Bldg 32 MWR Renovation Specifications_2023.1030.pdf
PDF 242 KB Posted
- Attached to
- BLDG 32 Renovation Natick Massachusetts
- Solicitation number
- W911QY24R0005
About this file
This document contains the specifications for the renovation of Building 32 at the Natick Soldier Systems Center in Natick, Massachusetts. It includes details on required shop drawings, product data, and samples; demolition work; and door hardware.
The related federal contract opportunity is a solicitation (Solicitation Number W911QY24R0005) for the renovation of Building 32 at the Natick Soldier Systems Center. This requirement is 100% set-aside for small businesses. Funding is currently available for CLIN 0001, but not CLIN 0002. The potential awardee shall provide all labor, materials, and equipment necessary to complete the renovation as described in the attached contract documents. Offerors will be required to attend a site visit at no cost to the government.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 32 MWR Renovation
General Greene Avenue Natick, MA 01760
Natick System Soldier Center
Directorate of Public Works Natick, Massachusetts
Specifications
30 OCTOBER 2023
TABLE OF CONTENTS
SPECIFICATIONS
01 33 23 Shop Drawings, Product Data and Samples
02 41 00 Demolition
08 71 00 Door Hardware
01 33 23 - 1
SECTION 01 33 23
SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
PART 1 – GENERAL
1.1 DESCRIPTION
A. This specification defines the general requirements and procedures for submittals. A submittal is information submitted for Government review to establish compliance with the contract documents.
B. Detailed submittal requirements are found in the technical sections of the contract specifications. The Contracting Officers Representative may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective technical specifications at no additional cost to the Government.
C. Government approval of a submittal does not relieve the Contractor of the responsibility for any error which may exist. The Contractor is responsible for fully complying with all contract requirements and the satisfactory construction of all work, including the need to check, confirm, and coordinate the work of all subcontractors for the project.
Non-compliant material incorporated in the work will be removed and replaced at the Contractor’s expense.
1.2 DEFINITIONS
A. Preconstruction Submittals: Submittals which are required prior to issuing contract notice to proceed or starting construction. For example, Certificates of insurance; Surety bonds; Site-specific safety plan; Construction progress schedule; Schedule of values; Submittal register; List of proposed subcontractors.
B. Shop Drawings: Drawings, diagrams, and schedules specifically prepared to illustrate some portion of the work. Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be integrated and coordinated.
C. Product Data: Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions, and brochures, which describe and illustrate size, physical appearance, and other characteristics of materials, systems, or equipment for some portion of the work. Samples of warranty language when the contract requires extended product warranties.
01 33 23 - 2
D. Samples: Physical examples of materials, equipment, or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged. Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project. Field samples and mock-ups constructed to establish standards by which the ensuing work can be judged.
E. Design Data: Calculations, mix designs, analyses, or other data pertaining to a part of work.
F. Test Reports: Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work. Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
G. Certificates: Document required of Contractor, or of a manufacturer, supplier, installer, or subcontractor through Contractor. The purpose is to document procedures, acceptability of methods, or personnel qualifications for a portion of the work.
H. Manufacturer's Instructions: Pre-printed material describing installation of a product, system, or material, including special notices and MSDS concerning impedances, hazards, and safety precautions.
I. Manufacturer's Field Reports: Documentation of the testing and verification actions taken by manufacturer's representative at the job site on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must indicate whether the material, product, or system has passed or failed the test.
J. Operation and Maintenance Data: Manufacturer data that is required to operate, maintain, troubleshoot, and repair equipment, including manufacturer's help, parts list, and product line documentation. This data shall be incorporated in an operations and maintenance manual.
K. Closeout Submittals: Documentation necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a phase of construction on a multi-phase contract.
01 33 23 - 3
1.3 SUBMITTAL REGISTER
A. The submittal register will list items of equipment and materials for which submittals are required by the specifications. This list may not be all inclusive and additional submittals may be required by the specifications. The Contractor is not relieved from supplying submittals required by the contract documents but which have been omitted from the submittal register.
B. The submittal register will serve as a scheduling document for submittals and will be used to control submittal actions throughout the contract period.
C. The Government will provide the initial submittal register in electronic format. Thereafter, the Contractor shall track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.
D. The Contractor shall update the submittal register as submittal actions occur and maintain the submittal register at the project site until final acceptance of all work by Contracting Officers Representative.
E. The Contractor shall submit formal monthly updates to the submittal register in electronic format. Each monthly update shall document actual submission and approval dates for each submittal.
1.4 SUBMITTAL SCHEDULING
A. Submittals are to be scheduled, submitted, reviewed, and approved prior to the acquisition of the material or equipment.
B. Coordinate scheduling, sequencing, preparing, and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow time for potential resubmittal.
C. No delay costs or time extensions will be allowed for time lost in late submittals or resubmittals.
D. All submittals are required to be approved prior to the start of the specified work activity.
1.5 SUBMITTAL PREPARATION
A. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
01 33 23 - 4
B. Collect required data for each specific material, product, unit of work, or system into a single submittal. Prominently mark choices, options, and portions applicable to the submittal. Partial submittals will not be accepted for expedition of construction effort. Submittal will be returned without review if incomplete.
C. If available product data is incomplete, provide Contractor-prepared documentation to supplement product data and satisfy submittal requirements.
D. All irrelevant or unnecessary data shall be removed from the submittal to facilitate accuracy and timely processing. Submittals that contain the excessive amount of irrelevant or unnecessary data will be returned with review.
E. Provide a transmittal form for each submittal with the following information:
1. Project title, location and number.
2. Construction contract number.
3. Date of the drawings and revisions.
4. Name, address, and telephone number of subcontractor, supplier, manufacturer, and any other subcontractor associated with the submittal.
5. List paragraph number of the specification section and sheet number of the contract drawings by which the submittal is required.
6. When a resubmission, add alphabetic suffix on submittal description.
For example, submittal 18 would become 18A, to indicate resubmission.
7. Product identification and location in project.
F. The Contractor is responsible for reviewing and certifying that all submittals are in compliance with contract requirements before submitting for Government review. Proposed deviations from the contract requirements are to be clearly identified. All deviations submitted must include a side by side comparison of item being proposed against item specified. Failure to point out deviations will result in the Government requiring removal and replacement of such work at the Contractor's expense.
G. Stamp, sign, and date each submittal transmittal form indicating action taken.
01 33 23 - 5
H. Stamp used by the Contractor on the submittal transmittal form to certify that the submittal meets contract requirements is to be similar to the following:
01 33 23 - 6
| CONTRACTOR |
| (Firm Name) |
| Approved |
| Approved with corrections as noted on submittal data and/or |
| attached sheets(s) |
| SIGNATURE: |
| TITLE: |
| DATE: |
1.6 SUBMITTAL FORMAT AND TRANSMISSION
A. Provide submittals in electronic format, with the exception of material samples. Use PDF as the electronic format, unless otherwise specified or directed by the Contracting Officers Representative.
B. Compile the electronic submittal file as a single, complete document.
Name the electronic submittal file specifically according to its contents.
C. Electronic files must be of sufficient quality that all information is legible. Generate PDF files from original documents so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required.
01 33 23 - 7
D. E-mail electronic submittal documents smaller than 5MB in size to e-mail addresses as directed by the Contracting Officers Representative.
E. Provide electronic documents over 5MB through an electronic FTP file sharing system. Confirm that the electronic FTP file sharing system can be accessed from the Government computer network. The Contractor is responsible for setting up, providing, and maintaining the electronic
FTP file sharing system for the construction contract period of performance.
F. Provide hard copies of submittals when requested by the Contracting
Officers Representative. Up to 3 additional hard copies of any submittal may be requested at the discretion of the Contracting Officers
Representative, at no additional cost to the Government.
1.7 SAMPLES
A. Submit two sets of physical samples showing range of variation, for each required item.
B. Where samples are specified for selection of color, finish, pattern, or texture, submit the full set of available choices for the material or product specified.
C. When color, texture, or pattern is specified by naming a particular manufacturer and style, include one sample of that manufacturer and style, for comparison.
D. Before submitting samples, the Contractor is to ensure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.
E. The VA reserves the right to disapprove any material or equipment which previously has proven unsatisfactory in service.
F. Physical samples supplied maybe requested back for use in the project after reviewed and approved.
1.8 OPERATION AND MAINTENANCE DATA
A. Submit data specified for a given item within 30 calendar days after the item is delivered to the contract site.
B. In the event the Contractor fails to deliver O&M Data within the time limits specified, the Contracting Officers Representative may withhold
01 33 23 - 8 from progress payments 50 percent of the price of the item with which such O&M Data are applicable.
1.9 TEST REPORTS
SRE may require specific test after work has been installed or completed which could require contractor to repair test area at no additional cost to contract.
1.10 REVIEW OF SUBMITTALS AND RFIS
A. The Government will review all submittals for compliance with the technical requirements of the contract documents. The Architect-Engineer for this project will assist the Government in reviewing all submittals and determining contractual compliance. Review will be only for conformance with the applicable codes, standards and contract requirements.
B. Period of review for submittals begins when the Government COR receives submittal from the Contractor.
C. Period of review for each resubmittal is the same as for initial submittal.
D. Government review period is 15 working days for submittals.
E. Government review period is 10 working days for RFIs.
F. The Government will return submittals to the Contractor with the following notations:
1. "Approved": authorizes the Contractor to proceed with the work covered.
2. "Approved as noted": authorizes the Contractor to proceed with the work covered provided the Contractor incorporates the noted comments and makes the noted corrections.
3. "Disapproved, revise and resubmit": indicates noncompliance with the contract requirements or that submittal is incomplete. Resubmit with appropriate changes and corrections. No work shall proceed for this item until resubmittal is approved.
4. "Not reviewed": indicates submittal does not have evidence of being reviewed and approved by Contractor or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals after taking appropriate action.
01 33 23 - 9
1.11 APPROVED SUBMITTALS
A. The Government approval of submittals is not to be construed as a complete check, and indicates only that the general method of construction, materials, detailing, and other information are satisfactory.
B. Government approval of a submittal does not relieve the Contractor of the responsibility for any error which may exist. The Contractor is responsible for fully complying with all contract requirements and the satisfactory construction of all work, including the need to check, confirm, and coordinate the work of all subcontractors for the project.
Non-compliant material incorporated in the work will be removed and replaced at the Contractor’s expense.
C. After submittals have been approved, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
D. Retain a copy of all approved submittals at project site, including approved samples.
1.12 WITHHOLDING OF PAYMENT
Payment for materials incorporated in the work will not be made if required approvals have not been obtained.
- - - E N D - - -
02 41 00 - 1
SECTION 02 41 00
DEMOLITION
PART 1 - GENERAL
1.1 DESCRIPTION:
This section specifies demolition and removal concrete, reinforcement bars, earthwork and other associated items.
1.2 PROTECTION:
A. Perform demolition in such manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of structures.
Comply with requirements of GENERAL CONDITIONS Article, ACCIDENT
PREVENTION.
B. Provide safeguards, including warning signs, barricades, temporary fences, warning lights, and other similar items that are required for protection of all personnel during demolition and removal operations.
C. Prevent spread of flying particles and dust. Sprinkle rubbish and debris with water to keep dust to a minimum.
D. In addition to previously listed fire and safety rules to be observed in performance of work, include following:
E. Before beginning any demolition work, the Contractor shall survey the site and examine the drawings and specifications to determine the extent of the work. The contractor shall take necessary precautions to avoid damages to existing items to remain in place, to be reused, or to remain the property NSSC; any damaged items shall be repaired or replaced as approved by the Contract Officers Representative. The
Contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports as required.
F. The work shall comply with the requirements of Section 01 00 00, GENERAL REQUIREMENTS.
PART 2 - PRODUCTS (NOT USED)
PART 3 – EXECUTION
3.1 DEMOLITION:
A. Completely demolish and remove all items indicated pertaining the relocated statue and new planter at Building 1.
02 41 00 - 2
B. Debris shall become property of Contractor and shall be disposed of by him daily, off of NSSC to avoid accumulation at the demolition site.
Materials that cannot be removed daily shall be stored in areas specified by the Contract Officers Representative. Contractor shall dispose debris in compliance with applicable federal, state or local permits, rules and/or regulations.
C. Remove and legally dispose of all materials as part of project work from any trash dumps. Materials removed shall become property of contractor and shall be disposed of in compliance with applicable federal, state, or local permits, rules and/or regulations be hauled to a legal disposal sit. The removal of hazardous material shall be in compliance with Local, State and Federal requirements.
3.2 CLEAN-UP:
On completion of work of this section and after removal of all debris, leave site in clean condition satisfactory to Contract Officers
Representative. Clean-up shall include the disposal of all items and materials not required to remain property of the Government as well as all debris and rubbish resulting from demolition operations.
- - - E N D - - -
08 71 00 ‐ 1
SECTION 08 71 00
DOOR HARDWARE SCHEDULE
PART 1 GENERAL
1.1 SUBMITTALS
The following shall be submitted for the door hardware:
SD-02 Shop Drawings
Manufacturer's Detail Drawings
Verification of Existing Conditions
Hardware Schedule
SD-03 Product Data
Hardware Items
SD-08 Manufacturer's Instructions Installation
SD-10 Operation and Maintenance Data
Hardware Schedule
SD-11 Closeout Submittals
1.2 SHOP DRAWINGS
Submit manufacturer's detail drawings indicating all hardware assembly components and interface with adjacent construction.
Indicate power components and wiring coordination for electrified hardware. Base shop drawings on verified field measurements and include verification of existing conditions.
1.3 PRODUCT DATA
Indicate fire-ratings at applicable components.
1.4 HARDWARE SCHEDULE
Prepare and submit hardware schedule in the following form
Hardware Item
Quantity Size Reference Publi-cation Type No.
Finish Mfr Name and Catalog No.
Key Control Symbols
UL
Mark (If fire-rated and listed)
BHMA
Finish Desig-nation
08 71 00 ‐ 2
1.5 QUALITY ASSURANCE
1.5.1 Hardware Manufacturers and Modifications
Provide, as far as feasible, locks, hinges, pivots, and closers of one lock, hinge, pivot, or closer manufacturer's make. Modify hardware as necessary to provide features indicated or specified.
1.6 DELIVERY, STORAGE, AND HANDLING
Deliver hardware in original individual containers, complete with necessary appurtenances including fasteners and instructions. Mark each individual container with item number as shown on hardware schedule. Deliver permanent keys and removable cores to the Contracting Officer Representative directly.
PART 2 PRODUCTS
2.1 HARDWARE FOR FIRE DOORS AND EXIT DOORS
Provide all hardware necessary to meet the requirements of NFPA 80 for fire doors, NFPA 101 for exit doors, NFPA 252 for fire tests of door assemblies.
2.2 HARDWARE ITEMS
Clearly and permanently mark with the manufacturer's name or trademark, hinges, pivots, locks, latches, exit devices and closers where the identifying mark is visible after the item is installed. For closers with covers, the name or trademark may be beneath the cover.
2.2.1 Hinges
Provide in accordance with ANSI/BHMA A156.1. Provide Stanley
Company Product FBB168, five (5) Knuckle Full Mortise heavy weight ball bearing Hinges. Hinges are to be 4-1/2 by 4-1/2 inch. Steel polished.
2.2.2 Locks and Latches
2.2.2.1 Mortise Locks and Latches
Provide in accordance with ANSI/BHMA A156.13, Series 1000, Operational
Grade 1, Security Grade 2. Provide Best Company Product 45H-Classroom F05-Lever type 15-Rose type H-626 Satin Chrome. Strike to match profile of mortise lock assembly.
2.2.2.2 Pushbutton Locks and Latches
Provide Kaba Simplex LL1041B26d41 pushbutton cylindrical lever lock, combination key override passage. Satin Chrome. Strike to match profile of mortise lock assembly.
2.2.3 Exit Devices
Provide in accordance with ANSI/BHMA A156.3, Grade 1. Provide
Precision Companies Product 08 Key Locks / Unlock Lever Knob, FL2308 x
08 71 00 ‐ 3
M40908A x S982 x width of door. 630 Satin Stainless Steel finish.
2.2.4 Cylinders and Cores
Provide Best Seven Pin Small Format series cores.
2.2.5 Lock Trim
Provide cast, forged, or heavy wrought construction and commercial plain design for lock trim.
2.2.6 Keys
Provide four (4) key blanks per door.
2.2.7 Closers
Provide in accordance with ANSI/BHMA A156.4, Series C02000, Grade 1, with PT 4C. Provide LCN Company Product 4040XP Series Heavy Duty door closure. Accessories to include: 4040XP-3071 Cast Iron Cylinder Assembly, 4040XP-72 Plastic Cover, 4040XP-3077 Regulator Arm. Color to be 689 Aluminum. Provide manufacturer's 10-year warranty.
2.2.7.1 Identification Marking
Engrave each closer with manufacturer's name or trademark, date of manufacture, and manufacturer's size designation in locations that will be visible after installation.
2.2.8 Door Protection Plates
Provide in accordance with ANSI/BHMA A156.6. Provide Hagar Company Product 190S Aluminum Door Protection Plates
2.2.8.1 Sizes of Kick Plates
2 inch less than door width for single doors; 1 inch less than door width for pairs of doors. Provide 10 inch kick plates for flush doors.
Provide a minimum 36 or 48inch armor plates for flush doors and completely cover lower panels of panel doors, and 16 inch high armor plates on fire doors.
2.2.9 Door Stops
Provide in accordance with ANSI/BHMA A156.16. Provide Hagar
Companies Product 242F Dome Stop Universal.
2.2.10 Silencers
Provide in accordance with ANSI/BHMA A156.16. Provide Hagar
Companies Product 307D Door Silencer. Provide three silencers for each single door.
2.2.11 Door Reinforcement Plate
Don Jo 15-S-CW wrap around Simplex 1000 plate, stainless steel.
2.3 FINISHES
08 71 00 ‐ 4
Provide in accordance with ANSI/BHMA A156.18. Provide hardware in BHMA 626 finish (Satin Chrome plated on brass), unless specified otherwise.
--- END OF SECTION ---
08 71 00 ‐ 5
HARDWARE SETS
HDW SET: 1 (Interior DOUBLE DOOR) Door Number(s): 1-1, 1-2
EA dr 2 pr Hinges EA dr 2 lever handle (passage) EA dr 4 Silencers
HDW SET: 2 (INTERIOR SINGLE DOOR)
Door Number(s): B-1, B-2, 1-3
EA dr 1-1/2 pr Hinges EA dr 1 Mortise lockset and lever handle EA dr 3 Silencers EA dr 1 Floor stop
HDW SET: 3 (INTERIOR SINGLE DOOR)
Door Number(s): B-3
EA dr 1-1/2 pr Hinges EA dr 1 Push plate EA dr 1 Pull EA dr 1 Surface closer
HDW SET: 4 (Interior DOUBLE DOOR) Door Number(s): 1-4
EA dr 2 pr Hinges EA dr 2 lever handle (passage) EA dr 2 Surface closer EA dr 1 Kick plate EA dr 4 Silencers
HDW SET: 5 (INTERIOR SINGLE DOOR)
Door Number(s): 1-5, 1-6, 1-7, 1-8, 1-9, 1-10
EA dr 1-1/2 pr Hinges EA dr 1 Mortise lockset and lever handle
--- END OF SECTION ---