Solicitation Amendment W90VN625RA0090003 SF 30.pdf

PDF 3 MB Posted

Attached to
MATOC: Repair Fuel Tanks and Certified Inspection, Osan Air Base
Solicitation number
W90VN625RA009
Issued by

About this file

This document is a Standard Form 30 (SF 30) Amendment of Solicitation/Modification of Contract for a Multiple Award Task Order Contract (MATOC) issued by the 411th CSB in Korea. The amendment modifies the solicitation W90VN625RA009 for a repair and inspection project at Osan Air Base, specifically targeting 14 pre-selected contractors with contract numbers W91QVN24-D-0022 through W91QVN24-D-0109.

The amendment updates the Statement of Work (SOW) and adds two new documents: a Revised Statement of Work dated 20250624 and a Solicitation Question and Answers document. The project requires the selected contractor to develop 100% plan and design, and provide all necessary resources to complete the project based on a 30% concept design provided by the government. Key attachments include project drawings, repair and repaint guidelines, technical specifications for excavation, coating, leak detection, and fuel storage tanks, a submittal register, and a contractor's tax exemption declaration. The effective date of the amendment is 24 JUN 2025, with changes highlighted in red on paragraph 2.1.5 of the SOW.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section C - Description/Specifications/Statement of Work

The Requirements text has been modified to:

THIS IS MATOC WORK PLAN RFP FOR THE FOLLOWING CONTRACTORS ONLY; W91QVN-

24-D-0022, -0023, -0024, -0025, -0026, -0027, -0028, -0030, -0031, -0033, -0035, -0036, -0038, -0080, -0083, -0109

This project is an individual Work Plan Task Order under the Multiple Award Task Order Contract (MATOC) issued by the 411th CSB, Korea. The definition of Work Plan is a task order in which the contractor must develop 100% plan and design, and provide all design drafting, management, supervision, plant, labor, materials, equipment, and any other resources necessary to complete this project based on the Government provided 30% of concept design and scope of work contained herein and as included in the as-built drawings and specifications.

See Section J for attached files 0011 (Revised Statement of Work 20250624), 0002 Appendix A (Drawing and Inventory), and 0003 - 0007 Appendix B for Guidelines.

Section J - List of Attachments

The attachments table has changed from:

Identifier Document Name Document Description Reference Identifier

Date Line Item Page Numbers

Document Type

Provided Under Separate Cover

0001 Statement of Work Statement of Work 0001 29 May 2025 23 Attachment No

Revised Statement of Work 20250612

Statement of Work 0001-1 12 Jun 2025 Attachment No

Appendix A:

Project Drawings and Inventory

Drawings 0002 29 May 2025 118 Attachment No

Appendix B_ Repair and Repaint Guidelines

Appendix B: Repair and Repaint Guidelines

0003 29 May 2025 53 Attachment No

Appendix B_ Section 02 61 13 Excavation and Handling of Contaminated Material

Appendix B: Section 02 61 13 0004 29 May 2025 11 Attachment No

Appendix B_ Section 09 97 13.27 High Performance Coating for Steel Structures

Appendix B: Section 09 97 13.27 0005 29 May 2025 43 Attachment No

Appendix B_ Section 33 01 50.31 Leak Detection for Fueling Systems

Appendix B: Section 33 01 50.31 0006 29 May 2025 16 Attachment No

Appendix B_ Section 33 56 10 Factory-Fabricated Appendix B: Section 33 56 10 0007 29 May 2025 70 Attachment No

W90VN625RA0090003

Fuel Storage Tanks

0008 Submittal Register Submittal Register 0008 29 May 2025 55 Attachment No

Contractor_s Tax Exemption Declaration

Contractor's Tax Exemption Declaration 0009 29 May 2025 3 Attachment No

To:

Identifier Document Name Document Description Reference Identifier

Date Line Item Page Numbers

Document Type

Provided Under Separate Cover

0001 Statement of Work Statement of Work 0001 29 May 2025 23 Attachment No

Revised Statement of Work 20250612

Statement of Work 0001-1 12 Jun 2025 23 Attachment No

Revised Statement of Work 20250624

Statement of Work 0011 24 Jun 2025 23 Attachment No

Solicitation Question and Answers

Solicitation Question and Answers 0012 24 Jun 2025 1 Attachment No

Appendix A:

Project Drawings and Inventory

Drawings 0002 29 May 2025 118 Attachment No

Appendix B_ Repair and Repaint Guidelines

Appendix B: Repair and Repaint Guidelines

0003 29 May 2025 53 Attachment No

Appendix B_ Section 02 61 13 Excavation and Handling of Contaminated Material

Appendix B: Section 02 61 13 0004 29 May 2025 11 Attachment No

Appendix B_ Section 09 97 13.27 High Performance Coating for Steel Structures

Appendix B: Section 09 97 13.27 0005 29 May 2025 43 Attachment No

Appendix B_ Section 33 01 50.31 Leak Detection for Fueling Systems

Appendix B: Section 33 01 50.31 0006 29 May 2025 16 Attachment No

Appendix B_ Section 33 56 10 Factory-Fabricated Fuel Storage Tanks

Appendix B: Section 33 56 10 0007 29 May 2025 70 Attachment No

0008 Submittal Register Submittal Register 0008 29 May 2025 55 Attachment No

Contractor_s Tax Exemption Declaration

Contractor's Tax Exemption Declaration 0009 29 May 2025 3 Attachment No

The following contract documents were added:

Revised Statement of Work 20250624 Solicitation Question and Answers

The following contract documents Page Counts were changed:

DOCUMENT PAGE COUNTS

DOCUMENT NAME FROM TO

Revised Statement of Work 20250624 none 23

Solicitation Question and Answers none 1

Miscellaneous text in this section has been modified to:

Changes highlighted in Red on paragraph 2.1.5 (page 6) as of 20250624

IDCode: J
Page: 1
Pages: 4
AmendNo: 0003
EffDate: 24 JUN 2025
ReqNo:
ProjNo: SMYU 21-1116
IssCode: W90VN6
AdmCode:
IssuedBy: 0906 AQ CO CONTRACTING BAT

KO DIRECTORATE OF CONTRACTING, UNIT 15273

APO, AP 96202-0000

UNITED STATES

STEPHEN CHUNG, EMAIL: STEPHEN.S.CHUNG.MIL@ARMY.MIL TELEPHONE: 757-6021

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W90VN625RA009
SolDate: 30 MAY 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: REVISED SOW (PARAGRAPH 2.1.5) AS OF 20250624 AND ANSWERS TO SOLICITATION Q&A
ContNameTitle:
CoNameTitle: MOSLEY, ANTHONY S.
ContDate:
CODate: 27 JUN 2025

File details come from the government source that posted it. Updated .