SF30 - Amendment 0002.pdf
PDF 4 MB Posted
- Attached to
- Dugway Proving Ground Environmental Support / Central Hazardous Waste Services - RFP Amendment 0006
- Solicitation number
- W911S626RA001
About this file
This is a Standard Form 30 (SF 30) Amendment of Solicitation/Modification of Contract for solicitation W911S626RA001, issued by the U.S. Army Corps of Engineers on April 28, 2026. Amendment 0002 is not extending the receipt deadline for offers, and offerors must acknowledge receipt of this amendment prior to the original solicitation deadline using one of three specified methods: completing items 8 and 15 and returning copies, acknowledging receipt on each copy of the offer, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt may result in rejection of the offer.
The amendment deletes the original "Attachment 03 - Past Performance Questionnaire" and replaces it entirely with a revised "Attachment 03 - Past Performance PPQ" dated April 29, 2026. The revised questionnaire removes non-applicable evaluation areas including software design and cost-reimbursement forecasting, and tailors performance questions specifically to Environmental Support Services Performance Work Statement requirements. The proposed due date for submissions remains unchanged. All other terms and conditions of the original solicitation remain in full force and effect. The contract documents table lists 13 attachments covering the Performance Work Statement, technical exhibits, proposal spreadsheets, past performance references, wage determination, antiterrorism/operations security requirements, visitor guide, and local site information, all dated between April 20 and April 29, 2026.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
List of Contract Documents, Exhibits, or Attachments
The attachments table has changed from:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0001 PWS ENV
Support DPG Revised 4-28 Amendment
Performance Work Statement 28 Apr 2026 Attach ment
No
0002 Revised Technical Exhibit 1 - Facilities Map
Supporting Technical Documentation
28 Apr 2026 Attach ment
No
0003 TE-2 90-Day Storage Sites
Supporting Technical Documentation
20 Apr 2026 Attach ment
No
0004 TE-3
Generator Training Requirements
Supporting Technical Documentation
20 Apr 2026 Attach ment
No
0005 TE- 4
Groundwater Monitoring Program (GMP)
Supporting Technical Documentation
20 Apr 2026 Attach ment
No
0006 TE-5 DPG
UST LUST
Management
Supporting Technical Documentation
20 Apr 2026 Attach ment
No
0007 Attachment 1 - Price Proposal Spreadsheet
Proposal 21 Apr 2026 Attach ment
No
0008 Attachment 2 Past Performance References
Attachment 2 - Past Performance References
21 Apr 2026 Attach ment
No
0009 Attachment 3 Past Performance
Attachment 3 Past Performance Questionnaire
21 Apr 2026 Attach ment
No
W911S626RA0010002
Questionnaire
PPQ
0010 Attachment 4 - DoL Area Wage Determination
Wage Determination Attachmen t 4 - DoL Wage Det ermination
21 Apr 2026 Attach ment
No
0011 ANTITERRORI
SM_OPERATI
ONS
SECURITY RE
QUIREMENTS
Antiterrorism / Operations Security Requirements
20 Apr 2026 Attach ment
No
0012 DPG Visitor Guide
DPG Visitor Guide 20 Apr 2026 Attach ment
No
0013 Local Site Information -
DPG
Local Site Information 20 Apr 2026 Attach ment
No
To:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0001 PWS ENV
Support DPG Revised 4-28 Amendment
Performance Work Statement 28 Apr 2026 Attach ment
No
0002 Revised Technical Exhibit 1 - Facilities Map
Supporting Technical Documentation
28 Apr 2026 Attach ment
No
0003 TE-2 90-Day Storage Sites
Supporting Technical Documentation
20 Apr 2026 Attach ment
No
0004 TE-3
Generator Training Requirements
Supporting Technical Documentation
20 Apr 2026 Attach ment
No
0005 TE- 4
Groundwater Monitoring Program (GMP)
Supporting Technical Documentation
20 Apr 2026 Attach ment
No
0006 TE-5 DPG
UST LUST
Supporting Technical Documentation
20 Apr 2026 Attach ment
No
Management
0007 Attachment 1 - Price Proposal Spreadsheet
Proposal 21 Apr 2026 Attach ment
No
0008 Attachment 2 Past Performance References
Attachment 2 - Past Performance References
21 Apr 2026 Attach ment
No
0009 Attachment 03
- Past Performance
PPQ
Attachment 3 Past Performance Questionnaire
29 Apr 2026 Attach ment
No
0010 Attachment 4 - DoL Area Wage Determination
Wage Determination Attachmen t 4 - DoL Wage Det ermination
21 Apr 2026 Attach ment
No
0011 ANTITERRORI
SM_OPERATI
ONS
SECURITY RE
QUIREMENTS
Antiterrorism / Operations Security Requirements
20 Apr 2026 Attach ment
No
0012 DPG Visitor Guide
DPG Visitor Guide 20 Apr 2026 Attach ment
No
0013 Local Site Information -
DPG
Local Site Information 20 Apr 2026 Attach ment
No
The following contract documents were added:
Attachment 03 - Past Performance PPQ
The following contract documents were deleted:
Attachment 3 Past Performance Questionnaire PPQ
The following contract documents Page Counts were changed:
DOCUMENT PAGE COUNTS
DOCUMENT NAME FROM TO
Attachment 03 - Past Performance PPQ none
| IDCode: J |
| Page: 1 |
| Pages: 5 |
| AmendNo: 0002 |
| EffDate: 28 APR 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W911S6 |
| AdmCode: |
| IssuedBy: W6QM MICC-DUGWAY PROV GRD |
KO DIRECTORATE OF CONTRACTIN, 5330 VALDEZ CIRCLE
DUGWAY, UT 84022-5000
UNITED STATES
AMY EILERTS, EMAIL: AMY.M.EILERTS.CIV@ARMY.MIL TELEPHONE: (435) 831-2103
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W911S626RA001 |
| SolDate: 23 APR 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE CONTINUATION |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The purpose of Amendment 0002 to Solicitation W911S626RA001 is to delete the original 'Attachment 03 - Past Performance Questionnaire' and replace it in its entirety with the attached 'Revised Attachment 03 - Past Performance Questionnaire.' The revised questionnaire removes non-applicable evaluation areas (e.g., software design, cost-reimbursement forecasting) and specifically tailors the performance questions to the Environmental Support Services PWS. Offerors must instruct their references to utilize the Revised Attachment 03. The proposal due date remains unchanged. |
| ContNameTitle: |
| CoNameTitle: AMY M. EILERTS |
| ContDate: |
| CODate: 29 APR 2026 |
File details come from the government source that posted it. Updated .