Amendment 4 BLDG 32 Reno.pdf

PDF 65 KB Posted

Attached to
BLDG 32 Renovation Natick Massachusetts
Solicitation number
W911QY24R0005
Issued by

About this file

This document is an amendment to a federal contract opportunity solicitation for the renovation of Building 32 at the US Army Natick Soldier Systems Center in Natick, Massachusetts. The amendment provides responses to various electrical-related questions, including the location of lighting controls, emergency light fixtures, light fixture types, and power requirements for specific equipment.

The overall federal contract opportunity is a 100% small business set-aside for the labor, materials, and equipment necessary to complete the renovation of Building 32. The solicitation number is W911QY24R0005, and funding is currently available for CLIN 0001 but not CLIN 0002. Offerors are asked to propose on both CLINs in case additional funding becomes available for CLIN 0002. The contracting agency is the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 4

CLIN 001

1. Where are lighting controls for room 012, 013, & 014?

Addressed in Attached PDF CLIN 001_Elect RFI_2024.0529

2. Where are the Emergency Light Fixture for this project Addressed in Attached PDF CLIN 001_Elect RFI_2024.0529

3. What type of Lights are in room 005 Addressed in Attached PDF CLIN 001_Elect RFI_2024.0529

4. There are missing light fixture type in room 105 hard ceiling.

Addressed in Attached PDF CLIN 001_Elect RFI_2024.0529

5. Where is the Tel/Data closet?

Addressed in Attached PDF CLIN 001_Elect RFI_2024.0529

CLIN 002

1. Where are lighting controls for room 003, 103, & 104?

Lighting control switches shall be located on interior wall of room at strike side of door. Motion detectors shall be installed, type shall be a submittal by contractor and location shall be coordinated with COR.

2. Where are the Emergency Light Fixture for this project Addressed in Attached PDF CLIN 002_Elect RFI_2024.0529

3. What type of Lights are in restroom 103 and kitchen 104 Addressed in Attached PDF CLIN 001_Elect RFI_2024.0529

4. There are missing light fixture type in room 105 hard ceiling.

Addressed in Attached PDF CLIN 001_Elect RFI_2024.0529

5. What are the power requirements for the wheelchair lift, dishwasher exhaust fan and dishwasher?

Items located on plan are Basis of Design Items, Contractor shall coordinate with manufacture for power requirements.

6. Do they need GFCI receptacles in the bathrooms?

No GFCI power receptacles are required in restrooms.