About this file

This is a Technical Exhibit detailing site-specific Underground Storage Tank (UST) and Leaking Underground Storage Tank (LUST) management requirements for U.S. Army Dugway Proving Ground. The Contractor is responsible for comprehensive management of 13 regulated USTs distributed across five facility locations: US Army DPG (5 USTs for emergency generators), AAFES Service Station (3 unleaded/1 diesel for public fueling), English Village Motor Pool (1 unleaded/1 diesel for GSA vehicle fueling), Ditto Motor Pool (1 unleaded/1 diesel for GSA vehicle fueling), and Security Building Ditto 4515 (1 UST for emergency generators). One tank at US Army DPG is in temporary closure status.

Annual compliance requirements include 13 leak detection tests verifying 100% functionality of leak detection systems to detect leaks at 0.1 gallons per hour; 26+ spill and overfill inspections of 13 spill buckets and 13 overfill prevention devices to ensure 95% capacity engagement; 5 facility certification renewals for Utah DERR Facility IDs to obtain annual Certificates of Compliance; 1 LUST site monitoring event involving collection and analysis of groundwater and soil samples at the Ditto Motor Pool LUST site from 3 to 8 monitoring wells depending on the DERR-approved plan; and 156 monthly inspections (12 per tank) documenting sensor status, logbooks, and signs of surface release or equipment tampering.

View the file

Other files

File Type Posted
RFP W911S626RA001 - Conformed SF1449 - Amendment 0006.pdf PDF
Consolidated Q and A - Final - Revised - Amendment 0006.pdf PDF
PWS ENV Support DPG.pdf PDF
SF 30 - Amendment 0006.pdf PDF
SF30 - Amendment 0004.pdf PDF
Attachment 1 - Price Proposal Spreadsheet FINAL - Am 0005.xlsx XLSX spreadsheet
RFP W911S626RA001 - Conformed SF1449 - Amendment 0005.pdf PDF
Performance Work Statement_PWS_FINAL.pdf PDF
SF30 - Amendment 0005.pdf PDF
SF30 - Amendment 0003.pdf PDF
SF30 - Amendment 0001.pdf PDF
SF30 - Amendment 0002.pdf PDF
Questions and Answers V3 FINAL RA001 Amendment 0005.pdf PDF
Cybersecurity Compliance Requirements V3 FINAL.pdf PDF
TE-7 SWMU HWMU 90-Day Site Locations.pdf PDF
RFP W911S626RA001 Amendment 0004 SF 30.pdf PDF
RFP 1449 W911S626RA001 Amendment 0004.pdf PDF
Questions and Answers V2 RA001 Amendment 0004.pdf PDF
TE-6 CHWSF CONTAINERS.pdf PDF
Technical Exhibit 8- Title V Emission Sources.pdf PDF
Cybersecurity Compliance Requirements.pdf PDF
Site Visit Roster 5-4-2026.pdf PDF
SF 30 - Amendment 0003.pdf PDF
Questions and Answers - V1 5-7-26.pdf PDF
RFQ W911S626RA001 Amendment 0003.pdf PDF
PWS ENV Support DPG - Amendment 0003 5-7-26.pdf PDF
Site Visit Slides 5-4-26.pdf PDF
Revised Attachment 03 - Past Performance PPQ.pdf PDF
Revised Attachment 03 - Past Performance PPQ.pdf PDF
Solicitation W911S626RA001 DD1449.pdf.pdf PDF
RFP Amendment W911S626RA0010002 SF 30.pdf PDF
RFP Amendment W911S626RA0010001 SF 30.pdf PDF
Revised Technical Exhibit 1 - Facilities Map.pdf PDF
PWS ENV Support DPG Revised 4-28 Amendment 0001.pdf PDF
Solicitation W911S626RA001 DD1449.pdf PDF
Solicitation - W911S626RA001 DD1449.pdf PDF
TE-3 Generator Training Requirements.pdf PDF
TE- 4 Groundwater Monitoring Program (GMP).pdf PDF
Attachment 1 - Price Proposal Spreadsheet .xlsx XLSX spreadsheet
Attachment 2 Past Performance References.docx DOCX document
Attachment 3 Past Performance Questionnaire PPQ.docx DOCX document
PWS ENV Support DPG FY26 Final.pdf PDF
TE-1 Facilities Map.pdf PDF
ANTITERRORISM_OPERATIONS SECURITY REQUIREMENTS.pdf PDF
TE-2 90-Day Storage Sites.pdf PDF
Attachment 4 - DoL Area Wage Determination.pdf PDF
Local Site Information - DPG.pdf PDF
DPG Visitor Guide.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit: DPG Site-Specific UST & LUST Management This exhibit details the specific assets, locations, and coordination requirements for UST operations at U.S. Army Dugway Proving Ground.

1. Regulated Asset Inventory (Facility Table) The Contractor is responsible for the comprehensive management of the following 13 regulated USTs across five (5) Facility IDs:

Facility ID Location Name Qty / Type of Tank Primary Use

#8000048 US Army DPG 5 USTs (1 in Temp Closure) Emergency Generators

#8000121 AAFES Service Station 3 UNL / 1 Diesel Public Fueling

#8000122 English Village (EV) Motor Pool 1 UNL / 1 Diesel GSA Vehicle Fueling

#8000123 Ditto Motor Pool (DMP) 1 UNL / 1 Diesel GSA Vehicle Fueling

#8000154 Security Bldg Ditto 4515 1 UST Emergency Generat

Annual UST Compliance Metrics

• 13 Leak Detection Tests: Verification of functionality for 100% of the leak detection systems (probes, sensors, and ELLDs) across all 13 tanks to ensure they can detect a leak of 0.1 gallons per hour (gph).

• 26+ Spill & Overfill Inspections: Visual and functional testing of at least 13 spill buckets and 13 overfill prevention devices (flapper valves or ball floats) to ensure they are clear of liquid/debris and engage at 95% capacity.

• 5 Facility Certification Renewals: Completion of 100% of the paperwork and fee processing for the 5 Utah DERR Facility IDs to secure the annual "Certificate of Compliance" for the installation.

• 1 LUST Site Monitoring Event: Collection and analysis of groundwater/soil samples at the Ditto Motor Pool LUST site, typically involving 3 to 8 monitoring wells (depending on the DERR-approved plan) to track contaminant trends.

• 156 Monthly Inspections (Aggregated): Execution of 12 monthly "Walk-through" inspections for each of the 13 tanks, documenting sensor status, logbooks, and any signs of surface release or equipment tampering.

Technical Exhibit: DPG Site-Specific UST & LUST Management
1. Regulated Asset Inventory (Facility Table)
Annual UST Compliance Metrics

File details come from the government source that posted it. Updated .