W911S723R0001 Amendment 0003.pdf

PDF 363 KB Posted

Attached to
Fort Leonard Wood MATOC IDIQ
Solicitation number
W911S7-23-R-0001
Issued by

About this file

This is an amendment to a solicitation for construction services. The purpose of the amendment is to update Attachment 18, the Contractor's Price Schedule Worksheet. The solicitation is for the Fort Leonard Wood MATOC IDIQ, issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis. The solicitation number is W911S7-23-R-0001. The amendment revises the table of contents to replace all prior versions of Attachment 18 with the updated 06-November-2023 version containing the Contractor's Price Schedule Worksheet. No other substantive changes are made.

View the file

Other files

File Type Posted
W911S723R0001 Amendment 0004.pdf PDF
ATTACHMENT 18 - Contractors Price Schedule Worksheet.xlsx XLSX spreadsheet
ATTACHMENT 3 - Davis-Bacon Act WD MO20230019 13 October 2023.pdf PDF
ATTACHMENT 4 - RFTOP Letter.pdf PDF
ATTACHMENT 20 Q and A - W911S7-23-R-0001.pdf PDF
ATTACHMENT 2 - Davis-Bacon Act WD MO20230005 13 October 2023.pdf PDF
W911S7-22-R-0001 Amendment 0002.pdf PDF
ATTACHMENT 19 - Davis-Bacon Act WD MO20230001 13 October 2023.pdf PDF
W911S7-23-R-0001 Amendment 00001.pdf PDF
ATTACHMENT 4 - RFTOP Letter.docx DOCX document
ATTACHMENT 10 - 8457_a4-DETAILS.pdf PDF
ATTACHMENT 15 - 8457_E3.pdf PDF
ATTACHMENT 16 - 8457_m-M1.pdf PDF
ATTACHMENT 8 - 8457_a2-FLOOR PLAN.pdf PDF
ATTACHMENT 7 - DEMOLITION PLAN.pdf PDF
ATTACHMENT 1 - FLW MATOC SOW.pdf PDF
ATTACHMENT 3 - MO20230005 14 July 2023.pdf PDF
ATTACHMENT 5 - Combined Specifications Kitchen 580.pdf PDF
ATTACHMENT 2 - Davis-Bacon Act WD MO20230005 8 September 2023.pdf PDF
ATTACHMENT 18 - Contractors Price Schedule Worksheet.xlsx XLSX spreadsheet
ATTACHMENT 13 - 8457_E1.pdf PDF
W911S7-23-R-0001 MATOC Solicitation - 13 Aug 2023.pdf PDF
ATTACHMENT 11 - 8457_a5-ELEVATIONS.pdf PDF
ATTACHMENT 6 - 8457_a0-TEMPORARY KITCHEN.pdf PDF
ATTACHMENT 14 - 8457_E2.pdf PDF
ATTACHMENT 12 - 8457_a6-ELEVATIONS (2).pdf PDF
ATTACHMENT 17 - 8457_m-M2.pdf PDF
ATTACHMENT 9 - 8457_a3-REFLECTED CEILING PLAN.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011835641

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this solicitation amendment is to update Attachment 18 - Contractors Price Schedule Worksheet.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Nov-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911S723R0001

X 9B. DATED (SEE ITEM 11)

13-Sep-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Nov-2023

CODE

MICC - FORT LEONARD WOOD

8112 NEBRASKA AVENUE

FORT LEONARD WOOD MO 65473

W911S7 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911S723R0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 ATTACHMENT 1 - FLW

MATOC SOW

10-MAY-2023

Attachment 10 ATTACHMENT 10 - 8457_a4-DETAILS

12-MAY-2023

Attachment 11 ATTACHMENT 11 - 8457_a5-ELEVATIONS

12-MAY-2023

Attachment 12 ATTACHMENT 12 - 8457_a6-ELEVATIONS

12-MAY-2023

Attachment 13 ATTACHMENT 13 - 8457_E1

12-MAY-2023

Attachment 14 ATTACHMENT 14 - 8457_E2

12-MAY-2023

Attachment 15 ATTACHMENT 15 - 8457_E3

12-MAY-2023

Attachment 16 ATTACHMENT 16 - 8457_m-M1

12-MAY-2023

Attachment 17 ATTACHMENT 17 - 8457_m-M2

12-MAY-2023

Attachment 18 ATTACHMENT 18 - Contractor's Price Schedule Worksheet

31-MAY-2023

Attachment 19 ATTACHMENT 19 - Davis-Bacon Act WD MO20230001 13 Octob

23-OCT-2023

Attachment 2 ATTACHMENT 2 - Davis-Bacon Act WD MO20230005 13 Octobe

23-OCT-2023

Attachment 20 ATTACHMENT 20 - Q and A W911S723R0001

23-OCT-2023

Attachment 3 ATTACHMENT 3 - Davis-Bacon Act WD MO20230019 13 Octobe

23-OCT-2023

Attachment 4 ATTACHMENT 4 - RFTOP Letter

23-OCT-2023

Attachment 5 ATTACHMENT 5 - Combined Specifications Kitchen 580

12-MAY-2023

Attachment 6 ATTACHMENT 6 - 8457_a0-TEMPORARY

KITCHEN

12-MAY-2023

Attachment 7 ATTACHMENT 7 -

DEMOLITION PLAN

12-MAY-2023

W911S723R0001

Attachment 8 ATTACHMENT 8 -

8457_A2-FLOOR PLAN

12-MAY-2023

Attachment 9 ATTACHMENT 9 -

8457_A3-REFLECTED

CEILING PLAN

12-MAY-2023

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 ATTACHMENT 18 -

Contractors Price Schedule Worksheet

06-NOV-2023

(End of Summary of Changes)

File details come from the government source that posted it. Updated .