ATTACHMENT 9 - 8457_a3-REFLECTED CEILING PLAN.pdf

PDF 234 KB Posted

Attached to
Fort Leonard Wood MATOC IDIQ
Solicitation number
W911S7-23-R-0001
Issued by

About this file

This reflected ceiling plan drawing package provides details for renovating the kitchen ceiling at Building 580 at Fort Leonard Wood, Missouri. The project includes installing a new gypsum board ceiling over the kitchen area to match the existing ceiling height, with appropriate transition moldings where the new ceiling abuts existing surfaces. Ceiling fixtures and devices will generally remain in the same locations unless noted otherwise. All new fixtures over the kitchen must be shatterproof, enclosed, gasketed, NSF rated for splash zones, and wet location rated. The existing locations of lights, sprinklers and other devices shown are for reference only and must be field verified. Sprinkler relocation must comply with applicable NFPA and IBC standards.

The related federal contract opportunity is a solicitation for the Fort Leonard Wood MATOC IDIQ through the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis. No other details are provided regarding response dates, award dates, pricing terms, set asides, incumbents or required products/services.

View the file

Other files

File Type Posted
W911S723R0001 Amendment 0004.pdf PDF
ATTACHMENT 18 - Contractors Price Schedule Worksheet.xlsx XLSX spreadsheet
W911S723R0001 Amendment 0003.pdf PDF
ATTACHMENT 3 - Davis-Bacon Act WD MO20230019 13 October 2023.pdf PDF
ATTACHMENT 4 - RFTOP Letter.pdf PDF
ATTACHMENT 20 Q and A - W911S7-23-R-0001.pdf PDF
ATTACHMENT 2 - Davis-Bacon Act WD MO20230005 13 October 2023.pdf PDF
W911S7-22-R-0001 Amendment 0002.pdf PDF
ATTACHMENT 19 - Davis-Bacon Act WD MO20230001 13 October 2023.pdf PDF
W911S7-23-R-0001 Amendment 00001.pdf PDF
ATTACHMENT 4 - RFTOP Letter.docx DOCX document
ATTACHMENT 10 - 8457_a4-DETAILS.pdf PDF
ATTACHMENT 15 - 8457_E3.pdf PDF
ATTACHMENT 16 - 8457_m-M1.pdf PDF
ATTACHMENT 8 - 8457_a2-FLOOR PLAN.pdf PDF
ATTACHMENT 7 - DEMOLITION PLAN.pdf PDF
ATTACHMENT 1 - FLW MATOC SOW.pdf PDF
ATTACHMENT 3 - MO20230005 14 July 2023.pdf PDF
ATTACHMENT 5 - Combined Specifications Kitchen 580.pdf PDF
ATTACHMENT 2 - Davis-Bacon Act WD MO20230005 8 September 2023.pdf PDF
ATTACHMENT 18 - Contractors Price Schedule Worksheet.xlsx XLSX spreadsheet
ATTACHMENT 13 - 8457_E1.pdf PDF
W911S7-23-R-0001 MATOC Solicitation - 13 Aug 2023.pdf PDF
ATTACHMENT 11 - 8457_a5-ELEVATIONS.pdf PDF
ATTACHMENT 6 - 8457_a0-TEMPORARY KITCHEN.pdf PDF
ATTACHMENT 14 - 8457_E2.pdf PDF
ATTACHMENT 12 - 8457_a6-ELEVATIONS (2).pdf PDF
ATTACHMENT 17 - 8457_m-M2.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERPENDICULAR TO FURRING

PARALLEL WITH FURRING

RUNNER CHANNELS

AS SPECIFIED

CONT. DUST MEMBRANE

AS SPECIFIED. MINIMUM

WIDTH 5' SEAL LIPS

HAT-SHAPED FURRING

CHANNELS OR STUDS

WHERE SHOWN AND AS

SPECIFIED

GYP. BD. CLG.

MTL. CASING BEAD

DUST MEMBRANE

MTL. CASING BEAD

GYP. BD. CLG.

3/16" CONTRACTION JOINT

3/16" CONTRACTION JOINT

METAL STUD WALL

5/8" GYPSUM BOARD

# 8 HANGER WIRE

MAIN RUNNERS 1.12 LBS/FT

CROSS RUNNER 25 GA

SUSPENDED 5/8" GYPSUM

BOARD CEILING

GYPSUM BOARD BEAD

SEALANT - CONTROL JOINT

WALL ANGLE AT FLOATING

EDGE. 2" MIN. HORIZONTAL

LEG. TO RECEIVE HAT

CHANNELS. 3/4" CLEARANCE

8" MAX.

7/8" HAT FURRING CHANNELS

@ 24" O.C. MAX.

1 1/2" HOT ROLLING CHANNELS

NOTE:

ONE FLOATING END AND ONE FIXED END FOR EACH MAIN AND CROSS

RUNNERS. WALL ANGLE WITH #10 S.M.S. AT EACH STUD. #16 WIRE SADDLE

TIE TO MAIN RUNNER AT EACH CROSS RUNNER. 4-WAY 45° DIAGONAL #12

WIRE BRACING AT 12'-0" X 8'-0" WITH COMPRESSION STRUT.

@ INTERSECTIONS 4'-0" O.C.

@ 4'-0" O.C. MAX.

RUNNER CHANNELS

AS SPECIFIED

GYPSUM BOARD

HAT-SHAPED FURRING

CHANNELS WHERE

SHOWN AND AS SPECIFIED

SCREW AND TAPE AT

EXISTING SUSPENDED

ACOUSTICAL CEILING

METAL STUD WITH

BOTTOM TRACK

CROSS RUNNER FIXED

EXISTING CEILING TILES NEW GYPSUM BOARD CEILING

3-5/8" METAL STUD

BRACED TO

STRUCTURE ABOVE

TO STRUCTURE ABOVE

3-5/8" METAL STUD

AT NEW HARD CEILING

EDGE WHERE NO WALLS

TRANSITION MOLDING

WITH 3/8" SHADOW REVEAL

ENDS AND @ 12" O.C.

HANGER WIRE

AS SPECIFIED

SCALE:

D E

S I G

N E

D

C H

E C

K E

D

S U

B M

I T

T E

D

A P

P R

O V

E D

D A

T E

R E

V I S

I O

N S

D I R

E C

T O

R A

T E

O

F

P

U B

L I C

W

R

K S

F O

R

L

O

N A

R D

W

O

D

M

I S

S O

U R

I

D R

A W

N

DATE:

PROJECT NO:

DRAWING NO:

SHEET OF

D A

T E

M A

D E

A P

P R

O V

E D

J

B a l e s

C

E

D B

A

L O

P E

Z

A

L O

P E

Z

J

B

A L E

S

A

L O

P E

Z

R E

F L

E C

T E

D

C

E I L

I N

G

P

L A

N

A N

D

D

E T

A I L

S

R E

N O

V A

K

I T

C H

N

A

B U

I L

D I N

G

AS SHOWN

07DEC22

M.0118951

FES 08369-1J

8457.12

A3 7

KITCHEN

N

EXISTING FIRE SPRINKLERS TO REMAIN

A3

A.F.F.

ABOVE FINISHED FLOOR

O.C.

ON CENTER

REFLECTED CEILING PLAN

A3

INDICATES EXISTING SOUND RATED WALL

LEGEND

INDICATES NEW WALL

0 1' 2' 3'

SCALE: 3/4"=1'-0" (ANSI D)

NEW GYPSUM BOARD CEILING

EXISTING ACOUSTIC SUSPENDED CEILING TILE SYSTEM TO

REMAIN

NEW GYPSUM BOARD TO ACOUSTICAL CEILING TRANSITION

MOLDING

EXISTING GYPSUM BOARD TO ACOUSTICAL CEILING

TRANSITION MOLDING TO REMAIN

EXISTING GYPSUM BOARD CEILING TO REMAIN

NEW CONTRACTION JOINT BETWEEN EXISTING AND NEW

GYPSUM BOARD CEILING

CEILING KEYNOTES

PANTRY CLOSET

RECESSED LED FLUSH LIGHT

NEW LOCATION FOR EXISTING LIGHT FIXTURES

NEW FLUSH LED AREA KITCHEN LIGHT FIXTURES

UNDER-CABINET LED LIGHT

NEW LOCATION FOR EXISTING FIRE SPRINKLERS

EXISTING LIGHT FIXTURES TO BE RELOCATED

EXISTING 2' x 2' SUSPENDED ACOUSTIC CEILING TO

REMAIN

1. REFER TO ELECTRICAL AND MECHANICAL FOR ADDITIONAL

INFORMATION.

2. PROVIDE NEW GYPSUM BOARD CEILING AS INDICATED OVER

KITCHEN AREA TO MATCH EXISTING CEILING IN HEIGHT. PROVIDE

APPROPRIATE TRANSITION MOLDINGS TO ABUT NEW CEILING WITH

EXISTING. TAPE AND MUD OVER GYPSUM BOARD BEADS AND

MOLDINGS.

3. ALL EXISTING CEILING FIXTURES AND DEVICES SHALL REMAIN IN

SAME LOCATION UNLESS OTHERWISE INDICATED.

4. ALL CEILING FIXTURES OR DEVICES LOCATED ABOVE KITCHEN

AREA ON NEW HARD CEILING SHALL BE SHATTERPROOF,

ENCLOSED AND GASKETED, AND, ACCORDING TO REGULATORY

TERMS, NSF-RATED, SPLASH ZONE CERTIFIED, AND WET-LOCATION

RATED.

5. EXISTING LOCATION OF LIGHT FIXTURES, FIRE SPRINKLER HEADS,

FIRE ALARMS, MASS NOTIFICATION DEVICES, HVAC DIFFUSERS,

AND ANY OTHER DEVICE SHOWN ON DRAWINGS IS FOR REFERENCE

ONLY. ACTUAL LOCATION SHALL BE VERIFIED BY CONTRACTOR.

6. FIRE SPRINKLER HEAD RELOCATION SHALL BE PERFORMED IN

STRICT ACCORDANCE WITH THE LATEST VERSION OF NFPA 01,

NFPA 13, NFPA 101, IBC, AND UFC 3-600-01.

CEILING NOTES

EXISTING LIGHT FIXTURES TO BE REMOVED

PLAN NORTH

GYPSUM BOARD / HARD CEILING (GYP. BD. CLG.)

GYPSUM CEILING CONTRACTION JOINT DETAILS

NO TO SCALE

A3

GYPSUM CEILING DETAIL

NO TO SCALE

A3

CEILING TRANSITION

NO TO SCALE

A3

MAX.

MAXIMUM

MTL.

METAL

EXISTING FIRE SPRINKLERS TO BE RELOCATED

S.M.S.

SHEET METAL SCREW

MIN.

MINIMUM

A3

CEILING OPENING WHERE STOVE HOOD IS LOCATED

COFFEE STATION

DAY ROOM / DINING

2'X2' FLUSH MOUNTED ACCESS PANEL PAINT TO

MATCH CEILING SEE DETAIL 1/A4

AP

AP

Sheets and Views
REFLECTED CEILING PLAN
2023-03-15T11:51:30-0500
BALES.JIMMIE.D.JR.1231309302

File details come from the government source that posted it. Updated .