W911S7-22-R-0001 Amendment 0002.pdf

PDF 753 KB Posted

Attached to
Fort Leonard Wood MATOC IDIQ
Solicitation number
W911S7-23-R-0001
Issued by

About this file

This document is an amendment to a solicitation for a Multiple Award Task Order Contract (MATOC) for construction services at Fort Leonard Wood, Missouri. The Army seeks up to five awardees for the IDIQ contract to provide general construction including repair, alteration, maintenance, and minor new construction. Key details include:

  • The response due date is extended to November 17, 2023 at 3:00pm CST. The maximum order amount under the IDIQ increases by $37 million to $42 million total.

  • A sample task order for kitchen renovation at Building 580 is provided for pricing evaluation purposes. Offerors must submit pricing using the attachment worksheet. The sample task order will be awarded to one contractor as the overall lowest priced technically acceptable offer.

  • Evaluation criteria includes technical acceptability of the organizational structure, project execution plan, past performance, and price. The requirement is a total small business set-aside. The period of performance is five years for task order competition under the IDIQ contracts.

View the file

Other files

File Type Posted
W911S723R0001 Amendment 0004.pdf PDF
ATTACHMENT 18 - Contractors Price Schedule Worksheet.xlsx XLSX spreadsheet
W911S723R0001 Amendment 0003.pdf PDF
ATTACHMENT 3 - Davis-Bacon Act WD MO20230019 13 October 2023.pdf PDF
ATTACHMENT 4 - RFTOP Letter.pdf PDF
ATTACHMENT 20 Q and A - W911S7-23-R-0001.pdf PDF
ATTACHMENT 2 - Davis-Bacon Act WD MO20230005 13 October 2023.pdf PDF
ATTACHMENT 19 - Davis-Bacon Act WD MO20230001 13 October 2023.pdf PDF
W911S7-23-R-0001 Amendment 00001.pdf PDF
ATTACHMENT 4 - RFTOP Letter.docx DOCX document
ATTACHMENT 10 - 8457_a4-DETAILS.pdf PDF
ATTACHMENT 15 - 8457_E3.pdf PDF
ATTACHMENT 16 - 8457_m-M1.pdf PDF
ATTACHMENT 8 - 8457_a2-FLOOR PLAN.pdf PDF
ATTACHMENT 7 - DEMOLITION PLAN.pdf PDF
ATTACHMENT 1 - FLW MATOC SOW.pdf PDF
ATTACHMENT 3 - MO20230005 14 July 2023.pdf PDF
ATTACHMENT 5 - Combined Specifications Kitchen 580.pdf PDF
ATTACHMENT 2 - Davis-Bacon Act WD MO20230005 8 September 2023.pdf PDF
ATTACHMENT 18 - Contractors Price Schedule Worksheet.xlsx XLSX spreadsheet
ATTACHMENT 13 - 8457_E1.pdf PDF
W911S7-23-R-0001 MATOC Solicitation - 13 Aug 2023.pdf PDF
ATTACHMENT 11 - 8457_a5-ELEVATIONS.pdf PDF
ATTACHMENT 6 - 8457_a0-TEMPORARY KITCHEN.pdf PDF
ATTACHMENT 14 - 8457_E2.pdf PDF
ATTACHMENT 12 - 8457_a6-ELEVATIONS (2).pdf PDF
ATTACHMENT 17 - 8457_m-M2.pdf PDF
ATTACHMENT 9 - 8457_a3-REFLECTED CEILING PLAN.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011835641

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to extend the offer due date and time to 17 November 2023 at 3 00 p.m. CST provide answ ers to all questions submitted by offerors, update Davis Bacon Act Wage Determinations, update attachment 4 RFTOP letter, update contract maximum dollar amount, and update Sample Questionnaire Cover Letter w ith point of contact information. Any future amendments w ill be posted to SAM.gov.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 29

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Oct-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911S723R0001

X 9B. DATED (SEE ITEM 11)

13-Sep-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Oct-2023

CODE

MICC - FORT LEONARD WOOD

8112 NEBRASKA AVENUE

FORT LEONARD WOOD MO 65473

W911S7 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911S723R0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 03-Nov-2023 03:00 PM to 17-Nov-2023 03:00 PM.

The required performance has changed from 1. The Multiple Award Task Order Contract (MATOC) is an Indefinite-Delivery - Indefinite-Quantity (IDIQ) Contract. 2. MATOC is a competitive Multiple Award IDIQ construction contract. This solicitation will result in more than one (1) award, not to exceed five (5) contracts. 3.

The NAICS for this requirement is 236220, with a size standard of $45M. 4. This is a Total Small Business Set- Aside. 5. Guaranteed Minimum for the ordering period is $2,000.00. 6. Bid guarantee is required. 7. Task Orders will be individually bonded. 8. IAW FAR 36.204 - Disclosure of the Magnitude of Construction Projects will be cited on the Request for Task Order Proposal (RFTOP).9. Written questions should be submitted to Candi Caquelin via electronic mail at candi.l.caquelin.civ@army.mil, no later than 3:00 p.m. CST on September 27, 2023. 10. The Sample Task Order is a live project which the Government intends to award to the lowest priced technically acceptable offeror. Refer to ATTACHMENT 4 for specific guidance. to 1. The Multiple Award Task Order Contract (MATOC) is an Indefinite-Delivery - Indefinite-Quantity (IDIQ) Contract. 2. MATOC is a competitive Multiple Award IDIQ construction contract. This solicitation will result in more than one (1) award, not to exceed five (5) contracts. 3. The NAICS for this requirement is 236220, with a size standard of $45M. 4. This is a Total Small Business Set-Aside. 5. Guaranteed Minimum for the ordering period is $2,000.00. 6. Bid guarantee is required. 7. Task Orders will be individually bonded. 8. IAW FAR 36.204 - Disclosure of the Magnitude of Construction Projects will be cited on the Request for Task Order Proposal (RFTOP).9. Written questions should be submitted to Candi Caquelin via electronic mail at candi.l.caquelin.civ@army.mil, no later than 3:00 p.m. CST on September 27, 2023. 10. The Sample Task Order is a live project which the Government intends to award to the lowest priced technically acceptable offeror. Refer to ATTACHMENT 4 for specific guidance. The sample task order will be awarded to only one offeror, the overall LPTA offer. Up to the five lowest priced technically acceptable offers will be awarded individual MATOC IDIQ contracts for competition during the ordering period of the MATOC..

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

The contractor shall furnish all personnel, labor, equipment, materials, facilities, transportation, tools, testing services, supervision, and other items and nonpersonal services necessary to accomplish a broad range of repair, alteration, maintenance, and minor construction services. All work shall be performed in accordance with the terms and conditions of the contract, statement of work, scope of work, specifications, drawings, and any resultant task order issued except for those items specified as government furnished property and/or material.

To:

The contractor shall furnish all personnel, labor, equipment, materials, facilities, transportation, tools, testing services, supervision, and other items and nonpersonal services necessary to accomplish a broad range of repair, alteration, maintenance, and minor construction services. All work shall be performed in accordance with the terms and conditions of the contract, statement of work, scope of work, specifications, drawings, and any resultant task order issued except for those items specified as government furnished property and or material.

The IDIQ maximum order amount has increased by $37,000,000.00 from $5,000,000.00 to $42,000,000.00.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 ATTACHMENT 1 - FLW

MATOC SOW

10-MAY-2023

Attachment 10 ATTACHMENT 10 - 8457_a4-DETAILS

12-MAY-2023

Attachment 11 ATTACHMENT 11 - 8457_a5-ELEVATIONS

12-MAY-2023

Attachment 12 ATTACHMENT 12 - 8457_a6-ELEVATIONS (2)

12-MAY-2023

Attachment 13 ATTACHMENT 13 - 8457_E1

12-MAY-2023

Attachment 14 ATTACHMENT 14 - 8457_E2

12-MAY-2023

Attachment 15 ATTACHMENT 15 - 8457_E3

12-MAY-2023

Attachment 16 ATTACHMENT 16 - 8457_m-M1

12-MAY-2023

Attachment 17 ATTACHMENT 17 - 8457_m-M2

12-MAY-2023

Attachment 18 ATTACHMENT 18 - Contractor's Price Schedule Worksheet

31-MAY-2023

Attachment 19 ATTACHMENT 19 - MO20230001 18 August

22-AUG-2023

Attachment 2 ATTACHMENT 2 - Davis-Bacon Act WD MO20230005 8 Sept 23

08-SEP-2023

Attachment 3 ATTACHMENT 3 - Davis-Bacon Act WD MO20230019 8 Sept 23

08-SEP-2023

Attachment 4 ATTACHMENT 4 - RFTOP Letter

31-MAY-2023

Attachment 5 ATTACHMENT 5 - Combined Specifications Kitchen 580

12-MAY-2023

Attachment 6 ATTACHMENT 6 - 8457_a0-TEMPORARY

KITCHEN

12-MAY-2023

Attachment 7 ATTACHMENT 7 -

DEMOLITION PLAN

12-MAY-2023

Attachment 8 ATTACHMENT 8 -

8457_A2-FLOOR PLAN

12-MAY-2023

Attachment 9 ATTACHMENT 9 -

8457_A3-REFLECTED

CEILING PLAN

12-MAY-2023

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 ATTACHMENT 1 - FLW

MATOC SOW

10-MAY-2023

Attachment 10 ATTACHMENT 10 - 8457_a4-DETAILS

12-MAY-2023

Attachment 11 ATTACHMENT 11 - 8457_a5-ELEVATIONS

12-MAY-2023

Attachment 12 ATTACHMENT 12 - 8457_a6-ELEVATIONS

12-MAY-2023

Attachment 13 ATTACHMENT 13 - 8457_E1

12-MAY-2023

Attachment 14 ATTACHMENT 14 - 8457_E2

12-MAY-2023

Attachment 15 ATTACHMENT 15 - 8457_E3

12-MAY-2023

Attachment 16 ATTACHMENT 16 - 8457_m-M1

12-MAY-2023

Attachment 17 ATTACHMENT 17 - 8457_m-M2

12-MAY-2023

Attachment 18 ATTACHMENT 18 - Contractor's Price Schedule Worksheet

31-MAY-2023

Attachment 19 ATTACHMENT 19 - Davis-Bacon Act WD MO20230001 13 Octob

23-OCT-2023

Attachment 2 ATTACHMENT 2 - Davis-Bacon Act WD MO20230005 13 Octobe

23-OCT-2023

Attachment 20 ATTACHMENT 20 - Q and A W911S723R0001

23-OCT-2023

Attachment 3 ATTACHMENT 3 - Davis-Bacon Act WD MO20230019 13 Octobe

23-OCT-2023

Attachment 4 ATTACHMENT 4 - RFTOP Letter

23-OCT-2023

Attachment 5 ATTACHMENT 5 - Combined Specifications Kitchen 580

12-MAY-2023

Attachment 6 ATTACHMENT 6 - 8457_a0-TEMPORARY

KITCHEN

12-MAY-2023

Attachment 7 ATTACHMENT 7 -

DEMOLITION PLAN

12-MAY-2023

Attachment 8 ATTACHMENT 8 -

8457_A2-FLOOR PLAN

12-MAY-2023

Attachment 9 ATTACHMENT 9 -

8457_A3-REFLECTED

CEILING PLAN

12-MAY-2023

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFERORS

1) PROPOSAL SUBMITTAL AND INQUIRIES

A. Proposals shall be submitted prior to the closing date and time identified in block 13 (a) of the SF 1442 to the following address:

Mission and Installation Contracting Command (MICC) ATTN: Candi Caquelin

SOLICITATION: W911S7-23-R-0001

8112 Nebraska Ave, Building 11400 Fort Leonard Wood, MO 65473

B. Electronic submissions via email or fax will not be accepted. Offers shall be mailed through a commercial/Government carrier or hand carried.

C. The point of contact responsible for supplying additional information and answering all inquiries is the Contracting Officer, Mr. Victor Richards. Address all questions or concerns you may have to the Contract Specialist, Candi Caquelin. All questions regarding this solicitation shall be submitted in writing via electronic mail, no later than 11:00 AM Central Time on September 27, 2023, to:

Email: candi.l.caquelin.civ@army.mil Subject: W911S7-23-R-0001

All questions submitted shall include W911S7-23-R-0001 in the subject line. Failure to comply may result in questions not being responded to.

Telephone inquiries will not be accepted.

D. Site Visit. The Government will hold a site visit at Fort Leonard Wood on September 20, 2023, beginning at 10:00am in building 11400, 8112 Nebraska Avenue, Fort, Leonard Wood, MO 65473. All interested firms may attend with a limit of three (3) attendees per firm. Please submit, in writing, the names of attendees to the Contract Specialist, Candi Caquelin, by 2:00 pm on September 15, 2023.

2) GENERAL INSTRUCTIONS

A. The selection of a source for award will be conducted utilizing source selection (negotiated) procedures as delineated in FAR Part 15.3. Offers will be evaluated using the criteria under Section M, “Evaluation Factors for Award.” Noncompliance with the Request for Proposal (RFP) requirements may hamper the Government's ability to properly evaluate the proposal and may result in elimination of the proposal from further consideration for contract award.

B. The Offer. The submission of the documentation specified below will constitute the Offeror's acceptance of the terms and conditions of the RFP, concurrence with the statement of work, and the proposed contract type.

C. It is the Government’s intention to award without discussions. Offerors are encouraged to present their best proposal and prices in their initial proposal submission. However, in accordance with FAR Part 15.306, should discussions become necessary, the Government reserves the right to hold discussions. If this occurs, a competitive range will be determined, and Offerors notified. The competitive range may be limited for purposes of efficiency IAW FAR Part 15.306(c)(2).

D. The Proposal Preparation Instructions (Para. L.3.) as set forth below, prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals.

E. In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Unless the Offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.

F. If an Offeror believes that the requirements in these instructions contain an error, an ambiguity, omission, or are otherwise unsound, the Offeror shall immediately notify the Contracting Officer in writing with supporting rationale. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.

G. Debriefings. The Contracting Officer will promptly notify Offerors of any decision to exclude them from the competitive range, whereupon they may request and receive a debriefing in accordance with FAR

15.505. The Contracting Officer will notify offerors who were in the competitive range of the source but were not selected for award in accordance with FAR 15.503(b). Upon such notification, unsuccessful offerors may request and receive a debriefing in accordance with the requirements of FAR 15.506.

3) PROPOSAL PREPARATION INSTRUCTIONS

A. Offeror’s proposal shall consist of four (4) separate volumes: Volume I – General, Volume II - Technical

Acceptability, Volume III - Past Performance, and Volume IV - Pricing Proposal.

B. Proposal Format:

i. Offerors shall submit an original and the number of copies listed in Table 2 - Volume Details.

ii. Exceptions. Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors and elements. Failure to meet a requirement may result in an offer being ineligible for award. If the offeror finds it necessary to take exception to any of the requirements specified in this solicitation, the offeror shall clearly identify the applicable Volume and exceptions with a complete explanation of why the exception was taken, what benefit accrues to the Government (if any), and its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Offerors are cautioned that taking an exception may render the offer ineligible for award. This information shall be provided in the format below.

Table 1 - Solicitation Exceptions

Solicitation Document

Page/ Paragraph

Requirement/ Portion

Rationale & Impact

Section B, PWS/SOO/ SOW, Section L&M, etc.

Applicable Page and Paragraph Numbers

Identify the requirement or portion to which exception is taken

Describe The rationale and impact of the exception

iii. The proposals shall be organized into four (4) volumes. Each volume of the proposal should be separately bound in a three-ring loose leaf binder which shall permit the volume to lie flat when open.

A cover sheet should be bound in each book, clearly marked as to volume number, title, copy number, solicitation identification and the Offeror's name. The same identifying data should be placed on the spine of each binder. All text shall be single spaced and printed black on white paper (black and white requirement does not apply to graphics, photos, etc., Company stationery and logos are acceptable).

Printing shall be easily readable (12-pitch type or 10 point proportional spacing.) Cross-references should be utilized to preclude unnecessary duplication of data between sections. In addition to submitting hard copies of the proposals, digital copies shall be provided on CD-ROM disk in Microsoft Word, PowerPoint, Excel or Adobe PDF. File names to be “Company Name – Initial” for the first submission. File name of later submissions (if necessary) shall be “Company Name – Revision X’ with X indicating the number of the revision. If files are compressed, they must be self-extracting archives (no software required to decompress). If files contain links, the links must be intact and maintained through all revisions. Additionally, spreadsheets must be easily traceable. None of the files submitted shall have any read/write/password protection. Page limitations are as follows:

Table 2 - Volume Details

VOLUME TITLE

NO. OF

HARD

COPIES

NO. OF

DIGITAL

COPIES (CD

ROM)

PAGE

LIMITS

I General Original

N/A

II

Technical

Acceptability Original + 3 50 Pages

III Past Performance Original + 1 N/A

IV

RFP Document & Pricing Proposal

Original + 1 N/A

iv. Proposal Limitation. The proposal shall not exceed the limits stated above. If the page limits are exceeded, the pages more than the limit shall be removed and returned, unread, to the Offeror. The Government will not accept any changes to the contractor’s proposal after the closing date of the solicitation (See FAR 15.208 for further information regarding late proposals). If discussions become necessary, page limitations may be placed on responses to Evaluation Notices (ENs). The specified page limits for EN responses will be identified in the letters forwarding the ENs to the Offerors.

v. Page Limit Includes: All appendices, charts, graphs, diagrams, tables, photographs, drawings, etc.

vi. Page Limit does not include the Executive Summary, covers for volumes, tables of contents, glossary of abbreviations and acronyms, indices, title pages, cross reference indices, and section dividers/tables if they are inserted solely to provide ease to the reader in locating parts/sections of the proposal. They will be counted if they contain any other information, i.e., diagrams, extraneous data, etc. Pages marked “This page intentionally left blank” will not be counted.

vii. What Counts as a Page? A page shall be an 8 ½ X 11” sheet of paper. When both sides of a sheet display printed material, it shall be counted as two pages. Letter size and spacing requirements for illustrations and tables can be at the discretion of the Offeror but must be easily readable. Fold-outs will be counted as the appropriate number of pages based on an 8 ½ X 11” sheet of paper. Use at least 1-inch margins on the top and bottom and 3/4 inch side margins. The Contractor shall number each page to eliminate any confusion. In the event the contractor creates an ambiguity in their numbering of pages, the Government may exercise its own discretion in counting pages.

viii. Indexing. Each volume shall contain a more detailed table of contents to delineate the subparagraphs within that volume. Tab indexing shall be used to identify sections.

ix. Glossary of Abbreviations and Acronyms. Each volume shall contain a glossary of all abbreviations and acronyms used, with an explanation for each.

C. Proposal Content

i. Volume I – General. Offerors are required to submit a completed SF 1442 (including acknowledgment of Amendments), Section B, and Section K. All final monetary extensions shall be in whole dollars only. Failure to follow the below Contract Proposal preparation instructions may cause your proposal to be deemed unacceptable by the Government. The General Volume shall be organized as follows and contain the identified information.

TAB A, Exceptions/Assumptions (if required) - Identification and explanation of any exceptions or deviations. Additionally, any assumptions used in the proposal preparation must be identified.

TAB B, SF 1442 - The SF 1442 shall be fully completed upon submission. The offeror is cautioned that the SF 1442 must contain an original signature in block 30 A, B, and C of the form.

The contractor shall acknowledge any amendments to the RFP in accordance with the instructions on the SF 1442 with Section L, FAR 52.215-1 (b), Instruction to Offerors—Competitive Acquisition. The offeror shall provide the name, title and telephone number of the company/division point of contact regarding decisions made with respect to your proposal and who can obligate your company contractually. Also, identify those individuals authorized to negotiate with the Government.

TAB C, Section B (Supplies or Services and Prices/Costs) - Section B shall be submitted fully completed. It shall contain the offeror’s prices for the established Contract Line Items (CLINS).

TAB D, Section K (Representation, Certifications, and Other Statements of Offerors) – The offeror shall ensure that Section K is submitted thoroughly completed with all blocks in each certification/representation completed truthfully and completely.

ii. VOLUME II – TECHNICAL ACCEPTABILITY: The Technical Acceptability Volume shall be clear, concise, and include sufficient detail for effective evaluation and for substantiating the validity of stated claims. Legibility, clarity, and coherence are very important. Your responses will be evaluated against the Technical Acceptability Factor as defined in Section M, Evaluation Factors for Award. The proposal should not simply rephrase or restate the Government's requirements; the proposal shall provide convincing rationale to address how the Offeror intends to meet these requirements. Statements that the Offeror understands, can, or will comply with the

SOW (including referenced publications, technical data, etc.); statements paraphrasing the SOW or parts thereof (including applicable publications, technical data, etc.); and phrases such as “standard procedures will be employed” or “well known techniques will be used,” etc., will be considered unacceptable and will negatively impact the Offerors rating under the Technical Acceptability factor. Offerors shall assume that the Government has no prior knowledge of their facilities and experience and will base its evaluation on the information presented in the Offeror's proposal. Elaborate brochures or documentation, binding, detailed artwork, or other embellishments are unnecessary and are not desired. The Technical Acceptability Volume shall be organized according to the following general outline:

TAB A - Table of Contents TAB B - List of Table and Drawings TAB C - Cross Reference Matrix TAB D - Factor 1: Technical Acceptability: Factor 1 consists of two (2) areas:

a. TAB D 1 - Sub-Factor 1: Organizational Structure

1.1. Organizational Chart/Management Approach

1.2. Key Personnel and Key Subcontractor

1.3. Bonding (Bid Bond, and Payment/Performance Bond capacity)

b. TAB D 2 - Sub-Factor 2: Project Execution

1.1. Sample Task Order (STO)

1.2. Critical Path Method (CPM)

1.3. Quality Control Plan (QCP)

1.4. Safety Plan

TAB D – Factor 1: Technical Acceptability Content – The Technical Volume shall, at a minimum, be prepared in a form consistent with the Statement of Work (SOW) and the evaluation criteria for award set forth in Section M of this solicitation. The section shall be prepared in an orderly format and in sufficient detail to enable the Government to make a thorough evaluation of the contractor’s technical competence and ability to comply with the contract task requirements specified in the SOW. The offeror shall address as specifically as possible the actual methodology you would use for accomplishing the SOW tasks. The volume shall be organized according to the following general outline:

i. TAB D1 - Sub-Factor 1: Organizational Structure

1. Organizational Chart/Management Approach. (This sub-factor element is applicable to both the overall IDIQ contract and sample task order).

The offeror shall provide an organizational chart that clearly illustrates the management, construction teams, and key positions to be utilized in executing task orders under the contract. In addition, offerors shall describe their overall management approach with regard to organization which demonstrates an understanding of construction processes, coordination, monitoring, and control of construction projects. A clear, logical, and effective approach shall identify the lines of authority and communications between home office, construction teams, subcontractor operations, Government project managers, contracting officials, inspectors, and users. Offerors methodology to subcontracting managing multiple task orders of varying size and complexity issued simultaneously, and interfacing with the Government shall be included. The offeror shall possess the skills and licenses required to perform construction projects and design/build projects required under the resulting contract or have a viable plan to obtain any skills and/or licenses lacking. A technical design level beyond 20% desgin-build will not be required by the offeror for any project under the resulting contract.

2. Key Personnel and Key Subcontractors. Shall provide a representation of the employees that will be utilized to perform under this contract.

1. Project Manager: The Offeror shall fully describe the Project

Manager’s role in the organization and how the Project Manager will ensure successful completion of all construction task orders issued under the resulting contract. The Project Manager shall be familiar with the requirements of EM 385-1- 1 and have experience in the areas of hazard identification and safety compliance. Additionally, the Project Manager shall be responsible for complete coordination of all work. The Project Manager shall have a minimum of 5 years of experience as a Project Manager.

2. Superintendent: The superintendent is responsible for the day-to-day safety and Quality Control (QC) at the project site.

The superintendent may oversee multiple task orders;

however, if at any time there are issues with quality or safety, the KO may require a Superintendent or alternate be at the job site full time with no additional cost to the government. The Superintendent cannot be the QC Manager or the Alternate QC Manager. The Superintendent shall have a minimum of 5 years of experience.

3. Quality Control Manager (QC): Each contractor shall be responsible for implementing an effective QC program. The QC program shall ensure that all work conforms to the task order requirements, whether performed by the contractor, subcontractors, or suppliers. Each contractor shall designate a qualified QC Manager who shall have the authority to act in all QC matters for the contractor. This person shall be on-site while work is in progress or shall have a qualified designated alternate to act in his/her absence. The contractor shall be responsible for performing all necessary inspections and tests.

Records shall be maintained of all inspections and test performed. These records shall be turned over to the contracting officer or authorized representative at the completion of the respective task order. The QC Manager shall ensure that work complies with the requirements of the EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The Quality Control Manager shall have a minimum of 5 years of experience.

3. Bid Guarantee, and Payment & Performance Bonds. A Bid guarantee is required to be submitted with proposal for 100% of the price proposal amount. The Offeror shall provide proof of bonding capacity for the potential estimated annual amount of $20 million aggregate and a capacity to bond $5 million per task order, with verification from the Securities or Bonding Company.

ii. TAB D2 – Sub-Factor 2: Project Execution

1. Sample Task Order. (STO) The offeror shall submit their approach for accomplishing the STO from commencement to completion. The approach shall describe the Offeror’s understanding of the work required utilized the SOW, specifications, and drawings. See Attachments 2-18 of this solicitation for further guidance concerning the sample task order.

2. Critical Path Method (CPM). Provide a Critical Path Method Schedule that would be used to manage the sample project. The CPM is a system of construction management that involves the complete planning and scheduling of a project and the development of a diagram showing each activity, its appropriate place in the timetable, and its importance relative to other tasks and the complete project. The offeror shall submit a CPM schedule that shows that the offeror fully understands the scope of work for the task order, the specifications, and any additional relevant task order documentation (e.g., drawings) to complete the task order successfully.

3. Quality Control Plan (QCP). Provide a quality control plan that sets out logical and effective processes and methods to ensure that the work to be accomplished shall be with only high-quality materials, thereby assuring high quality workmanship. Further, the offeror’s quality control plan must clearly define the methodology and/or tools it will employ to identify and correct substandard work either by its own personnel or subcontractors. Such methodology and tools must be fully described in the quality control plan and demonstrate that they are logical, feasible, and reflect a sound management approach. Finally, the quality control plan must fully describe the procedures and processes the offeror will use to track work progress, to include interface with the Government from commencement to completion of the work for concurrent multiple task order(s) under the basic contract and the sample task order.

4. Safety Plan. Provide a health and safety plan that sets out logical and effective processes and methods to ensure that the work to be accomplished shall be performed in a safe manner, meeting OSHA standards, and meets the requirements set forth in EM-385-1-1.

iii. Volume III - Past Performance: The Past Performance evaluation will be accomplished by reviewing aspects of an Offeror's recent and relevant Past Performance, focusing on and targeting performance which is relevant to the effort as it directly relates to the work being procured under this solicitation and as defined in Section M. Past Performance information described herein is required on the offeror and all subcontractors, teaming partners, and/or joint venture partners proposed to perform 25% of the proposed effort based on the total proposed price. The offeror shall submit, along with the information required in this paragraph, a consent letter, executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing release of adverse past performance information to the offeror so the offeror can respond to such information. For each identified effort for a commercial customer, the offeror shall also submit a client authorization letter, authorizing release to the Government of requested information on the offeror's performance.

a. Early Proposal Information. The offeror is requested to submit the Past Performance

Volume by November 17, 2023, to the Contracting Officer at the address specified in L.1(1).

b. The offeror shall include documentation regarding their relevant past performance as it directly relates to the work being procured under this solicitation. The offeror SHALL NOT go back any farther than six (6) years for the submitted data. The past performance data shall document a successful history of past contract performance.

c. In conducting the Past Performance evaluation, the Government reserves the right to use both the information provided in the offeror’s Past Performance Volume and information obtained from other sources, such as the Past Performance Information Retrieval System (PPIRS) or similar systems, Defense Contract Management Agency (DCMA) and commercial sources. Offerors are reminded that both independent data and data provided by offerors in their proposals may be used by the Government to evaluate offeror past performance. However, the burden of providing thorough, complete, and current past performance information as requested in this paragraph remains with the offerors.

Proposals that do not contain the information requested by this paragraph risk rejection or a less than acceptable performance rating by the Government. All past performance comments received will be considered and could affect the overall rating. The overall past performance evaluation is a subjective decision based on the whole of all data received. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”

d. Submission Requirements. The offeror shall submit a Past Performance Volume containing the following:

Table of Contents

Summary Page describing the role of the offeror and each subcontractor, teaming partner, and /or joint venture partner that the offeror is required to provide Past Performance Specific Relevant Contract Reference Sheets for the past performance experience in accordance with Attachment 1 in Section L.

Consent Letters executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing the release of past performance information so the offeror can respond to such information. A sample consent letter is attached as Attachment 2 in Section L).

Client Authorization Letters for each identified effort for a commercial customer authorizing release to the Government of requested information on the offeror’s performance.

Organization Structure Change History— Organizational Structure Change History. Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. In many cases, these changes have taken place during the time of performance of relevant present or past efforts or between conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this acquisition. To facilitate this relevancy determination, include in this proposal volume a "roadmap" describing all such changes in the organization of your company. As part of this explanation, show how these changes impact the relevance of any efforts you identify for past performance evaluation/performance confidence assessment. Since the Government intends to consider present and past performance information provided by other sources as well as that provided by the offeror(s), your "roadmap" should be both specifically applicable to the efforts you identify and general enough to apply to efforts on which the Government receives information from other sources.

Specific Relevant Contracts Format - Specific Relevant Contracts Format - Sheets in accordance with Attachment 2 and 3 of Section L below are limited to 3 pages per reference. The offeror shall provide documentation outlining the offeror’s past performance with contracts, as a prime or major subcontractor, which is the same or similar in nature, size, and complexity to the services being procured under this Solicitation. The submittal shall include rationale supporting your assertion of relevance and how it was determined that the work performed previously was the same or similar in nature, size, and complexity to the work specified by this solicitation. Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate.

e. Past Performance Questionnaire - See Attachment 3, Past Performance Questionnaire.

For the contracts identified on each Specific Relevant Contract Reference, the offeror shall forward a copy of the Past Performance Questionnaire to the points of contact responsible for monitoring performance under such contracts. The points of contact shall return the questionnaires directly to Contracting Officer at the address specified in L.1 by November 17, 2023. Any questionnaires not returned directly to the KO will not be reviewed and evaluated. The information contained in the questionnaires will be used to evaluate the offeror’s past performance. New entities that have no past customers shall annotate on the Summary Page that they have had no previous clients and that the minimum number of questionnaires cannot be provided.

iv. VOLUME IV – Price Proposal: Volume IV shall consist of the Price Proposal and must be clearly marked “VOLUME IV –PRICE PROPOSAL, W911S7-23-R-0001.” Electronic versions of the Price Proposal should be submitted on a CD in MS Office Excel format and shall not be read only, or password protected. All formulas, lookup tables, and links should be intact, and no links shall exist to files not included with the submission. Spreadsheets shall not contain hidden worksheets. PDF or flat files will not be considered adequate. The hard copy version will take precedence for any differences noted between the hard and electronic versions of the contractor’s proposal. Failure to follow the below Contract Proposal preparation instructions may cause your proposal to be deemed unacceptable by the Government.

Tab A – Price Proposal. The contractor shall submit the following documents as part of the Price Proposal:

a. Section B (Supplies or Services and Prices/Costs) – Price-Section B shall be submitted fully completed. The price proposal is based on the sample task order for “Kitchen Renovation, Building 580, Fort Leonard Wood, MO” using firm-fixed pricing.

(Attachments 2-18 of this solicitation). Pricing for the sample task order will be used for evaluation purposes.

b. Offerors shall prepare pricing information for the Sample Task Order, provided at

Attachment 18 - Contractor’s Price Schedule Worksheet, using firm-fixed pricing. Offerors shall complete the subsequent worksheets, listing the work elements, number of units for each work element, pricing for material, equipment, labor, labor burden, general and administration costs, profit, bonds, and all other charges that the offeror intends to recover and perform. No other format will be accepted.

c. The Government reserves the right to request Certified Cost or Pricing Data and Other Than

Certified Cost or Pricing Data if the Government deems it necessary to determine price reasonableness. The offeror may provide background information, other than the pricing data that is required, concerning its pricing methodology. This information might include details of the methodology applicable to your offer. The data, if submitted, would be used by the government to better understand their pricing.

ATTACHMENT 1

SUBCONTRACTOR/TEAMING PARTNER CONSENT FORM FOR THE RELEASE OF PAST

PERFORMANCE INFORMATION TO THE PRIME CONTRACTOR

Past performance information concerning subcontractors and teaming partners cannot be disclosed to a private party without the subcontractor's or teaming partner's consent. Because a prime contractor is a private party, the Government will need that consent before disclosing subcontractor/teaming partner past and present performance information to the prime during exchanges. In an effort to assist the Government's Past Performance Evaluators in assessing your past performance relevancy and confidence, we request that the following consent form be completed by the major subcontractors/teaming partners identified in your proposal. The completed consent forms should be submitted as part of your Past Performance Volume III Proposal.

SAMPLE

Dear (Contracting Officer)

We are currently participating as a (subcontractor/teaming partner) with (prime contractor or name of entity providing proposal) in responding to the Mission and Installation Contracting Command request for Proposal (solicitation number) for the (program title or description of effort).

We understand that the Government is placing increased emphasis on past performance in order to obtain best value in source selections. In order to facilitate the performance confidence assessment process we are signing this consent form to allow you to discuss our past performance information with the prime contractor during the source selection process.

(Signature and Title of individual who has the authority to sign for and legally bind the company)

Company Name:

Address:

Attachment 2 Specific Relevant Contracts Sheet

The offeror shall provide documentation outlining the offeror’s past performance with contracts, as a prime or major subcontractor, which is the same or similar in nature, size, and complexity to the services being procured under this Solicitation. The submittal shall include rationale supporting your assertion of relevance and how it was determined that the work performed previously was the same or similar in nature, size, and complexity to the work specified by this solicitation. Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate.

1. Contract Number, Award Date and Contract type.

2. Price/Cost – original awarded AND final (or projected final, if contract is current).

3. Delivery Schedule – original AND final (or projected final, if the contract is current).

4. Contact Information - Address and telephone number for the Government (or commercial) procuring contracting activity AND contract administrative activity (if applicable).

Name, telephone number, fax number and e-mail address for the following:

5. Procuring Contracting Officer (PCO

6. Administrative Contracting Officer (ACO)

7. Government or commercial technical representative or COR Identify in specific detail for each contract listed, why or how you consider that effort relevant or similar to the effort required by this solicitation. In determining relevancy, consideration should be given but not limited to such things as product/service similarity, product/service, size and complexity, contract type, contract environment, division of company proposing, and subcontractor interaction.

8. Narrative explanation on each contract listed describing the objectives achieved and the following data: any cost growth or schedule delays encountered. For any Government contracts which did not/do not meet original requirements with regard to cost, schedule, or technical performance, a brief explanation of the reason(s) for such shortcomings and any demonstrated corrective actions taken to avoid recurrence. Offerors may include a discussion of efforts accomplished by the offeror to resolve problems encountered on prior contracts as well as past efforts to identify and manage program risk. Merely having problems does not automatically equate to a Limited or a No Confidence rating, since the problems encountered may have been on a more complex program, or an offeror may have subsequently demonstrated the ability to overcome the problems encountered. The offeror is required to clearly demonstrate management actions employed in overcoming problems and the effects of those actions, in terms of improvements achieved or problems rectified. This may allow the offeror to be considered a Substantial Confidence or Satisfactory Confidence candidate.

9. Negative Performance Documentation. A copy of any cure notices, show cause letters or contract discrepancy reports received on each contract listed and a description of any corrective action by the offeror or proposed subcontractor.

10. Completion Date/Delivery Schedule. The contractor shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary.

1. Contract Number __________________________ Award Date________________________________ Contract type_______________________________

2. Completion Date/Delivery Schedule.

Original completion/delivery date ______________________________________________ Revised completion/delivery date ______________________________________________

3. Price/Cost – original awarded price__________________________________________

4. Modified Price/Cost - ____________________________________________________

5. Completion Date or Delivery Schedule – original AND final (or projected final, if the contract is current).

6. Changed Dates _________________________________________________________

7. Contact Information - Address and telephone number for the Government (or commercial) procuring contracting activity AND contract administrative activity (if applicable). Name, telephone number, fax number and e-mail address for the following:

8. Procuring Contracting Officer (PCO).

Address: _____________________________________________________________ Phone Number: _______________________________________________________ Fax Number: _________________________________________________________ E-Mail Address: ______________________________________________________

9. Administrative Contracting Officer (ACO).

Address: _____________________________________________________________ Phone Number: _______________________________________________________ Fax Number: _________________________________________________________ E-Mail Address: ______________________________________________________

10. Government or commercial technical representative or COR.

Address: ____________________________________________________________ Phone Number: _______________________________________________________ Fax Number: _________________________________________________________ E-Mail Address: _______________________________________________________

11. Relevancy Description. __________________________________________________

12. Narrative explanation. __________________________________________________________

13. Negative Performance Documentation. ____________________________________________

ATTACHMENT 3

PAST PERFORMANCE QUESTIONNAIRE

WHEN FILLED IN THIS DOCUMENT IS SOURCE SELECTION SENSITIVE INFORMATION IAW FAR 3.104

SECTION 1: CONTRACT IDENTIFICATION

A. Contractor: _______________________________________________________________________________

B. Cage Code: __________________________________

C. Contract number: _____________________________

D. Contract type: ________________________________

E. Was this a competitive contract? Yes _____ No _____

F. Period of performance: _________________________________________________________

G. Initial contract cost: $____________________________

H. Current/final contract cost: $_______________________________

I. Reasons for differences between initial contract cost and final contract costs:

J. Description of service provided: ______________________________________________________

SECTION 2: CUSTOMER OR AGENCY IDENTIFICATION

A. Customer or agency name:

B. Customer or agency description (if applicable):

C. Geographic description of services under this contract, i.e. local, nationwide, worldwide, other Commands:

SECTION 3: EVALUATOR IDENTIFICATION

A. Evaluator's name:

B. Evaluator's title:

C. Evaluator's phone/fax number:

D. Number of years evaluator worked on subject contract:

SECTION 4: EVALUATION

Please indicate your satisfaction with the contractor’s performance by placing an “X” in the appropriate block using the scale provided to the right of each question. This scale is defined as follows:

CODE PERFORMANCE LEVEL

S SATISFACTORY – The contractor’s performance meets contractual requirements. The contractual performance contained some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

M MARGINAL – Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.

US UNSATISFACTORY – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

NA NOT APPLICABLE - Unable to provide a score.

The questions shown below should be tailored to the Factors/Subfactors of the instant acquisition.

Technical Performance S M US NA

T1. Quality & repeatability of operations & maintenance.

T2. Quality of technical system testing and certification efforts

T3. Quality/integrity of technical data/report preparation efforts

T4. Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements

T5. Ability to implement current standard practices for computer hardware design, operation, maintenance, upgrades and configuration control

T6. Ability to implement current standard practices for computer software design, operation, maintenance, upgrades and configuration control

T7. Adequacy/effectiveness of environmental safety procedures

Program Management S M US NA

P1. Effectiveness of overall contract management (including ability to effectively lead, manage and control the program)

Program Management S M US NA

P2. Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes)

P3.…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .