Bid Results.pdf

PDF 97 KB Posted

Attached to
Pike Island Monolith R33 and RR34 River Wall Crack Stabilization 2020
Solicitation number
W911WN20B8008
Issued by

About this file

This document contains bid results for a federal contract to stabilize cracks in river wall monoliths. Coastal Drilling East, LLC submitted the lowest bid of $957,400.00 to repair and stabilize cracks within two concrete river wall monoliths at Pike Island Locks and Dam in Wheeling, West Virginia. The work includes installing steel bar anchors, pressure grouting cracks, and demolishing and replacing concrete. The U.S. Army Corps of Engineers, Pittsburgh District, will award a firm fixed-price contract with a period of performance of 365 days after notice to proceed. The contract is valued between $500,000 and $1,000,000 and utilizes NAICS code 237990 for other heavy and civil engineering construction.

View the file

Other files

File Type Posted
Bid Opening Attendance Register .pdf PDF
Amendment 4 - W911WN20B8008-0013 Pike Island River Wall Crack Stabilization.pdf PDF
Plans W911WN20B8008 Amendment 0004.pdf PDF
Plans W911WN20B8008 Amendment 0003.pdf PDF
Amendment 3 - W911WN20B8008-0009 Pike Island River Wall Crack Stabilization.pdf PDF
01 35 00.00 08.pdf PDF
Attachment 5 - Repair Gate Schedule Additional.pdf PDF
Amendment 2 - W911WN20B8008-0008 Pike Island River Wall Crack Stabilization.pdf PDF
01 22 00.00 08.pdf PDF
Conformed CLINs 0001 through 0013 - W911WN20B8008.pdf PDF
13 51 00.10 08.pdf PDF
02 41 00.pdf PDF
Plans W911WN20B8008- Amendment 0002.pdf PDF
Site Visit Sign In Sheet - W911WN20C8008 Pike Island Crack Stabilization.pdf PDF
Amendment 0007 W911WN20B8008.pdf PDF
Amendment 0007 Spec Section 01 35 00.00 08.pdf PDF
Amendment 0007 Spec Section 01 35 26.00 08.pdf PDF
Amendment 0007 Spec Section 01 32 33.pdf PDF
Amendment 0007 Spec Section 03 30 53.00 08.pdf PDF
Amendment 0007 Spec Section 01 74 19.00 08.pdf PDF
Amendment 0007 Wage Determination WV20200073 1-24-2020.pdf PDF
Amendment 0007 Spec Section 13 51 00.10 08.pdf PDF
A.03 W911WN20B8008 - Contract and Reference Drawings, Attachment 2.pdf PDF
A.03 Pike Island L&D River Wall Crack Stabilization 2020 Tech Specs Certified Final Documents, Attachment 1.pdf PDF
B.08 W911WN20B8008 (Pike Island Monolith Repairs -Crack Stabilization).pdf PDF
B.04 Wage Determination PA20200002 (July 24, 2020), Attachment 3.pdf PDF
A.02 Pike Island L&D Monolith R33 and R34 River Wall Crack Stabilization Virtual Site Visit, Attachment 4.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID RESULTS

W911WN20B8008

Pike Island Monolith R33 and R34 River Wall Crack Stabilization, Wheeling, WV

Bid Opening: September 10 2020 @ 11:00 a.m. ET

Contractor's Name & Address Total Bid Amount

Coastal Drilling East, LLC 130 Meadow Ridge Road Mt. Morris, PA 15349

$957,400.00

J.F. Brennan Company, Inc.

818 Bainbridge Street La Crosse, WI 54603

$1,355,135.00

Gregori Construction Inc.

P.O. Box 121 Sarver, PA 16055

$1,410,000.00

Sunesis Construction Co.

2610 Crescentville Road West Chester, OH 45069

$1,444,675.00

Kovilic Construction Co., Inc.

3721 N. Carnation Street Franklin Park, IL 60131

$1,570,250.00

C.J. Mahan Construction Company, LLC 250 N. Hartford Avenue Columbus, OH 43222

$1,607,900.00

Brayman Construction Corporation 1000 John Roebling Way Saxonburg, PA 16056

$1,949,200.00

Mosites Construction Company 400 Mosites Way, Suite 100 Pittsburgh, PA 15205

$2,115,732.44

Government Estimate w/o Profit $1,093,516.00

File details come from the government source that posted it. Updated .