This document is an amendment to a solicitation for the renovation of Building 32010. The amendment incorporates revised drawings labeled as Technical Exhibit A Revised Drawings v1, and adds Technical Exhibits C through F documenting as-built conditions, asbestos and lead-based paint surveys, and mold sampling results. It also adds an attachment responding to contractor questions. The purpose is to provide additional information to support the solicitation for the renovation of Building 32010 issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood under solicitation number W91151-23-B-0020. The response due date was extended from August 24, 2023 to August 31, 2023 at 1:00 PM Central Time by a previous amendment.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011951647 AD210940PC
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
a. Incorporate revised draw ings labeled as Technical Exhibit A Revised Draw ings v1
b. Add Technical Exhibit C As Builts
c. Add Technical Exhibit D ACM Survey
d. Add Technical Exhibit E LBP Survey
e. Add Technical Exhibit F Mold Sampling
f. Add Attachment 1 RFIs Govt Response
g. All other terms and conditions remain unchanged
b. Provide revised Technical Exhibit A - Revised Draw ings.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Aug-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9115123B0020
X 9B. DATED (SEE ITEM 11)
24-Jul-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Aug-2023
CODE
MICC - FORT CAVAZOS (901ST CBN)
SHOEMAKER CENTER - 36000 SHOEMAKER LANE
FORT CAVAZOS TX 76544-5025
W91151 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9115123B0020
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 01:
The purpose of this admendment is to extend the bid opening from 10:00AM 24 Aug 2023 to 01:00PM CDT, 31
AUG 2023.
Amendment 02:
The purpose of this amendment is to:
a. Incorporate revised drawings labeled as Technical Exhibit A Revised Drawings v1
b. Add Technical Exhibit C As Builts
c. Add Technical Exhibit D ACM Survey
d. Add Technical Exhibit E LBP Survey
e. Add Technical Exhibit F Mold Sampling
f. Add Attachment 1 RFIs Govt Response
g. All other terms and conditions remain unchanged
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
W9115123B0020
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Exhibit/Attachment Table of Contents
TITLE FILE Drawing No. / # of PAGES Technical Exhibit A Revised Drawings v1 G-101, D-001, D-101, A-001, A-101, A-
501, A-502, A-602, S-001, S-101, M-001, M-101, M-102, M-501, P-001, P-101, E-
001, E-101, E-102, E-103, T-101 Technical Exhibit B Specifications 3,173 Technical Exhibit C As Builts 38 Technical Exhibit D ACM Survey 12 Technical Exhibit E LBP Survey 6 Technical Exhibit F Mold Sampling 9
Attachment 1 RFI Government Responses 7