RFI Ref Bldg.32 MWR Renovation Page #1.pdf
PDF 115 KB Posted
- Attached to
- BLDG 32 Renovation Natick Massachusetts
- Solicitation number
- W911QY24R0005
About this file
This document is a Request for Information (RFI) related to the renovation of Building 32 at the US Army Natick Soldier Systems Center in Natick, Massachusetts. The RFI seeks clarification on various mechanical, plumbing, and related construction details for CLIN 002 of the solicitation, which is identified as a design-build effort by the contractor. The government provides responses indicating that the mechanical and plumbing work is to be designed and installed by the contractor, with some additional guidance on requirements such as the use of Carrier controls, compliance with Massachusetts plumbing code, and the need for grease traps and backflow preventers. The related federal contract opportunity is a small business set-aside solicitation for the overall renovation of Building 32, with CLIN 0001 currently funded and CLIN 0002 pending additional funding.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
#1
RFIs REF: Bldg 32 MWR RENOVATION
1. Drawing package 03 Drawing M-100 depicts mechanicals first floor no mechanicals shown woman’s bathroom
1. Please provide the following: Ducts and ducting for space conditioning. Ducts and ducting for exhaust. Locations of RGD’s and exterior penetrations for exhaust.
Government Response: Mechanical work for CLIN 002 is to be design/build by the contractor.
2. Drawing package 03 Drawing M-101 depicts mechanicals second floor.
1. Please provide exhaust ducts and ducting for bathroom exhaust with sizing, Government Response: Mechanical work for CLIN 002 is to be design/build by the contractor.
2. penetrations on exterior of building for exhaust.
Government Response: Mechanical work for CLIN 002 is to be design/build by the contractor.
3. Space conditioning ducts and duct sizing, for new bathroom.
Government Response: Mechanical work for CLIN 002 is to be design/build by the contractor.
4. Dishwasher exhaust fan, make and model. Cost savings would be a vent free dishwasher with cold water steam knockdown built in. Please advise.
Government Response: Mechanical work for CLIN 002 is to be design/build by the contractor.
5. Duct sizing for new kitchen supplies and returns.
Government Response: Mechanical work for CLIN 002 is to be design/build by the contractor.
6. New lift area does not depict any space conditioning mechanicals. Please advise Government Response: Mechanical work for CLIN 002 is to be design/build by the contractor.
7. AD-103 state all ceiling tiles and RGDs to be removed and salvaged for reuse. Drawing M-
101 States all existing to remain. Please advise.
Government Response: CLIN 002 AD-103 states ceiling tile and grid to be removed as well as mechanical RDGs. Is this question referring to CLIN 002? In addition, mechanical is to be design/build by the contractor.
3. Statement of work states new smoke detectors and automatic devices to be installed and tied into BMS. Please depict where required and locations.
Government Response: Smoke detectors or located on FA drawings.
4. Statement of work states all new HVAC controls. Please advise as to what new controls are requested and the actions of the controls.
New Controls must be Open-BACnet type as manufactured by Carrier Co. – CCN/I-VU kind to be compatible with existing Natick’s Central BAS.
5. Statement of work is starting all new carrier Thermostats, to be integrated into base BMS. Please advise if existing systems are Carrier.
Yes, existing controls system is Carrier based.
6. Statement of work states emergency outside are intakes and work associated with. Please depict on drawing with locations, sizing and or if existing.
Not sure what they are talking about. If they are referring to Attachment A, they should state a section number and DPW should respond.
7. Please provide neck sizes for all RGD’s Government Response: Contractor to verify all existing neck sizes, new are to be determined by contractor.
8. The guide during walk thru stated it was our responsibility to have all ducts cleaned and inspected. Please advise.
Reputable certified Duct-Cleaning Co. such as the one represented by Greg Ilkowitz/Greg Distaso/Junction that usually cleans the ductwork Base-Wide – shall be utilized.
9. The guide at walk thru state it was our responsibility to verify all mechanical equipment was in good working condition. Please advise
YES, CONTRACTOR TO VERIFY THAT THE NEW MECHANICAL EQUIPMENT IS IN WORKING
CONDITION.
10. P-100 First floor: No piping is depicted at bar.
1. Bar is not to current Board of Health code. Hand sinks required, Dump sink required, glass wash sink required. Please Advise Government Response: Plumbing work for CLIN 002 is to be design/build by the contractor.
11. P-100 Men’s bathroom.
1. Piping is not depicted for second floor kitchen. Please provide.
Government Response: Plumbing work for CLIN 002 is to be design/build by the contractor.
2. Is men’s bathroom going to be demoed for installation of new kitchen plumbing. Please advise.
Government Response: Means and methods of plumbing installation is determined by the contractor. If work is needed to be located in restroom below kitchen, the contractor would be responsible to return the restroom back to its condition.
3. Gas smell was noticed in Mechanical room behind bar where water heaters are located. Is fresh air required for these fixtures. Please advise.
Yes, ventilation is required for the mechanical room where gas-fired water heaters are located.
12. P-101 new bathroom
1. A slop sink is depicted in drawing. Please provide make and model of fixture.
Government Response: Plumbing work for CLIN 002 is to be design/build by the contractor.
2. Roof drain was noticed during walk thru, roof drain is run in PVC which is not to Mass Code.
Should roof drain be brought up to current code. Please advise.
YES, TO COMPLY TO MASS CODE
3. Roof drain is tied into sanitary stack above first floor vent fixtures. Should roof leader be run to the first floor level and tied in below properly vent fixtures. Please advise.
Answer to 12-3 question = No Respond from Primo (Maintenance): I went to 32 and followed the plumbing and it appears to be correct as installed.
Two different systems.
1.- Sanitary sewer lift station for the whole bldg. functions, pumps up to navy bldg. St. then flows gravity.
2.- Storm liter lines from roof drains are tied in and go west to the lakeside head wall.
4. 2 bay and 3 bay sinks are depicted within new kitchen. Are grease interceptors required for these fixtures.
YES GREASE INTERCEPTORS ARE REQUIRED
5. Is the 3 bay sink in new kitchen to be install per Mass 248 CMR? Please advise.
YES COMPLY TO THE MASS CODE
6. There are no floor drains depicted in the new kitchen. Should floor drains be installed for cleaning purposes. Please advise.
YES INSTALL FLOOR DRAINS
7. Is a Grease trap required for the commercial dishwasher. Please advise.
YES INSTALL GREASE TRAP
8. Is there any kitchen cleaning chemicals required in this kitchen and if so are back flow preventers required. Please advise.
YES BACK FLOW PREVENTERS REQUIRED
13. Please provide Statement of work for plumbing scope.
Government Response: Plumbing work for CLIN 002 is to be design/build by the contractor, but DPW should provide input from previous questions.