This document is an Electrical Plan drawing for electrical construction at Letterkenny Army Depot in Chambersburg, Pennsylvania. The drawing, numbered FEP-863, dated 17 July 2025, depicts the installation and modification of electrical infrastructure including panel replacements, transformer upgrades, and conduit routing. Key components specified include: Panel HV (800A, 480V, 3-phase, 3-wire with main breaker, Type SOD I-Line); Panel LV (400A, 208/120V, 3-phase, 4-wire with main breaker, Type SOD I-Line); two new panels (PP-1 and PP-2) rated at 200A and 208/120V; Panel BR (175A, 208/120V, 3-phase, 4-wire); a 150 kVA transformer (480V-208/120V, 3-phase); a 30-ton air conditioning unit; and various conduit installations including 4-inch PVC conduit with three 500 MCM white conductors and grounding. The plan specifies demolition of existing equipment, installation of new equipment, and routing of feeders from Panel LV to multiple distribution points.
The drawing requires approvals from multiple departments including the Fire Chief, Safety Office, Environmental Coordinator, AT/FP Officer, Chief of Construction and Transportation Division, and Director of Risk Management. The plan is issued by the Department of the Army, Office of Engineering and Planning Division at Letterkenny Army Depot and includes provisions for room ventilation options and transformer pole modifications. This is Sheet 1 of 1 of the electrical construction documentation.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I u
CJ
o□
V
�PROPOSED LOCATION
/ ROOM VENTILATION OPTION
I I
PAN EL H V, 800A,
480V, 30, 3W, MB,
TYP SOD I-LINE
I /�-AIR COMP
I/ DISCON.
[v EXISTING
EXHAUST
LOUVER
- �PROPOSED LOCATION
-v MTS OPTION
3" CONDUITS W /
FEEDER CABLES
FROM PANEL L V TO:
PANEL PP-1
PANEL BR
30 TON A/C UNIT
- {:}r----
✓i\
=-------, '--l/ r---.._
EXIST.
TRANSFORMER
POLE -�
INSTALL
PP-2 '
�I'-� DEMO
f-------����----------t---- I �"-------ABND
200A, 208/120V, 30, 4W, M.L.
54 SPACE
TYPE SOD
� CONDUIT �4" PVC W/(3)
� 500 MCM
WH
DISCON.
'-------PAN EL L V, 400A,
208/120V, 30, 4W, ��� MB, TYPE-SOD I-LINE
DEMO ,� "-------GND BAR
DISCONNECT
T1 "" � (2)2J" COND. W/(4)
4/0+ (1) #4 GND.
o □ f---------1)-�11"-----------+�1��------------, � �'--------,-+7"-- 1 5 o K v A /
'WILr:::::::;::,r::::::====� -�
TRANSFORMER
PP-1, 200A, 208/120V,
30, 4W, M.L. 84 SPACE
TYPE SOD HQ FED -�
FROM PNL LV
JUNCTION
L_ • � 480V-208/120V, 30
BOX
PANEL BR, 175A,
208/120V, 30, 4W, -
M.C. FED FROM PNL LV
ELECTRICAL PLAN
SCALE: 3/8" = l'-O"
APPROVED-
DATE
APPROVED-FIRE CHIEF REV DATE
------- PROJECT NUMBER
DATE
APPROVED-SAFETY OFFICE
DATE:
D-AT_E ___ DRAWN BY
APPROVED-ENV COORDINATOR TRACED BY
DATE CHECKED BY f---=-'--'--'====
APPROVED-AT/FP OFFICER
SUBMITTED BY
DESCRIPTION BY
DEPARTMENT OF THE ARMY
OFFICE OF ENGINEERING AND PLANNING DIVISION
LETTERKENNY ARMY DEPOT
CHAMBERSBURG, PA
ELECTRICAL CONSTRUCTION
DATE
APPROVED-CH CONST & TRANS DIV
_______ 1---':'.DA�T--=--E ====-----1..::C
H __:E
NG
R __:&
P
_:;L A�N�D
:-=:I V :_______,-c::--::-:-=-::-:-r::c==---------.--:.----::-;::------=.--.---iDATE APPROVED SCALE: AS SHOWN IDATE: 17 JUL 25
APPROVED-DIR RISK MANAGEMENT
-----===-=- DRAWING NUMBER
COMMANDING
FEP - 863 SHEET 1 OF 1 DATE DATE
| BLDG 5311 ELECTRICAL CON BW.pdf |
| Contract# W912DR-17-C-0043 AS-BUILT 02.pdf |
File details come from the government source that posted it. Updated .