Example Pricing Sheets.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- W911N226RA009
About this file
This file is an example pricing sheet template for two construction projects—roofing and electrical work—at Letterkenny Army Depot under solicitation W911N226RA009. The roofing project template breaks down costs across multiple line items including roof replacement and fascia (3.2.A & 3.2.B), gutters, downspouts, and bollards (3.2.C), roof insulation (3.2.D), snow retention system (3.2.E), roof hatches/skylights (3.2.F), and lightning protection system (3.3), with optional pricing for a Roof Hugger System, removal of fallen insulation, and a fall protection system. The electrical project template itemizes pricing for a power panel 2 (3.2.A), surge suppression unit (3.2.B), main service ground (3.2.C), grounded duplex service receptacles (3.2.D), and arc flash risk assessment study (3.5.B), along with optional pricing for metering and data recording, manual transfer switch, panel low voltage door, and compressor room ventilation.
As a template document, this pricing sheet is designed to guide contractors on how to structure and format their cost proposals for the multiple-award indefinite delivery indefinite quantity (IDIQ) firm-fixed price construction contract. Contractors responding to this 100% 8(a) small business set-aside solicitation should use this example format to present their proposed costs for facilities alteration, repair, maintenance, and minor construction work at Letterkenny Army Depot. The file does not specify actual pricing, dollar amounts, or response dates; those details are indicated with placeholder values ($XXXXX or $XXXX).
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Roofing Project
| EXAMPLE PRICING SHEET | ||
| Base Roofing Project | ||
| 3.2.A & 3.2.B | Roof Replacement and Fascia | $XXXXX |
| 3.2.C | Gutters, Downspouts, bollards | $XXXXX |
| 3.2D | Roof Insulation | $XXXXX |
| 3.2.E | Snow Retention System | $XXXXX |
| 3.2.F | Roof Hatches/Skylights | $XXXXX |
| 3.3 | LPS | $XXXXX |
| Total Base Roofing Project | $XXXXX | |
| Options - Roof Hugger System | ||
| 4.1 | Roof Hugger System | $XXXXX |
| 3.2.C | Gutters, Downspouts, bollards | $XXXXX |
| 3.2.E | Snow Retention System | $XXXXX |
| 3.2.F | Roof Hatches/Skylights | $XXXXX |
| 3.3 | LPS | $XXXXX |
| Total Roof Hugger Option | $XXXXX | |
| Options | ||
| 4.2 | Removal of Fallen Insulation | $XXXXX |
| 4.3 | Fall Protection System | $XXXXX |
Electrical Project
EXAMPLE PRICING SHEET
| Base Electrical Project | ||
| 3.2.A | Power Panel 2 (PP-2) | $XXXX |
| 3.2.B | Surge suppression unit | $XXXX |
| 3.2.C | Main service ground | $XXXX |
| 3.2.D | Grounded duplex service receptacles | $XXXX |
| 3.5.B | Arc Flash Risk Assessment Study | $XXXX |
| Total Electrical Project | $XXXX |
| Options | ||
| 4.1 | Metering & Data Recording | $XXXX |
| 4.2 | Manual Transfer Switch | $XXXX |
| 4.3 | Panel LV Door | $XXXX |
| 4.4 | Compressor Room Ventilation | $XXXX |
File details come from the government source that posted it. Updated .