A.02 Pike Island L&D Monolith R33 and R34 River Wall Crack Stabilization Virtual Site Visit, Attachment 4.pdf

PDF 2 MB Posted

Attached to
Pike Island Monolith R33 and RR34 River Wall Crack Stabilization 2020
Solicitation number
W911WN20B8008
Issued by

About this file

This solicitation package outlines requirements for a federal construction contract to repair and stabilize cracks in two concrete river wall monoliths at Pike Island Locks and Dam on the Ohio River in West Virginia. The scope of work includes installing temporary instrumentation to monitor crack movement, drilling and grouting horizontal high-strength steel bar anchors in the lock wall monoliths at various levels, demolishing and replacing a concrete section, pressure grouting the crack with hydrophobic grout, replacing recess frames and covers, drilling and placing reinforcement dowels, installing reinforcement, and placing new concrete. The work must be performed while the lock remains operational with some short-term shutdowns allowed. Access to the monoliths is limited, requiring use of a contractor barge or crane if needed. The contract will have a 365-day period of performance after receipt of the notice to proceed. The estimated cost range for the work is $500,000 to $1 million. The solicitation will be issued on or around July 31, 2020 through beta.SAM.gov as an unrestricted acquisition with a firm-fixed-price contract awarded to one contractor. The NAICS code is 237990 and small business size standard is $39.5 million.

View the file

Other files

File Type Posted
Bid Opening Attendance Register .pdf PDF
Bid Results.pdf PDF
Amendment 4 - W911WN20B8008-0013 Pike Island River Wall Crack Stabilization.pdf PDF
Plans W911WN20B8008 Amendment 0004.pdf PDF
Plans W911WN20B8008 Amendment 0003.pdf PDF
Amendment 3 - W911WN20B8008-0009 Pike Island River Wall Crack Stabilization.pdf PDF
01 35 00.00 08.pdf PDF
Attachment 5 - Repair Gate Schedule Additional.pdf PDF
Amendment 2 - W911WN20B8008-0008 Pike Island River Wall Crack Stabilization.pdf PDF
01 22 00.00 08.pdf PDF
Conformed CLINs 0001 through 0013 - W911WN20B8008.pdf PDF
13 51 00.10 08.pdf PDF
02 41 00.pdf PDF
Plans W911WN20B8008- Amendment 0002.pdf PDF
Site Visit Sign In Sheet - W911WN20C8008 Pike Island Crack Stabilization.pdf PDF
Amendment 0007 W911WN20B8008.pdf PDF
Amendment 0007 Spec Section 01 35 00.00 08.pdf PDF
Amendment 0007 Spec Section 01 35 26.00 08.pdf PDF
Amendment 0007 Spec Section 01 32 33.pdf PDF
Amendment 0007 Spec Section 03 30 53.00 08.pdf PDF
Amendment 0007 Spec Section 01 74 19.00 08.pdf PDF
Amendment 0007 Wage Determination WV20200073 1-24-2020.pdf PDF
Amendment 0007 Spec Section 13 51 00.10 08.pdf PDF
A.03 W911WN20B8008 - Contract and Reference Drawings, Attachment 2.pdf PDF
A.03 Pike Island L&D River Wall Crack Stabilization 2020 Tech Specs Certified Final Documents, Attachment 1.pdf PDF
B.08 W911WN20B8008 (Pike Island Monolith Repairs -Crack Stabilization).pdf PDF
B.04 Wage Determination PA20200002 (July 24, 2020), Attachment 3.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PIKE ISLAND L/D RIVER WALL MONOLITH CRACK STABILIZATION

SCOPE OF THE PROPOSED ACQUISITION:

The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the repair and stabilization of a crack within two concrete river wall monoliths at Pike Island Locks and Dam, Ohio River, WV. The contract generally includes installation of a hollow core rock anchors, pressure grouting of the crack, and concrete demolition and placement. The major features of the requirements are identified below:

The contract specifically includes:

• Installation of temporary instrumentation for monitoring the cracks movement.

• Drilling, placing, tensioning and grouting of rock anchors.

• Demolition of a concrete section on top of the monoliths.

• Pressure grouting of the crack with hydrophobic grout.

• Replacement of multiple recess frames and covers.

• Drilling and placement of dowels for concrete repair.

• Placement of reinforcement for concrete repair.

• Placement of new concrete.

Pittsburgh District

Fig. 1: Overview of total area Project

Location of Monoliths R33/34

PIKE ISLAND L/D RIVER WALL MONOLITH CRACK STABILIZATION

SCOPE OF THE PROPOSED ACQUISITION:

The work is to be performed on the river side wall of the lock while the lock is in operation. There will be intermittent short term shutdowns of the river side lock permitted for specified critical operations of the construction. However, it is expected that the majority of the work can be completed while the lock remains in operation.

Access to the monoliths is limited due to their location in the project. The maximum load that can be carried across the miter gates to the work location is 100lb/sf. If needed, it is anticipated the contractor will move larger loads to the work site on the monoliths by utilizing river access by contractor supplied barge or with a contractor supplied crane. There will be a laydown area supplied on shore.

Disposal of concrete rubble will be required. Ferrous and all other construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable.

Construction work will occur in direct proximity to waterway traffic and the operating locks and dam. The existing lock chambers are currently operated 24 hours a day, 7 days a week.

Pittsburgh District

Fig. 2: Overview of area of interest

Location of Monoliths R33/34

Fig. 3: Existing Crack in River Wall Monoliths R33 and R34 (Hand railing will be removed by project staff before start of work)

Pike Island L/D River Wall Monolith Crack Stabilization

Fig. 4: Crack on R33 View Facing Upstream. Fig. 5: View Facing Riverward Crack Passing Through Utility Box Recess and Terminating at Pump Well.

Fig. 6: View Looking Riverward Upstream Crack Crossing Bulkhead Slot and Monolith Joints of R33/34

Fig. 7: Buckled Grating and Framing to be Replaced

Fig. 8: Location of Crack Passing Through Utility Trench

Fig 9: View From Boat, River Side Face of Monolith R34 With Crack Running Down Chamfer of Monolith

Fig 10: View From Top of Wall River Side Face of R34 Monolith, With Crack Running Down Chamfer of Monolith

Pike island l/d river wall monolith crack stabilization
Pike island l/d river wall monolith crack stabilization
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8

File details come from the government source that posted it. Updated .