Solicitation Amendment W90VN625RA0090002 SF 30.pdf
PDF 3 MB Posted
- Solicitation number
- W90VN625RA009
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a Multiple Award Task Order Contract (MATOC) work plan at Osan Air Base, Korea. The amendment revises the Statement of Work for specific contractors (W91QVN24-D-0022 through -0109) to develop a 100% plan and design for repairing fuel tanks and conducting certified inspections. The contractor must provide all design drafting, management, supervision, labor, materials, equipment, and resources to complete the project based on the government's 30% concept design.
Key changes include adding a Revised Statement of Work dated 20250612, updating the list of attachments, and highlighting changes in red on specific paragraphs (2.1.5.4, 2.1.17.16, 2.1.17.17, and 2.1.17.18). The amendment is effective 12 June 2025, with attachments including project drawings, repair and repaint guidelines, technical specifications for excavation, coating, leak detection, fuel storage tanks, a submittal register, and a contractor's tax exemption declaration. The solicitation is issued by the 411th CSB (Contract Support Battalion) in Korea.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section C - Description/Specifications/Statement of Work
The Requirements text has been modified to:
THIS IS MATOC WORK PLAN RFP FOR THE FOLLOWING CONTRACTORS ONLY; W91QVN-
24-D-0022, -0023, -0024, -0025, -0026, -0027, -0028, -0030, -0031, -0033, -0035, -0036, -0038, -0080, -0083, -0109
This project is an individual Work Plan Task Order under the Multiple Award Task Order Contract (MATOC) issued by the 411th CSB, Korea. The definition of Work Plan is a task order in which the contractor must develop 100% plan and design, and provide all design drafting, management, supervision, plant, labor, materials, equipment, and any other resources necessary to complete this project based on the Government provided 30% of concept design and scope of work contained herein and as included in the as-built drawings and specifications.
See Section J for attached files 0010/(0001-01) Revised Statement of Work 20250612, 0002 Appendix A (Drawing and Inventory), and 0003 - 0007 Appendix B for Guidelines.
Section J - List of Attachments
The attachments table has changed from:
Identifier Document Name Document Description Reference Identifier
Date Line Item Page Numbers
Document Type
Provided Under Separate Cover
0001 Statement of Work Statement of Work 0001 29 May 2025 23 Attachment No
Appendix A:
Project Drawings and Inventory
Drawings 0002 29 May 2025 118 Attachment No
Appendix B_ Repair and Repaint Guidelines
Appendix B: Repair and Repaint Guidelines
0003 29 May 2025 53 Attachment No
Appendix B_ Section 02 61 13 Excavation and Handling of Contaminated Material
Appendix B: Section 02 61 13 0004 29 May 2025 11 Attachment No
Appendix B_ Section 09 97 13.27 High Performance Coating for Steel Structures
Appendix B: Section 09 97 13.27 0005 29 May 2025 43 Attachment No
Appendix B_ Section 33 01 50.31 Leak Detection for Fueling Systems
Appendix B: Section 33 01 50.31 0006 29 May 2025 16 Attachment No
Appendix B_
W90VN625RA0090002
0007 Section 33 56 10 Factory-Fabricated Fuel Storage Tanks
Appendix B: Section 33 56 10 0007 29 May 2025 70 Attachment No
0008 Submittal Register Submittal Register 0008 29 May 2025 55 Attachment No
Contractor_s Tax Exemption Declaration
Contractor's Tax Exemption Declaration 0009 29 May 2025 3 Attachment No
To:
Identifier Document Name Document Description Reference Identifier
Date Line Item Page Numbers
Document Type
Provided Under Separate Cover
0001 Statement of Work Statement of Work 0001 29 May 2025 23 Attachment No
Revised Statement of Work 20250612
Statement of Work 0001-1 12 Jun 2025 23 Attachment No
Appendix A:
Project Drawings and Inventory
Drawings 0002 29 May 2025 118 Attachment No
Appendix B_ Repair and Repaint Guidelines
Appendix B: Repair and Repaint Guidelines
0003 29 May 2025 53 Attachment No
Appendix B_ Section 02 61 13 Excavation and Handling of Contaminated Material
Appendix B: Section 02 61 13 0004 29 May 2025 11 Attachment No
Appendix B_ Section 09 97 13.27 High Performance Coating for Steel Structures
Appendix B: Section 09 97 13.27 0005 29 May 2025 43 Attachment No
Appendix B_ Section 33 01 50.31 Leak Detection for Fueling Systems
Appendix B: Section 33 01 50.31 0006 29 May 2025 16 Attachment No
Appendix B_ Section 33 56 10 Factory-Fabricated Fuel Storage Tanks
Appendix B: Section 33 56 10 0007 29 May 2025 70 Attachment No
0008 Submittal Register Submittal Register 0008 29 May 2025 55 Attachment No
Contractor_s Tax Exemption Declaration
Contractor's Tax Exemption Declaration 0009 29 May 2025 3 Attachment No
The following contract documents were added:
Revised Statement of Work 20250612
The following contract documents Page Counts were changed:
DOCUMENT PAGE COUNTS
DOCUMENT NAME FROM TO
Revised Statement of Work 20250612 none 23
Miscellaneous text in this section has been added to:
Changes highlighted in Red on paragraph 2.1.5.4 (page 7), 2.1.17.16 (page 15), 2.1.17.17 (page 16), and
2.1.17.18 (page 16)
W90VN625RA0090002
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0002 |
| EffDate: 12 JUN 2025 |
| ReqNo: |
| ProjNo: SMYU 21-1116 |
| IssCode: W90VN6 |
| AdmCode: |
| IssuedBy: 0906 AQ CO CONTRACTING BAT |
KO DIRECTORATE OF CONTRACTING, UNIT 15273
APO, AP 96202-0000
UNITED STATES
STEPHEN CHUNG, EMAIL: STEPHEN.S.CHUNG.MIL@ARMY.MIL TELEPHONE: 757-6021
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W90VN625RA009 |
| SolDate: 30 MAY 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: REVISED STATEMENT OF WORK AS OF 20250612 |
| ContNameTitle: |
| CoNameTitle: MOSLEY, ANTHONY S. |
| ContDate: |
| CODate: 16 JUN 2025 |
File details come from the government source that posted it. Updated .