TETSS_Solicitation_W9115123R0024_Government Responces to Questions_15 Mar 23--.pdf
PDF 625 KB Posted
- Attached to
- Test and Evaluation Technical Support Services United States Army Operational Test Command (USAOTC)
- Solicitation number
- W91151-23-R-0024
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Qustion Number
Document (PWS, RFP, TE) Designation
Question / Clarification /
Suggestion
Category (page#, section #)
Citation (copy in the RFP section) Comment / Question Government Response
1 RFP Suggestion Page 45, Table 2 Table 2 – Volumes and Page Limitations | Volume I Mission Capability 70 pages TAB F: Factor 1 Mission Capability Subfactors.
Subfactor 1 –Base Operations
a. The Offeror shall provide Task Implementation Plans (TIPs) for each Base Task Authorization Request (TAR) in support of Base Operations Support for Air and Missile Defense Test Directorate (AMDTD) located at Fort Bliss, Technical Exhibit (TE) K and Base Operations Support for Fires Support Test Directorate (FSTD), Fort Sill, TE L, and PWS 5.1, IAW the TIP format listed as TE D – Task Implementation Plan Revision 20220106. Subfactor 3 – Test Support Operations
a. The Offeror shall provide a Task Implementation Plan (TIP) for Test Support Operations, Sample Test TAR (Attachment 1), using the TIP format listed as TE – Task Implementation Plan Revision 20220106. The Offeror’s TIP shall provide its technical approach IAW the entire PWS Section 5.2 and demonstrate their ability to perform pre-test services, test execution, and post-test services. The Offeror shall include their workload shifts for personnel management at multiple locations IAW Attachment 1.
Based on the requirements within Volume I Mission Capability Subfactors 1 and 3, recommend adding 60 pages to the current Mission Capability Volume page limitation of 70 pages in order for the offeror to address the 18 pages of Air and Missile Defense Test Directorate (TE K) requirements and the 15 pages of First Support Test Directorate (TE D) requirements. As well as all the requirements for this volume.
The Government extended the page limit and added 60 pages to the current Mission Capability Volume page limitation. The limit is increased to 130 pages.
2 RFP Question RFP Section L and TE D In the Government instructions, vendors are asked to:
1. Limit Volume 1 to 70 pages
2. Provide TIP response to 3 TARs
3. Respond to TIP as instructed within TE - Task Implementation Plan Revision 20220106 format instructions (which is .ppt)
4. Respond to PWS Section specified within TE - Task Implementation Plan Revision 20220106 format instructions (which is .ppt)
Under what conditions would the Government consider an alternative approach to either:
1. Increase the total page count to 150 pages
2. Allow each TIP submission in compliance to TE D and submit as a PowerPoint format as a separate attachment, AND respond to PWS Sections within the limited 70 page proposal page count
The Government extended the page limit and added 60 pages to the current Mission Capability Volume page limitation. The limit is increased to 130 pages. Will be issued with Amendment 0002.
3 RFP Question Page 44 C. Proposal Preparation Instructions | 2. Proposal Format | a. The Offerors shall submit their proposal through PIEE at https://piee.eb.mil/.
We have not been able to access PIEE at https://piee.eb.mil/ can the Government please tell us when we will have access?
The Government acknowledge that the solicitation was not uploaded initially, but this has been corrected and it is located in the PIEE Solicitation Module. All offerors should now be able to access and upload documents within the solicitation module.
4 Amendment 0001 Suggestion N/A N/A Amendment 0001 released on 30 Jan 2023 changed the due date for submission from 1 March 2023 to 23 February 2023. Taking away 6 days gives the current incumbent an advantage over all other bidders. With the amount of content required we would ask that the Government change the submission date back to 1 March 2023 to allow all bidders adequate time to response and equal play with the incumbent.
This is a revised response.
The Government is changing the closing date to 8 March 2023 22 March 2023. Was extended with Amendment 0004
5 RFP Question Volume - II Past Performance Will the Government accept an affiliate’s past performance, as long as a meaningful relationship commitment letter (MRCL) is provided?
No, we will not accept the MRCL for the affiliate's past performance.
6 RFP Question Page 40 Section 3a. On Pg. 40 states, 'The Offeror’s file name shall be “Company Name, Volume - Initial” for the first submission.'
May the Government please confirm the file names should be "Company Name, Volume #
- Initial"? E.g. "CompanyXYZ, Volume 1 - Initial", "CompanyXYZ, Volume 2 - Initial", etc.
Yes, the file names shall included a Volume number (e.g. II or 2)
7 Attachment 2 Past Performance and RFP Solicitation Mod 0001 p. 12, Tab G para d
Question Attachment 2 Past Performance pages 1 through 3, and RFP Amendment 0001, page 12.
Attachment 2 provides a form letter (dtd 23 Jun 2022) regarding client PPQs. It directs recipients to submit their assessments within 15 days of receipt (or date TBD, whichever is sooner) to Ebonie McClintock-Bennett at ebonie.f.mcclintock-bennett.civ@army.mil.
However, RFP Solicitation, Mod 0001 p. 12 states "The points of contact shall email the questionnaires directly to Lesa Crockett, CS, at lesa.m.crockett.civ@army.mil and Dianne K.
Grimes, KO, at dianne.k.grimes.civ@army.mil not later than 1:00 pm Central Time, 23 February 2023."
Please clarify the due date and appropriate person(s) to whom PPQs should be submitted, and re-issue Attachment 2 if appropriate.
The PPQ are due 5 calendar days (if the 5th day falls on Saturday or Sunday the next business day will be used) prior to solicitation closing.
Attachment 2 Past Performance has been revised to reflect the correct POC information.
8 RFP Solicitation Mod
Question Page 12, para 2 (a) through (k).
2. Contract Description. This section shall include the following information in the following format:
paras (a) - (k) outline information to be included in the citation.
For subcontractor past performance citations, if there is no visibility of the POCs with whom our Prime contractor interacts at the higher-level Contracting Activity, is it allowable/desirable to provide only the POC information for the Prime contractor and Government ACOR?
Yes, the Government will accept the POC information for the Prime Contractor and any Government Contracting Officer Representative (COR) for subcontractor past performance citations.
TETSS - Solicitation #: W9115123R0024
9 RFP Question Page 9. Amendment 1, pg. 8 says, “A page shall be an 8 ½” X 11” size of paper, no exceptions.” Pg 9 states, “TAB D: Cross Reference Matrix. Offeror shall use the Government-provided TETSS Attachment 6, Proposal Compliance Matrix”. To meet these two requirements, Offerors will have to rotate the Attachment 6 table AND reduce the font size to get it to fit within the parameters of a page.
Will the Government allow Offerors to adjust tables, graphs and formatting to fit into an 8 ½” X 11” size of paper?
This is a revised reponse.
Please refer to Amendment 0001 of the Solicitation, page 8, paragraph f. Cross reference indices are not included in the page limit. However, the font remains the same, but the table can overflow to more than one page.
The text size of the font size will be no larger than 12 point and no smaller than 10 point.
Illustrations and tables can overflow on to more than one page, however, they are counted as the number of pages they occupy.
10 RFP Question Page 49 Amendment 1, pg. 12 states, "d. For the contracts identified on each Specific Relevant Contract Reference, the Offeror shall forward a copy of the Past Performance Questionnaire (Attachment
2) to the points of contact responsible for monitoring performance under such contracts". The Evaluation Criteria does not mention PPQs but states, "The Government will review Offerors Past Performance in CPARS to include Quality, Schedule, Cost Control, Management and Regulatory Compliance."
Would the Government accept CPARS in lieu of PPQs? As a recent but former contract (within the past 3 years) may be referenced in Volume II of the proposal, it is likely that a Government POC familiar with an Offeror's performance may no longer be available to contact.
No, PPQs are in addition to the CPARS.
11 RFP Question Page 8 Amendment 0001, pg. 8 states: “Each volume shall contain a glossary of all abbreviations and acronyms used, with a definition for each.”
The submission requirements for Volume II (pgs. 10-13) do not specify a location for the required glossary. Are Offerors required to insert a glossary in Volume II? If so, may the Government please provide a location?
Please insert a glossary at the end of Volume II.
12 N/A Question N/A "The Government has several references for Government personnel for different actions. Please clarify the action owner for each of the following actions:
“Test Officer” Review and approve Offeror data collection forms developed “Test Officer / MTPA” -Provide input and approve any modifications to the agreed upon data collection schemes -Approve a property pass and discuss the LAN User Agreement responsibilities for travel with Government Furnished Computer Systems ahead of travel “Government” :
-Final authority to validate collected data meets and/or exceeds accuracy levels mutually agreed upon at the start of the test.
-Determine data reliability and appropriateness during data collection, reduction, and analysis “Government Representative” Provide applicable installation, facility, area commander installation and facility access, and local security policies and procedures."
1. PWS updated to include Test Officer, Military Test Plans Analysts definition.
2. MPTA can- approve data collection forms, approve modifications to the agreed upon data collection schemes, determine data reliability and appropriateness during data collection, reduction, and analysis, approves final authority to validate collected data meets and/or exceeds accuracy levels mutually agreed upon at the start of the test.
3. Property Pass/LAN User Agreement responsibilities are done during in processing.
4. Provide applicable installation, facility, area commander installation and facility access, and local security policies and procedures is done during the transition phase in.
13 RFP Question Page 46 "The Offeror shall provide Task Implementation Plans (TIPs) for each Base Task Authorization Request (TAR)...IAW the TIP format listed as TE D – Task Implementation Plan Revision 20220106".
TE D states, "10.2 The TIP shall be submitted to the Government (COR) as one document, consisting of a cover letter, technical approach, power point slides, and costing attachments, identified by the TAR number and title if applicable and title. The contractor shall also identify the POC or Lead responsible for accomplishing the task, with telephone number.
a.As per Government request, the contractor shall conduct an Oral TIP within 5 working days after electronic TIP submission"
Is the expectation that the contents within the TIP instructions be included in the proposal and therefore outside of the Form Approved OMB No. 0704-0188 document?
As TE D is embedded into a template (Form Approved OMB NO. 0704-0188), is the Government requiring a Cover Letter and Form Approved OMB No. 0704-0188 to be embedded into the Offeror's proposal within Volume 1, Subfactor 1?
The DID (OMB No. 0704-0188) is to provide Offerors with what is included in the TIP response. Offerors do not use the form for their proposal response. Based on the TE D, provide a written description as one complete document that includes a cover letter, technical approach, power point slides and costing. The sample test TAR will not have a costing attachment.
14 RFP Question See above Is the Cover Letter for each TIP included as part of the Offeror's page count? Yes.
15 RFP Question TE D See above In addition, is the Government expecting an Oral TIP within 5 working days after electronic TIP (proposal) submission?
If requested by the Government, yes, within 5 business days.
16 RFP Question TE D See above Are PowerPoint slides to be submitted as separate attachments, or are the slides to be embedded in each TIP response?
PowerPoint Slides are part of the TIP response, but not embedded. They are to be submitted a separate attachment.
17 RFP Question See above Are PowerPoint slides included as part of the Offeror's page count? Yes. The Government extended the page limit and added 60 pages to the current Mission Capability Volume page limitation. The limit is increased to 130 pages. Will be issued with Amendment 0002.
18 Amendment 0001 Question Page 2 The required response date/time has changed from 01-Mar-2023 01:00 PM to 23-Feb-2023 01:00
PM.
As the period of performance is not anticipated until April 2024 with a 30 day transition and proposal validity of 270 days from the proposal due date, will the Government provide Offerors with an adequate extension that synchronizes with a "reasonable" timeframe?
This is a revised response.
Yes, we have amended the 270 days to 406 365 days (Section L General Instructions Page 2).
19 Amendment 0001 Question Pages 14 Under Section L Vol. 3 Factor C- Cost # 8 states "Offerors shall provide Worker’s Compensation Insurance Certificate or other supporting documentation from the Contractor’s insurance company detailing how the cost of Worker’s Compensation Insurance proposed was derived. The submitted must be a Microsoft Excel document and not a flat (without formulas) file such as an Adobe PDF or Microsoft Word document.
Is it the Government’s intent that should an Offeror submit a Worker’s Compensation Insurance Certificate to satisfy this requirement, that the Worker’s Compensation Insurance Certificate must be submitted in a Microsoft Excel document? Please note, the Worker’s Compensation Insurance Certificate is provided by the Insurance Company in a letter/document format.
A submission of other supporting documentation must be in Excel format. If providing the Worker's Compensation Insurance Certificate, it can be in the format you receive from the Insurance Provider.
20 RFP - Attachment 5 Question Attachment 5 Cost Volume Workbook
N/A Will the Government allow bidders to make changes to all Tabs in order to capture all costs correctly.
Yes, the tabs can be modified. Propose according to your accounting system and how the Government is being charged. Ensure Attachment 5 links and cells appropriately work. See updated Attachment 5.
21 RFP Question Page 44 Section L, C.2.a. Please clarify how subcontractors are to submit their sealed packages. The feature of PIEE solicitation module allows for subcontractor to submit their sealed packages to the Government. Review the training modules for PIEE submissions.
22 RFP Question Page 44 Section L, C.2.c. It does not identify acceptable font size for tables and graphics. Would the Government Consider 10pt?
This is a revised response.
No, it will not be 10pt. The font remains the same, but the table can overflow to more than one page. The text size of the font size will be no larger than 12 point and no smaller than 10 point. Illustrations and tables can overflow on to more than one page, however, they are counted as the number of pages they occupy.
23 RFP Question Page 45 Section L, C.2.f. Is Volume I TAB E, executive summary considered part of the 70 page limit? Yes, the executive summary is included in the page count. The Government extended the page limit and added 60 pages to the current Mission Capability Volume page limitation. The limit is increased to 130 pages. Will be issued with Amendment 0002.
24 RFP Question Page 46 Section L, C. 3. i(3) TAB F, Subfactor 1 (a) The instructions direct offerors to use TE D to prepare the TIPS. However, the TIP identifies providing pricing data. Please confirm that pricing date should only be included in the pricing volume.
Place all your TIP information in TE D and the cost information in Attachment 5 Cost Volume Workbook.
25 RFP Question Page 46 Section L, C. 3. i(3) TAB F, Subfactor 1 (a) We recognize that TIPs are conducted via PowerPoint slides and orals. The instructions direct offerors to submit the TIP IAW the format listed in TE D. TE D 10.2 states one document, consisting of a cover letter, technical approach, power point slides, and costing attachments. Please confirm offerors are to provide the information listed in TE D
10.3 and 10.4 as a narrative within the 70 page count of Vol 1 and the format instructions in 10.1 and 10.2 do not apply for proposal submission purposes. Suggest changing "IAW the TIP format listed as TE D" to "IAW the TIP contents as defined in TE D 10.3 and 10.4".
This has been revised to read "IAW TIP Contents as defined in TE D 10.2 (does not include 10.2.a and 10.2.b,) 10.3 and 10.4.
Offerors are to provide this information within the 130 page count of Volume 1."
26 RFP Question Page 46 Section L, C. 3. i(3) TAB F, Subfactor 1 (a) The instructions direct offerors to use TE D to prepare the TIPS. However, the TIP identifies providing cost data under 10.4. Traditional, cost data is not provided in the Technical approach. Please clarify that the cost data required in TE D should be in Volume III and not included in Volume I subfactor 1.
Place all your TIP information in TE D and the cost information in Attachment 5 Cost Volume Workbook.
27 RFP Question Page 47 Section L, C. R. i(3) TAB F, Subfactor 1 c. **Note The ** note states to submit both BASE Operation TAR TIP cost in Attachment 5, Cost Volume Workbook. Please describe how the government want offerors to separate out that costs within the existing spreadsheet tabs.
Place all cost TIP information in Attachment 5, Cost volume Workbook. Tabs for the tests have been added to Attachment 5.
28 RFP Question Page 47 Section L, C.3.i(3) TAB F Subfactor 3 (a) The instructions direct offerors to use TE D to prepare the TIPS. The instructions also imply not to provide cost data for the Test Operation TIP. Please clarify which format/content in TE D is required in Volume I subfactor 3.
Place all cost TIP information in Attachment 5, Cost volume Workbook. Tabs for the tests have been added to Attachment 5.
29 RFP Question Page 47 Section L, C.3.i(3) TAB F Subfactor 3 (b) Can the Government provide a description clarifying the 2nd scenario, SUT equipment increases by 1/3?
Initial test concepts will occasionally change.
For example, the number of Engagement Operation Centers for an event may increase after initial planning or requirements for data collection/audio-video recording equipment will increase. Consequently, short notice adjustments will need to be made based on equipment availability, manpower, acquisition timelines, etc.
30 RFP Question Page 47 Section L, C.3.i(3) TAB F Subfactor 3 (b) Can the Government provide a description explaining and clarifying the 3rd scenario, overlapping SUTs?
Initial test concepts will occasionally change.
For example, the number of Engagement Operation Centers for an event may increase after initial planning or requirements for data collection/audio-video recording equipment will increase. Consequently, short notice adjustments will need to be made based on equipment availability, manpower, acquisition timelines, etc. In addition, events might take longer to complete creating an overlap into another test event that is currently going on or just starting. Meaning the contractor will need to handle the situation of continued operations on one site while adjusting to new timelines for another.
31 RFP Question Page 49 RFP Section L, C.3.ii.1 TAB G b. Please define what criteria constitutes a major subcontractor or is this up to the Prime offeror?
A major subcontractor is defined as performing 10% or more of the work.
32 RFP Question Page 49 RFP Section L, C.3.ii.1 TAB G c. Please define what size is considered same or similar to this effort. The dollar value, complexity, and scope are used to define same or similar effort.
33 RFP Question Page 49 RFP Section L, C.3.ii.1 TAB G d. Are Past Performance Questionnaires required if CPARS exists for the reference contract? PPQs are in addition to the CPARS.
34 RFP Question Page 50 RFP Section L, C.3.ii.4 Subcontracts Please define what the Government considers "Critical Services" or is it up to the Prime offeror to determine based on approach?
Critical Services under the TETSS contract refer to any "critical Services " defined as necessary to the agency to effectively perform and maintain control of its mission and operations.
Typically, those Services are recurring and long-term in duration.
35 RFP Question Page 50 RFP Section L, C.3.iii.3 Volume III, cost general instructions Please confirm that we have to include the DCAA POCs and documentation of accounting system for all subcontractors verses the subcontractor including it in their sealed packages.
The prime will provide their DCAA POC and the Subcontractor to provide their DCAA POC in their sealed packages.
36 RFP Question Page 51 RFP Section L, C.3.iii.8 Volume III Workers Comp: Please specify the required Workers Compensation Insurance limits. See Clause FAR 52.228-3 in the solicitation.
37 RFP Question Page 51 RFP Section L, C.3.iii.8 Volume III Workers Comp: The 2nd sentence in implies that a separate excel document is to be submitted. Please clarify if this can be included in the existing Volume narrative and applied in Attachment 5.
A submission of other supporting documentation must be in Excel format. If providing the Worker's Compenstation Insurance Certificate, it can be in the format you receive from the Insurance Provider
38 RFP Question Page 51 RFP Section L, C.3.iii.9 Volume III DBA Insurance: Please clarify if the indirect are to be applied in addition to the plug number, or be included in the plug number.
The plug number is used for evaluation purposes only. The indirect rates are not included in the plug number. Please see revised language in the CLIN 0006 extended description.
39 RFP Question Page 53 Section L, C.3.iii.3 Volume III, Other elements of cost d) It states that a cost proposal for each TIP for each TAR in Subfactor 1 is to be provided using TE D. Please clarify if this is separate from Attachment 5 and the Cost Narrative.
Government direction is unclear. Shall we list out the costs separately from Attachment 5? If so, can we add a TAB in Attachment 5 for each TIP or present the cost in the cost narrative?
Place all your cost TIP information in Attachment 5, Cost volume Workbook. Tabs for the tests have been added to Attachment 5.
40 RFP Question Page 54 Section L, Clause 52.216-1 Will the Government be awarding the submitted Base Operation TIPs as task orders with the IDIQ award?
The Government will meet the minimum guarantee in clause FAR 52.216-19; however, the specific task order(s) will be determined at the time of award.
41 RFP Question Page 54 RFP Section L, Clause 52.216-1 Will the awarded value be the price proposed in Section B and Attachment 5? The contract ceiling will become the value proposed in Section B and Attachment 5. The specific task order(s) will be determined at the time of award
42 RFP Question Page 60 RFP Section M, C.b.(iii).2 Factor 3 - Cost Since offerors are only pricing the 2 BASE Operation TARS in Attachment 5, does that mean it will become the contract ceiling value?
No, the contract ceilling will become what is proposed in Section B and Attachment 5.
43 Attachment 1 Question Sample Test TAR, Para. III b In the Additional Requirements paragraph, the Gov't makes mention of "analysts". Are these the Scientific Analysts and Systems Analysts identified in Attachments 3 & 4 (Historical Staff for Ft Bliss and Ft Sill)? Or is the Gov't envisioning the bidder to provide other types of analysts?
The term refers to Scientific Analysts, Systems Analysts, or other Analysts deemed necessary by the contractor to complete the requirement.
44 Attachment 1 Question Attachment 1, Sample Test TAR. Para IV 2 In order to fully understand the duration of deployment are we to assume that the full length of the required TDYs for testing must include travel to the site, test setup and checkout prior to the tests and then teardown, packing, and travel back to home base, in addition to the dates listed in the Milestone Table?
Yes, TDYs for tests must include travel to the site, test setup, checkout prior to the tests, along with site teardown, packing, and travel back to home base. This is in addition to the dates listed in the Milestone Table.
45 Attachment 1 Question Attachment 1, Sample Test TAR. Para IV 2 Support Record Test: Are there any support requirements for 24/7 operations? Yes, Attachment 1, Sample Test TAR was revised to include 24/7 operations. Normally, operational test events include 24-hour operational phases during Limited User Test (LUT) or Initial Operational Test & Evaluation (IOTE). Typically 3-4 instances of 72-96 hour mission pulses.
46 Attachment 1 Question Attachment 1, Sample Test TAR. Para IV 2 How many systems are under test? ( the number will determine the number of personnel the bidder must provide for video instrumentation and Data Collectors)
There are variable numbers of systems under test (SUT). All have varying degrees of complexity. Each test has different number of Major Equipment Items (MEIs) under test, this requirement will be spelled out in the TAR if required
47 Attachment 1 Question Attachment 1, Sample Test TAR. Para IV 2 Does the Gov't intend to provide additional information on the systems that will be tested in Sample Test TAR? Without more details it is impossible to determine the total number and types of personnel that will be required to support the test. Specifically, bidders need to know how large and how many pieces of test equipment is involved to support the test so we know how many personnel to provide for setup, checkout, operation, etc. (e.g., can one person do it, does our team need to be a 2-5 person support team, or more?)
The answer impacts travel planning logistics.
Attachment 1, Sample Test TAR was updated in Page 3, Section III Work Requirement paragraph 1.c. Major Equipment Items (MEI) Page 3, Section III Work Requirement paragraph 1.c. Major Equipment Items (MEI) quantities for testing and estimated scheduled time to execute.
48 RFP, Attachment 2 Question If a subcontractor is doing a PPQ, who shall they enter in Section B Identification of Offeror's Representative? The Prime POC or the Subcontractor POC or the contract Contracting Office POC?
If the subcontractor is doing a PPQ, for work accomplished as a subcontractor, the PPQ should list the information for the prime and the subcontractor should provide an explanation of what work they performed as the subcontractor for that contract.
49 Attachments 4 and 5 Question Position Description TABS Are offeror's expected to use the historical labor categories as required in building our labor response in the TIPs and pricing? If so, the labor categories do not identify year's of experience or education.
This is a revised response.
The Government is providing Attachment 3 Historically Staffing Fort Bliss and Attachment 4 Historical Staffing Fort Sill, which depicts the historical staffing by labor category, hours and fiscal year previously used to accomplish the mission. The Offeror shall describe the approach to successfully respond to rapid increases and decreases in workload, specifying methodology. The Government wants your proposal on what labor category is required.
We provided historical data for reference but is not a requirement to use. Historical data is defined as data collected about past events;
belonging to the past, not the present. This historical information is provided for the Offeror's use if they choose to in their proposal preparation. It is not baseline staffing; therefore, not provided as a minimum staffing solution.
50 RFP, Attachment 5 Question Summary TAB for total 60 month ordering period includes Phase in. Please confirm that is correct because Section B has Phase in as a separate CLIN, 0005.
Yes the 60 month ordering period includes Phase In. CLIN 0005 is separate to account for transitional requirements.
51 RFP, Attachment 5 Question Summary TAB the equations for TAR total have bad reference. Please correct. The bad references on the summary tab have been updated/ corrected.
52 RFP, Attachment 5 Question Please provide instructions on how we are to separate out cost for each BASE TAR. TABs for each test have been added to Attachment 5.
53 RFP, Attachment 5 Question The Total 60 Month Ordering Period TAB has no instructions and is not conducive to roll up all the costs in the yearly tabs. Entering costs in this tab to represent the cost for all 5 years creates additional burden on offerors to get this tab to work. Recommend deleting this tab and have the Year costs be applied to the summary page where the total ordering period cost is added up.
Agreed, deleted Total 60 Month Ordering Period tab. Offeror is able to use the tabs per year for increased labor rates.
54 RFP, Attachment 5 Question Subcontractors are not going to provide Prime the data for columns A thru U, just their cost to the prime offeror. Their sealed package would have that data. However, on the Prime's cost submission, the subcontractor cost is entered. The Yearly tabs do not provide a provision for subcontractor costs to be entered. Please provide instruction and updated spreadsheet to insert subcontractor costs to the prime within the prime's cost submission.
As a guide, a section for subcontract labor has been added with a column for the burdened labor rate provided by the subcontractor and hours. Modify the spreadsheet as necessary to include prime burdens. Ensure cells and links are working properly if Attachment 5 is modified.
55 TE A - PWS Question Page 4 PWS 1.4 The second line on Page 4 states, "The Government will issue Task Authorization Requests (TARs) and Test Implementation Plans(TIPs)…" Will the Government issue TIPs?
No the Government does not issues Task Implementation Plan (TIP). The PWS Paragraph
1.4 has been revised.
56 TE A - PWS Question Page 19 PWS 1.6.10.1.3 Please identify which DoD 8570 baseline certification (e.g. IAT vs IAM) and level (I, II, or III) meet the requirement.
PWS 1.6.10.1.3 revised 8570 to 8140, and
5.4.4.2. was revised to say DOD 8140.03 Obtain and maintain certifications at Information Assurance Certification Training (IAT) II level listed instead of the DoD 8570.01-M for IAT II.
57 TE A - PWS Question Page 19 PWS 1.6.10.1.3 Please identify how many years of experience the RMF System Administrator Key Personnel require.
PWS 1.6.10.1.3, revised language states, the RMF System Administrator shall have 1-3 years’ experience in eMASS and RMF processes.
58 TE A - PWS Question Page 19 PWS 1.6.10.1.3 Please identify if any educational degrees are required the RMF System Administrator Key Personnel.
There are no educational degree requirements for RMF System Administration Key Personnel.
59 TE K AMDTD Base TAR, 2.5.1.5
Question Page 7 Base TAR, 2.5.1.5 Please confirm PWS 5.4 reference verses 5.3. TE K 2.5.1.5 has been revised, please review.
60 TE K AMDTD Question Page 9 Base TAR, 2.5.1.1 through 2.5.1.15 For clarity, can the Government provide a more specific PWS reference. The following Base TAR TE K paragraphs have been revised to include the following specific PWS references: TE K
2.5.1.1 with PWS 5.2.1.2;
TE K 2.5.1.2 with PWS 5.2.1.2;
TE K 2.5.1.3 with PWS 5.2.1.6.2;
TE K 2.5.1.4 with PWS 5.2.1.6.2;
TE K 2.5.1.5 with PWS 5.2.1.6.8.4 and 5.2.1.6.8.5;
TE K 2.5.1.6 with PWS 5.2.1.6.8.2;
TE K 2.5.1.7 with PWS 5.4.1.2;
TE K 2.5.1.8 with PWS 5.2.2.1.5.12;
TE K 2.5.1.9 with PWS 5.2.1.4;
TE K 2.5.1.10 with PWS 1.6.14 and 5.2.2.1.5.11.1;
TE K 2.5.1.11 with PWS 5.3.1.3.5;
TE K 2.5.1.12 with PWS 3.5.5 and 5.3.1.1;
TE K 2.5.1.13 with PWS 5.2.1.2 and 5.2.1.6.8.2;
TE K 2.5.1.14, with PWS 5.2.1.6.8.2 and 5.2.1.6.8.3;
TE K 2.5.1.15 with PWS 5.3.3.1.
Section 2.5 has been revised to add PWS paragraphs.
61 TE K AMDTD Question Page 10 Base TAR, 2.5.2.2 Please confirm PWS 5.4 reference verses 5.3. The government confirms PWS 5.4. Also refer to
PWS 5.4.3.5.
62 TE K AMDTD Question Page 10 Base TAR, 2.5.3 For clarity, can the Government provide a more specific PWS reference. PWS reference is 5.2.2.1.5.9.
63 TE K AMDTD Question Base TAR, 2.5.4, 2.5.7, 2.5.9.1, 2.5.9.2, 2.5.9.4, 2.5.9.5, 2.5.9.7, 2.5.9.8, 2.5.9.9, 2.5.9.11, 2.5.9.12, 2.5.9.13, 2.5.9.21, 2.5.9.22, 2.5.9.24, 2.5.9.25, 2.5.9.26.
For clarity, can the Government provide a more specific PWS reference. The Base TAR , TE K was updated to include the following references:
2.5.4, PWS 5.2.1.2.; 5.2.2.1.4.; 5.2.1.6.2.;
5.4.1.2.
2.5.7, PWS 1.6.17.; 5.3.1.1.
2.5.9.1, PWS 1.6.9.1.; 5.2.2.1.5.; 4.4.
2.5.9.2, PWS 5.2.1.2.; 5.4.2.4.
2.5.9.4, PWS 5.2.1.3.; 5.2.1.5.;
5.2.2.1.3.;5.5.4.4.; 5.5.6.
2.5.9.5, PWS 5.5.6.; 5.4.2.1.
2.5.9.7, PWS no reference in PWS, no longer a requirement .5.9.8, PWS 5.3.1.1.; 5.4.2.2.;
5.4.4.13.
2.5.9.9, PWS 5.0.; 5.2.2.1.5.2.; 5.2.1.6.2.;
5.2.1.6.8.; 5.2.1.6.8.3.; 5.2.2.1.3.
2.5.9.11, PWS 5.2.2.1.3.; 5.2.2.1.3.;
2.5.9.12, PWS 5.2.2.1.5.;
2.5.9.13, PWS 5.4.4.18.; 5.4.4.20.
2.5.9.21, PWS 3.4.1.1.; 1.6.8.4.; 5.5.4.1.;
2.5.9.22, PWS 5.2.1.2.; 5.2.1.3.;
2.5.9.24, PWS 1.1.; 5.5.6.;
2.5.9.25, PWS 1.1.; 5.5.6.;
2.5.9.26 PWS 5.2.1.2.; 5.2.3.1. Section
2.5 has been revised to add specific PWS references.
64 TE L FSTD Question Page 3 Base TAR, 2.1.2.6. Please confirm reference to 5.8 verses 5.7. This reference should be PWS 5.7, not PWS 5.8.
65 TE-N (GPL) Question Gov't Property List (GPL) Are there more GFP located at Ft Sill (FSTD)? Reason is the AMDTD (Ft Bliss) GPL list includes information on vehicles, trailers, tools, special test equipment, generators, etc.
Does Ft Sill have any of this property? If so, please provide.
There is a separate tab on TE N for FSTD property. An updated TE N will be provided.
66 Solicitation - Volume I Mission Capability
Question Page 42 L-B.3.a(2) states, “The required information regarding these two (2) individuals must be submitted with the Offeror’s proposal and included in the cover letter.”
A Cover Letter is required with contact information for two (2) POCs for ASSIST2Industry, however it is unclear where the Cover Letter belongs and whether it is page counted. In which volume shall the Cover Letter be included, and can it be excluded from page count limitations?
The cover letter should be included at the top of the General Volume. There is not a page count for the General Volume. See solicitation Under C Proposal Preparation Instruction, 2 Proposal Format c. Table 2 Volume and page limitation
67 Solicitation Volume III - Cost/Price and Attachment 5
Question Pages 52, 53 Section ii (d) of the Solicitation "Other Elements of Cost" states: d) The Offeror shall provide a cost proposal with each Task Implementation Plans (TIPs) for each Task Authorization Request (TAR) identified in Subfactor 1-Base Operations. Respond using the TIP format listed in A002, TE D.
Each of the Base TAR TIPs require cost proposals within this volume, which are to be completed within Att. 5 (Excel). However, it is unclear whether Attachment 5 is correctly set up for this information. Is it the expectation of the USG that the offeror will add additional tabs to Attachment 5 Cost Volume Workbook in this format to calculate the totals for the base TARS on the summary tab or does the USG plan to amend Attachment 5 Cost Volume Workbook to include the base TAR pricing calculations?
Place all your cost TIP information in Attachment 5, Cost volume Workbook. Tabs for the tests have been added to Attachment 5.
68 Solicitation Volume III - Cost/Price and Attachment 5
Question Page 47 L-C(3)(i)(3)(1) states, “A cost proposal is required for the Base Operation TAR for Fort Bliss, TX, (TE K) and Fort Sill, OK, (TE L) and shall be submitted in the Offeror's Attachment 5, Cost Volume Workbook, included with the Volume III for Factor 3 Cost.”
Each of the Base TAR TIPs require cost proposals within this volume, which are to be completed within Att. 5 (Excel). However, it is unclear whether Attachment 5 is correctly set up for this information. If Attachment 5 is correct with a single amount entered for each Base TAR, are the formulas correct as currently shown in the Summary tab?”
Place all your cost TIP information in Attachment 5, Cost volume Workbook. Tabs for the tests have been added to Attachment 5.
69 Attachment_5_Cost_Vo lume_Workbook.xlsx
Question Tabs: Phase In, Total 60 Month Ordering Period, Year 1, Year 2, Year 3, Year 4, Year 5
May Offerors insert additional columns to include additional Fringe elements? Yes, the tabs can be modified. Propose according to the offeror's accounting and estimating systems. Ensure Attachment 5 links and cells work appropriately if Attachment 5 is modified.
70 Solicitation and Attachment 5
Question Page 3 and Tabs: Total 60 Month Ordering Period, Year 1, Year 2, Year 3, Year 4, Year 5
Section B The sum of the Other Direct Cost Plug Numbers from the Tabs Year 1 - Year 5 equal $7,935,005.00. The Other Direct Cost Plug Number total on Tab Total 60 Month Ordering Period and Item No 0002 in Section B is $7,935,004.00.
Which plug numbers are correct? This is a revised reponse.
The Government will not update Section B the plug number $7,935,004.00 is correct. See revised Attachment 5, Year 5 ODC amount corrected from $1,666,327.00 to $1,666,326.00.
71 Solicitation and Attachment 5
Question Page 5 and Tabs: Total 60 Month Ordering Period, Year 1, Year 2, Year 3, Year 4, Year 5
Section B Should the plug figure for Item No 0006 Defense Base Act Insurance be added to the Cost Volume Workbook tabs?
Yes, added to Attachment 5.
72 Solicitation and Attachment 5
Question Page 47 L-C(3)(i)(3)(1) “A cost proposal is required for the Base Operation TAR for Fort Bliss, TX, (TE K) and Fort Sill, OK, (TE L) and shall be submitted in the Offeror's Attachment 5, Cost Volume Workbook, included with the Volume III for Factor 3 Cost."
Attachment 5 has a line for each TAR total; however, there are no tabs in the Workbook to provide a breakdown of the proposed estimated costs for each TAR. Should the Offeror add a tab for each TAR, AMDTD Fort Bliss Base TAR and FSTD Base Fort Sill TAR?
TABs for each test have been added to Attachment 5.
73 Solicitation and Attachment 5
Question Page 51 L-C(3)(iii)(6) "The substantiation of labor mix, direct labor hours, and full-time equivalents (FTEs) for all labor categories shall be supported and crosswalk to the technical volume."
Should the labor proposed on each "Year x" tab of Attachment 5 be the total of the Subfactor 1 - Base Operations requirements? If not, please clarify what is to be priced in each "Year x" tab.
Yes, the Mission Capability Volume 1 and the Cost Volume 3 both should match what offeror is proposing.
74 Solicitation and Attachment 5
Question Page 53 L-C(3)(iii) Volume III - Factor 3 - Cost, Other Elements of Cost (d) "The Offeror shall provide a cost proposal with each Task Implementation Plans (TIPs) for each Task Authorization Request (TAR) identified in Subfactor 1- Base Operations. Respond using the TIP format listed in A002, TE D."
Should this information be included on additional, separate tabs of the Attachment 5? Yes, TABs for each test have been added to Attachment 5.
75 Performance Work Statement
Question Page 30 1.6.39.1 and 1.6.39.2 As part of the Phase-in and Phase -Out paragraphs, the PWS states "Costs associated with the immediate transition of necessary personnel upon contract award shall be included in its associated CLIN 0004 and as part of the solicitation cost."
CLIN 0004 is the Service Contract Reporting (SCR) CLIN. Should this be CLIN 0005 Phase- In FFP as referenced on page 5 of the solicitation?
PWS has been revised to state CLIN 0005
76 Solicitation Question Pages 3 and 10 Section B Should the POP for CLIN 0001 be 20 MAY 2024 to 19 APR 2029 since CLIN 0005 Phase-In covers POP 20 APR 2024 to 19 MAY 2024? Will the Government clarify?
No, the POP dates are correct in the RFP.
77 Solicitation Question Page 33 Section J Exhibit R The Exhibit R Wage Determination 2015-5229 Rev 19 Ft Bliss that is listed in Section J does not match the TE_R_-Wage_Determination_2015-5229_Rev_17_Bliss.pdf that was provided with the solicitation. Will the Government provide the most recent Wage Determination and update Section J?
The Wage Determinations was verified and it has been updated.
78 Solicitation Question Page 33 Section J Exhibit S The Exhibit S Wage Determination 2015-5313 Rev 19 Ft Sill that is listed in Section J does not match the TE_S_-_Wage_Determination_2015-5313_Rev17_Sill.pdf that was provided with the solicitation. Will the Government provide the most recent Wage Determination and update Section J?
The Wage Determinations was verified and it has been updated.
79 Solicitation Question Page 34 Section J Exhibit V The Exhibit V CDRL A009-A010 wording does not match TE_V-_TETSS_CDRL_A009- A011_DD1423_4_Oct_22.pdf that was provided with the solicitation. Will the Government update the wording in Section J for Exhibit V?
Section J has been revised.
80 Solicitation Question Page 34 Section J Attachment 6 was provided with the solicitation but is missing in Section J. Will the government add Attachment 6 to Section J?
Section J has been updated to include Attachment 6.
81 Solicitation Question Pages 40-41 Section L Will the government provide PIEE submission instructions for subcontractor's cost/pricing files?
The feature of PIEE solicitation module allows for subcontractor to submit their sealed packages to the Government. Review the training modules for PIEE submissions.
82 Solicitation Question Page 44 Section L, C (2) "A maximum size file of 1.95 GB (PIEE) is allowed and only files submitted …" Is the 1.95 GB a max per file or for total submission, including all four volumes combined? The 1.95 GB is a maximum file size not the total submission.
83 Solicitation Question Page 46 Section L Tab E Is Tab E included in the 70-page count of Volume I Mission Capability? Yes, the executive summary, TAB E is included in the page count. The Government extended the page limit and added 60 pages to the current Mission Capability Volume page limitation. The limit is increased to 130 pages.
84 Attachment 1 Question Page 3 2. Task Data Summary - Frequency and amount of data being collected daily How many data harvests are required per day? Minimum of one data harvest per 24hr period.
85 Attachment 1 Question Page 3 2. Task Data Summary - Daily instrumentation & data turn in Where is data turn-in (Data Management) occurring, WSMR 901 or Bliss? The sample test TAR was updated, so this verbiage is no longer in the document in this paragraph.
86 Attachment 1 Question Page 9 VIIII, Hours of Work The TAR states hours of work are 7:30 a.m. to 4:30 p.m., although it also states there is possible 24 hour operations; can the Government verify for this TAR that data collection will only occur between 7:30-4:30?
Operational test events include 24-hour operational phases during Limited User Test (LUT) or Initial Operational Test & Evaluation (IOTE). Typically 3-4 instances of 72-96 hour mission pulses. When 24 hour operations are required it will be spelled out in the TAR and will not be determined until the test schedules are prepared.
87 Technical Exhibit D Section iii of the Solicitation Volume III - Factor 3 - Cost
Question "Under no circumstance shall this information and documentation be included elsewhere in the proposal."
The TIP shall be submitted to the Government (COR) as one document, consisting of a cover letter, technical approach, power point slides, and costing attachments
This statement conflicts with the instructions for the TIP instructions in TE D.
Which instructions does the USG intend for the offerors to follow for the purposes of the proposal?
The Sample Test TAR, Attachment 1 is being updated to clarify work hours.
88 Solicitation Question Page 1 SF33 Will the Government consider an extension of 14 days from the date government responses to the questions and answers to allow industry time to analyze and incorporate changes in their proposal response?
This is a revised reponse.
The Government is changing the closing date to 8 March 2023 22 March 2023.
89 Attachment 2 Past Performance and RFP Solicitation Mod 0001 p. 12, Tab G para d
Page 2 Sample Letter of Consent Instructions for Past Performance Questionnaire instructs offeror to submit Past Performance Questionnaires to the Prime contractor for citations where the offeror performed as a subcontractor. In the event that the Prime contractor that would be providing the evaluation is also competition for the TETSS contract, would the government consider allowing the offeror to submit the past performance questionnaire directly to the government customer for completion. This will prevent potential competitors from erroneous reporting past performance information and or ratings.
Pricing shall only be included in Cost Volume 3 and Attachment 5.
90 RFP Section L (ii) 1 Tab G d.
Question/Sugge stion
Page 49 For the contracts identified on each Specific Relevant Contract Reference, the Offeror shall forward a copy of the Past Performance Questionnaire (Attachment 2) to the points of contact responsible for monitoring performance under such contracts. The points of contact shall email the questionnaires directly to Lesa Crockett, CS, at lesa.m.crockett.civ@army.mil and Dianne K.
Grimes, KO, at dianne.k.grimes.civ@army.mil not later than 1:00 pm CT, 09 March 2023. Any questionnaires not emailed directly to the CS and KO will not be reviewed or evaluated. The information contained in the questionnaires will be used to evaluate the Offeror’s past performance. New entities that have no past customers shall annotate on the Summary Page that they have had no previous clients and that questionnaires cannot be provided.
Because KOs and CORs are extremely busy and provide performance feedback via CPARS on most Prime contracts, for those past performance references that have CPARS, will the Government consider allowing for the submission of the latest CPARS rather than or in lieu of a PPQ submission?
RECOMMENDATION: Recommend CPARS submission as the primary means of assessing the quality performance on Past Performance submissions to enable the Confidence Assessment defined in Section M evaluation Criteria. Require Offerors to submit a copy of the latest CPARS, as applicable, for each submitted Past Performance citation.
No, PPQs are in addition to the CPARS.
91 RFP Section L (ii) 1. Tab D
Question Page 48 TAB D: Consent Letters. The Offeror shall submit consent letters executed by each subcontractor, teaming partner, and/or JV partner, authorizing the release of past performance information so the Offeror can respond to such information. This is in addition to the page count in Table 2.
Does the Government want the Offerors to use the "SAMPLE LETTER OF CONSENT" that is indicated on page 2 of RFP Attachment 2 (Past Performance) as the format for the Consent Letter at Tab D?
The Government did not state that the format in the "Sample Letter of Consent" shall be used.
The content inside the sample letter was provided as guidance so offerors would know the type of information that the letter should include.
92 RFP Section L (ii) 2. - 3. Question Page 49-50 2. Contract Description. This section shall include the following information in the following format:
(a) Contractor/subcontractor place of performance, Commercial and Governmental Entity (CAGE) Code and Unique Entity ID Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (PoC) within the prime contractor organization (name, current address, e-mail address, and telephone numbers).
(b) Government contracting activity, and current address, Procuring Contracting Officer’s name, e-mail address, and telephone numbers.
(c) Government’s technical representative/Contracting Officer’s Representative name, current email address, and telephone numbers.
(d) Government contract administration activity and the Administrative Contracting Officer’s name, current e-mail address, and telephone number.
(e) Government contract administration activity’s Pre-Award Monitor’s name, current e-mail address, and telephone numbers.
(f) Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements, include Delivery Order Numbers.
(g) Contract Type (specific type such as Fixed-Price (FP), Cost Reimbursement (CR), Time & Material (T&M), etc.). In the case of Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc.).
(h) Awarded price/cost.
(i) Final or projected final price/cost.
(j) Original delivery schedule, including dates of start and completion or work.
(k) Final or projected final, delivery schedule, including dates of start and completion of work.
3. Performance. Offerors shall provide a specific narrative explanation of each contract listed in the Contract Description, describing the objectives achieved and detailing how the effort is relevant to the requirement of this RFP.
(a) For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.
(b) For all contracts, the Offeror shall provide data on all manufacturing warranty returns. Data shall delineate total number of warranty returns, number of Could Not Duplicate (CND), number of failures attributable to Government-Furnished Equipment (GFE) component failures, and number and nature of failures attributable to the Offeror’s delivered product.
Since there is a page constraint on each submitted Past Performance, will the Government provide a standard template attachment that includes all of the requirements?
No, the Government will not be providing an additional template. Attachment 2, past performance questionnaire was previously…