ATT 0002-CLIN STRUCTURE- LEBANON W58RGZ-25-R-0002 14 JULY 2025.xlsx
XLSX spreadsheet 21 KB Posted
- Solicitation number
- W58RGZ-25-R-0002
About this file
The file is an Excel spreadsheet detailing the Contract Line Item Number (CLIN) structure for a Department of the Army solicitation (W58RGZ-25-R-0002) for Contractor Logistics Service (CLS) and Contract Field Service Representative (CFSR) support for the Lebanese Air Force. The contract will provide sustainment support for six armed MD-530F helicopters, with a total five-year period of performance consisting of a two-year base period and three one-year option years. The procurement is 100% set aside for small businesses, with a projected award date of 1 September 2025 and proposal responses due by 1 August 2025 at 1700 CST.
The CLIN structure includes multiple contract line items across base and option years, covering program requirements, CFSR labor, Other Direct Costs (ODC), travel, over and above work, spares, and Contract Delivery Requirements List (CDRLs). The contract will be awarded using a mix of Firm Fixed Price (FFP) and Cost-Plus-Fixed-Fee (CPFF) contract types. Specific CLIN categories include Program Requirements, CFSR Labor, CLS Technicians (A&P, Aviation, and Mission Equipment), Travel, and ODCs, with varying unit measures including months (MO) and lots, and some items with Not-to-Exceed (NTE) or To-Be-Determined (TBD) quantities.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Update
| Proposed CLIN Structure, Lebanon Follow On W58RGZ-25-R-0002 | Notes: | ||||||||
| CLIN # | CLIN DESCRIPTION | Period of Performance | TYPE | UNIT OF MEASURE | Units | PWS REFERENCE | UNIT PRICE | EXTENDED PRICE | United Price and Extended Price will be filled in by offeror |
| 0001AA | Program Requirements | Base- 2 year | FFP | MO | 24 | 4.1 - 4.7, 4.10-4.11, 5.4, 5.6-5.10 | Total Period of Performance is 5 years: 2 year base, plus three option years | ||
| 0002AA | CFSR Labor | Base- 2 year | FFP | MO | 24 | 5.1 | |||
| 0003AA | CFSR ODC | Base- 2 year | CPFF | LOT | 1 | 4.9, 5.1 | Acronyms | ||
| 0004AA | CFSR Travel | Base- 2 year | CPFF | LOT | 1 | 4.8 | MO=Months | ||
| 0005AA | Over and Above Work | Base- 2 year | CPFF | NTE | 1 | 5.3 | $ 500,000 | NTE= Not to Exceed | |
| 0005AB | AOG | Base- 2 year | CPFF | TBD | LOT= Lots | ||||
| 0005AC | Spares | Base- 2 year | CPFF | TBD | |||||
| *0006 | CDRLs | Base- 2 year | NSP | N/A | N/A | ||||
| 0007AA | CLS A&P Technicians | Base- 2 year | FFP | MO | 24 | 5.2.10 | |||
| 0007AB | CLS Aviations Technician | Base- 2 year | FFP | MO | 24 | 5.2.11 | |||
| 0007AC | CLS Mission Equipment Technician | Base- 2 year | FFP | MO | 24 | 5.2.12 | |||
| 0008AA | CLS ODC | Base- 2 year | CPFF | LOT | 1 | 4.9 5.2 | |||
| 0009AA | CLS Travel | Base- 2 year | CPFF | LOT | 1 | 4.8 | |||
| 1001AA | Program Requirements | Option Year 1 | FFP | MO | 12 | 4.1 - 4.7, 4.10-4.11, 5.4, 5.6-5.10 | |||
| 1002AA | CFSR Labor | Option Year 1 | FFP | MO | 12 | 5.1 | |||
| 1003AA | CFSR ODC | Option Year 1 | CPFF | LOT | 1 | 4.9, 5.1 | |||
| 1004AA | CFSR Travel | Option Year 1 | CPFF | LOT | 1 | 4.8 | |||
| 1005AA | Over and Above Work | Option Year 1 | CPFF | NTE | N/A | 5.3 | $ 250,000 | ||
| 1005AB | AOG | Option Year 1 | CPFF | TBD | |||||
| 1005AC | Spares | Option Year 1 | CPFF | TBD | |||||
| *1006 | CDRLs | Option Year 1 | NSP | N/A | N/A | ||||
| 1007AA | CLS A&P Technicians | Option Year 1 | FFP | MO | 12 | 5.2.10 | |||
| 1007AB | CLS Aviations Technician | Option Year 1 | FFP | MO | 12 | 5.2.11 | |||
| 1007AC | CLS Mission Equipment Technician | Option Year 1 | FFP | MO | 12 | 5.2.12 | |||
| 1008AA | CLS ODC | Option Year 1 | CPFF | LOT | 1 | 4.9 5.2 | |||
| 1009AA | CLS Travel | Option Year 1 | CPFF | LOT | 1 | 4.8 | |||
| 2001AA | Program Requirements | Option Year 2 | FFP | MO | 12 | 4.1 - 4.7, 4.10-4.11, 5.4, 5.6-5.10 | |||
| 2002AA | CFSR Labor | Option Year 2 | FFP | MO | 12 | 5.1 | |||
| 2003AA | CFSR ODC | Option Year 2 | CPFF | LOT | 1 | 4.9, 5.1 | |||
| 2004AA | CFSR Travel | Option Year 2 | CPFF | LOT | 1 | 4.8 | |||
| 2005AA | Over and Above Work | Option Year 2 | CPFF | NTE | N/A | 5.3 | $ 250,000 | ||
| 2005AB | AOG | Option Year 2 | CPFF | TBD | |||||
| 2005AC | Spares | Option Year 2 | CPFF | TBD | |||||
| *2006 | CDRLs | Option Year 2 | NSP | N/A | N/A | ||||
| 2007AA | CLS A&P Technicians | Option Year 2 | FFP | MO | 12 | 5.2.10 | |||
| 2007AB | CLS Aviations Technician | Option Year 2 | FFP | MO | 12 | 5.2.11 | |||
| 2007AC | CLS Mission Equipment Technician | Option Year 2 | FFP | MO | 12 | 5.2.12 | |||
| 2008AA | CLS ODC | Option Year 2 | CPFF | LOT | 1 | 4.9 5.2 | |||
| 2009AA | CLS Travel | Option Year 3 | CPFF | LOT | 1 | 4.8 | |||
| 3001AA | Program Requirements | Option Year 3 | FFP | MO | 12 | 4.1 - 4.7, 4.10-4.11, 5.4, 5.6-5.10 | |||
| 3002AA | CFSR Labor | Option Year 3 | FFP | MO | 12 | 5.1 | |||
| 3003AA | CFSR ODC | Option Year 3 | CPFF | LOT | 1 | 4.9, 5.1 | |||
| 3004AA | CFSR Travel | Option Year 3 | CPFF | LOT | 1 | 4.8 | |||
| 3005AA | Over and Above Work | Option Year 3 | CPFF | NTE | N/A | 5.3 | $ 250,000 | ||
| 3005AB | AOG | Option Year 3 | CPFF | TBD | |||||
| 3005AC | Spares | Option Year 3 | CPFF | TBD | |||||
| *3006 | CDRLs | Option Year 3 | NSP | N/A | N/A | ||||
| 3007AA | CLS A&P Technicians | Option Year 3 | FFP | MO | 12 | 5.2.10 | |||
| 3007AB | CLS Aviations Technician | Option Year 3 | FFP | MO | 12 | 5.2.11 | |||
| 3007AC | CLS Mission Equipment Technician | Option Year 3 | FFP | MO | 12 | 5.2.12 | |||
| 3008AA | CLS ODC | Option Year 3 | CPFF | LOT | 1 | 4.9 5.2 | |||
| 3009AA | CLS Travel | Option Year 3 | CPFF | LOT | 1 | 4.8 |
File details come from the government source that posted it. Updated .