ATTACHMENT 13 - 8457_E1.pdf

PDF 204 KB Posted

Attached to
Fort Leonard Wood MATOC IDIQ
Solicitation number
W911S7-23-R-0001
Issued by

About this file

This document is a temporary kitchen equipment plan for renovating the kitchen at Building 580 at Fort Leonard Wood, Missouri. The plan shows the tentative arrangement of kitchen appliances and equipment including a cooking range, refrigerators, microwave, and dishwasher. It specifies that new wiring and conduits will be provided for the temporary setup and must comply with electrical codes. A heat detector will be installed in the ceiling and connected to the existing fire alarm system. Outlets within 6 feet of the sink must have GFCI protection. The contractor must verify circuitry for existing appliances and outlets before starting work and mount new connections on surfaces.

View the file

Other files

File Type Posted
W911S723R0001 Amendment 0004.pdf PDF
ATTACHMENT 18 - Contractors Price Schedule Worksheet.xlsx XLSX spreadsheet
W911S723R0001 Amendment 0003.pdf PDF
ATTACHMENT 3 - Davis-Bacon Act WD MO20230019 13 October 2023.pdf PDF
ATTACHMENT 4 - RFTOP Letter.pdf PDF
ATTACHMENT 20 Q and A - W911S7-23-R-0001.pdf PDF
ATTACHMENT 2 - Davis-Bacon Act WD MO20230005 13 October 2023.pdf PDF
W911S7-22-R-0001 Amendment 0002.pdf PDF
ATTACHMENT 19 - Davis-Bacon Act WD MO20230001 13 October 2023.pdf PDF
W911S7-23-R-0001 Amendment 00001.pdf PDF
ATTACHMENT 4 - RFTOP Letter.docx DOCX document
ATTACHMENT 10 - 8457_a4-DETAILS.pdf PDF
ATTACHMENT 15 - 8457_E3.pdf PDF
ATTACHMENT 16 - 8457_m-M1.pdf PDF
ATTACHMENT 8 - 8457_a2-FLOOR PLAN.pdf PDF
ATTACHMENT 7 - DEMOLITION PLAN.pdf PDF
ATTACHMENT 1 - FLW MATOC SOW.pdf PDF
ATTACHMENT 3 - MO20230005 14 July 2023.pdf PDF
ATTACHMENT 5 - Combined Specifications Kitchen 580.pdf PDF
ATTACHMENT 2 - Davis-Bacon Act WD MO20230005 8 September 2023.pdf PDF
ATTACHMENT 18 - Contractors Price Schedule Worksheet.xlsx XLSX spreadsheet
W911S7-23-R-0001 MATOC Solicitation - 13 Aug 2023.pdf PDF
ATTACHMENT 11 - 8457_a5-ELEVATIONS.pdf PDF
ATTACHMENT 6 - 8457_a0-TEMPORARY KITCHEN.pdf PDF
ATTACHMENT 14 - 8457_E2.pdf PDF
ATTACHMENT 12 - 8457_a6-ELEVATIONS (2).pdf PDF
ATTACHMENT 17 - 8457_m-M2.pdf PDF
ATTACHMENT 9 - 8457_a3-REFLECTED CEILING PLAN.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCALE:

D E

S I G

N E

D

C H

E C

K E

D

S U

B M

I T

T E

D

A P

P R

O V

E D

D A

T E

R E

V I S

I O

N S

D I R

E C

T O

R A

T E

O

F

P

U B

L I C

W

R

K S

F O

R

L

O

N A

W

O

D

M

I S

S O

U R

I

D R

A W

N

DATE:

PROJECT NO:

DRAWING NO:

SHEET OF

D A

T E

M A

D E

A P

P R

O V

E D

J

B a l e s

C

E

D B

A

K H

A N

A

K H

A N

J

B

A L E

S

A

L O

P

Z

M

P O

R A

Y

K

T

C H

N

Q U

I P

M E

N T

P L

A N

R E

N O

V A

K

T

C H

N

A

B U

I L

D I N

G

AS SHOWN

07DEC22

M.0118951

FES 08369-1J

8457.12

E1 3

N

E1

MICROWAVE

DISHWASHER

TEMPORARY ARRANGEMENT OF KITCHEN EQUIPMENT IN BUILDING 580

NOT TO SCALE

12'-0"

15'-0"

COOKING RANGE

REFRIGERATOR

REFRIGERATOR

REFRIGERATOR

CKT NO.4/ PANEL-EP-S

CKT NO.6/ PANEL-EP-S

CKT NO.8/ PANEL-EP-S

CKT. NO.8 /PANEL-KP

CKT. NO.3/

PANEL-KP

CKT. NO.5/PANEL-KP

CKT. NO.28/

PANEL-RM

CKT NO.2/PANEL-LP

GENERAL NOTES

1. REFER TO DRW. NO. E2 AND E3 FOR THE RENOVATION OF THE KITCHEN.

2. THIS IS THE TENTATIVE ARRANGEMENT AND THE CONTRACTOR SHALL

MATCH WITHIN THE PLUMBING DRAWING FOR THE FINAL LAYOUT.

3. THE CONTRACTOR SHALL PROVIDE NEW WIRING AND CONDUITS FOR

THE TEMPORARY ARRANGEMENT AND SHALL FOLLOW STRICTLY IEEE

C2,NFPA70,NFPA 72 AND NFPA-101 RULES.

4. THE CONTRACTOR SHALL PROVIDE HEAT DETECTOR IN THE CEILING AS

SHOWN IN THE DRAWING.THE CONTRACTOR SHALL PROGRAM THE

DETECTOR WITH EXISTING FIRE ALARM SYSTEM AND TEST IT WITH THE

10% FIRE ALARM DEVICES IN THE PRESENT OF FIRE DEPARTMENT

PERSONNEL.

5. THE CONTRACTOR SHALL RELOCATE ALL THE EXISTING RECEPTACLES

FROM THE KITCHEN.ALL THE DUPLEX WITHIN THE DISTANCE OF 6'-0"

FROM THE SINK SHALL BE GFCIS.

6. THE CONTRACTOR SHALL FIELD VERIFY THE CIRCUITRY OF THE

EXISTING APPLIANCES,RECEPTACLES AND LIGHTING BEFORE START

THE WORK.

7. SMALL APPLIANCES RECEPTACLES SHALL BE LOCATED AT COUNTER

HEIGH.

8. ALL NEW CONNECTIONS SHALL BE SURFACE MOUNTED.

LEGEND :

G

DUPLEX RECEPTACLES WALL MOUNT

GFCI DUPLEX RECEPTACLES WALL MOUNT

( FOR DISH WASHER UNDER THE COUNTER)

(APPROX)

H

H

NEW HEAT DETECTOR TO BE MOUNTED ON THE CEILING

SINK

SINK

TABLE

TABLE

G

CKT. NO.1 /

PANEL-KP

CKT.NO.6/PANEL-KP

FRYER

Sheets and Views
8457_E1-DEMOLITION PLAN
2023-03-15T11:49:14-0500
BALES.JIMMIE.D.JR.1231309302

File details come from the government source that posted it. Updated .