Exhibit_A_CDRLs_.pdf

PDF 518 KB Posted

Attached to
One Semi-Automated Forces - Award Notice Federal contract opportunity
Solicitation number
W900KK-18-R-0010
Issued by
Department of the Army Materiel Command Contracting Command Orlando Contracting Center

About this file

OneSAF CDRLs

View the file

Other files for this federal contract opportunity

Other files attached to One Semi-Automated Forces - Award Notice, newest first.
File Type Posted
W900KK-18-R-0010.amendment0004.conformed.pdf PDF
1_RFP_Question_Comment_Form_OneSAF_Amendment0004.pdf PDF
W900KK-18-R-0010.amendment0004.mod.pdf PDF
Attachment_L3_-_Cost_Price_Workbook(v3).xlsx XLSX spreadsheet
W900KK-18-R-0010.modification_amend.0003.pdf PDF
L1_RFP_Question_Comment_Form_OneSAF_Amendment0003.pdf PDF
W900KK-18-R-0010.conformed_amend.0003.docx.pdf PDF
L1_RFP_Question_Comment_Form_OneSAF_Amendment_0002.pdf PDF
Attachment_L3_-_Cost_Price_Workbook(update).xlsx XLSX spreadsheet
W900KK-18-R-0010.modification(amend2).pdf PDF
W900KK-18-R-0010.conform(amend2).pdf PDF
L1_RFP_Question_Answer_OneSAF.pdf PDF
L1_Amendment.01_Question_Answer_OneSAF.pdf PDF
W900KK-18-R-0010_Amendment.01_Modification.pdf PDF
W900KK-18-R-0010_Amendment.01_Conformed.pdf PDF
2_OneSAF_PWS_4Dec2017_TO_0001.pdf PDF
Attachment_L3_-_Cost_Price_Workbook.xlsx XLSX spreadsheet
Amendment_01_Letter.pdf PDF
Exhibit_A_CDRLs-Corrected.pdf PDF
3_OneSAF_PWS_TO_0002.pdf PDF
L5_OneSAF_WBS_Recompete.xlsx XLSX spreadsheet
8_OneSAF_GFE_Listing.xlsx XLSX spreadsheet
L1_RFP_Question_Comment_Form.xlsx XLSX spreadsheet
4_OneSAF_QASP.pdf PDF
7_OneSAF_V9.0_UseCases.pdf PDF
L2_OneSAF_DISTRIBUTION_AGREEMENT_for_USG_and_DOD_Cntr_only_-_20170927.pdf PDF
Exhibit_B_DSL.pdf PDF
L3_OneSAF_Contract_Price_Workbook.xlsx XLSX spreadsheet
6_OneSAF_9__Memo.pdf PDF
W900KK-18-R-0010.Final.pdf PDF
L8_Proposal_Receipt_Form.pdf PDF
L6_PastPerformance_Questionnaire.pdf PDF
9_Key_Personnel.pdf PDF
5_W900KK-18-R-0010_OneSAF_DD254.pdf PDF
L4_Pre_award_Survey_of_Prospective_Offeror_Accounting_System.pdf PDF
L7_Past_Performance_POC_List.xlsx XLSX spreadsheet
2_OneSAF_PWS_TO_0001.pdf PDF
1_OneSAF_PWS_IDIQ.pdf PDF
Draft_OneSAF_WBS_Recompete_25Sep2017.pdf PDF
Draft_OneSAF_V9.0_UseCases.pdf PDF
OneSAF_Access_Request.pdf PDF
OneSAF_DISTRIBUTION_AGREEMENT_for_USG_and_DOD_Cntr_only_-_20170927.pdf PDF
Draft_OneSAF_9__Memo.pdf PDF
Draft_OneSAF_PWS_21June2017_TO_0001.pdf PDF
Draft_OneSAF_PWS_21June2017_TO_0002.pdf PDF
Draft_OneSAF_PWS_21June2017_IDIQ.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SFAE-STRI-ITE-CSS

6. REQUIRING OFFICE

PWS 3.1

5. CONTRACT REFERENCE

DI-MGMT-80227

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

CPSMR

See Block 16

2. TITLE OF THE DATA ITEM

A001

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-18-R-0010

E. CONTRACT/PR NO.

OneSAF

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMT

B. EXHIBIT

A. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

8. APP CODE

LT

7. DD 250 REQ

C

9. DIST STATEMENT

REQUIRED

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

12. DATE OF FIRST

MNTHLY

10. FREQUENCY

Repro Reg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATE

Figaroa, Rodney

I. APPROVED BY

06 JUL 2017

H. DATE

G. PREPARED BY

Robbins, Bruce

Block 2: Contractors Progress, Status and Management Report

1. BLOCK 12: SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD.

2. BLOCK 13: SHALL CONTINUE MONTHLY THROUGH THE LIFE OF THE CONTRACT.

3. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MEDIA

IN MICROSOFT OFFICE 2013 FORMAT. GRAPHIC PACKAGES USED TO CREATE

FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT

OFFICE 2013 AND/OR ADOBE PDF COMPATIBLE FORMATS.

4. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

5. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

6. CONTRACTOR FORMAT IS ACCEPTABLE.

16. REMARKS

1 SFAE-STRI-ITE-CSS

1 ACC-ORL-OPC

2 0 0 15. TOTAL

18. ESTIMATED

TOTAL PRICE

17. PRICE GROUP

Page 1 of 1 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

PWS 3.1.5

DI-MISC-80711A

Process Report

Scientific and Technical Reports

A002

TM OTHER MISC

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

QRTLY

1. BLOCK 3: PROCESS REPORT TOPICS SHALL BE FINALIZED AT THE PAC.

2. BLOCK 12: SHALL BE DUE 120 DAYS AFTER PAC.

3. BLOCK 13: SHALL BE DUE THREE TIMES ANNUALLY THROUGH END OF CONTRACT.

4. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MEDIA

5. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF THE SUBMISSION.

6. THE CONTRACTOR SHALL HAVE 20 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

7. CONTRACTOR FORMAT IS ACCEPTABLE.

SFAE-STRI-PM ITE

PWS 3.1.1

DI-MGMT-81334

Contract Work Breakdown Structure

A003

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

ASREQ

1. BLOCK 12: SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD

2. BLOCK 13: REVISIONS SHALL CONTINUE AS REQUIRED THROUGH THE

LIFE OF THE CONTRACT.

3. BLOCK 14: *REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL

FIGURES, TABLES AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT OFFICE 2013.

4. 4. THE GOVERNMENT WILL HAVE 20 WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION.

6. 5. THE CONTRACTOR SHALL HAVE 10 WORKING DAYS TO INCORPORATE

GOVERNMENT COMMENTS.

SFAE-STRI-OPS

PWS 3.1.6

DI-MGMT-80259

Inventory Report

Physical Inventories Report

A004

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

N/A

ANNLY

1. BLOCK 8: GOVERNMENT APPROVAL WILL BE REQUIRED PRIOR TO

COMPLETION OF THE CONTRACT.

3. BLOCK 12: SHALL BE DUE NINETY (90) DAYS AFTER POST AWARD CONFERENCE.

4. BLOCK 13: SHALL BE UPDATED AFTER THE FIRST SUBMISSION AS

REQUIRED BY INVENTORY CHANGES, SUBMISSIONS REQUIRING APROVAL

SHALL BE PROVIDED FORTY-FIVE (45) DAYS PRIOR TO COMPLETION OF EACH

OPTION YEAR ON AN ANNUAL BASIS.

5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MEDIA

6. THE GOVERNMENT WILL HAVE TEN (10) WORKING DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF THE SUBMISSION.

7. THE CONTRACTOR SHALL HAVE FIVE (5) WORKING DAYS TO INCORPORATE

GOVERNMENT COMMENTS.

8. CONTRACTOR FORMAT IN ACCORDANCE WITH DI-MGMT-80259 IS ACCEPTABLE.

PWS 3.17.2

DI-IPSC-81429A

STrP

SOFTWARE TRANSITION PLAN (STrP)

A005

TM OTHER IPSC

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

2TIME

1. BLOCK 12: DRAFT SUBMISSION SHALL BE DUE TWELVE (12) MONTHS PRIOR

TO THE END OF THE CONTRACT.

2. BLOCK 13: FINAL SUBMISSION SHALL BE DUE SIX (6) MONTHS PRIOR TO

THE END OF THE CONTRACT.

4. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR

5. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

PWS 3.4

Technical Report

A006

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

1. BLOCK 10 AND 12: SHALL BE DUE AS REQUIRED BY THE GOVERNMENT 30

DAYS FOLLOWING COMPLETION OF A SIGNIFICANT EVENT OR DEVELOPMENT,

INTEGRATION AND TEST ACTIVITY. TECHNICAL REPORT SHALL BE DUE 90

DAYS PRIOR TO THE END OF THE CONTRACT.

2. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MEDIA

3. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF THE SUBMISSION.

4. THE CONTRACTOR SHALL HAVE 20 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

5. CONTRACTOR FORMAT IS ACCEPTABLE.

PWS 3.3.4

DI-SESS-80639D

ECP

Engineering Change Proposal (ECP)

A007

TM OTHER CMAN

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

1. BLOCK 12 AND 13: SHALL BE DUE 30 DAYS AFTER IDENTIFYING A CHANGE

TO ANY ESTABLISHED BASELINE.

2. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MEDIA

3. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR

4. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMNET COMMENTS.

PWS 3.15.3

Integrated Development Environment

A008

TM OTHER

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

SS

1. BLOCK 13: SUBSEQUENT SUBMISSIONS DUE ANNUALLY FOR THE LENGTH OF

THE CONTRACT. FINAL SUBMISSION SHALL BE DUE 60 DAYS PRIOR TO THE

END OF CONTRACT.

2. BLOCK 14: *REPRODUCIBLE SHALL BE DELIVERED VIA DVD-ROM AND

SHALL CONTAIN ALL THE HARDWARE SPECIFICATIONS, SOFTWARE AND

MODIFICATIONS THEREOF, DATA, SETUP/CONFIGURATION INSTRUCTIONS,

PASSWORD LISTS, NETWORK DIAGRAMS AND ALL OTHER DOCUMENTATION

NEEDED TO SETUP ONESAF'S INTEGRATED DEVELOPMENT ENVIRONMENT (IDE).

3. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR

4. THE CONTRACTOR SHALL HAVE 20 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

PWS 3.9, 3.9.1

DI-AVCS-80700

OneSAF Software Version Release

COMPUTER SOFTWARE PRODUCT END ITEMS

B001

TM OTHER MCCR

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

SS

1. BLOCK 9: SOFWARE VERSION, TECHNICAL DOCUMENTS AND CODE BASE

SHALL INCLUDE THE FOLLOWING MARKING:

A. FOR A DOMESTIC VERSION RELEASE -

DISTRIBUTION STATEMENT C. DISTRIBUTION IS AUTHORIZED TO U.S.

GOVERNMENT AGENCIES AND THEIR CONTRACTORS. ADMINISTRATIVE OR

OPERATIONAL; 23 AUGUST, 2012. OTHER REQUESTS FOR THIS DOCUMENT

SHALL BE REFERRED O U.S. ARMY PEO STRI, PM ITE, PdM ONESAF.

B. FOR DOMESTIC MINUS, ABCA, OR INTERNATIONAL VERSION RELEASES -

DISTRIBUTION STATEMENT C. DISTRIBUTION IS AUTHORIZED TO U.S.

GOVERNMENT AGENCIES AND THEIR CONTRACTORS. EXPORT CONTROLLED; 23

AUGUST, 2012. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED O

U.S. ARMY PEO STRI, PM ITE.

2. BLOCK 12 AND 13: SHALL BE DUE FOR EACH RELEASE OF THE SOFTWARE

THROUGH THE LIFE OF THE DELIVERY ORDER.

3. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED ON A SET OF DVD-ROMS,

COMPATIBLE WITH THE INTEGRATION AND DEVELOPMENT ENVIRONMENT

SYSTEM AND SOFTWARE ENGINEERING ENVIRONMENT TOOLS. COPIES TO ACC.

PWS 3.3

B002

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

1TIME/R

1. BLOCK 3: OneSAF Product Line Architecture Specification

2. BLOCK 12: SHALL BE DUE AT EVERY DOMESTIC SOFTWARE RELEASE.

3. BLOCK 13: REVISIONS AS REQUIRED THROUGH LIFE OF THE CONTRACT.

6. THE CONTRACTOR SHALL HAVE 30 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

PWS 3.3

B003

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

1. BLOCK 3: OneSAF Product Line Requirement Specification

2. BLOCK 12: SHALL BE DUE AT EVERY DOMESTIC SOFTWARE RELEASE.

3. BLOCK 13: REVISION AS REQUESTED THROUGH THE LIFE OF THE CONTRACT.

6. THE CONTRACTOR SHALL HAVE 30 DAYS TO INCORPORATE GOVERNMENT COMMENTS

PWS 3.3.1

OneSAF System Integration Plan

B004

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

1. BLOCK 12: INITIAL SUBMISSION DUE 30 DAYS AFTER CONTRACT AWARD.

2. BLOCK 13: SUBSEQUENT SUBMISSIONS WILL OCCUR ANNUALLY THROUGH THE

LIFE OF THE CONTRACT.

4. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR

5. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

PWS 3.18

DI-MGMT-82000

OneSAF RMF Package

B005

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

D

ONE/R

1. Block 2: DOD Risk Management Framework (RMF).

2. BLOCK 4: The DIACAP and/or RMF artifacts for OneSAF shall be delivered in a format approved by the Governments Designated Accrediting Authority (DAA), Authorizing Official (AO), or Information Systems Security Manager (ISSM).

See tailoring below.

3. BLOCK 12: SHALL BE DUE 60 DAYS PRIOR TO A PRODUCT VERSION RELEASE AND 60

DAYS PRIOR TO AN ACCREDIDATION EVENT.

4. BLOCK 13: REVISIONS AS NEEDED THROUGHOUT CONTRACT PERIOD OF PERFORMANCE.

5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MEDIA

6. BLOCK 4: Omit the term DOD Information Assurance Certification and

Accreditation Process (DIACAP) from all sections. All deliverable data shall conform to the Risk Management Framework (RMF) requirements.

7. BLOCK 4: Section 2.1.5 is changed into:

RMF Implementation Plan (RIP). The RIP shall use the approved DAA, AO, or

ISSM format. The RIP shall be used during the RIP Concurrence meeting with the Government. The RIP shall define which IA Controls (IACs) will be

Implemented, Inherited, Non-Compliant, or Not Applicable. The RIP shall be accomplished through the use of the Army's eMASS System. The RIP shall be approved by the DAA, AO, and ISSM prior to execution of the IA Test Plan.

8. BLOCK 4: Omit Section 2.1.6 PIT Implementation Plan (PIP).

9. BLOCK 4: Omit Section 2.1.8 PIT Designation Request.

10. BLOCK 4: Omit Section 2.1.9 PIT Determination Brief.

11. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND ACCEPTANCE OR

12. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

DI-IPSC-80603A

OneSAF Product Release Test Procedure

Software Test Plan

B006

TM OTHER NDTI

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

A

ONE/R

1. BLOCK 8: GOVERNMENT APPROVAL WILL BE REQUIRED PRIOR TO THE

START OF ANNUAL RELEASE TESTING.THE GOVERNMENT WILL HAVE 10

WORKING DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION OF EACH

SUBMISSION. THE CONTRACTOR SHALL HAVE 5 WORKING DAYS TO

INCORPORATE GOVERNMENT COMMENTS

2. BLOCK 12: SHALL BE DUE 30 DAYS AFTER INITIAL PLANNING CONFERENCE

FOR EACH SOFTWARE VERSION RELEASE

3. BLOCK 13: SHALL BE DUE FOR EACH RELEASE OF THE SOFTWARE THROUGH

THE LIFE OF THE CONTRACT.

5. BLOCK 14: TEST PLAN SHALL ALSO BE PUBLISHED TO THE DEVELOPMENT

ENVIRONMENT IN FORMAT COMPATIBLE WITH MICROSOFT OFFICE 2013 FORMATS.

6. BLOCK 4: PROPOSED CONTRACT TAILORING ACCEPTABLE.

OneSAF Operator Manual

C001

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

1. BLOCK 3: UPDATES TO OPERATOR'S MANUAL SHALL INCLUDE SPECIFIC

PRODUCT/COMPONENT USER GUIDES SUCH AS TURF, WebMSDE, WebAAR, MCA, etc.

2. BLOCK 12: SHALL BE DUE WITH EACH B001 SOFTWARE DELIVERY AND SHALL

INCLUDE UPDATES TO THE OPERATOR MANUAL

3. BLOCK 13: REVISIONS AS REQUIRED WITH EACH B001 SOFTWARE DELIVERY

AND SHALL INCLUDE UPDATES TO THE OPERATOR MANUAL

4. BLOCK 14: *REPRODUCIBLE SHALL BE DELIVERED VIA DVD-ROM IN

MICROSOFT OFFICE 2013 AND/OR ADOBE PDF COMPATIBLE FORMATS.

OneSAF Maintenance Manual

C002

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

1. BLOCK 3: MAINTENANCE MANUAL SHALL INCLUDE INSTALLATION

INSTRUCTIONS AS APPROPRIATE FOR ALL PRODUCTS/COMPONENTS

2. BLOCK 12: SHALL BE DUE WITH EACH B001 SOFTWARE DELIVERY AND SHALL

INCLUDE INCORPORATE UPDATES TO THE MAINTENANCE MANUAL

3. BLOCK 13: REVISIONS AS REQUIRED WITH EACH B001 SOFTWARE DELIVERY

4. BLOCK 14: *REPRODUCIBLE SHALL BE DELIVERED VIA DVD-ROM IN

Fa1

DI-IPSC-81442A

OneSAF Version Description Document

Software Version Description (SVD)

C003

TM OTHER IPSC

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

1. BLOCK 12: SHALL BE DUE WITH EACH B001 SOFTWARE DELIVERY AND SHALL

INCLUDE UPDATES TO THE VERSION DESCRIPTION DOCUMENT.

2. BLOCK 13: REVISIONS AS REQUIRED WITH EACH B001 SOFTWARE DELIVERY

3. BLOCK 14: *REPRODUCIBLE SHALL BE DELIVERED VIA DVD-ROM IN

4. CONTRACTOR FORMAT IS ACCEPTABLE.

PWS 3.14

OneSAF User Training Material

C004

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

1. BLOCK 12: SHALL BE DUE 30 DAYS AFTER B001 SOFTWARE DELIVERY AND

SHALL INCLUDE UPDATES TO THE TRAINING MATERIALS

2. BLOCK 13: REVISIONS AS REQUIRED, 30 DAYS AFTER EACH B001 SOFTWARE

DELIVERY. TRAINING MATERIALS FOR TRAINING SESSIONS SHALL BE

DELIVERED 15 DAYS PRIOR TO CONDUCT OF THE TRAINING.

4. THE GOVERMENT WILL HAVE 5 WORKING DAYS FOR REVIEW AND

5. THE CONTRACTOR SHALL HAVE 5 WORKING DAYS TO INCORPORATE GOVERNMENT

COMMENTS.

PWS 3.14

OneSAF Developer Training Material

C005

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

1. BLOCK 12: SHALL BE DUE 30 DAYS AFTER B001 SOFTWARE DELIVERY AND

SHALL INCLUDE UPDATES TO THE TRAINING MATERIALS

2. BLOCK 13: REVISIONS AS REQUIRED, 30 DAYS AFTER EACH B001 SOFTWARE

DELIVERY. TRAINING MATERIALS FOR TRAINING SESSIONS SHALL BE

DELIVERED 15 DAYS PRIOR TO CONDUCT OF THE TRAINING.

4. THE GOVERMENT WILL HAVE 5 WORKING DAYS FOR REVIEW AND

5. THE CONTRACTOR SHALL HAVE 5 WORKING DAYS TO INCORPORATE GOVERNMENT

COMMENTS.

A001_CDRL
A002_CDRL
A003_CDRL
A004_CDRL
A005_CDRL
A006_CDRL
A007_CDRL
A008_CDRL
B001_CDRL
B002_CDRL
B003_CDRL
B004_CDRL
B005_CDRL
B006_CDRL
C001_CDRL
C002_CDRL
C003_CDRL
C004_CDRL
C005_CDRL

File details come from the government source that posted it.