This document is a lead-based paint hazard survey report for Building 32010 at Fort Hood, Texas. The report identifies lead-based paint on several interior and exterior surfaces that will be impacted by planned renovations to the building. Interior surfaces found to contain lead-based paint include walls, doors, windows, and ceilings in various rooms. Exterior surfaces containing lead-based paint include overhead door frames and bump posts. The report recommends stabilization, removal, or replacement of lead-based painted surfaces and proper handling and disposal of any waste generated during remediation work. It also offers consulting services for managing lead abatement projects.
The related federal contract opportunity is a solicitation from the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood to renovate Building 32010 at Fort Hood, Texas. Given the identification of lead-based paint in the building, the renovation work will likely include lead remediation services.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clean Environments, inc.
Industrial Hygiene & Environmental Consultants
April 19,2011
Kickapoo Empire, LLC 1003 Paulsun Drive, Texas 78130 San Antonio, Texas 78219 Attn: Sonny Gomez
RE: Lead-Based Paint Hazard Survey, Building 32010, Fort Hood, Texas CEI Project JV» 8997B
Dear Mr. Gomez:
Clean Environments, Inc. conducted a limited lead-based paint survey of the interior and exterior surfaces scheduled to be impacted by renovations and/or demolition at the above referenced building on March 21 and 23, 2011. The survey was conducted by Mr. Michael Williams, Lead Inspector, Department of State Health Services (DSHS) License N° 2060822, working under Craig Nelson, Lead Risk Assessor, Department of State Health Services (DSHS) License N° 2070897 of Clean Environments, Inc, Lead Firm, DSHS License N° 211-0096. This survey satisfies the EPA Renovation, Repair and Painting Final Rule 745.82 (a) (1).
The building was tested using an Innov-X Systems, Model (X-6500R XRF Analyzer, Serial N2 8029.
A copy of the XRF data sheet is attached below=
SUMMARY:
• Interior: The following Lead Based Paint (LBP) surfaces were identified in the interior of the Building:
• Room 9 Wall, sheetrock, red, intact
• Room 14 Door, wood, tan, intact
• Room 19 Window Sill, wood, tan, intact
• Storage Room, Ceiling, sheetrock, tan, intact
• Shop, Overhead Door Bump Posts, metal, yellow, peeling
• Shop, Floor, concrete, yellow, peeling
• Shop, East Wall (adjoining office area), CMU, tan, intact
• Exterior: The following Lead Based Paint (LBP) surfaces were identified on the exterior of the Building:
• Throughout Building, Overhead Door Bump Posts, Metal, yellow/brown, peeling
• Throughout Building, Overhead Door Frame, Metal, tan, intact
10803 Gulfdale, Suite 210 • San Antonio, Texas 78216 • 210/349-7242 • Fax 210/349-1132
Lead-Based Paint Hazard Survey Building 32010, Fort Hood, Texas CEI Project JVs 8997B
RECOMMENDATIONS
Survey results indicate that the building contains lead-based paint. The lead-based painted surfaces may be stabilized and repainted/encapsulated, removed to the substrate, or removed and replaced.
The waste material generated during the stabilization/removal process should be properly characterized (TCLP Lead) and disposed in accordance with the applicable TCEQ and EPA requirements. The waste material substrates with identified LBP should be segregated from non-LBP substrates. The LBP response actions should be conducted by qualified lead abatement personnel in accordance with the applicable Occupational Safety and Health Administration (OSHA), Lead in Construction Standard and OSHA Respiratory Protection Program standard.
Clean Environments, Inc. is a licensed lead consultant firm. We will be happy to assist in finding a licensed lead abatement contractor and preparing specifications for the abatement project. Clean Environments, Inc. also offers air monitoring and project management for lead abatement projects.
We will be happy to answer any questions concerning the report. It has been a pleasure to work with you on this project. We look forward to being of continued service to you.
If there are any questions concerning this project, please call.
Very truly yours, CraiifNelsoh ' Michael Williams Le^a Risk Assessor Lead Inspector DSHS License No 2070897 DSHS License # 2060822
Attachments: XRF Data Sheet
XRF DATA SHEETS
XRF RESULTS
Mode Standardization LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection
Room Side Component Substrate Color ConditionPass Fail
PASS
Positive Positive Positive
Negative Positive Negative Negative Negative
Negative Negative
Negative Negative Negative
Negative
Negative Negative Negative Negative Negative
Negative
Negative Negative
Negative Negative
Negative
Negative Positive Negative
Negative
Negative
Negative Negative
Pb
1.03 1.03 1.01 0.02
2.64 0.09
0.09
0.07
0.02
0.16
0.02
0.03
0.19
0.1
0.07
0.08
0.06
0.06
0.13
0.05
0.05
Date 03/22/11
03/22/11 03/22/11 03/22/11
03/22/11
03/22/11 03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11 03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
Reading
N/A N/A N/A
Room 9 Room 9 Room 9 Room 9 Room 9 Room 9 Room 9 Room 9 Room 9 Room 4 Room 4 Room 3 Room 3 Room 3 Room 3 Room 3 Room 3 Latrine Latrine Latrine Latrine Latrine Room 14 Room 14 Room 14 Room 14 Room 14 Room 14 Room 14 c D D D
D
B A
B B
A A
C
C D D
A A
C
C C
C A
C c c A
D
D D
Calibration Calibration Calibration Wall Wall Wall Wall
Window Wall Floor
Door
Door Frame
Wall Wall
Wall Wall Window Case Window Floor
Ceiling Stall
Stall
Stall Wall Wall
Door Frame Door Wall Ceiling
Wall
Wall Wall
Sheetrock Sheetrock Sheetrock
Sheetrock Metal
CMU
Concrete Metal Metal
CMU
CMU
CMU
Metal
Metal Metal Concrete Sheetrock
Metal Metal
Metal
CMU
CMU
Metal Wood
CMU
Sheetrock
Sheetrock
CMU
Sheetrock
Tan Red Red
Red Brown Tan
Grey Tan Tan
Tan Tan
Tan Tan
Tan Tan
Black Tan
Tan Tan
Tan Tan
Tan Tan
Tan Tan Tan
Tan
Black
Black
Intact
Intact Intact Intact Intact
Intact Intact
Intact Intact
Intact Intact
Intact Intact Intact Intact
Intact Intact
Intact Intact Intact
Intact Intact
Intact
Intact Intact Intact
Intact Intact
Intact
Ft. Hood, Bldg. 32010 CEI Project 8997 Page: 1
Date 03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
03/22/11
Reading
Mode LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection
Pass Fail Negative
Negative
Negative
Negative
Negative
Negative
Positive
Negative
Negative
Negative
Negative
Negative
Positive
Negative
Negative
Negative
Negative
Negative
Negative
Positive
Negative
Negative
Positive
Negative
Negative
Negative
Negative
Positive
Negative
Positive
Negative
Negative
Negative
Pb
0.04
0.1
0.02
0.03
2.37
0.05
0.01
0.01
0.07
0.39
2.41
0.02
0.13
0.91
2.32
0.01
2.45
0.03
XRF RESULTS
Room Room 14
Room 14
Room 14
Room 14
Room 14
Room 14
Room 19
Room 19
Room 19
Room 19
Room 19
Room 19
Room 19
Room 19
Room 19
Shop
Shop
Shop
Shop
Shop
Shop
Shop
Shop
Shop
Shop
Shop
Shop
Shop
Storage 2
Storage 2
Storage 2
Exterior
Exterior
Side A
A
A
C
C
C
B
B
A
A
C
D
D
D
D
C
C
C
C c B
B
A
A
A
A
A
A
A
A
C
D
D
Component Wall
Ceiling
Floor
Door
Door Frame
Wall
Door
Door Frame
Floor
Floor
Wall
Wall
Window Sill
Window Casing
Window Sash
Overhead Door
Overhead Frame
Column
Wall
Post
Door
Door Frame
Floor
Column
Column
Wall
Wall
Wall
Wall
Ceiling
Wall
Door
Door Frame
Substrate
CMU
Sheetrock
Concrete
Wood
Wood
CMU
Wood
Metal
Concrete
Concrete
CMU
Sheetrock
Wood
Sheetrock
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Concrete
Metal
Metal
Wood
CMU
CMU
Sheetrock
Sheetrock
Sheetrock
Metal
Metal
Color Tan
Tan
Grey
Tan
Tan
Green
Tan
Tan
Yellow
Yellow
Tan
Tan
Tan
Tan
Tan
Grey
Grey
White
Tan
Yellow
Brown
Tan
Yellow
White
White
Brown
Tan
Tan
Tan
Tan
Tan
Brown
Brown
Condition Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
Intact
CEI Project 8997 Page:2
Date
03/22/11
03/22/11
03/22/11 03/22/11 03/22/11 03/22/11 03/22/11
03/22/11 03/22/11 03/22/11
03/22/11
03/22/11 03/22/11 03/22/11
03/22/11 03/22/11
03/22/11 03/22/11 03/23/11 03/23/11
03/23/11
03/23/11 03/23/11
03/23/11 03/23/11 03/23/11 03/23/11
Reading
Mode
LBP Inspection
LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection LBP Inspection
LBP Inspection LBP Inspection LBP Inspection LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection LBP Inspection
LBP Inspection LBP Inspection LBP Inspection LBP Inspection
LBP Inspection LBP Inspection LBP Inspection
LBP Inspection
LBP Inspection
LBP Inspection LBP Inspection
LBP Inspection
Pass Fail
Negative
Negative Negative Negative
Negative Negative Negative Negative
Positive Negative
Negative
Negative
Negative Negative Negative
Negative Negative
Negative Negative Negative Negative
Negative
Negative
Negative Negative Negative
Negative
Pb
0.01 0.05
0.11
0.09
0.01 0.1
0.07
0.03
0.03 0.01 0.04 0.02
0.02
0.04
0.03
XRF RESULTS
Room
Exterior
Exterior Exterior Exterior
Exterior Exterior Exterior Exterior
Exterior Exterior
Exterior
Exterior Exterior
Exterior Exterior
Exterior Exterior
Exterior Mech. Rm Mech. Rm Mech. Rm
Mech. Rm
Mech. Rm Mech. Rm
Mech. Rm Mech. Rm
Mech. Rm
Side
D
D
C C
C C C C c c B
B
B B
A A A
A A B D
D
A
A A A
A
Component
Siding
Window Siding Door
Door Frame Window
Down Spout Post
Substrate
Metal
Metal
Metal Metal
Metal Metal Metal
Metal Over Head Frame Metal Over Head Door
Down Spout Door
Door Frame Siding
Overhead Overhead Frame Door Siding
Wall Wall
Wall Wall
Ceiling
Ceiling Boiler Boiler
Tank
Metal
Metal
Metal
Metal Metal Metal
Metal Metal
Metal Sheetrock
Sheetrock
CMU
CMU
Sheetrock
Sheetrock Metal Metal
Metal
Color
Tan
Tan Tan Tan
Tan Tan Brown
Brown/Ye Tan Brown
Brown
Brown Brown
Tan Brown Tan
Brown Tan
White
White White White
White
White Black Green
Gray
Condition
Intact Intact
Intact Intact Intact
Intact Intact Intact
Intact Intact
Intact
Intact Intact Intact
Intact Intact Intact
Intact Intact
Intact Intact Intact
Intact
Intact Intact Intact
Intact
CEI Project 8997 Page:3
File details come from the government source that posted it. Updated .