.M 12/1473

REFER TO SHEET S-1 FOR

STRUCTURAL DETAILS

SEALED CONCRETE - SEE

SPECIFICATION SECTION 07920

COMPACTED SUBGRADE - SEE

SPECIFICATION SECTION 02221.

EPDM MEMBRANE - SEE

SPECIFICATION SECTION 07530.

R-19 RIGID INSULATION - SEE

SPECIFICATION SECTION 07220.

8"x8"x16" CONCRETE MASONRY UNITS WITH

HORIZONTAL REINFORCING @ 16" ON CENTER.

4" RUBBER MOULDING BASE - SEE

SPECIFICATION SECTION 09650.

8" X 4’ X 28’ PRECAST CONC.

PANELS.

NOTE: PERIMETER INSULATION EXTENDS 4 FEET BELOW

THE UNDERSIDE OF SLAB.

CHANGES MADE BY AMENDMENT OOO4: (1) AT

DETAIL A-A/A-1/A-3 TRANSVERSE SECTION,

THE PARAPET HEIGHT OF 8" IS DELETED.

THE DETAIL OF THE BOTTOM OF THE PRECAST

WALL PANELS AND TOP OF FLOOR SLAB IS

REVISED TO SHOW BOTH AT 100’-0". THE

FOLLOWING NOTE IS ADDED: "PERIMETER

INSULATION EXTENDS 4 FEET BELOW THE

UNDERSIDE OF THE SLAB". CHANGES MADE BY

MODIFICATION P0004: (1) DELETED THE

FOLLOWING DETAILS: 1/A-1/A-3, WALL

SECTION; 2/A-1/A-3, WALL SECTION;

3/A-1/A-3, WALL SECTION; 4/A-1/A-3,

WALL SECTION; 5/A-1/A-3, PARAPET CAP

DETAIL. (2) ADDED DETAIL 5/A-1/A-3,

WALL SECTION.

SRJ2

CURRENT REVISION CHANGES:

29JUN95

28NOV95(1) AT THE

TITLE BLOCK, AT REVISION THE WORDS

"VALUE ENGINEERING CHANGE 1" ARE

DELETED AND THE DETAILED CHANGE

DESCRIPTION IS ADDED. (2) AT THE

TRANSVERSE SECTION THE SLAB IS NOW

SHOWN INDEPENDENT OF THE FOUNDATION

WALL. (3) AT THE TRANSVERSE SECTION

THE WORDS "6" THICK CONCRETE PAD" ARE

DELETED AND THE WORDS "14" THICK

CONCRETE PAD" ARE ADDED.

OMITTED THE WORDS "5/8" GYPSUM BOARD ON

1-1/2" FURRING STRIPS" FROM WALL SECTION

DEPICTION.

C

B

A

5 4 3 2 1

A

B

C

D

U.S.ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

REVISIONS

SYMBOL

DESCRIPTIONS

DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DETROIT, MICHIGAN

CHIEF, ENGINEERING MANAGEMENT BRANCH

RWE

DRAWING NUMBER

SCALE :

SAULT STE. MARIE

MICHIGAN

SUBMITTED TO:

OFSHEET

1120 MAY STREET, LANSING, MICHIGAN 48906

TELEPHONE (517) 374-6800

A DLZ Company

DODSON-LINDBLOM

ASSOCIATES

INC. AS SHOWN

EMERGENCY DAM STEAMPLANT REPLACEMENT

KJB

RLB

D E

T .D

G N

A-4 4

DETAILS

1 2

A

A

SCALE: 3/4" = 1’-0"

2DOOR/WINDOW ELEVATIONS

3 4

WINDOW HEAD DETAIL WINDOW SILL DETAIL

SCALE: 1-1/2" = 1’-0"

SCALE: 1-1/2" = 1’-0"

SCALE: 1-1/2" = 1’-0"

DOOR JAMB DETAIL

6ROOF DRAIN DETAIL

NOT TO SCALE

NOTES:

1. REMOVE ALL LEAD AND OTHER FLASHING.

2. ALL BOLTS OR CLAMPS MUST BE IN PLACE TO PROVIDE CONSTANT

COMPRESSION ON WATER CUT-OFF MASTIC.

3. CUT THE MEMBRANE SO IT EXTENDS A MINIMUM OF 1/2" FROM THE

ATTACHMENT POINTS OF THE DRAIN CLAMPING RING.

4. HOLE IN MEMBRANE MUST EXCEED SIZE OF DRAIN PIPE.

5. ROOF DRAIN AND NUMBER OF DRAINS SHALL BE IN ACCORDANCE

WITH LOCAL CODES.

7PIPE SEAL DETAIL

NOT TO SCALE

NOT TO SCALE

MECHANICAL CURB DETAIL

NOTES:

1. TREATED WOOD NAILER MUST EXTEND PAST TOTAL

WIDTH OF DECK FLANGE.

2. LENGTH OF ROD STOCK IS LIMITED TO 4 FEET.

3. DETAIL IS NOT ACCEPTABLE FOR VIBRATING

ROOFTOP UNITS.

4. IN-SEAM SEALANT MUST BE PLACED NO MORE THAN

1/2" FROM EDGE OF FLANGE.

5. 6" WIDE UNCURED ELASTOFORM FLASHING OR PRESSURE

SENSITIVE FLASHING MUST BE CENTERED OVER FIELD SPLICE

AT ANGLE CHANGE.

6. PRESSURE SENSITIVE CORNERS CANNOT BE USED FOR

THIS DETAIL WHEN THE FLANGE IS LOCATED ON TOP OF

THE MEMBRANE DUE TO INCOMPLETE COVERAGE OF THE

METAL FLANGE AT THE CORNERS.

D.M 12/1474

ROOF DRAIN COVER - SEE

SPECIFICATION SECTION 15400.

CLAMPING RING

SURE-SEAL WATER

CUT-OFF MASTIC

EPDM ROOF RIGID INSULATION

PRECAST CONCRETE ROOF

1 " MIN.

3"

MIN.

CAULK

GLAZING - SEE SPECIFICATION

SECTION 08810

ALUMINUM WINDOW FRAME - SEE

SPECIFICATION SECTION 08520.

CAULKING - SEE SPECIFICATION

SECTION 07920.

METAL CAP OR COUNTERFLASHING

RUBBER OR URETHANE ROD STOCK

ADHERED IN PLACE

SURE-SEAL BONDING ADHESIVE

SURE-SEAL EPDM MEMBRANE

SURE-SEAL SPLICING CEMENT

SURE-SEAL IN-SEAM SEALANT

RIGID INSULATION

PRECAST CONCRETE ROOF

CAULK - SEE SPECIFICATION

SECTION 07920.

STEEL DOOR FRAME - SEE

SPECIFICATION SECTION 08110.

PRECAST CONCRETE PANEL

1-1/2" FURRING STRIPS

5/8" GYPSUM BOARD

WEEP HOLE

GLAZING - SEE SPECIFICATION

SECTION 08810

ALUMINUM WINDOW FRAME - SEE

SPECIFICATION SECTION 08520.

CAULK

NOTE:

SEE DOOR SCHEDULE, SHEET A-1 AND

SPECIFICATION SECTION 08110 FOR

DOOR TYPES AND QUANTITIES.

STEEL DOOR - SEE SHEET

A-1 AND SPECIFICATION

SECTION 08110.

STEEL DOOR FRAME - SEE

SHEET A-1 AND SPECIFICATION

SECTION 08110.

4’-0"

1 3/4 "

TYP.

ALUMINUM WINDOW FRAME - SEE

SHEET A-1 AND SPECIFICATION

SECTION 08520.

3’-0"

3’-4"

2"

TYP.

2"

STEEL DOOR FRAME - SEE

SHEET A-1 AND SPECIFICATION

SECTION 08110.

WIDTH VARIES - SEE

DOOR SCHEDULE, SHEET A-1

OVERHEAD ROLLING DOOR - SEE SHEET A-1

AND SPECIFICATION SECTION 08330.

10’-0"

RIGID INSULATION

TREATED WOOD NAILER SURE-SEAL MEMBRANE

ROOFTOP MECHANICAL UNIT

M

IN

IM

U M

PRE-FABRICATED

ROOF CURB - SEE

MECHANICAL DETAILS.

1 29JUN95

C.M.U.

DRIP EDGE

LIMESTONE VENEER

LIMESTONE VENEER

LIMESTONE VENEER

C.M.U.

MASONARY CAVITY

MASONARY CAVITY

MASONARY CAVITY

CHANGES PER MODIFICATION P00004:

(1) TYPICAL PRECAST PANEL SECTION WAS

DELETED. (2) SECTIONS 6, 7 AND 8

PRECAST CONCRETE ROOF PANELS. (3) A

LIMESTONE VENEER AND MASONRY CAVITY WERE

ADDED TO SECTIONS 3, 4 AND 5. (4) THE

AND THE DETAILED CHANGE DESCRIPTION IS

THE TITLE BLOCK, AT REVISION THE WORDS1

CHANGES MADE BY THIS REVISION: (1) AT

ARE REVISED TO SHOW VOIDS IN THE

"VALUE ENGINEERING CHANGE 1"ARE DELETED

NOTES:

1. MORTAR FILL IN CAVITY TO BOTTOM OF WEEP,

PEA STONE ABOVE. (REQUIRED) SLOPE MORTAR FILL

WITH WEEP HOLES TO PROVIDE POSITIVE DRAINAGE

AND ELIMINATE PONDING WITHIN CAVITY.

SRJ

ADDED.

28NOV95

NOTES:

1. REMOVE ALL LEAD AND OTHER FLASHING BEFORE

INSTALLING FIELD-FABRICATED PIPE SEAL.

2. NAILER REQUIRED AROUND ALL PIPES GREATER

THAN 18" O.D.

3. UNCURED ELASTOFORM FLASHING WRAPPED AROUND

PIPE SHALL HAVE 3" MIN. MEMBRANE SPLICE.

4. A HEAT GUN MUST BE USED WHEN FORMING BRITE-

PLY FLASHING.

CORRECTED FROM "B" TO "3". (5) BELOW

SECTION 4, WINDOW SILL DETAIL, THE

FOLLOWING NOTE IS ADDED: "NOTES: 1.

MORTAR FILL IN CAVITY TO BOTTOM OF

WEEP, PEA STONE ABOVE. (REQUIRED)

SLOPE MORTAR FILL WITH WEEP HOLES TO

PROVIDE POSITIVE DRAINAGE AND

ELIMINATE PONDING IN CAVITY."

OVERHEAD ROLLING DOOR LABEL WAS

TYPICAL LIMESTONE LINTEL

ELASTOFORM FLASHING

COLD PIPE

SURE-SEAL LAP SEALANT

SURE-SEAL SPLICING CEMENT

RIGID INSULATION

PRECAST CONCRETE ROOF

SCALE: 3"= 1’-0"

5’-4"

5’-0"

8" CMU

CMU LINTEL

LIMESTONE VENEER

RIGID INSULATION

3/8" X3" HILTI KWIK-BOLT

AT 16" O.C. TYP

1-3/4" MIN EMBEDMENT

L6X4X3/8

SCALE: 3"= 1’-0"

OVERHEAD DOOR JAMB

DOOR SUPPORT

TO BE INSTALLED

OVER SHEET METAL CLOSURE

CMU

RIGID INSUL

LIMESTONE VENEER

SEALENT OVER

BACKER

2X FURRING

KYNAR FINISH ON

24 GAGE STEEL

SHEET METAL CLOSURE

NOTES:

1. STEEL HEADER SHALL EXTEND 8 INCHES BEYOND LIMESTONE OPENING EACH SIDE.

ADDED ’OVERHEAD DOOR JAM’; ADDED ’TYPICAL

LIMESTONE LINTEL’; OMITTED THE WORDS "5/8"

GYPSUM BOARD" AND THE WORDS "1-1/2"

FURRING STRIPS" FROM BOTH ’WINDOW HEAD

DETAIL’ AND ’WINDOW SILL DETAIL’; CHANGED

DOOR/WINDOW ELEVATIONS DIMENSIONS TO

REFLECT AS-BUILT DIMENSIONS.

C

B

A

5 4 3 2 1

A

B

C

D

U.S.ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

REVISIONS

SYMBOL DESCRIPTIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DETROIT, MICHIGAN

CHIEF, ENGINEERING MANAGEMENT BRANCH

JJB

DRAWING NUMBER

SCALE :

SAULT STE. MARIE

MICHIGAN

SUBMITTED TO:

OFSHEET

1120 MAY STREET, LANSING, MICHIGAN 48906

TELEPHONE (517) 374-6800

A DLZ Company

DODSON-LINDBLOM

ASSOCIATES

INC.

AS SHOWN

EMERGENCY DAM STEAMPLANT REPLACEMENT

MPR

MPR

FOUNDATION PLAN, ROOF FRAMING PLAN

AND SECTIONS

SCALE: NONE

4" 4"1’-6"

(M

IN

EL. 100’-0"

1" ALUM GRATING

TWO- L1 1/4 X 1 1/4 X 1/4

W/ 3/8"O X 6" ANCHORS @ 16"

S-1 2

1’-0"

C

S-1 S-1

ABBREVIATIONS:

#5 @ 12" EW

1 1/4"

1"

3/16 2" @ 12"

SCALE: NONE

d

S-1 S-1

DETAIL

SCALE: NONE

6" 1’-0"

E

S-1 S-1

1" ALUMINUM

GRATING

8" SLAB-ON-GRADE

W/ #4 @ 12" EW

TRENCH SECTION

TRANSFORMER PAD SECTION

8" SLAB-ON-GRADE

W/ #4 @ 12" EW

#4 TRANSFORMER

DETAIL D/S-1

D.M. 12/1475

EL. 100’-0"

- ALUMINUM

- EACH WAY

- ELEVATION

ALUM

EW

EL

29jun95 srj srj13nov95

CHANGES TO AMENDMENT 0004: (1) ALL REFERENCES TO STEPPED

ROOFING DETAIL Q/S-2 ARE DELETED. (2) ALONG COLUMN LINE 1

OF THE FOUNDATION PLAN, THE STEPPED FOOTINGS ARE DELETED AND

EXTERIOR FOOTINGS AT ELEVATION 95’ ARE SUBSTITUTED. (3)

THE NOTATION "T/FTG. EL. 80’-0""IS DELETED AND THE NOTATION

"T/FTG. EL. 95’-0"" IS SUBSTITUTED. (4) AT EXTERIOR WALL

FTG. SECTION, THE NOTATION "GROUT" IS ADDED. CHANGES PER

MODIFICATION P00004: (1) THE SECTIONS ROOF FRAMING PLAN,

FOUNDATION PLAN, EXTERIOR WALL FTG. SECTION, AND EXTERIOR

DOOR THRESHOLD SECTION ARE DELETED. THE LEGEND AND ALL

ABBREVIATIONS EXCEPT ALUM, EW, AND EL ARE DELETED.

CURRENT REVISION CHANGES: (1) AT THE TITLE BLOCK, AT

REVISION THE WORDS "VALUE ENGINEERING CHANGE 1" ARE

DELETED AND THE DETAILED CHANGE DESCRIPTION IS SUBSTITUTED.

TRANSFORMER PAD SECTION

SCALE: 3"= 1’-0"

14" CONC PAD WITH

#4@12" EW TOP AND BOTTOM

1/2" RADIUS TOOL EDGE

1/2" POLYURETHANE

JOINT FILLER

8" CONC SLAB ON GRADE

WITH #4@12" EW

SCALE: 3"= 1’-0"

TRENCH NEXT TO EQUIPMENT PAD DETAIL

ISOLATED EQUIPMENT PAD

TRENCH HIGH POINT - SOUTHWEST CORNER

TRENCH LOW POINT - EAST END

CUT REBAR TO ALLOW

2" END COVER AT

ISOLATION JOINT

4" 1"-6" 4"

NOTES:

1. TRENCH REINFORCING, COVER, AND FRAME

AS SHOWN ON TYPICAL TRENCH CROSS-SECTION.

20-1/2"

ADDED ’TRENCH NEXT TO EQUIPMENT PAD DETAIL’; ADDED ’ISOLATED

EQUIPMENT PAD DETAIL’.

S T

.D

C

B

A

5 4 3 2 1

A

B

C

D

U.S.ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

REVISIONS

SYMBOL DESCRIPTIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DETROIT, MICHIGAN

CHIEF, ENGINEERING MANAGEMENT BRANCH

JJB

DRAWING NUMBER

SCALE :

SAULT STE. MARIE

MICHIGAN

SUBMITTED TO:

OFSHEET

1120 MAY STREET, LANSING, MICHIGAN 48906

TELEPHONE (517) 374-6800

A DLZ Company

DODSON-LINDBLOM

ASSOCIATES

INC.

AS SHOWN

EMERGENCY DAM STEAMPLANT REPLACEMENT

MPR

MPR

SCALE: NONE

FOUNDATION WALL CONSTRUCTION JOINT

1/2" t 3t

1:3 Slope t t

3/16" WIDE X 1" DEEP TOOLED OR

SAWN JOINT, FILL W/ SEALANT

CONTROL JOINT

1" X 2" KEYWAY

USE IN LIEU OF CONTROL JOINTS

AT TERMINATION OF POUR

CONSTRUCTION JOINT

SCALE: NONE

3/16" WIDE X 3/4" DEEP SAW

CUT, FILL W/ SEALANT

S-2

STRUCTURAL SECTIONS AND DETAILS

Reinf Continuous

S-2

J

S-2

S-2

D

S-2

SLAB JOINT DETAILS

#4 x 2’-0" @ 12"

SLAB-ON-GRADE

W/ #4@12" EW

SLAB-ON-GRADE

W/ #4@12" EW

EL. 100’-0"

1/4" PJF AROUND PERIMETER

#5@12"

#5@12" EW

NOTE: CONTRACTOR TO COORDINATE FOR INSTALLATION

OF REQUIRED SLEEVES AND INSERTS.

5"5"

#5 CIRCULAR @ 12"

SCALE: NONE S-2

P

S-1

SECTION

8" SLAB-ON-GRADE

W/ #4 @ 12" EW

2’-0"

FOUNDATION

WALL

D.M. 12/1476

C PITL

2’-0" 2’-0"

1 29JUN95

2 13NOV95 SRJ

SRJCHANGES PER AMENDMENT 0001: (1) AT

SECTION P/S-1/S-2, THE PIT DEPTH

DIMENSION OF "6’-0"" WAS DELETED AND

"8’-0"" WAS SUBSTITUTED. (2) AT DETAIL

F/S-2/S-2, THE TITLE OF THE DETAIL WAS

DELETED AND THE CURRENT TITLE WAS

SUBSTITUTED. (3) THE TEE WALL PORTION OF

THE PLAN WAS DELETED. CHANGES PER

AMENDMENT 0004: (1) AT SECTION M/S-1/S-2

THE GROUT BETWEEN THE PRECAST SLAB AND

THE PRECAST WALL IS DELETED AND JOINT

FILLER IS SUBSTITUTED. (2) THE STEPPED

FOOTING DETAIL Q/S-2/S-2 AND SECTION A-A

ARE DELETED. CHANGES PER MODIFICATION

P00004: (1) SECTIONS A,B,C,F,G,H,K,L,M

AND N ARE DELETED. (2) AT SECTION P/S-1/

S-1, THE FOUNDATION WALL DIMENSION OF

"1’-6"" IS DELETED AND THE DIMENSION

"2’-0"" IS SUBSTITUTED.

CURRENT REVISION CHANGES: (1) AT THE

TITLE BLOCK, AT REVISION THE WORDS

"VALUE ENGINEERING CHANGE 1" ARE

DELETED AND THE DETAILED CHANGE

DESCRIPTION IS ADDED. (2) THE EQUIPMENT

PAD DETAIL IS DELETED.

PRECAST CONCRETE SUMP

WITH INTERGRAL BASE.

S D

E T

.D G

ADDED THE WORDS "PRECAST SUMP WITH

INTEGRAL BASE" TO ’SECTION P’; OMITTED THE

WORDS "ROUGHEN SURFACE" FROM ’SECTION P’;

CHANGED ’SECTION P’ DIMENSIONS TO REFLECT

AS-BUILT DIMENSIONS.

C

B

A

5 4 3 2 1

A

B

C

D

U.S.ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

Revisions

Symbol Descriptions

Designed by:

Drawn by:

Checked by:

DETROIT, MICHIGAN

CHIEF, ENGINEERING MANAGEMENT BRANCH

BJS

DRAWING NUMBER

SCALE :

SAULT STE. MARIE

MICHIGAN

SUBMITTED TO:

OFSHEET

1120 MAY STREET, LANSING, MICHIGAN 48906

TELEPHONE (517) 374-6800

A DLZ Company

DODSON-LINDBLOM

ASSOCIATES

INC.

EMERGENCY DAM STEAMPLANT REPLACEMENT

GENERAL NOTES

A.F.F.

E.C.

M.C.

OA

S.S.

W.C.

ABOVE FINISHED FLOOR

WATER COLUMN

ABBREVIATIONS

SYMBOLS - GENERAL

KJB

ALF

SYMBOLS, GENERAL NOTES, AND

ABBREVATIONS

NOT TO SCALE

S H

T M

.D

G N

SANITARY SEWER

SANITARY VENT

GAS PIPING

POTABLE COLD WATER

POTABLE HOT WATER

HIGH PRESSURE STEAM

LOW PRESSURE STEAM

LOUVER

MOTOR OPERATED DAMPER

PRESSURE REDUCING VALVE

PRESSURE RELIEF VALVE

GAS REGULATING VALVE

SOLENOID VALVE

UNION

CONTROL VALVE

BALL VALVE

WYE STRAINER

GLOBE VALVE

GATE VALVE

THERMOMETER

CHECK VALVE

COMPRESSED AIR OUTLET

UNIT HEATER

EXHAUST FAN

AIR FLOW DIRECTION

FLOOR DRAIN

PIPING RISER

PIPING DROP

THERMODYNAMIC STEAM TRAP

STOP VALVE (OS&Y)

DESIGNATES REMOVAL

M

A

G

PCW

HPS

B.F.F. BELOW FINISHED FLOOR

ELECTRICAL CONTRACTOR

ELEV. ELEVATION

MECHANICAL CONTRACTOR

OUTSIDE AIR

REQ’D REQUIRED

SILLCOCK

SERVICE SINK

W/ WITH

HW

LPS

A

M-1

H.B. HOSE BIBB

S.C.

OH OVERHEAD

COMPRESSED AIR PIPING

NPW NON-POTABLE WATER

P.A. PIPE ANCHOR

D DRAIN

D.M. 12/1477

1. DRAWINGS ARE DIAGRAMMATIC. ALL DIMENSIONS SHOWN ARE APPROXIMATE.

ALL EXISTING LOCATIONS SHALL BE FIELD VERIFIED.

2. WHERE PIPE SIZES ARE NOT SHOWN, THE CONTRACTOR

SHALL INSTALL PIPES OF THE SIZES APPROPRIATE FOR

THE EQUIPMENT BEING FURNISHED AND INSTALLED.

JUSTIFICATION FOR THE SIZES SELECTED SHALL BE INCLUDED

IN THE SHOP DRAWING SUBMITTALS.

CHANGES PER MODIFICATION 0001: ADDED NOTE 2 UNDER GENERAL NOTES

DATE APPROVED

SRJ29JUN95

AS-BUILT APR 1997

C

B

A

5 4 3 2 1

A

B

C

D

U.S.ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

Revisions

Symbol Descriptions Date Approved

Designed by:

Drawn by:

Checked by:

DETROIT, MICHIGAN

CHIEF, ENGINEERING MANAGEMENT BRANCH

DRAWING NUMBER

SCALE :

SAULT STE. MARIE

MICHIGAN

SUBMITTED TO:

N

OFSHEET

1120 MAY STREET, LANSING, MICHIGAN 48906

TELEPHONE (517) 374-6800

A DLZ Company

DODSON-LINDBLOM

ASSOCIATES

INC. 1/16" = 1’-0"

M A

T C

H L

IN

E

A

M A

T C

H L

IN

E

A

M A

T C

H L

IN

E

B

M A

T C

H L

IN

E

B

SCALE: 1/16" =1’-0"

SCALE: 1/16" =1’-0"

KJB

ALF

AREA PLAN 2: CABLE GALLERY PIPING PLAN

AREA PLAN 3: CABLE GALLERY PIPING PLAN

AREA PLAN 1: CABLE GALLERY PIPING PLAN

SCALE: 1/16" =1’-0"

JJB

AREA PLANS 1, 2 & 3

3" UNDERGROUND STEAM

MANHOLE

4" UNDERGROUND STEAM

CABLE GALLERY

FOR CONTINUATION OF PIPING

SEE DRAWING M-5

CONNECT REQ’D 1" AIR PIPING

TO 2" AIR PIPING

REQ’D 4"

GAS PIPING

REQ’D 4"

GAS PIPING

REQ’D 4"

GAS PIPING

REQ’D 4"

GAS PIPING

REQ’D 4"

GAS PIPING

REQ’D 4"

GAS PIPING

EMERGENCY DAM STEAMPLANT REPLACEMENT

M-2

M A

T C

H L

IN

E

C

(F O

R C

O N

T

IN

U A

T

IO

N

S E

E D

R A

W I N

G M

REQ’D. EMERGENCY DAM

STEAMPLANT LOCATION

200 0 200 400 600

SCALE 1" = 200’

N

G R

ID

N

O R

T H

T R

U E

N O

R T

H

E

,6 ,0

E

,6 ,5

E

,6 ,0

E

,6 ,5

E

,6 ,0

N 639,000

N 638,500

N 638,000

N 637,500

TANK

TANK

AVENUE

PORTAGE

AVENUE

DAM

RAMP

MH

MH

MH MH

MH

MH

MH

MH

SABIN LOCK

POE LOCK

MACARTHUR LOCK

f f

KEY PLAN

AREA PLAN 3

SEE DWG. M2

AREA PLAN 2

SEE DWG. M2

AREA PLAN 1

SEE DWG. M2

DAVIS LOCK

AREA PLAN 4

SEE DWG. M3

1’-0"

BUILDING

FOOTING

GRADE

STEAMPLANT

TOP OF WALL

FACE OF PIER

WALL

ALL UTILITY PIPING TO BE

ROUTED FROM EXISTING PIPING

GALLERY TO NEW STEAMPLANT

CAULK

PIPING

PIPE

SLEEVE

NEW PIPING TO BE

HUNG FROM WALL.

HANG PIPE SIMILAR

TO EXISTING

EXISTING

PIPING

PIPING

GALLERY

IN

SCALE: 1/4" =1’-0"

SECTION A A

M-2 M-2

1" PCW

4" GAS

1" AIR

PIPE

ANCHOR

PROVIDE PIPE ANCHOR

ON STEAM AND DRAIN

PIPING AT CABLE

GALLERY PENETRATION

PITCH STEAM PIPING

TOWARD DRIP TRAP

SEE TYPICAL PIPE

HANGING DETAIL

ON DRAWING M-7.

EXTERNALLY PRESSURIZED

GUIDED EXPANSION JOINT

PIPE

ANCHOR

PIPE

GUIDE

PIPE

ANCHOR

EXTERNALLY PRESSURIZED

GUIDED EXPANSION JOINT

EXTERNALLY PRESSURIZED

GUIDED EXPANSION JOINT

PIPE

GUIDE

PIPE

ANCHOR

DUAL CENTER ANCHOR

BELLOWS EXPANSION JOINT2" UNDERGROUND 0IL

TO BE ABANDONED

EXTERNALLY

PRESSURIZED

GUIDED

EXPANSION JOINT

PIPE

ANCHOR

PIPE

GUIDE

SEE NOTE 4

REQ’D

ISOLATION

VALVE

PIPE

ANCHOR

CONNECT REQ’D 4" STEAM PIPING

TO 4" STEAM RISER UP TO MANHOLE

PROVIDE END OF MAIN STEAM DRIP TRAP, T-1.

RUN CONDENSATE TO NEARBY TRENCH DRAIN.

DAVIS

BLDG.

ADMIN

BLDG.

2" FORCE MAIN

1" PCW

4" GAS

1" AIR

CORE DRILL AS REQ’D

FOR UTILITY PIPING

CONNECT REQ’D

2" FORCE MAIN TO 2" OIL

EXISTING

2" OIL TO

BECOME

FORCE MAIN

REQ’D 2"

FORCE MAIN

REQ’D 2"

FORCE MAIN

2" FORCE MAIN

GENERAL NOTES:

1. MECHANICAL CONTRACTOR TO ROUTE GAS PIPING MAIN FROM

REQUIRED GAS METER TO STEAMPLANT. BRANCH

PIPING TAKE-OFFS SHALL BE PROVIDED TO DELIVER GAS TO THE

ADMINISTRATION AND DAVIS BUILDINGS. GAS PIPING TO BE ROUTED

FROM GAS METER DOWN TO ELECTRIC SERVICE TUNNEL AND THROUGH

CABLE GALLERY AS SHOWN ON DRAWING M-2, M-3, & M-4.

2. ALL PIPING TO BE HUNG FROM EXISTING PIPING GALLERY WALL.

HANG PIPE SIMILAR TO EXISTING PIPE HANGING METHOD. SEE

TYPICAL PIPE HANGING DETAIL ON DRAWING M-7.

3. ALL PIPE ANCHORS TO INCLUDE REQUIRED ANGLES WELDED TO PIPE.

ANGLES TO BE ANCHOR BOLTED INTO PIPING GALLERY STRUCTURE.

4. CONNECT NEW 2" FORCE MAIN TO EXISTING 2" OIL PIPE. FUEL OIL

PIPING IS TO BE USED AS SANITARY DRAIN (FORCE MAIN) FROM NEW STEAM

PLANT. SEE SITE DRAWING C-1 FOR REQ’D MANHOLE AND CONNECTION

TO CITY SEWER.

D.M. 12/1478

A

M-2M-2

M-2M-2

A

CONTRACT NUMBER: DACW35-95-C-0040

FOR CONTINUATION OF PIPING

SEE DRAWING M-5

4" HPS

2" PCW

3" NPW

CONNECT REQ’D 1" WATER

PIPING TO 2" WATER PIPING

REQ’D 4" STEAM PIPING

CONNECT 2" PCW TO EXISTING POTABLE CITY

WATER LINE IN GALLERY

SEE DETAIL C ON SHEET M-3

DETAIL B

(SEE SHEET M-3)

SECTION OF EXISTING 3" LINE TO BE

REPLACED WITH 4" LINE (3" LINE WILL BE

REMOVED BY CORPS OF ENGINEERS)

CHANGES MADE BY AMENDMENT 0004: (1) AT SECTION A, M-2/M-2,

AT THE RIGHT SIDE OF THE SECTION, THE WORD "LOCK" IS DELETED

AND THE WORD "PIER" IS SUBSTITUTED. (2) AT AREA PLAN 3,

AND A CROSS SECTION VIEW LOCATED TO THE LEFT OF THE PIPES

EXITING THE GALLERY, FACING TO THE RIGHT, IS SUBSTITUTED.

AT THE LIST OF PIPING THAT EXTENDS THRU GALLERY WALL "4 HPS"

3" NPW ARE ADDED. THE NOTATION "FOR CONTINUATION OF PIPING

SEE DWG M-5", "CONNECT 2" PCW TO EXISTING POTABLE CITY WATER

LINE IN GALLERY" AND "PIPE ANCHOR" ARE ADDED. (3) AT THE

AREA PLAN 3, THE CALLOUT FOR DETAIL B IS ADDED. (4) AT THE

AREA PLAN 3, THE 4" HPS LINE EAST OF THE NEW STEAM PLANT

THE LOCATION OF THE CROSS SECTION VIEW A, M-2/M-2 IS DELETED

CURRENT REVISION CHANGES: (1) AT SECTION A, M-2/M-2,

IS DELETED. (2) AT THE AREA PLAN 3, THE 4" HPS, 2" PCW AND

BUILDING IS DELETED. (5) AT THE AREA PLAN 3, THE WORDS

"CONNECT REQ’D 1 1/2 " WATER PIPING TO 2" WATER PIPING" ARE

DELETED AND THE WORDS "CONNECT REQ’D 1" WATER PIPING TO

2" WATER PIPING" ARE SUBSTITUTED. (6) AT AREA PLAN 3, THE

NOTATION "SECTION OF EXISTING 3" LINE TO BE REPLACED WITH 4"

LINE (3" WILL BE REMOVED BY CORPS OF ENGINEERS)" IS ADDED.

(7) AT THE AREA PLAN 3, THE CALL OUT FOR DETAIL C IS ADDED.

SRJ13 NOV 95

3’-8"

4’-8"

5’-8"

A R

E A

.D G

N

APR 1997ADDED DIMENSIONS TO ’AREA PLAN 3: CABLE GALLERY PIPING PLAN’

TO REFLECT AS-BUILT DIMENSIONS; REVISED ’AREA PLAN 1’: CABLE

GALLERY PIPING PLAN

C

B

A

5 4 3 2 1

A

B

C

D

U.S.ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

Revisions

Symbol Descriptions Date Approved

Designed by:

Drawn by:

Checked by:

DETROIT, MICHIGAN

CHIEF, ENGINEERING MANAGEMENT BRANCH

DRAWING NUMBER

SCALE :

SAULT STE. MARIE

MICHIGAN

SUBMITTED TO:

N

OFSHEET

1120 MAY STREET, LANSING, MICHIGAN 48906

TELEPHONE (517) 374-6800

A DLZ Company

DODSON-LINDBLOM

ASSOCIATES

INC. 1/16" = 1’-0"

M A

T C

H L

IN

E

A

M A

T C

H L

IN

E

A

M A

T C

H L

IN

E

B

M A

T C

H L

IN

E

B

SCALE: 1/16" =1’-0"

SCALE: 1/16" =1’-0"

KJB

ALF

AREA PLAN 2: CABLE GALLERY PIPING PLAN

AREA PLAN 3: CABLE GALLERY PIPING PLAN

AREA PLAN 1: CABLE GALLERY PIPING PLAN

SCALE: 1/16" =1’-0"

JJB

AREA PLANS 1, 2 & 3

3" UNDERGROUND STEAM

MANHOLE

4" UNDERGROUND STEAM

CABLE GALLERY

FOR CONTINUATION OF PIPING

SEE DRAWING M-5

CONNECT REQ’D 1" AIR PIPING

TO 2" AIR PIPING

REQ’D 4"

GAS PIPING

REQ’D 4"

GAS PIPING

REQ’D 4"

GAS PIPING

REQ’D 4"

GAS PIPING

REQ’D 4"

GAS PIPING

REQ’D 4"

GAS PIPING

EMERGENCY DAM STEAMPLANT REPLACEMENT

M-2

M A

T C

H L

IN

E

C

(F O

R C

O N

T

IN

U A

T

IO

N

S E

E D

R A

W I N

G M

REQ’D. EMERGENCY DAM

STEAMPLANT LOCATION

200 0 200 400 600

SCALE 1" = 200’

N

G R

ID

N

O R

T H

T R

U E

N O

R T

H

E

,6 ,0

E

,6 ,5

E

,6 ,0

E

,6 ,5

E

,6 ,0

N 639,000

N 638,500

N 638,000

N 637,500

TANK

TANK

AVENUE

PORTAGE

AVENUE

DAM

RAMP

MH

MH

MH MH

MH

MH

MH

MH

SABIN LOCK

POE LOCK

MACARTHUR LOCK

f f

KEY PLAN

AREA PLAN 3

SEE DWG. M2

AREA PLAN 2

SEE DWG. M2

AREA PLAN 1

SEE DWG. M2

DAVIS LOCK

AREA PLAN 4

SEE DWG. M3

1’-0"

BUILDING

FOOTING

GRADE

STEAMPLANT

TOP OF WALL

FACE OF PIER

WALL

ALL UTILITY PIPING TO BE

ROUTED FROM EXISTING PIPING

GALLERY TO NEW STEAMPLANT

CAULK

PIPING

PIPE

SLEEVE

NEW PIPING TO BE

HUNG FROM WALL.

HANG PIPE SIMILAR

TO EXISTING

EXISTING

PIPING

PIPING

GALLERY

IN

SCALE: 1/4" =1’-0"

SECTION A A

M-2 M-2

1" PCW

4" GAS

1" AIR

PIPE

ANCHOR

PROVIDE PIPE ANCHOR

ON STEAM AND DRAIN

PIPING AT CABLE

GALLERY PENETRATION

PITCH STEAM PIPING

TOWARD DRIP TRAP

SEE TYPICAL PIPE

HANGING DETAIL

ON DRAWING M-7.

EXTERNALLY PRESSURIZED

GUIDED EXPANSION JOINT

PIPE

ANCHOR

PIPE

GUIDE

PIPE

ANCHOR

EXTERNALLY PRESSURIZED

GUIDED EXPANSION JOINT

EXTERNALLY PRESSURIZED

GUIDED EXPANSION JOINT

PIPE

GUIDE

PIPE

ANCHOR

DUAL CENTER ANCHOR

BELLOWS EXPANSION JOINT2" UNDERGROUND 0IL

TO BE ABANDONED

EXTERNALLY

PRESSURIZED

GUIDED

EXPANSION JOINT

PIPE

ANCHOR

PIPE

GUIDE

SEE NOTE 4

REQ’D

ISOLATION

VALVE

PIPE

ANCHOR

CONNECT REQ’D 4" STEAM PIPING

TO 4" STEAM RISER UP TO MANHOLE

PROVIDE END OF MAIN STEAM DRIP TRAP, T-1.

RUN CONDENSATE TO NEARBY TRENCH DRAIN.

DAVIS

BLDG.

ADMIN

BLDG.

2" FORCE MAIN

1" PCW

4" GAS

1" AIR

CORE DRILL AS REQ’D

FOR UTILITY PIPING

CONNECT REQ’D

2" FORCE MAIN TO 2" OIL

EXISTING

2" OIL TO

BECOME

FORCE MAIN

REQ’D 2"

FORCE MAIN

REQ’D 2"

FORCE MAIN

2" FORCE MAIN

1. MECHANICAL CONTRACTOR TO ROUTE GAS PIPING MAIN FROM

REQUIRED GAS METER TO STEAMPLANT. BRANCH

PIPING TAKE-OFFS SHALL BE PROVIDED TO DELIVER GAS TO THE

ADMINISTRATION AND DAVIS BUILDINGS. GAS PIPING TO BE ROUTED

FROM GAS METER DOWN TO ELECTRIC SERVICE TUNNEL AND THROUGH

CABLE GALLERY AS SHOWN ON DRAWING M-2, M-3, & M-4.

2. ALL PIPING TO BE HUNG FROM EXISTING PIPING GALLERY WALL.

HANG PIPE SIMILAR TO EXISTING PIPE HANGING METHOD. SEE

TYPICAL PIPE HANGING DETAIL ON DRAWING M-7.

3. ALL PIPE ANCHORS TO INCLUDE REQUIRED ANGLES WELDED TO PIPE.

ANGLES TO BE ANCHOR BOLTED INTO PIPING GALLERY STRUCTURE.

4. CONNECT NEW 2" FORCE MAIN TO EXISTING 2" OIL PIPE. FUEL OIL

PIPING IS TO BE USED AS SANITARY DRAIN (FORCE MAIN) FROM NEW STEAM

PLANT. SEE SITE DRAWING C-1 FOR REQ’D MANHOLE AND CONNECTION

TO CITY SEWER.

D.M. 12/1478

A

M-2M-2

M-2M-2

A

CONTRACT NUMBER: DACW35-95-C-0040

FOR CONTINUATION OF PIPING

SEE DRAWING M-5

4" HPS

2" PCW

3" NPW

CONNECT REQ’D 1" WATER

PIPING TO 2" WATER PIPING

REQ’D 4" STEAM PIPING

CONNECT 2" PCW TO EXISTING POTABLE CITY

WATER LINE IN GALLERY

SEE DETAIL C ON SHEET M-3

DETAIL B

(SEE SHEET M-3)

SECTION OF EXISTING 3" LINE TO BE

REPLACED WITH 4" LINE (3" LINE WILL BE

REMOVED BY CORPS OF ENGINEERS)

CHANGES MADE BY AMENDMENT 0004: (1) AT SECTION A, M-2/M-2,

AT THE RIGHT SIDE OF THE SECTION, THE WORD "LOCK" IS DELETED

AND THE WORD "PIER" IS SUBSTITUTED. (2) AT AREA PLAN 3,

AND A CROSS SECTION VIEW LOCATED TO THE LEFT OF THE PIPES

EXITING THE GALLERY, FACING TO THE RIGHT, IS SUBSTITUTED.

AT THE LIST OF PIPING THAT EXTENDS THRU GALLERY WALL "4 HPS"

3" NPW ARE ADDED. THE NOTATION "FOR CONTINUATION OF PIPING

SEE DWG M-5", "CONNECT 2" PCW TO EXISTING POTABLE CITY WATER

LINE IN GALLERY" AND "PIPE ANCHOR" ARE ADDED. (3) AT THE

AREA PLAN 3, THE CALLOUT FOR DETAIL B IS ADDED. (4) AT THE

AREA PLAN 3, THE 4" HPS LINE EAST OF THE NEW STEAM PLANT

THE LOCATION OF THE CROSS SECTION VIEW A, M-2/M-2 IS DELETED

CURRENT REVISION CHANGES: (1) AT SECTION A, M-2/M-2,

IS DELETED. (2) AT THE AREA PLAN 3, THE 4" HPS, 2" PCW AND

BUILDING IS DELETED. (5) AT THE AREA PLAN 3, THE WORDS

"CONNECT REQ’D 1 1/2 " WATER PIPING TO 2" WATER PIPING" ARE

DELETED AND THE WORDS "CONNECT REQ’D 1" WATER PIPING TO

2" WATER PIPING" ARE SUBSTITUTED. (6) AT AREA PLAN 3, THE

NOTATION "SECTION OF EXISTING 3" LINE TO BE REPLACED WITH 4"

LINE (3" WILL BE REMOVED BY CORPS OF ENGINEERS)" IS ADDED.

(7) AT THE AREA PLAN 3, THE CALL OUT FOR DETAIL C IS ADDED.

SRJ13 NOV 95

3’-8"

4’-8"

5’-8"

A R

E A

.D G

N

APR 1997ADDED DIMENSIONS TO ’AREA PLAN 3: CABLE GALLERY PIPING PLAN’

TO REFLECT AS-BUILT DIMENSIONS; REVISED ’AREA PLAN 1’: CABLE

GALLERY PIPING PLAN

MENS

BATHROOM

BOILER ROOM

ASH PIT

STORAGE

A

STORAGE

B

LUNCH ROOM

U

P

ELECTRIC

WATER

HEATER

B O

IL

E

R

12345

D

C

B

A

5 4 3 2 1

A

B

C

D

U.S.ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

Revisions

Symbol Descriptions Date Approved

Designed by:

Drawn by:

Checked by:

DETROIT, MICHIGAN

CHIEF, ENGINEERING MANAGEMENT BRANCH

JJB

DRAWING NUMBER

SCALE :

SAULT STE. MARIE

MICHIGAN

SUBMITTED TO:

N

OFSHEET

1120 MAY STREET, LANSING, MICHIGAN 48906

TELEPHONE (517) 374-6800

A DLZ Company

DODSON-LINDBLOM

ASSOCIATES

INC.

A R

E A

A

.D G

N

1/8" = 1’-0"

SCALE: 1/8" =1’-0"

G

G

G

REQ’D. GAS REGULATING VALVE

M

A T

C H

L

IN

E C

F O

R C

O N

T

IN

U A

T

IO

N

S E

E D

R A

W

IN

G M

-4

SCALE: 1/32"=1’-0"

AREA PLAN 4

ELECTRICAL SERVICE TUNNEL (ELEV. = 39’)

SEE ENLARGED PLAN OF

ADMINISTRATION BUILDING

ON DRAWING M-4

AREA PLAN 4 & ENLARGED PLAN

KJB

ALF

REQ’D. 1-1/4"

GAS PIPING

CABLE GALLERY

(ELEV. = 102’)

DAVIS BUILDING

CABLE GALLERY

(ELEV. = 102’)

COMFORT STATION

REQ’D 4" GAS PIPING IN

ELECTRICAL SERVICE TUNNEL

EMERGENCY DAM STEAMPLANT REPLACEMENT

N

M-3

SERVICE SHAFT NO. 2

AT BASEMENT LEVEL

SERVICE SHAFT NO. 1

REQ’D GAS METER

BY LOCAL GAS

COMPANY

MACARTHUR LOCK

POE LOCK

ADMINISTRATION BUILDING

SERVICE SHAFT NO. 3

AT BASEMENT LEVEL

SCALE: 1/8" =1’-0"

G

G

SERVICE SHAFT NO.3

REQ’D. 4" GAS PIPING IN

ELECTRICAL SERVICE TUNNEL

REQ’D. 4"

GAS PIPING

N

ELECTRICAL SERVICE TUNNEL

BELOW (ELEV. = 39’)

REQ’D. 4" GAS PIPING

DOWN TO ELECTRICAL

SERVICE TUNNEL

LADDER TO DEEP

ELECTRICAL SERVICE

TUNNEL

REQ’D. 4" GAS PIPING BELOW

IN ELECTRICAL SERVICE TUNNEL

MANHOLE-TO ELECTRICAL

SERVICE TUNNEL

REQ’D. 1 1/4"

GAS PIPING

REQ’D 4"

GAS PIPING

DAVIS BUILDING - ENLARGED BASEMENT PLAN

DAVIS BUILDING - ENLARGED

SUB-BASEMENT PLAN

SEE ENLARGED SUB-BASEMENT

AND BASEMENT PLAN OF DAVIS

BUILDING - THIS DRAWING

1. MECHANICAL CONTRACTOR TO ROUTE GAS PIPING MAIN

FROM REQUIRED GAS METER TO STEAMPLANT.

BRANCH PIPING TAKE-OFFS SHALL BE PROVIDED TO DELIVER

GAS TO THE ADMINISTRATION AND DAVIS BUILDINGS. GAS

PIPING TO BE ROUTED FROM GAS METER DOWN TO ELECTRIC

SERVICE TUNNEL AND THROUGH CABLE GALLERY AS SHOWN ON

DRAWING M-2, M-3, & M-4.

REQUIRED 4" GAS

PIPING UP TO BASEMENT

(SEE DAVIS BUILDING-ENLARGED

BASEMENT PLAN ON THIS DRAWING)

REQ’D. 4" GAS IN CABLE GALLERY

TO STEAM PLANT

SEE ENLARGED PLAN OF

ELECTRICAL SERVICE TUNNEL

ENTRANC…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .