2- Knowledge Based Scenarios Draft RFP.pdf

PDF 113 KB Posted

Attached to
Draft Request for Proposal (RFP) for Enterprise Classroom Program (ECP)
Solicitation number
W911S024R0005
Issued by

About this file

This draft request for proposal outlines requirements for an indefinite delivery/indefinite quantity contract to provide turnkey classroom sustainment and technology services. The contract will have a one year base period and two one year option periods. The Mission and Installation Contracting Command at Fort Eustis intends to award this recurring requirement as a competitive 8(a) set-aside. Services will include trouble ticket processing, logistics, installation, repair, and documentation for sustainment of over 3,500 classrooms across Army training centers. The contractor will also be responsible for requirements analysis, engineering, logistics, installation, and documentation for periodic technology refreshes impacting hundreds of classrooms annually.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Factor 1- Technical Approach – Knowledge Based Scenarios

Scenario 1

Technology Refresh/Upgrade

Scenario: The annual priority list for technology refresh/upgrade of classrooms has been completed and is provided in July for initial review. Because of funding timelines, the actual task orders will not be awarded until the end of the FY. The task order will be for 300+ classrooms covering all designs ECP has in the classroom inventory and will have a 12-month period of performance.

Project execution: Based on the above scenario, describe your processes and the tools you would use for assessing requirements for each classroom, developing the Requirements Analysis Design (RADs) and Engineer Design Plans (EDPs), workloads, logistics actions, scheduling and installation, and final documentation preparation.

(1) Requirements review/gathering: Based on the above scenario, describe the processes you would use to gather, review, and confirm classroom requirements for technology refresh/upgrade of audio-visual components.

(2) RAD and EDP development and approval: Based on the above scenario, describe the process, workload and timeline execute to develop the RAD and EDP for submission to ECP for final approval.

(3) Logistics – component ordering, procurement, delivery: Based on the above scenario, describe the process for the ordering, delivery and QAQC for audio visual components used in the technology refresh/upgrade of classrooms. Consider addressing in your answer: (1) the processes you would use to procure audio visual components for use across an enterprise for classroom with different designs and (2) any work arounds to address reduce long lead times in order to accomplish the technology refresh/upgrade within the design timeline parameters.

(4) Installation planning, preparation and install: Based on the above scenario, describe how you would coordinate the installation of audio-visual components as part of the technology refresh/upgrade task orders(s). Consider addressing in your answer: (1) the processes you would use to plan, coordinate, and execute installation of AV components in classrooms. (2) The work rate and CFTEs used to complete the instillation processes.

(5) Final Documentation preparation: Based on the above scenario, describe the process and formats used to document the work performed for technology refresh/upgrade task orders.

Factor 1- Technical Approach – Knowledge Based Scenarios

Scenario 2

Sustainment

Scenario: Annually ECP received approximately 1000 trouble tickets for repair, replacement, and sustainment of audio-visual components for a classroom inventory of over 3500 classrooms across all TRADOC Centers of Excellence and School located in the continental United States (CONUS). The sustainment task order’s period of performance is for 12 months.

Sustainment Operations: Based on the above scenario, describe your processes to address and plan for the sustainment of classrooms, trouble ticket processes, logistics actions, scheduling and installation, and final documentation preparation.

(1) Trouble Ticketing: Based on the above scenario, describe the processes you would use to receive, troubleshoot/review, confirm and execute trouble tickets using the ECP repository data base.

(2) Logistics – component ordering, procurement, delivery: Based on the above scenario, describe the process for the ordering, delivery and QAQC for audio visual components used in the sustainment of classrooms. Consider addressing in your answer: (1) the processes you would use to procure audio visual repair parts and components for use across an enterprise for classrooms with different designs and (2) any work arounds to address/reduce long lead times in order to accomplish sustainment action.

(3) Execution of sustainment actions (installation, repair, move/reinstall): Based on the above scenario, describe how you would coordinate the required sustainment actions associated with a trouble ticket. Consider addressing in your answer: (1) the processes you would use to plan, coordinate, and execute instillation, repair and or move/reinstall of AV components in classrooms. (2) The work rate and CFTEs used to complete the sustainment processes.

(4) Final Documentation preparation: Based on the above scenario, describe the process and formats used to document the work performed for sustainment operations task orders.

Scenario Based Q and A Factor 1 ECP Technology Refresh 1