This document is an Electrical Plan drawing for electrical construction at Letterkenny Army Depot in Chambersburg, Pennsylvania. The drawing, numbered FEP-863, dated 17 July 2025, depicts the installation and modification of electrical infrastructure including panel replacements, transformer upgrades, and conduit routing. Key components specified include: Panel HV (800A, 480V, 3-phase, 3-wire with main breaker, Type SOD I-Line); Panel LV (400A, 208/120V, 3-phase, 4-wire with main breaker, Type SOD I-Line); two new panels (PP-1 and PP-2) rated at 200A and 208/120V; Panel BR (175A, 208/120V, 3-phase, 4-wire); a 150 kVA transformer (480V-208/120V, 3-phase); a 30-ton air conditioning unit; and various conduit installations including 4-inch PVC conduit with three 500 MCM white conductors and grounding. The plan specifies demolition of existing equipment, installation of new equipment, and routing of feeders from Panel LV to multiple distribution points.

The drawing requires approvals from multiple departments including the Fire Chief, Safety Office, Environmental Coordinator, AT/FP Officer, Chief of Construction and Transportation Division, and Director of Risk Management. The plan is issued by the Department of the Army, Office of Engineering and Planning Division at Letterkenny Army Depot and includes provisions for room ventilation options and transformer pole modifications. This is Sheet 1 of 1 of the electrical construction documentation.

View the file

Other files

File Type Posted
SOW Electric Project Rev 1_Redacted.pdf PDF
SOW Roof Project Rev 1_Redacted.pdf PDF
W911N226RA009 Site Visit Attendee List.pdf PDF
Solicitation W911N226RA009 Amendment 0005 SF 30.pdf PDF
Solicitation W911N226RA009 Amendment 0005.pdf PDF
Davis-Bacon Act WG PA20260002 Rev. 3 01.30.2026.pdf PDF
Davis-Bacon Act WG PA20260090 Rev. 2 01.30.2026.pdf PDF
Q and A Responses 1.pdf PDF
Example Pricing Sheets.xlsx XLSX spreadsheet
Solicitation W911N226RA009 Amendment 0004 SF 30.pdf PDF
Solicitation W911N226RA009 Amendment 0003 SF 30.pdf PDF
Solicitation W911N226RA009 Amendment 0003.pdf PDF
FEP-864 Roof Repairs - Site Plan.pdf PDF
SOW Roof Repairs.pdf PDF
SOW Electrical Service Construction.pdf PDF
Solicitation W911N226RA009 Amendment 0002 SF 30.pdf PDF
FEP-864 Roof Repairs - Demo Plan.pdf PDF
Solicitation - W911N226RA009 Amendment 0002.pdf PDF
Solicitation - W911N226RA009 Amendment 0001.pdf PDF
Solicitation - W911N226RA009 Amendment 0001 SF30.pdf PDF
Davis-Bacon Act WG PA20260090 01.09.2026.pdf PDF
SOW ASRS Roof Repairs.pdf PDF
Performance Assessment Questionnaire.docx DOCX document
Attachment 0006 Visitor Request 2025.pdf PDF
Davis-Bacon Act WG PA20260002 01.09.2026.pdf PDF
Solicitation - W911N226RA009.pdf PDF
SOW Electrical Service Construction.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I u

CJ

o□

V

�PROPOSED LOCATION

/ ROOM VENTILATION OPTION

I I

PAN EL H V, 800A,

480V, 30, 3W, MB,

TYP SOD I-LINE

I /�-AIR COMP

I/ DISCON.

[v EXISTING

EXHAUST

LOUVER

- �PROPOSED LOCATION

-v MTS OPTION

3" CONDUITS W /

FEEDER CABLES

FROM PANEL L V TO:

PANEL PP-1

PANEL BR

30 TON A/C UNIT

- {:}r----

✓i\

=-------, '--l/ r---.._

EXIST.

TRANSFORMER

POLE -�

INSTALL

PP-2 '

�I'-� DEMO

f-------����----------t---- I �"-------ABND

200A, 208/120V, 30, 4W, M.L.

54 SPACE

TYPE SOD

� CONDUIT �4" PVC W/(3)

� 500 MCM

WH

DISCON.

'-------PAN EL L V, 400A,

208/120V, 30, 4W, ��� MB, TYPE-SOD I-LINE

DEMO ,� "-------GND BAR

DISCONNECT

T1 "" � (2)2J" COND. W/(4)

4/0+ (1) #4 GND.

o □ f---------1)-�11"-----------+�1��------------, � �'--------,-+7"-- 1 5 o K v A /

'WILr:::::::;::,r::::::====� -�

TRANSFORMER

PP-1, 200A, 208/120V,

30, 4W, M.L. 84 SPACE

TYPE SOD HQ FED -�

FROM PNL LV

JUNCTION

L_ • � 480V-208/120V, 30

BOX

PANEL BR, 175A,

208/120V, 30, 4W, -

M.C. FED FROM PNL LV

ELECTRICAL PLAN

SCALE: 3/8" = l'-O"

APPROVED-

DATE

APPROVED-FIRE CHIEF REV DATE

------- PROJECT NUMBER

DATE

APPROVED-SAFETY OFFICE

DATE:

D-AT_E ___ DRAWN BY

APPROVED-ENV COORDINATOR TRACED BY

DATE CHECKED BY f---=-'--'--'====

APPROVED-AT/FP OFFICER

SUBMITTED BY

DESCRIPTION BY

DEPARTMENT OF THE ARMY

OFFICE OF ENGINEERING AND PLANNING DIVISION

LETTERKENNY ARMY DEPOT

CHAMBERSBURG, PA

ELECTRICAL CONSTRUCTION

DATE

APPROVED-CH CONST & TRANS DIV

_______ 1---':'.DA�T--=--E ====-----1..::C

H __:E

NG

R __:&

P

_:;L A�N�D

:-=:I V :_______,-c::--::-:-=-::-:-r::c==---------.--:.----::-;::------=.--.---iDATE APPROVED SCALE: AS SHOWN IDATE: 17 JUL 25

APPROVED-DIR RISK MANAGEMENT

-----===-=- DRAWING NUMBER

COMMANDING

FEP - 863 SHEET 1 OF 1 DATE DATE

BLDG 5311 ELECTRICAL CON BW.pdf
Contract# W912DR-17-C-0043 AS-BUILT 02.pdf