This is an amendment to a solicitation for the Pike Island Monolith R33 and R34 River Wall Crack Stabilization 2020 project. The amendment reschedules a virtual site visit, extends the question submission deadline to August 17, 2020, provides an updated wage determination, and modifies several technical specifications sections. It also extends the bid due date to September 4, 2020. The work involves repairing and stabilizing a crack in two concrete river wall monoliths at Pike Island Locks and Dam in Wheeling, West Virginia. The contract will include installing steel bar anchors, pressure grouting the crack, and demolishing and replacing concrete. Bids must be submitted electronically through the Army's DOD SAFE file sharing system.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81ET401214739
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PIKE ISLAND MONOLITH R33 AND R34 RIVER WALL CRACK STABILIZATION 2020
The purpose of this Amendment is to:
1. reschedule Virtual Site Visit. A Virtual Site Visit is scheduled for Tuesday, 11 August 2020 at 10:00 a.m. ET. (FAR 52.236-27)
2. extend the due date for Submission of Questions to Monday, 17 August 2020 at 12:00 p.m. ET. (Addendum to Section 00 21 00 para 09)
3. correct Wage Determination to WV20200073 01/24/2020. (DFARS 252.236-7001)
4. provide updated Specif ications Sections: 01 32 33; 01 35 00.00 08; 01 35 26.00 08; 01 74 19.00 08; 03 30 53.00 08; and 13 51 00.10 08.
5. extend the Bid Due Date to 4 September 2020 at 11:00 a.m. ET.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911WN20B8008
X 9B. DATED (SEE ITEM 11)
29-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Aug-2020
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CELRP-CT
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911WN20B8008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 02-Sep-2020 11:00 AM to 04-Sep-2020 11:00 AM.
The following have been added by full text:
SUMMARY OF CHANGES TO SPECS
W911WN20B8008 TECHNICAL SPECIFICATIONS
The following Sections have been revised:
01 32 33 DIGITAL PROGRESS IMAGES
Section edited to change language of “Contracting Officer” to “Contracting Officer or their designated representative.”
01 35 00.00 08 SPECIAL PROCEDURES
Paragraph 1.9.5 Mooring of Floating Plant Website link fixed to fit onto page.
01 35 26.00 08 GOVERNMENTAL SAFETY REQUIREMENTS
Section edited to change language of “Contracting Officer” to “Contracting Officer or their designated
01 74 19.00 08 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
Table 1 Disposal Requirements Section edited to clarify testing requirements.
03 30 53.00 08 MISCELLANEOUS CAST-IN-PLACE CONCRETE
Paragraph 3.8 TESTING AND INSPECTING Section edited to correct section reference title to 01 45 00.00
10 QUALITY CONTROL.
13 51 00.10 08 INSTRUMENTATION
Section edited to change language of “Contracting Officer” to “Contracting Officer or their designated
(End of Summary of Changes to Specs)
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
ADDENDUM TO SECTION 00 21 00
ADDENDUM TO SECTION 00 21 00
00 21 00-1 POINT OF CONTACT
Inquiries may be made by writing this office, or by calling (collect calls not accepted), the following individuals:
Connie Ferguson 412-395-7551 Email: Connie.L.Ferguson@usace.army.mil
Requests for hardcopies of the specifications will not be honored by telephone. Vendors must register at https://beta.sam.gov . This site is also used for obtaining bid results and award information.
00 21 00 – 02 SUBMISSION OF BIDS
Bids: A LL RESPONSES TO THIS ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY. Hand carried delivery or USPS/UPS/FEDEX delivery of hard copies and or CD-ROMs are not authorized. Facsimile submission is not authorized. Electronic Bid Submission is required through the Army’s Electronic File Sharing S ervice, DOD SAFE (https://safe.apps.mil) The DOD SAFE Application is used to send large files to individuals that would normally be too large to send via email. There are no user accounts for SAFE. Authentication is handled via email. Anyone has access to DOD SAFE, and the application is available for use by anyone. The SAFE “Getting Started Guide” has information on how to utilize the system (https://safe.apps.mil/about.php).
Instructions for uploading are as follows:
1. Send an email to the Contracting Officer and Contract Specialist to receive the drop off link where you will submit your bid package. The email request for the drop off link will need to be completed no sooner than 7 calendar days prior to the bid due date and time but no later than 1 calendar day prior to the bid due date.
a. Connie Ferguson, Contract Specialist at Connie.L.Ferguson@usace.army.mil
b. Carole Householder, Contracting Officer at CCarole.Householder@usace.army.mil
□ You will receive an email from NoReplyTo@mail.mil with the drop off link, Claim ID, Recipient Code, and Claim Passcode to submit your bid package. As this is a system generated message, please be sure to check your junk or spam folder as it may be there depending on email settings.
□ Click the Add File(s) or Drag and Drop your file(s). See below for the file naming convention requirements.
□ Click Upload button to send documents.
e. Guest users will need to check their email to verify their email address before the recipients will be notified. No additional action is required by CAC users.
File Size Limitations: Bidders are advised to follow the DOD SAFE instructions for uploading files.
DOD SAFE supports delivery up to 8GB. If a file size greater than 8GB is anticipated, bidders are advised to contact the Contract Specialist and Contracting Officer.
File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:
0. W911WN20B8008-FIRMNAME-BID
1. W911WN20B8008-FIRMNAME-BID BOND
If providing more than one file, each file name shall begin with the solicitation number followed by the firm’s name and a brief file description. Please see examples above.
File Organization: The entire bid package, to include completed SF1442, acknowledgement of all amendments, and valid bid bond (SF24) including powers of attorney shall be submitted as one pdf document.
Upload Completion & Deadline: Bidders shall submit bid packages no later than the date and time specified in Block 13A on the SF1442. The time & date of bid receipt will be the upload completion/delivery time & date recorded within DOD SAFE site. Do not assume that electronic submission will occur instantaneously. Large files (e.g.
10MB or more) will take some time to upload. Bidders should time their upload effort with prudence by not waiting until the last few minutes - this will allow for unexpected delays in the transmittal process. Bidders are encouraged to keep a copy of the upload confirmation for their record.
00 21 00 – 03 BID OPENINGS
Due to health and safety concerns related to COVID-19 pandemic, the bid opening for this project will be conducted virtually by teleconference as follows:
a. Bid Opening will be by teleconference to begin promptly on the date and time specified in Block 13A on the SF1442. At the time of the bid opening, all bids received will be downloaded by the Government official opening the bids. Once all bids have been downloaded, they will be individually opened and read aloud.
b. Bidders should call into the teleconference 10 minutes prior to the teleconference start time at
(877-402- 9753), access code (6818503), and security code (8005).
All bids are required to be received by the bid acceptance closing date and time stated in Block 13A of the Standard Form 1442.
00 21 00-04 AMENDMENTS PRIOR TO DATE SET FOR OPENING BIDS
The right is reserved as the interest of the Government may require, to revise or amend the specifications or drawings or both prior to the date set for opening bids. Such revisions and amendments, if any, will be announced by an amendment or amendments to this Invitation for Bids. If the revisions and amendments are of a nature which require material changes in the quantities or prices bid or both, the date set for opening bids may be postponed by such number of days as in the opinion of the Issuing Office will enable bidders to revise their bids. In such cases, the amendment will include an announcement of the new date for opening bids.
00 21 00 – 05 POSTPONEMENT OF BID OPENINGS
a. Bid openings may be postponed up to or even after the time scheduled for bid opening under the following circumstances:
(i) when the Contracting Officer has reason to believe that the bids of an important segment of bidders have been delayed for causes beyond their control and without their fault or negligence (such as, but not limited to, flood, fire, accident, weather conditions or strikes);
or
(ii) when emergency or unanticipated events interrupt normal Government processes so that the conduct of bid openings as scheduled is impracticable; or
(iii) when interruption of Government technology systems prevents bid opening as scheduled.
b. At the time a determination is made to postpone a bid opening under a(i) above, an announcement of the determination shall be publicly posted and, if practicable before issuance of formal amendment of the invitation, otherwise communicated to prospective bidders likely to attend the scheduled bid opening.
c. In the case of a(ii) above, when urgent Government requirements preclude amendment of the solicitation, the time specified for opening of bids will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume. In such case, the time of actual bid opening shall be deemed to be the time set for bid opening for the purpose of determining “late bids” under FAR 14.304.
d. In the case of a(iii) above, when the bid opening is scheduled for a specific date and time but interruption of Government technology prevents bid opening and precludes and amendment, the time specified for opening of bids will be deemed to be extended to the same time of day specified in the solicitation on the next business day. In such case, the time of actual bid opening shall be deemed to be the time set for bid opening for the purpose of determining “late bids” under FAR 14.304.
00 21 00-06 BID BOND REQUIREMENTS
Each bidder shall submit with his electronic bid package, an electronic copy of the Bid Bond form using the “current version” of Standard Form 24 (SF24) with good and sufficient surety or sureties acceptable to the Government in the penal sum of twenty percent (20%) of the bid price or $3,000,000.00, whichever is lesser. In order to be considered an acceptable surety, a corporate surety must appear on the list contained in the Department of Treasury Circular 570, “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and Acceptable Reinsuring Companies”. The bid bond penalty may be expressed in terms of a percentage of the bid price or may be expressed in dollars and cents. A valid Power of Attorney for an individual acting as agent for surety shall accompany the bond.
FAILURE TO FURNISH A BID BOND OR A VALID POWER OF ATTORNEY, AS SPECIFIED, WITH BID
MAY RESULT IN REJECTION OF BID FOR NON-COMPLIANCE
*Standard Form 24 (Bid Bond) can be found on the GSA Forms website at hhttps://www.gsa.gov/portal/forms/type/SF
In addition to the electronic copy of the Bid Bond, bidders are required to submit a hard copy version of the original bid bond and valid Power of Attorney to the address identified in Block 7 of the SF 1442. The hard copy Bid Bond must be identical to the electronic version submitted with the electronic bid package. Any differences in the electronic version and the hard copy versions may result in rejection of bid. Hard copy bid bonds will be validated for acceptability as soon as possible after receipt.
00 21 00-07 CERTIFIED OR CASHIER’S CHECKS, BANK DRAFTS, MONEY ORDERS OR CURRENCY
When a certified or cashier's check, bank draft, money order, or currency is furnished in lieu of furnishing a surety or sureties on a bond, the regular form of bond must be utilized and signed by the bidder. In the space provided for the insertion of the surety, a statement shall be made substantially as follows:
“In lieu of surety (Insert here a description of the negotiable instrument or currency. Description to include where appropriate, date and number of negotiable instrument, bank on which drawn and amount) was furnished. The (check, sum, etc.) was deposited with the Finance and Accounting Officer, of Engineers, Department of the Army, (insert address).”
An electronic copy of any certified or cashier’s check, bank draft, money order, or currency must be included in the electronic bid package.
In addition to the electronic copy, any certified or cashier’s check, bank draft, money order, or currency must be submitted in hard copy original to the address identified in Block 7 of the SF 1442. The hard copy must be identical to the electronic version submitted with the electronic bid package. Any differences in the electronic version and the hard copy versions may result in rejection of bid. Hard copy documents will be validated for acceptability as soon as possible after receipt.
00 21 00-08 LOCATION AND DESCRIPTION OF WORK
Location. The work is located at Pike Island Lock and Dam, Ohio River, Wheeling, WV; Ohio County, WV.
Description. The project involves the repair and stabilization of a crack within two concrete river wall monoliths.
The contract generally includes installation of hollow core high strength steel bar anchors, pressure grouting of the crack, and concrete demolition and placement. For a complete description of work see Technical Specification Section 01 11 00 Summary of Work.
00 21 00-09 SUBMISSION OF QUESTIONS
Due to the importance of maintaining the schedule for this project, it is requested that all questions regarding the solicitation, specifications, and/or drawings be submitted no later than 12:00PM ET on Monday August 17, 2020.
All questions must be in writing, emailed to Connie.L.Ferguson@usace.army.mil. Any questions received after the above deadline will be answered at the discretion of the Contracting Officer. Answers to submitted questions will be provided in an amendment to the Solicitation.
Request for hardcopies of specifications will not be honored. Vendors must register as an interested vendor at https://beta.sam.gov . This site is also used for obtaining bid results and award information.
00 21 00-10 AWARD
Award will be made as a whole to one responsive/responsible bidder submitting the lowest priced bid.
00 21 00-11 ESTIMATED COST OF THE WORK
The estimated cost of the proposed work is between $500,000 and $1,000,000.
00 21 00-12 SCOPE OF EMPLOYMENT OF ROFESSIONAL REGISTRANTS
This project was designed by the Pittsburgh District of the U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appearing on these project documents are within the scope of their employment as required by ER 1110-1-8152.
00 21 00-13 ACCESS TO SITE
The site of the work may be reached from state highways and local roads and streets, and the inland waterway system, as indicated on the drawings.
00 21 00-14 MINIMUM RATES
The wage rates specified in these specifications represent the minimum rates to be paid on the work and are not intended to represent the actual rates that the Contractor may have to pay.
The Government does not guarantee that a sufficient supply of qualified labor can be obtained at the minimum rates specified.
00 21 00-15 UNBALANCED BIDS
A Contractor’s bid which is found to be materially unbalanced may be rejected.
00 21 00-16 PRE-AWARD SURVEY
Prior to award of the contract, the apparent low bidder will be required to furnish the following information upon request by the Contracting Officer:
a. Financial ability to perform the contract, including the availability of necessary working capital and credit. Bidder shall furnish a copy of its current fniancial statement and obtain statements from its bank or banks and/or lending institutions with whom it does business as to its credit and other data deemed pertinent regarding its ability to perform the work.
b. Business and financial reputation and integrity. Bidder shall furnish names and addresses of four or more commercial firms for whom work has been performed recently or is under construction. A brief description of the projects and dollar value of the same shall also be furnished. Data on work performed which is similar to the proposed work is preferred. The same information is required regarding work performed for other Government installations.
c. Give brief history of buisness experience, including length of time in present business.
d. Furnish statement as to similarity between services being rendered and those required by the proposed contract.
e. Indicate total dollar amount of all business on hand (military and commercial) with brief description of major projects and locations of same.
f. Furnish statement of facilities, materials, together with a list of key personnel and their qualifications available for performance of proposed contract.
g. Furnish name and address of surety company which will furnish performance and payment bonds.
h. Furnish names and addresses of proposed subcontractors.
The Government reserves the right to request any other pertinent information deemed necessary to make a responsibility determination in accordance with FAR 9.1.
00 21 00-17 ELECTRONIC MAIL (E-MAIL) ADDRESS
Establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments as text files, pdf files, and other similar formats. Within 10 days after contract award, provide the Contracting Officer a single (only one) e-mail address for electronic communications from the Contracting Officer related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The Contracting Officer may also use email to notify the Contractor of base access conditions when emergency conditions warrant, such as hurricanes or terrorist threats. Multiple email addresses are not allowed.
It is the Contractor's responsibility to make timely distribution of all Contracting Officer initiated e-mail with its own organization including field office(s). Promptly notify the Contracting Officer, in writing, of any changes to this email address.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized virtual site visit has been scheduled for--
Tuesday August 11, 2020, 10:00 AM Eastern Time (ET) Zone
Interested parties shall register for this presentation in advance by emailing the Contract Specialist, Connie Ferguson at Connie.L.Ferguson@usace.army.mil
NOTE: The visual presentation will be added as an attachment to this Solicitation
(c) Participants who register will –
Step 1: Dial into the conference.
Dial-in: 877-402-9753 Access Code: 6818503 Security Code: 8008
(End of provision)
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Technical Specifications, Pike Island Lock and Dam, River Wall Crack Stabilization, Attachment 1
Contract Drawings, Pike Island Lock and Dam, River Wall Crack Stabilization, Attachment 2
-Wage Determination General Decision No. PA20200002 (07/24/2020); State: PA, Heavy and Highway (Allegheny County), WV20200073 01/24/2020; State: WV, Heavy (Ohio County), Attachment 3.
-Pike Island L/D Monolith R33 and R34 Crack Stabilization Visual Presentation, Attachment 4
(End of clause)
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
SUPPLEMENTARY CONDITIONS
00 73 00 - 1 COPYING, DISSEMINATION OR DISTRIBUTION OF INFORMATION
Those who disseminate information contained in the solicitations and/or drawings must ensure that the recipients have a legitimate need for the information and maintain a record of each recipient. Legitimate need means recognized business entities seeking to do business, or having business, with the Government as prime contractors, subcontractors or suppliers. You shall maintain a record of the following information on each recipient: Business name and address, DUNS Number and IRS Tax ID Number, and name and telephone number of person receiving the information.
00 73 00 - 2 SUBMISSION OF CONTRACT DOCUMENTATION
Provide contract documentation in an electronic format to the greatest extent practicable. Contract documentation to be submitted electronically includes, but is not limited to, the following:
□ Submittals, including ENG 4025 transmittal form
□ Meeting Minutes
□ Construction Photographs
□ Correspondence
□ Requests for Information
□ Payroll Documents
□ Statement and Acknowledgement Forms (SF 1413)
□ Request for Additional Classification (SF 1444)
□ Progress Payment Requests and Supporting Documentation
□ Contract Modification Documentation, including SF 30, Contractor’s Offer, Cost/Pricing Audit Report, and Certificate of Current Cost or PricingData
□ Contractor Quality Control Reports (with attachments)
□ Accident Reports
□ Schedules and Schedule Updates
□ Closeout Documentation, including Release of Claims
Electronic files must be of sufficient quality that all information is legible. Electronic format shall be in Adobe.PDF format, unless otherwise specified or directed by the Contracting Officer. Whenever possible, PDF files shall be generated from original documents so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Reolution (OCR) routines are required. Files exceeding 30 pages shall be indexed and bookmarked to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.
Email electronic documents fewer than 10MB to an email address as directed by the Contracting Officer.
Electronic documents over 10MB shall be provided on a CD/DVD, or through an electronic file sharing system such as the DoD Secure Access File Exchange (SAFE) Web application located at the following website:
https://safe.apps.mil
00 73 00 – 3 REQUIRED INSURANCE
a. The Contractor shall procure and maintain during the entire performance period of this contract, the following minimum insurance. (See also FAR 52.228-5 INSURANCE--WORK ON A
GOVERNMENT INSTALLATION (JAN 1997)
Type Bodily Injury Amount Property Damage Comprehensive General $500,000 Per Occurrence $100,000 Liability
Automobile Liability $200,000- Each person--
$500,000 Per Occurrence $20,000
Workmen’s Compensation $100,000
And Employer’s Liability
b. The Contracting Officer will notify the Contractor of any noncompliance with the foregoing provisions.
The Contractor shall, after receipt of such notice, immediately comply. Such notice, when delivered to the Contractor or his representative at the site or mailed to the Contractor's address, will be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until the Contractor complies. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor. Compliance with the provisions of this article by subcontractors will be the responsibility of the Contractor.
c. Longshoreman and Harbor Worker's Insurance MAY be required for this work. Please consult with your insurance carrier and applicable statutes (33 USC 901, et. seq.).
00 73 00-4 WORK UNDER OTHER CONTRACTS
Attention is directed to the fact that other Contractors may be employed by the Government or by local interests at or in the vicinity of the work covered by these specifications. All Contractors shall have equal rights to the use of all roads and grounds so far as practicable and this Contractor shall cooperate with other Contractors so that the work may be performed with the maximum efficiency. Should a disagreement occur between Contractors as to the use of facilities or in other matters, the decision of the Contracting Officer shall govern. (See also FAR 52.236-8 OTHER CONTRACTS).
00 73 00 – 5 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
f. This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the clause entitled "FAR 52.249-10 Default (Fixed-Price Construction)".
In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied.
1. The weather experienced at the project site during the contract period must be found to be unusually severe; that is, more severe than the adverse weather anticipated for the project location during any given month.
2. The unusually severe weather must actually cause a delay to the completion of the project. This delay must be beyond the control and without the fault or negligence of the Contractor.
g. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY WORK DAYS BASED ON (5)
DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
14 13 9 9 9 8 8 7 7 6 9 13
c. Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the
Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more on the Contractor's scheduled work day. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph b. above, the Contracting Officer will convert any qualifying delays to work days, giving full consideration for equivalent fair weatherwork days, and issue a modification in accordance with the clause entitled, "FAR 52.249-10 Default (Fixed- Price Construction)".
d. The anticipated adverse weather work days listed above are based on days with precipitation greater than
0.1 inch and/or maximum temperature below 32 degrees F. The numbers shown represent the number of work days (not calendar days) normally expected to have these particular weather conditions based on historical data. The actual number of days will vary. This information is furnished for computation of possible time extensions due to weather delays and is not intended to imply that no work can be done on these days. The Contractor shall make his own determination of the effect of these conditions on his operations under this contract, and schedule his work accordingly.
00 73 00 – 6 CONTRACTOR QUALITY CONTROL
Section 01 45 00.00 08, QUALITY CONTROL, of this specification requires that the Contractor's Quality Control System Manager or person responsible for Contractor Quality Control complete the Corps of Engineers' "Construction Quality Management for Contractors" course not later than 90 days after receipt of the Notice to Proceed. The course consists of approximately 12 hours of classroom instruction and is offered periodically by the Pittsburgh District. For additional information on scheduling and location of the training, contact U.S. Army Engineer District, Pittsburgh, Theresa Bonanno, U.S. Army Engineer District, Pittsburgh, Upper Ohio Area Office, 3510 Grand Ave.,Pittsburgh, Pennsylvania 15225, telephone (412) 395-7677.
Certification of course completion is valid for 5 years. Completion of training offered by other Corps of Engineers Districts will be acceptable provided a valid certification is presented.
00 73 00 – 7 WORK PERFORMED BY CONTRACTOR
Within ten (10) days after award of the contract, the successful bidder will be required to furnish a description of the work which he intends to perform with his own organization, the percentage of the total work this represents, and the estimated cost thereof.
00 73 00 – 8 SAFETY AND HEALTH REQUIREMENTS MANUAL
A copy of the current US Army Corps of Engineers Safety and Health Requirements Manual, EM 385- 1-1 and its changes are available at http://www.usace.army.mil/Safety-and-Occupational-Health/Safety-and- Health- Requirments-Manual. The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.
00 73 00 – 9 PAYMENT FOR PERFORMANCE AND PAYMENT BONDS
a. In order to ensure that sufficient funds have been set-aside for payment of performance and payment bond premiums, bidders shall insert in Contract Line Item No. 0001, an appropriate not- to-exceed dollar amount. Failure of bidders to insert a not-to-exceed dollar amount in Contract Line Item No.
0001 will cause the bid to be rejected as non-responsive.
b. The Contractor shall be reimbursed the actual bond costs only, as established by evidence of full payment to the surety, up to the dollar amount set forth in Contract Line Item No. 0001. In no case will the Contractor be reimbursed an amount which exceeds the dollar amount set forth in Contract Line Item No. 0001.
c. The Government will reimburse only the Prime Contractor for actual paid bond premiums. The
Government will not reimburse any subcontractor's paid bond premiums.
(End of Summary of Changes)